List of Projects in New South Wales


RESMED LTD
Industrial (Warehouses, cargo sheds, distribution centres) project In The The Hills Shire Council Area of Factory/Warehouse/Office - Stage 1 type. Construction of a new factory/warehouse including 2 levels of administration office. Concrete slab, steel frame, lightweight steel & glazed facade, metal roof. Associated carparking & landscaping. Click for more details...

BADDELEY PARK SPORTSGROUND
Sportsground - Improvements project at Lot 209 Vincent St (DP755215), Cessnock, NSW 2325 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). The work under the proposed contract includes but is not limited to the construction of: a 1,200 seat tiered grandstand with toilet & kiosk facilities, media & multipurpose room, first aid room, changerooms & offices. With the grandstand generally comprising structural steel framework, blockwork & tilt-up panel walls, pre-cast seating plats, & aluminium sheeting & louvres. A second amenities building incorporating toilet & kiosk facilities. Two spectator earth mounds. A Rugby League football field with internal fencing & associated stormwater & subsoil drainage, irrigation, floodlighting, goalposts & scoreboard. Irrigation for an adjacent training field. Perimeter security fencing of the entire site enclosing the football field, training field & grandstand. A pedestrian footbridge over Black Creek adjacent. Construction of utility services other than sewer rising main, but including sewer pump station. Click for more details...

FORMER BANKSTOWN COUNCIL DEPOT SITE RESIDENTIAL DEVELOPMENT - SEDYR
Villas (35) - 2 Storey project at 112A (Lot 1) Thomas St (DP1045964), Picnic Point, NSW 2213 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construction of 35 villa homes, 15 x 3, 20 x 4 bedroom. At grade carparking for 7 visitors & double garage for each villa. Landscaping, utility service installation & internal roadway construction. Click for more details...


Currently at the Construction stage In Wollongong is a project estimated to be $ 500000. This project Concrete floor, brick veneer, tile roof. Landscaping. Click for more details...

STANHOPE GARDENS DWELLINGS & SUBDIVISION
New project of Residential (Units, apartments, flats, townhouses, villas) project at 15 Newbury Ave, 21 Leyburn St & Lot 54 Rothbury Tce (DP 270298), Stanhope Gardens, NSW 2768. Construction of 11 dwellings. Associated carparking & landscaping. Subdivision of residue lot 21001 into 11 lots Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project In The Liverpool Council Area of Townhouses (8)/Villas (3) type. 3 x 2 & 5 x 3 bedroom townhouses & 2 x 2 & 1 x 3 bedroom villas. Associated carparking & landscaping. Click for more details...


Child Care Centre New project In The Penrith Council Area. This is a small extension to an existing centre Click for more details...

GREENWELL POINT BOWLING CLUB
Club - Addns Addition project In The Shoalhaven Council Area. New entry, extensions to billiard room & change room. Click for more details...


Industrial (Factories & Factory Units) project at 14 Blackmore Road, Smeaton Grange, NSW 2567 of Factory Units (2) type of New development. 2 new factory/warehouse units. Concrete walls, steel roof, steel frame, concrete floors. Click for more details...

MACQUARIE UNIVERSITY
Carpark/Research Facility - 3/4 Storey project at Balaclava Rd, North Ryde, NSW 2113 In The Council Area Of Ryde of Private. Reinforced concrete slab & frame. Botanical research facility to be constructed above, steel frame, metal sandwich panels, metal roof. Click for more details...

BENELONG CRESCENT UNITS
Units (7) - 5 Storey - Subcontracts Subcontract project In The Woollahra Council Area. Demolition of 2 existing dwelling houses & construction of a 5 level residential flat building containing 7 units & 15 car parking spaces. Click for more details...

BOURKE ROAD INDUSTRIAL UNITS
Industrial (Factories & Factory Units) project at 79 Bourke Rd, Alexandria, NSW 2015 for Subcontract. Construction of 6 industrial units including carparking and landscaping. Click for more details...

LANDEX APARTMENTS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The North Sydney Council Area of Private ownership. Project includes the construction of a residential flat building containing split level units, some of which will have attic space with 24 units, 9 x1 bedroom, 12 x 2 bedroom & 3 x 3 bedroom, associated basement parking and landscaping. Click for more details...

MILITARY POLICE COMPLEX
Site Clearance/Roadworks New project In The Liverpool Council Area. Site to be cleared. Construct non-sealed access roadway for use by contractors involved in building works. Click for more details...

OXFORD HOTEL
Hospitality (Hotels, Serviced Apartments) project at 166-170 (Lot 1, Lot 8 & Lot 21) William St (DP 329668, DP398406 & DP225630), Bathurst, NSW 2795 of Hotel/Tavern - Redevelopment - 2 Storey - Stage 1 type of New development. Redevelopment of the existing Hotel/Tavern will consist of gutting the interior of the Hotel/Tavern & replacing the bottle shop. Click for more details...

HILDA AVENUE TOWNHOUSES/VILLAS
A project in the NSW Within Liverpool. Erection of 2 x 2 & 2 x 3 bedroom townhouses & 7 x 2 & 2 x 3 bedroom villas, associated carparking & landscaping. Click for more details...

SHOALHAVEN COUNCIL AREA ROADWORKS
various within Shoalhaven Council area, ., NSW 2999 Has Shoalhaven Council Area Roadworks currently at Tenders & Building stage. Specification No. IS0401/01 - insitu stabilisation of pavements. Specification No. IS0401/02 - spray sealing of pavements. Specification No. IS0401/03 - supply & laying of asphaltic concrete. Click for more details...

REWARD GOLD PROJECT
Mining (Underground - including longwall) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

PACIFIC ST VILLAS
Residential (Units, apartments, flats, townhouses, villas) project at 62-66 (Lots 16, 17 & 18) Pacific St (DP12043), Long Jetty, NSW 2261 of Villas (8) - 2 Storey type of New development. Construction of 8 x single storey villas. Carparking. Landscaping. Click for more details...

KOOINDAH RESORT MAINTENANCE FACILITY
Commercial Premises (Offices) project at 131-151 Pollock Av, Wyong, NSW 2259 for New. Construction of office building for use as maintenance facility for resort. Click for more details...

PRINCE HENRY SITE
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construction of a 4 storey multi-unit housing development comprising 19 units. Basement carparking on 1 level for 30 vehicles. Associated landscaping. Click for more details...

NOWRA LOCAL POOLS & SPAS
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Shoalhaven Council Area for New development. Construction of an industrial building with 850sq m storage and 31sq m for inground swimming pool display and office. Carparking for 7 vehicles and construction of concrete areas for turning of 19 metre semi trailers. Click for more details...

COMMON STREET 10 LOT SUBDIVISION
Industrial Subdivision (10) Lots New project In The Goulburn Mulwaree Council Area. The site is for a light industrial/commercial subdivision. The sizes of the proposed lots range from 1,323 sq m to 5,350 sq m Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

CROATIAN CLUB
Croatian Club is currently at the Planning stage, valued at about $ 180000 it is Alterations & additions to existing Croatian Club including children's rumpus room to mezzanine floor level, open roof terrace to first floor level & extension to open terrace area at north west corner of club Click for more details...

SWEETWATER
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Lot 1 cnr Rosier Pde & Comer St (DP110327), Henty, NSW 2658. This type is Earthworks with Private ownership. All associated earthworks for the proposed Sweetwater retirement village. Click for more details...

MARAS CREEK RD 10 LOT SUBDIVISION
Lot 2 & Lot 57 Maras Creek Rd (DP1013711 & DP873738), Utungun, NSW 2447 Has Maras Creek Rd 10 Lot Subdivision currently at Construction stage. Ten lot rural-residential plus 2 rural residue lots. Click for more details...

ENTERTAINMENT QUARTER BRENT ST DANCE STUDIO
Hospitality (Restaurants, Canteens) project at 114-220 (Lot 52) Lang Rd (DP1041134) (Buildings 101 & 102), Moore Park, NSW 2021 for Addition. Alterations to buildings 101 and 102 within The Entertainment Quarter. Alterations include a new mezzanine level in building 102, a new pedestrian bridge link between the two buildings and new signage on the southern facade of building 101. Both buildings are proposed to be used by 'Brent Street Studio' for tuition in dance, drama, performance and singing with two associated retail tenancies and a cafe. Works will include the construction of a pedestrian bridge link between the 2 buildings & construction of a mezzanine level in Building 102. The ground floor of Building 101 will contain the reception area, an office, classrooms, 2 retail tenancies and a cafe. the first floor will house the offices of Brent St. The ground floor of Building 102 will contain 5 separate studios and the mezzanine level will contain a drama room, classic ballet studio, singing room & 3 singing booths. The proposed use of the 2 buildings is for tuition in dance, drama, performance and singing. The studio will comprise a talent Development High School for 50 students, a full time course for 60 dance students and part time courses for children. Click for more details...

DEMONS SPORTS CLUB
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project for Addition development. Alterations & additions to existing club comprising addition of new function & store room to the existing building including internal alterations. Click for more details...

MACQUARIE UNIVERSITY LIBRARY - LEARNING & RESEARCH CENTRE
Currently at the Construction stage In Ryde is a project estimated to be $ 60000000. This project Construction of a new campus library to be located on vacant land south of buildings W3A, C3A & C3B, along Macquarie Dr. The new library will include Australia's first automated document storage & retrieval system that will allow the same volume of material to be stored in about one-seventh of the floor space. 80% of Macquarie's collection will be housed in this automated collection system, retrieved by robots & delivered to users. The remaining 20% will be on open shelving. The library will accommodate the following built elements: a large building footprint of approximately 6,770sq m on ground floor including the sunken garden at the northern facade (without the sunken garden the built footprint is approximately 6,550sq m); some 16,000sq m of gross floor area; 5 levels of library space including one level wholly underground and one partially below ground. The proposed development will appear as 4 storeys with the topmost storey occupying only a small (eastern) portion of the building footprint. East-facing entrance and foyer area including a café with indoor and outdoor seating; an automated book storage and retrieval system operating in an environmentally controlled vault; an exhibition space and one-stop shop; loading area; a number of library uses including: serial and new books section;- open access area; reserve collection; quiet study area; collaboration and group area; computer stations; - learning café and lounge; consultation space; training and meeting rooms; office spaces; toilet facilities; associated plant and storage rooms; and landscaped courtyard and perimeter landscaping. The building sustainability will be very high, with 4 systems of controlling air, including 100% fresh air systems, whilst rainwater collection, storage, treatment & re-use systems will significantly reduce water use. ESD initiatives include landscaped 'Green Roof' utilizing drought resistant planting; rain water collection and passive water filtering through native planted vegetation; water storage tank; treatment and re-use of rainwater for flushing of toilets, urinals and for irrigation of the external landscaped areas. The energy systems of the building will be designed to achieve significant savings in mains power requirements. This can be achieved through an integrated response to the primary power draws of air-conditioning and lighting and peak load reduction measures . When combined with the integration of passive systems such as thermal performance of the building envelope mixed mode ventilation, and night purge systems, measurable savings in power requirements are achieved All glazing will be selected based on providing a balance of high transmission of natural light, and low transmission of heat. The facade systems for the proposed library are predominantly 2 types: a podium to be clad in precast panels with inserted perimeter glazing & profiled form glazing, supported with aluminium framing. Blinds are proposed to eastern & western facades. Timber clad internal blade screens. The building sustainability will be very high, with 4 systems of controlling air, including 100% fresh air systems, whilst rainwater collection, storage, treatment & re-use systems will significantly reduce water use, & a landscaped green roof will help insulate the building. Click for more details...

QUEENWOOD SCHOOL
Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)) project at 44 Mandolong Rd & cnr Waitovu St, Mosman, NSW 2088 of School - Altns & Addns - 2 Storey type of Addition development. Alterations and additions to the existing building at Queenwood lower school site. The upgraded facility ground and level 1 is proposed to provide laboratories, amenities for staff and students, fitness training areas, seminar room, lift access and 3 stairwells. The lower ground floor construction of a 25 metre indoor pool and training pool, associated seating, amenities and office space. The existing external tennis court is to be converted into a multi purpose court and covered. Pump room, 3 store rooms, cleaners room, bag store, first aid room, office, 3 amenities rooms, fresh water rinse area, training room, loading dock, lift access and 3 stairwells. Associated carparking and landscaping. Click for more details...

WOOMARGAMA BYPASS
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Greater Hume Council Area of Roadworks - Bypass type. Construction of a 8.9km 4 lane divided highway bypass of Woomargama. Construct dual two-lane carriageways. At-grade intersections north & south of Woomargama. Twin bridges over Mountain Creek & a crossing of Sandy Creek. Click for more details...

ST AGATHA'S CATHOLIC PRIMARY SCHOOL BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at 7 Trebor Rd, Pennant Hills, NSW 2120 for New. Construction of multipurpose hall. Refurbishment of existing classrooms Click for more details...

ST MICHAELS PRIMARY SCHOOL BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project In The Blacktown Council Area of Private ownership. Construction of a multi-purpose hall Click for more details...

ENDEAVOUR 88
Currently at the Construction stage In Randwick is a project estimated to be $ 8166000. This project Construction of 22 x 4 bedroom detached & 2 x 3 bedroom semi-detached dwelling houses, within 9 x 2 storey base house types. Utility services installation to dwellings. rainwater tanak to each dwelling. Construction of extension of pedestrian path to connect to internal road network. Steel frame, masonry walls, painted or rendered, painted fibrous cement cladding at high level. Carparking for 2 spaces within each building, either within double garage or single garage with additional off-street carspace. Associated landscaping treatment within the private domain of each allotment. Click for more details...

WOOLWORTHS PETROL STATION BOMADERRY
Private ownership Industrial (Service stations) project In The Shoalhaven Council Area for New development. Construction of a new petrol filling station with a site area of 1495sq m. The work comprises an 80sq m control pay point kiosk including 50sq m retail store with a concrete paved apron which also accommodates the water storage tanks, bin enclosure & gas cylinder exchange; 30sq m of toilets and storage area; 3 underground fuel tanks & 1 underground LPG tank; a bunded apron entry ramp at the north-western corner & an exit ramp at the south-western corner; 4 double sided fuel dispensers & 2 liquid petroleum gas (LPG) dispensers; a 320sq m canopy over the fuel dispensers & linking to pay point; 2 new crossovers; new kerbing with new guttering. Carparking for 6 vehicles including an air/water fill point. Associated landscaping. Associated signage. Walls core filled concrete block cement rendered, steel frame, concrete floor, metal decking roof & fencing. Click for more details...

BARNETT COURIERS WAREHOUSE
Barnett Couriers Warehouse is currently at the Construction stage, valued at about $ 750000 it is Extension of existing warehouse for Barnetts Couriers. Concrete walls, metal cladding, steel roof & concrete floor. Click for more details...

VIEWBROOK CL INDUSTRIAL DEVELOPMENT
Currently at the Construction stage In Blacktown is a project estimated to be $ 400000. This project Construction of a new warehouse & office facility. Click for more details...

MASTERS TRADE SUPPLIES STORE
Industrial (Warehouses, cargo sheds, distribution centres) project for Renovations, Refurbishments etc. development. Reconfiguring of an existing warehouse/office facility for a Masters Trade Supplies store. Demolition of existing awning. Total GFA 12,404sq m, including main floor 8232sq m, trade area 2,127sq m, receiving area 860sq m, garden centre 2,045sq offices 458sq m. New cement render & paint finish to existing masonry walls with selected paint finish, alcubond main entry feature, glazed shopfronts to nursery, glazed auto sliding doors, zincalume corrugated metal roof sheeting, clear polycarbonate roofing system. Carparking for 394 vehicles. Landscaping. Click for more details...

LINGARD PRIVATE HOSPITAL - STAGE 3
Hospital - Altns & Addns Addition project In The Newcastle Council Area. Alterations & additions to existing Lingard Private Hospital. The work comprises demolition of part of the southwest portion, construction of 2 prefabricated portable buildings, each 3m x 6m, for temporary use by the hospital administration, construction of a new 41 bed surgical ward building to replace the demolished southwest part. Construction of a new store building within the western section of the adjoining existing building. Internal reconfigurations within the existing building comprise amendments to the temporary Day Procedure Unit, Recovery & IVF Clinic to establish a full 24 chair/bed Day Procedure Unit; adjustments to the existing waiting room, unbuilt space & beds to create an equipment room, pre-op holding room & larger waiting room; changes to the IVF rooms & lab, beds & office space to create a board room & offices & alterations to the existing IVF procedure room to create an extension to the imaging area. Establishment of a new bike parking area. The work also includes a minor extension to the existing medical gas enclosure to accommodate a larger oxygen cylinder. Click for more details...

CENTENNIAL AV & GORDON CR UNITS - SEVANA
Currently at the Construction stage In Lane Cove is a project estimated to be $ 53185000. This project Demolition of 12 dwellings. Construction of a 3 residential flat buildings containing 213 units, 10 x studio, 97 x 1, 83 x 2 & 23 x 3 bedroom, 38 of which are adaptable. 2 small commercial units, which have a GFA of 80sq m, earmarked for shops, are located in Block C and front the main pedestrian walkway to the residential complex. Communal gymnasium and swimming pool. 40 seat theatrette in Block A. Communal open space of 2631sq m is provided on ground level, 969sq m of communal open space is provided in form of rooftop terraces on the 3 buildings. Dedication of new public open space on the southern portion of the site adjacent to batten reserve & Wilsons Creek. The indoor swimming pool/gym and theatrette have an area of 300sq m. Brick veneer walls, single clear glazed aluminium framed window, concrete floor. Carparking over 3 basement levels for 329 car spaces, garbage holding rooms, storage and plant, 19 bike lockers, 16 bike racks & 12 motorcycles. Landscaping. Click for more details...

SOUTHERN CROSS MOTOR INN REDEVELOPMENT
Addition project of Hospitality (Motels, Bed & Breakfast, Cabins) project at 27-29 Barwan & 2 Fitzroy St, Narrabri, NSW 2390. Demolition of the existing dwellings, shedding & self serviced apartments located to the rear of the motel. Extension of motel facilities consisting of 10 motel units with the potential for 4 additional service apartments at a later stage Click for more details...

ASIA PACIFIC FOOTBALL INSTITUTE
Change Rooms/Administration/Meeting Rooms - Stage 1 project at 52 Skyline Rd, Lismore, NSW 2480 In The Council Area Of Lismore of Private. Demountable building to be used in association with proposed training fields. Change rooms & administration/meeting rooms. Carparking. Click for more details...

LAWRENCE HARGRAVE DR & REDMAN AV TOWNHOUSES
Townhouses (5) - 2 Storey project at 264-270 Lawrence Hargrave Dr & 1-3 Redman Av, Thirroul, NSW 2515 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 5 x 2 storey 3 bedroom townhouses. Reinforced concrete slab floors, combination of external cement render and masonry walls, selected FC sheet and timber cladding elements, colorbond metal roofing, powder coated aluminium framed windows and doors. Basement carparking for 12 vehicles. Associated landscaping. Click for more details...

SMART ST OFFICE
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) Renovations, Refurbishments etc. project at 61-63 (Lot 46) Smart St (DP1171916) (ground floor), Fairfield, NSW 2165. This type is Office - Fitout with Private ownership. Fitout of existing commercial & community space on ground floor to provide new office space 155sq m, 2 x interconnected community spaces 80sq m, service suite 31 sq m, new community garden on existing common open space, & alterations to shopfront windows. Click for more details...

CASTLEREAGH ST APARTMENTS
Castlereagh St Apartments is currently at the Construction stage, valued at about $ 11201000 it is Demolition of existing dwellings. Construction of a 7 storey residential flat building containing 56 apartments, 1 x studio, 8 x 1, 39 x 2 & 8 x 3 bedroom. Face brick walls, render & paint, light stack stone to garden beds, glass balustrades, aluminium framed doors & windows. Two levels of basement parking for 72 vehicles, 22 bikes & 3 motorbikes. Landscaping. Click for more details...

NELSON BAY GOLF CLUB
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project In The Port Stephens Council Area of Clubhouse type. Construction of a larger temporary building to replace the clubhouse destroyed by fire. The compound will consist of, the main building (clubhouse), second level administration area, 3 toilet blocks, 1 for disabled use, pro-shop, storage containers & kitchen. Click for more details...

ARGOWAN RD SUBDIVISION
Currently at the Construction stage In Blacktown is a project estimated to be $ 1260000. This project Proposed residential subdivision comprising 29 residential lots with lot sizes ranging from 250sq m to 304sq m with a residue lot of 1,875 hectares. Construction of roads & services Click for more details...

WATTAWA HEIGHTS PUBLIC SCHOOL
Canteen - Refurbishment project at The Avenue, Bankstown, NSW 2200 in the Education (Schools - primary, secondary (up to Yr 12)). Upgrade of existing canteen. Click for more details...

WARRAROON RESERVE
., Riverview, NSW 2066 Has Warraroon Reserve currently at Construction stage. Construction of a CDS2018 gross pollutant trap at Warraroon Reserve Click for more details...