List of Mining - Subcontracts Projects


HISMELT EXPANSION PROJECT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Subcontracts (Electrical installation) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

NELSON POINT - IRON ORE
Mining - Subcontracts (Mechanical installation) project at Port facilities via, Port Hedland, WA 6721 of Operations - Bogie Changeout type of Renovations, Refurbishments etc. development. Contract to involve refurbishment & replacement of bogies (8 sets) on car dumper number one. Click for more details...

QUARRY OPERATIONS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Gosnells Council Area for Addition development. Structural steelwork required for new screening facility. Construction of 2 hoppers to be included in tender. Click for more details...

YANDI - IRON ORE
Mining - Subcontracts (Mechanical installation) project for Addition development. Supply only contract to provide approximately 250t of steel for the new stacker & a similar amount of steelwork for the new feed conveyor. Pricing exercise & design work completed. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

MOUNT TODD GOLD MINE
Mine - Mechanical Package - Wet Plant - Installation - Phase 2 - Expansion project at 45 km northeast of, Pine Creek, NT 0847 In The Council Area Of Katherine Town of Private. It is envisaged this facility will utilise a combination of flotation/regrind/leach methods. Contract to provide structural steelwork & mechanical services. Click for more details...

KANOWNA BELLE GOLD OPERATIONS
Addition project of Mining - Subcontracts (Electrical installation) project at 16 km northeast of, Kalgoorlie, WA 6430. Stage 3A is to involve a portal development & a decline from below the open pit floor (approximately 220m from surface). Mining to a depth of 360m will involve vertical haulage shaft & long-hole open stoping mining methods. The resource below 200m has been divided into two main categories. From 200m to 360m a total of 3.6mt grading 7.2gpt gold is estimated. Between 360m and 800m an inferred resource of 3.85mt at 5.5gpt gold has been estimated. Ore production is due to start in 1998 for a mine life of approximately 16 years at a rate of 1mtpa-1.25mtpa. Drilling to test mineralisation from 650m to 1,000m demonstrated encouraging widths and grades with best results including 27.5m (from 1,008m) grading 10.1gpt gold. Mining & haulage expected to utilise inhouse resources. Ore will be processed through the Joint Venture's refractory plant at Kanowna Belle. The decline is expected to extend to 760m to allow additional exploration & ore definition work to be conducted. This contract will include diamond drilling (28,000m), raise boring (1,400m) & decline (9,000m). Associated electricals to also form part of this tender. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project for Addition development. Work expected to involve a 2.4m diameter stainless steel duct & associated services. This new plant is designed to reduce sulphur dioxide emissions. Click for more details...

MILLMERRAN POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Toowoomba Regional Council Area for New development. Above ground mine infrastructure to include electrical, mechanical, sewerage & water treatment systems, storage & amenities. Contract period 14 weeks approx. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Subcontracts (Air-conditioning installation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

KOGAN CREEK POWER STATION - BCP(PUMP CASING) - SUPPLY
A project in the QLD Within Western Downs Regional. BCP (Pump Casing) type grandless quantity: 1 Discharge rate:855/h Total Head: 911kpa Motor Capacity:400kw (Max), Voltage 690V. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Subcontracts (Electrical installation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

TANNA COAL TERMINAL - ELECTRICAL CABLES
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of State ownership. Supply and delivery of 'Electrical Cables' for works associated with the expansion at RG Tanna Coal Terminal. Click for more details...

NEWLANDS COAL OPERATIONS - SUPPLY OF STRUCTURAL STEEL PACKAGE NO2 FOR WASHPLANT
Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743 of Structural Steel Package (No2) - Supply For Washplant type of New development. Two Fine Coal buildings. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

MOUNT ISA MINE UNDERGROUND MEDIUM VOLTAGE INFRASTRUCTURE PROJECT
Underground Medium Voltage Infrastructure - Installation New project In The Mt Isa City Council Area. Work comprises installation of 33 kv cable & switchgear, installation of transformer and switchgear, installation of two mobile sub stations, relocation of between 2-4 mobile mining substations throughout the mine and installation of cable. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BOLLARDS
Mining - Subcontracts (Mechanical installation) project In The City Of Greater Geraldton Council Area of Bollards - Design/Construct type. Design and construct Bollards & Quick Release Hooks. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Subcontracts (Structural) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Private ownership. For the mine site laboratory. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ORIFICE PLATES & ASSEMBLEYS
Orifice Plates/Assemblies - Supply Of project at 15km Southeast of, Collie, WA 6225 in the Mining - Subcontracts (Electrical installation). For the supply of orifice places and assembleys. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WHIMS BUILDING
Electrical - For Whims Building New project In The Mildura Council Area. For the provision of electrical works & instrumentation for the wet high intensity magnetic separators building. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - LOW VOLTAGE - FOR MINESITE
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of various low voltage installations for the minesite. Click for more details...

SINO IRON ORE PROJECT - FORTESCUE VILLAGE ROADHOUSE CONSTRUCTION CAMP ELECTRICAL DISTRIBUTION
Construction Camp - Electrical Distribution project at Cape Preston 100km Southwest of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. For the of electrical distribution at the Fortescue Village Roadhouse construction camp. Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Subcontracts (Piping & Hydraulic) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Subcontracts (Electrical installation) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

PILBARA ELECTRICAL INFRASTRUCTURE REPLACEMENT PROJECT
Mining - Subcontracts (Electrical installation) project at Tom Price, Paraburdoo & Channar Mines via, Dampier, WA 6713 for New. Major upgrades to electrical & control systems infrastructure at Rio Tinto Pilbara mines including Tom Price, Paraburdoo & Channar. Click for more details...

PILBARA IRON ORE EXPANSION - SMP FRAMEWORK AGREEMENT
Mining - Subcontracts (Electrical installation) project at via, Karratha, WA 6714 for New. Preferred structural, mechanical & piping (SMP) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Structural) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM HOOK UP COMMISSIONING - PAINTING INSULATION CLADDING FIRE PROTECTION
Mining - Subcontracts (Painting) project In The Ashburton Council Area of Private ownership. For the provision of painting, insulation, cladding & passive fire protection. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - PLUMBING DRAINAGE & HYDRAULICS
Plumbing/Drainage/Hydraulics project at 110km north of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of plumbing, drainage & hydraulics services. Click for more details...

QCLNG OPERATIONS - INSTRUMENTATION MAINTENANCE
Mining - Subcontracts (Electrical installation) New project at Bowen & Surat Basins, ., QLD 4999. This type is Instrumentation Maintenance with Private ownership. A service agreement for the provision of maintenance services for gas field instrumentation assets. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Subcontracts (Electrical installation) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Subcontracts (Mechanical installation) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - ELECTRICAL WORKS
Mining - Subcontracts (Electrical installation) Renovations, Refurbishments etc. project at Barrarda Estate, Onslow, WA 6710. This type is Electrical Works with Private ownership. For the installation of mains cables from street to house, connection of AC & HWS for 50 modular houses. Includes excavation & backfill. Click for more details...