State

Categories

Sub Categories

Click Here to Find Current Projects

List of Oil & Gas Projects


HARRIET JV - LINDA
Oil & Gas (Pipelines & associated contracts) project In The City Of Karratha Council Area of Platform type. The development will include a multi-slot platform to allow development of the Linda Gas/condensate field via two or three wells. The platform is positioned to allow development of the Rose and Lee Gas/condensate fields and other future discoveries in the area. The platform is to be connected to the Campbell pipeline. Processing to be at Varanus Island. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

LATROBE VALLEY COAL GASIFICATION & GAS TO LIQUIDS PROJECT
Oil & Gas (Pipelines & associated contracts) project for New development. The Victorian Government awarded Australian Power and Energy Ltd an exploration licence to undertake research, development and feasibility studies for one or more new brown coal-based projects. The company proposes to use a number of known technologies to produce low sulphur liquid fuels and to generate 500MW of electricity. Undergrounding (Geosequestration) of carbon dioxide produced in the process is proposed. In stage one, 52000 barrels per day of high quality low sulphur fuels, mainly diesel, as well as the electricity will be produced. Click for more details...

TASSIE SHOAL METHANOL PROJECT - JETTY/OFFSHORE MOORINGS
Jetty/Offshore Moorings New project In The Darwin City Council Area. Key components of the Tasie Shoal project include a jetty (200 metres long for loading methanol onto export tankers); and two offshore moorings ( one on Tassie Shoal and one beside Tassie Shoal) for use by service boats, tugs and visiting fishing vessels. Click for more details...

TASSIE SHOAL METHANOL PROJECT - ACCOMMODATION & CONTROL PLATFORM
Oil & Gas (Topside - modules, platforms) project for New development. Key components of the Tassie Shoal Methanol project include accommodation and control platform for personnel living quarters. Click for more details...

GRIFFIN OIL & GAS OPERATIONS
Port facilities at, Fremantle, WA 6160 Has Griffin Oil & Gas Operations currently at Construction stage. Contract to include project design, resource backup & general planning required to oversee scheduled maintenance. Vessel to be sailed to Fremantle for a 20-day maintenance programme starting 6 October 1995. Griffin gas field is located about 80 km northwest of Onslow. Click for more details...

BLACKTIP GAS PROJECT - SUBSEA PIPELINE
Currently at the Construction stage In Offshore is a project estimated to be $ 100000000. This project 108 km offshore pipeline is to be constructed from the gas field to the onshore processing facility. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

MOOMBA GAS OPERATIONS
Oil & Gas (Onshore processing facilities) project at Via, Innamincka, SA 5731 for New. The Moomba Gas Facility (Liquids Recovery Section) was damaged in a gas leak and fire on 1 January 2004. Initial investigation has pointed to a failure of a heat exchanger inlet nozzle as the source of the gas release. Findings from an independent metallurgical laboratory study have confirmed that the failure of the heat exchanger inlet nozzle (which led to the fire) was due to Liquid Metal Embrittlement of the train B aluminium cold box by elemental mercury. Further investigations are in progress to determine if any other factors could have contributed. Re-instatement plans included procurement of new cold boxes and associated facilities. Click for more details...

GIPPSLAND BASIN JOINT VENTURE PROJECT - TURRUM
Resource - Oil & Gas - Offshore project at Gippsland Basin Bass Strait, Gippsland Basin, VIC 3999 in the Oil & Gas (Topside - modules, platforms). Full development of the Turrum gas field expected to recover around 1 trillion cubic feet of natural gas and 110 million barrels of oil and gas liquids. Processing to be at the onshore Longford Gippsland Basin Joint Venture Facilities. Production to be enhanced with the late 2010 installation of the new Marlin B platform. Click for more details...

GATTON TO GYMPIE GAS PIPELINE
Gate Station project at via, Gatton, QLD 4343 In The Council Area Of Lockyer Valley Regional of Private. At the existing AGL Roma to Brisbane gas pipeline near Gatton. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - GENERAL PLANT & EQUIPMENT
General Plant & Equipment project at On, Barrow Island, WA 6712 in the Oil & Gas (Pipelines & associated contracts). For the provision of general plant & equipment. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

JOHNDILO GAS PROJECT
Johndilo gasfield to, Camden, NSW 2570 Has Johndilo Gas Project currently at Construction stage. 4.8 km 20 cm steel pipeline from APAP No.1 well to the town boundary at Camden. To deliver coal bed methane gas to the AGL gas network at Camden. Part of the Johndilo CBM pilot project which includes of its gas gathering system and treatment facility and the pipeline to deliver gas to AGL at Camden. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Wattle Range Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

SOLE GAS PLANT EXTENSION - DOUBLE ENTRY REFER ID 955674
Private ownership Oil & Gas (Onshore processing facilities) project In The East Gippsland Council Area for New development. Extension to an existing gas plant. The existing plant produces 43 terjoules per annum with potential to expand to 75 terjoules per annum. Click for more details...

PLUTO LNG PLANT PROJECT - REFRIGERANT COMPRESSORS
A project in the WA Within City Of Karratha. Liquefaction 1400 Unit. Mixed / Propane Refrigerant Compressors. Type : Centrifugal Compressors and associated packages. Material of construction : 3.5% Nickel. Compressor Ratings 37-72 MW, Capacity 58-243 Km3/hr. This is a major proprietary equipment package within the Train. Full String testing required in the Main Equipment Suppliers Workshop. Click for more details...

WOOLLYBUTT OIL FIELD - WA-25-L - SOUTH LOBE PROJECT
Oil & Gas (Sub-sea equipments, floating production facilities) project at West of Barrow Island, Barrow Sub-Basin, WA 6999 for New. Work comprises the drilling and completion of Woollybutt-4 horizontal development well and Woollybutt-6 appraisal well. There will be modifications to the existing FPSO, new sub-sea christmas trees, flowlines, manifolds and control systems. Resource estimate is 7 million barrels of oil. Click for more details...

MOUNT ARTHUR UNDERGROUND COAL PROJECT - SITE SERVICES
Oil & Gas (Pipelines & associated contracts) project at Approx 3 km south west of, Muswellbrook, NSW 2333 for New. Site services required will include powerlines, potable water pipelines, mine water and groundwater pipelines, a water extraction point on the Hunter River and a clean water pipeline and minor access roads and other such minor infrastructure within the project mining leases. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Oil & Gas (Pipelines & associated contracts) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - CLEARING CONTRACT
Bonaparte Gas Pipeline Project - Clearing Contract is currently at the Construction stage, valued at about $ 10000000 it is For the provision of clearing services for 275 km pipeline. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FLOATING ROOF SEALS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Floating Roof Seals currently at Construction stage. For the provision of floating roof seals. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - OPERABILITY RELIABILITY & MAINTAINABILITY CONTRACTOR
Wheatstone Development Project - Offshore Platform - Operability Reliability & Maintainability Contractor is currently at the Construction stage, valued at about $ 15000000 it is For a operability, reliability and maintainability contractor. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - CHOKE VALVES
Choke Valves project at 475km NNE, Broome, WA 6725 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of choke valves. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - HYDRAULIC & UTILITY WINCHES
Oil & Gas (Sub-sea equipments, floating production facilities) New project at 475km N/NE of, Broome, WA 6725. This type is Hydraulic/Utility Winches with Private ownership. For the provision of hydraulic & utility winches. Click for more details...

CHARO TO TIRRAWARRA GAS PIPELINE UPGRADE
Oil & Gas (Pipelines & associated contracts) New project at Northwest of MOOMBA via, Innamincka, SA 5731. This type is Gas Pipeline - Upgrade with Private ownership. A project by the South Australian Cooper Basin (SACB) parties to upgrade the pipeline from the Charo oil field (PPL 177) to the Tirrawarra oil field from 4 to 6 inches diameter. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - LEVEL GAUGES & TRANSMITTERS
Private ownership Oil & Gas (Onshore processing facilities) project In The Ashburton Council Area for New development. For the provision of level gauges (magnetic float) and transmitters. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - SECURITY
Oil & Gas (Pipelines & associated contracts) project at On & Off, Barrow Island, WA 6712 of Security type of New development. For the provision of project support services - security. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

QGC SURAT BASIN CSG SERVICE CONTRACT
Coal Seam Gas Plant & Equipment - Service Contract project at Between WANDOAN &, Dalby, QLD 4405 in the Oil & Gas (Onshore processing facilities). A 5 year contract to service coal seam gas assets in southern & central Queensland. To include refurbishment of 191 well site processing units involving the decommissioning, replacement & recommissioning of vessels, pipe work, electrical & control instrumentation. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - ISBL CONCRETE & CIVIL WORKS
Oil & Gas (Onshore processing facilities) project at Within the vicinity of, Onslow, WA 6710 of Isbl Concrete/Civil Works type of New development. For the provision of ISBL concrete and civil works. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - REINFORCEMENT SUPPLY (PACKAGE 2)
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Reinforcement Supply (Package 2) currently at Construction stage. For the provision of reinforcement bar. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - TELEPHONE HOODS
Shell Prelude Gas Field Project - Turret & Mooring - Telephone Hoods is currently at the Construction stage, valued at about $ 50000 it is For the provision of telephone hoods. Click for more details...

SHELL PRELUDE GAS FIELD PROJECT - TURRET & MOORING - UHF ANTENNAS
Uhf Antennas project at Approx 475km NNE, Broome, WA 6725 In The Council Area Of Broome of Private. For the provision of UHF antennas. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Oil & Gas (Pipelines & associated contracts) project In The East Pilbara Council Area of Private ownership. Increase in the pipeline's capacity by an additional 20 TJ/d. Installation of additional compression at the existing Yarraloola & Paraburdoo compressor stations. Click for more details...

WEST ANGELAS OCGT POWER STATION - GAS TRANSMISSION PIPELINE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 50000000. This project A 50km approx pipeline from the Boonamichi Well off-take station on the Gas Goldfields pipeline to the new gas turbine power station at West Angelas mine. Click for more details...

GREATER GORGON GAS PROJECT - SUBSEA ROCK INSTALLATION - PNEUMATIC FENDERS
New project of Oil & Gas (Sub-sea equipments, floating production facilities) project at Off, Barrow Island, WA 6712. For the purchase of pneumatic fenders. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Oil & Gas (Pipelines & associated contracts) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - COMPRESSORS
New project of Oil & Gas (Onshore processing facilities) project at Vicinity of, Onslow, WA 6710. For the supply of compressors. Click for more details...

WALLUMBILLA LPG PLANT RECOMMISSIONING
Oil & Gas (Onshore processing facilities) project In The Maranoa Regional Council Area of Private ownership. A project to recommission the plant which was under care & maintenace when purchased by AGL. To be used to remove propane, butane & condensate from gas which has been stored underground in the Silver Springs facility for supply to the QCLNG project. Click for more details...

APLNG LNG PLANT - CLEANING SERVICES
New project of Oil & Gas (Onshore processing facilities) project at At, Curtis Island, QLD 4680. For the provision of cleaning services. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - PRESSURE TESTING & FLUSHING SERVICES
A project in the NT Within Darwin City. For the provision of pressure testing & flushing services. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - LUBE OIL FLUSHING
Lube Oil Flushing project at Blaydin Point, via, Darwin, NT 0800 in the Oil & Gas (Onshore processing facilities). For the provision of pop testing. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - MANUFACTURE OF CRA LINED & CRA CLAD LINEPIPE
A project in the WA Within Carnarvon Basin. For the manufacture of CRA Lined & CRA Clad Linepipe. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (WA-1-1 PERSEPHONE LNG) - PRODUCTION HYDRAULIC POWER UNITS
Production Hydraulic Power Units - Supply project at 135km North/NW of, Karratha, WA 6714 in the Oil & Gas (Sub-sea equipments, floating production facilities). For the provision of production hydraulic power units. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT CONTRACTS - MARINE GENERAL SERVICES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of marine general services including: Maintenance on navigational aids. Maintenance on marine infrastructure (such as fenders). Diving Works. Minor maintenance dredging (i.e. sweeping or plough works, backhoe dredging, small size trailer suction hopper dredge etc). Crew transfer vessel. Line boat services. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - SENSORS
Private ownership Oil & Gas (Sub-sea equipments, floating production facilities) project In The Exmouth Council Area for New development. Provision for the supply of sensors for the Greater Enfield Project. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect