Project : KAMBAH P-10 SCHOOL - NAMADGI
|
Civil Engineering
Bridges, Aqueducts, Viaducts
|
|
Estimated Project Value
$
3,374,000
|
|
|
Address
|
Drakeford Dr
|
Suburb
|
Kambah
|
State
|
ACT
|
Council
|
Act
|
Postcode
|
2902
|
|
Project Type
|
Pedestrian Link Bridge
|
Development Type
|
New
|
Status
|
Commenced
|
Stage
|
Construction
|
Ownership
|
Local Govt
|
Notes
|
Contract Let Work Commenced Early January 2012 (17045.313)
|
|
Commence Date
|
4/1/2012
|
Completion Date
|
3/12/2012
|
|
|
Details
|
|
-
Construction of a pedestrian link across Drakeford Drive to provide a safer means for students to access the new Kambah P-10 School - Namadgi, as well as improved links for other pedestrians & cyclists.
- Eastern approach comprises 3.0m wide concrete paths connect to the existing concrete paths in the eastern approaches.
- Western spiral approach spans of the proposed bridge connect to a concrete path supported on a retaining wall that curves around an existing mound.
- The retaining wall to have a mortared stone finish.
- At the point were the wall matches the existing surface level a concrete path is extended at existing surface level to connect to the existing 2.0m wide concrete path behind the school The bridgeworks comprise 2 elements, the main cabletayed bridge structure over Drakeford Drive & the ramp structure on the east side of the crossing.
- The cable stayed bridge comprises a single steel portal framed type pylon with 6 pairs of stay cables supporting the bridge deck.
- The bridge deck consist of a trapezoidal shape steel ttrough section that acts compositely with the reinforced concrete decks slab on top.
- The stay cables are set in a radial shaped arrangement whereby all the cables are connected to the top of the pylon.
- The approach ramp structure comprises of 7 spans of approximately equal length of up to approximately 11m.
- The ramp is curved structure & comprises a cast in -situ reinforced concrete deck having a similar cross-sectional profile to that of the main cable stayed bridge.
- A transition pier is provide at the interface between the cable stayed bridge & the ramp structure.
- As an alternative to pedestrians using the ramp provision has been made in the design for a stair structure.
- The colours proposed for the bridge complement the school colour scheme,with greys, blacks & silvers, & the nominated orange together with the deep red used at the school will provide an important landmark within the area.
- Main steel girder, cable anchor beams, pedestrian fence posts & Securemax Mesh, Anitprojectile screen posts, galvanised handrails, galvanised stay cables, Anti Graffiti coating on exposed concrete.
- Landscaping
|
|
|
|
|
We’ve been providing the Australian construction industry with comprehensive project
information and construction leads for over 45 years to help people like you get
involved and get specified in projects. From the very early stages of a project
right through to construction we’ve got it covered, helping you stay one step ahead
of your competitors. So if you want to find out about more projects with Australia’s
most trusted construction information, then contact us now to grow your business,
and find out about more activity than ever before.
|
|
More Projects by States
More Projects by Categories
|
|