List of ⊂category= Projects in New South Wales®ion= in region


VALENTINE ON GEORGE
Valentine On George is currently at the Construction stage, valued at about $ 400000 it is Fitout upper levels of building as hotel rooms/bar facilities. Click for more details...

EASTERN VALLEY WAY UNITS
Aged Care & Retired Developments (Aged units, seniors units) project at 50 Eastern Valley Way, Northbridge, NSW 2063 of Units (6) - 2 Storey- Sepp5 type of New development. Demolition of dwelling. Construction of a part 2/part 1 x 2 storey RFB containing 6 units. Basement carparking. Associated landscaping. Click for more details...

WALDRONS SWAMP ROADWORKS
Roadworks project at Princes Hwy (SH 1) 17-21 km south of, Batemans Bay, NSW 2536 In The Council Area Of Eurobodalla of State. Widening of 4 km of existing 2 lane road. Click for more details...

PORT BOTANY TERMINAL EXPANSION PROJECT
Currently at the Construction stage In Randwick is a project estimated to be $ 580000000. This project Proposed extensions to existing port facilities at Brotherston Dock North. Stage 1 comprises the construction & operation of a container terminal and associated infrastructure described generally as: an additional 550m plus 980m of berth face at approx 51 hectares of land to the west of Brotherson Dock North; provision for an extra 4 nominal berths; dedicated road access to foreshore Road via a bridge across the channel separating the terminal from the existing shoreline; rail access to the new terminal area by means of an extension to the existing Botany Freight Rail Line parallel to Foreshore Road, including a rail bridge & carriageway; 2 new rail sidings; an inter-terminal access road & 2 additional rail storage sidings parallel to the northern boundary of the Patrick Terminal; reclamation adjacent to Foreshore road to create a recreational boat ramp, tug & support vessel facility; restoration & enhancement of Foreshore beach and adjoining landscape area; and ecological habitat relocation and enhancement work within the Penrhyn Estuary. Stage 2 works will comprise the construction and operation of approx 12 hectares of additional terminal area of approx 320m of additional quay line to accommodate a nominal fifth berth. There are 3 different options for Stage 2 fifth berth: Western Option, Eastern Option & Northern Option. Click for more details...

PERRY ST INDUSTRIAL BUILDING
Industrial (Factories & Factory Units) project at 47-51 Perry st, Matraville, NSW 2036 for New. Demolition of existing and construction of an industrial building containing factory, warehouses, offices and showroom. Carparking for 14 cars Click for more details...

WATKINS ST TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project In The Wyong Council Area of Private ownership. Demolition of existing and construction of 3 townhouses. Associated landscaping & carparking. Click for more details...

PACIFIC SQUARE STAGE 1
Residential Units (300) Commercial Units (30) - 10 Storey New project In The Randwick Council Area. Three separate towers (high rise) with a common ground floor level. Ground floor level will contain 30 commercial units including a coles superstore. Level one upwards will have 300 residential units Click for more details...

CHADDERTON ST WAREHOUSE
Commercial Premises (Offices) project for New development. (Lot 34 & 35 ; DP456221) Construction of a 1500sqm warehouse and 304sqm office, concrete block and metal building. Click for more details...

CHURCHILL AVE MIXED DEVELOPMENT
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Strathfield Council Area for Subcontract development. Proposal involves the demolition of 2 x existing dwellings with associated site works, to make way for the construction of an 11 storey mixed residential/ commercial development containing 54 units on the upper levels, which sits above a ground floor podium. The ground floor has 157 sqm of retail, 3 x basement parking levels for 103 cars, a loading dock and courier space. Associated landscaping on rooftop and ground floor. Click for more details...


is currently at the Construction stage, valued at about $ 740000 it is 9 x 2 & 3 x 3 bedroom units associated carparking & landscaping. Click for more details...

FORMER ACI SITE - PRECINCTS A & B
Residential (Units, apartments, flats, townhouses, villas) project In The Sydney Council Area of Private ownership. Construction of a mixed residential and retail development within precincts A & B consisting of 3 buildings ranging in height from 6 storeys to 15 storeys containing a total of 249 residential units, 3,862sqm of retail floor space including a 2,705sqm supermarket and 17 shops. Gym on level 1 for use of residents only. Two levels of basement parking and an upper level carpark providing space for 370 cars. Associated landscaping. Click for more details...

BOWMAN TERRACES
Commercial Premises (Offices) project at 60 Bowman St, Pyrmont, NSW 2009 for Subcontract. Project involves the construction of 62 x 2 & 3 storey terrace houses with associated basement parking and landscaping. Click for more details...

ALSTONVILLE BYPASS
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Ballina Council Area for New development. Construction of 6km of roadworks including earthworks, drainage, structures & pavement works. The Bruxner Highway bypass at Alstonville & Wollongbar requires construction of an interchange at Kays Lane, the development of various service roads & retention basins for stormwater. Construction of 2 bridges & a cattle underpass. The bypass will commence at Sneaths Road, Wollongbar & rejoin the highway at the Tropical Fruit Research Station at Perrys Hill, east of Alstonville Click for more details...

CHAPEL ST TOWNHOUSES
Villa/Townhouses (6) - 2 Storey project at 62-64 Chapel St, Belmore, NSW 2192 In The Council Area Of Canterbury of Private. Construction of 1 x 4 bedroom villa, 4 x 3 & 2 x 2 bedroom townhouses, associated carparking & landscaping. Click for more details...

BLAXLAND MOTOR SHOWROOM
Motor Showroom project at 13 Blaxland Serviceway (Lot 15 DP870558), Campbelltown, NSW 2560 in the Industrial (Depot, Garages, Workshops, Carwashes, Hangars). Erection of a motor showroom & workshop comprising of a showroom, offices, amenities, storage areas & associated working bays. Click for more details...

WILLOUGHBY RD MIXED DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) New project at 202-210 Willoughby Rd, Naremburn, NSW 2065. This type is Units (22)/Offices (2) - 4 Storey with Private ownership. To demolish all existing buildings and to construct a 4 storey commercial/residential development consisting of 2 commercial units , total area of 284 sq m, a commercial residents' room with open space on the ground floor and 22 units in a mix of 1 & 2 bedrooms, some on the ground floor and the others on floors 1-3, with basement carparking for 32 vehicles. Associated landscaping. Click for more details...

VELETTA ST SHOPS/FLATS
Veletta St Shops/Flats is currently at the Planning stage, valued at about $ 450000 it is Construction of a 3 storey retail/residential building with basement carparking. Click for more details...

ANGLICARE
Addition project of Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project at 152 Keira St (Lot 1 DP1010835), Wollongong, NSW 2500. Extension to existing building to provide additional facilities for counselling & food distribution. Concrete slab, brick & concrete panel construction, metal roof. Click for more details...

KOREE ISLAND
A project in the NSW Within Port Macquarie-Hastings. Construction of a third pumping station & rising main on Koree Island. Click for more details...

UNIVERSITY OF NEWCASTLE
Currently at the Planning stage In Newcastle is a project estimated to be $ 250000. This project Erection of a building incorporating pilot scale facility for the remediation of groundwater containing Flouride & Cyanide. Click for more details...

ARGYLE PLACE SHOP/OFFICE/DWELLING
Residential (Units, apartments, flats, townhouses, villas) Refurbishment project at 7 Argyle Pl, Millers Point, NSW 2000. This type is Shop/Office/Dwelling - Refurbishment - 2 Storey with Private ownership. Refurbishment & restorative works to shop, office & dwelling. Click for more details...

CIVIC PLACE REDEVELOPMENT
Civic Place Redevelopment is currently at the Planning stage, valued at about $ 300000 it is Theatre consultant to support the design process for a 1000-seat concert hall, 500-seat theatre, exhibition hall & rehearsal spaces. Click for more details...

RICHMOND VALLEY COUNCIL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various sites within district via, Casino, NSW 2470 of Bitumen Works type of New development. Sprayed bituminous surfacing for 2004/05 resealing programme. Click for more details...

BEAUMONT RD OFFICE
Commercial Premises (Offices) project In The Hornsby Council Area of Office - Altns & Addns type. Alterations & additions to the first floor of an industrial building for use as office area. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

KENNETH ST UNITS
A project in the NSW Within Waverley. Demolition of the existing boarding house known as Tama House & construction of a part 2 & 5 storey building, including 2 basement levels of car parking located part below ground level. The proposal provides for 5 x 3 bedroom apartments & 10 car spaces. Levels 1 & 2 will have 5 car spaces on each level, garbage store room (level 1), car lift, storage, bike storage (level 2), access stairs & pedestrian lift. Other levels to contain 5 units, each bedroom with ensuite & robe, kitchen, living/dining room & rear terraces. Click for more details...

THREE44
Residential (Units, apartments, flats, townhouses, villas) project In The Rockdale Council Area of Commercial/Retail/Apartments (3) - 5 Storey - Stage 2 type. Construction of a 5 storey mixed use development containing ground level retail tenancies & 2 levels of commercial above, total commercial GFA 600sq m, & upper level of 3 residential apartments. Associated carparking & landscaping. Click for more details...

STAR CITY - SWITCHING STATION SITE - PROJECT STAR
Casino/Retail - 16 Storey New project In The Sydney Council Area. Construction of a multi-storey, mixed-use hotel/retail arcade, gaming room extension and additional carparking at the Switching Station site; & alterations & additions to the existing Star City Casino building, including additional retail/restaurants gaming space and other tourist-related facilities and new entry at Pirrama Rd. Redevelopment of ground floor retail arcade. Redevelopment of the eastern portion of the casino currently occupied by large external stairs to contain additional restaurants, retail outlets, gaming space, other entertainment and tourist related facilities, a ceremonial entry & driveway providing a new vehicular drop-off to the Casino. Works to the exterior of the existing tower buildings to enhance their external appearance. Podium level of the casino complex will be extended onto the Switching Station site. Podium structure will comprise 3 levels above ground, which continue the form and scale of the existing podium to be used generally as follows: Level 00: hotel foyer, hotel back of house areas, retail and café/restaurant space; Level 01: gaming, leisure and relaxation areas, being an extension of the gaming floor in the existing casino complex; Level 02: conference facilities. The ground level of this building will be provided with connections with the surrounding streets, new major pedestrian entry points to the complex will be created to provide connection into the rest of the casino complex via the reconfigured internal pedestrian arcade through the building. Retail and café/restaurant premises are provided along the Union St frontage. Level 1 of the extended podium will contain an enclosed extension to the gaming floor, and an adjacent outdoor area. Level 2 of the podium will accommodate conference facilities & back of house areas. Frontage will be significantly altered, the arcade will be provided with a new pedestrian entry point, & will be expanded and altered to connect to the new entry point located on the corner of Union and Edward Sts. The arcade will be upgraded to provide new connection points, retail premises and café/restaurant areas. Extensive alterations & additions to the frontage of the complex, stairs to the main entry to the casino complex will be demolished, frontage redeveloped to provide new 'front' to the site orientated towards Sydney Harbour. At ground level, new 'porte cochere' will be created, glass enclosed foyer containing stairs, escalators and elevators, café/restaurant at ground level. Level 00 of the new frontage will comprise an extension of the existing internal pedestrian arcade, with premium new retail outlets. Level 01 of the new frontage of the building will comprise an extension to the existing gaming floor, including two large open balconies, and a void to the entry below, Level 02 of the new frontage of the building will provide a new harbour view night venue, bar and restaurant, and an open landscape deck and void to the entry below. Level 03 will comprise a series of open decks, including a large pre-function area adjacent to the existing ballroom, which will be expanded. The large open deck immediately within the proposed new façade will have a bridge link to the ballroom pre-function area, and will accommodate a range of food, beverage and seating facilities. Basement comprising 4 levels of carparking, with each level connecting into and extending the existing car parking provided on the casino complex; an additional 500 car parking spaces are provided in the new basement parking area. Landscaping. Click for more details...

KU-RING-GAI HIGH SCHOOL
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) New project at 403 Bobbin Head Rd, Turramurra North, NSW 2074. This type is Storage Shed with State ownership. Construction of a facility storage shed with pitch roof & high eaves & vehicular access in & out of the premises. Minor internal refurbishments to the existing office Click for more details...

TAMWORTH WAX MUSEUM
407-411 (Lot 22) Goonoo Goonoo Rd, Hillvue (DP1027598), Tamworth, NSW 2340 Has Tamworth Wax Museum currently at Construction stage. Minor demolition. Internal alterations & additions to the existing Museum. Click for more details...

VICTA WAY SHED
Shed project at 10 Victa Way, Bomaderry, NSW 2541 in the Industrial (Depot, Garages, Workshops, Carwashes, Hangars). Construction of a storage shed. Materials include concrete floor slab, steel walls & frame & metal roof Click for more details...

THE STRAND UNITS
Currently at the Construction stage In Rockdale is a project estimated to be $ 2300000. This project Demolition of existing dwellings. Construction of 4 storey residential flat building of 21 units comprising 9 x 1, 12 x 2 bedroom units. Basement carparking for 23 vehicles. Lift access. Associated landscaping. Strata subdivision. Click for more details...

ARMOURY WHARF CAFE
A project in the NSW Within Auburn. Construction, fit-out & operation of the Armoury Wharf Care at Blaxland Riverside Park. The proposal is for a new café building generally in the location of former Building 13, in which the previous café was housed. The proposed café building is single storey with a maximum height of 4.2m (to the top of the roof) and 7.2m to the highest point on the chimney element). It provides seating for 98 patrons, comprising 70 seats internally and a further 28 seats outdoors beneath part of the existing shade canopy to the east of the proposed building. A kitchen and servery, back-of-house facilities and male, female and accessible toilets are provided internally. A takeaway counter is also provided adjacent to the waterfront at the front of the building. Back-of-house areas are located generally at the western end of the building and include a garbage storage room which provides storage for 3 bins with external access, cool room and dry store. The proposed chimney provides for kitchen and toilet exhaust above the lower roof line. Hydraulic plant for the water features within the Blaxland Riverside Park are provided within the plant areas to the western end of the building. The building is contemporary in design, materials and detailing. It has been designed to complement and respect the existing buildings and structures in the vicinity and uses similar or complementary materials and colours. Building materials will include a mix of fibre cement and steel wall cladding with aluminium and steel roof cladding. All materials will weather to be non reflective to ensure no negative visual impact. The proposed chimney element will similarly be steel clad to provide a modern industrial interpretation to the building. On the northern elevation, aluminium framed glass sliding doors are proposed to enable the café to open out onto the wharf apron. Fixed glazing will be provided above the doors on this elevation. Aluminium louvred windows are to be provided on the southern elevation to allow for natural cross-ventilation. Concrete slab to be demolished & new concrete slab to be constructed. Click for more details...

COPLAND ST BULKY GOODS RETAIL OUTLET
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 75 Copland St, Wagga Wagga, NSW 2650. Construction of a new bulky goods retail outlet. Carparking. Landscaping. Click for more details...

EASTERNS SUBURBS MEMORIAL PARK SOUTHERN ASIAN SECTOR
Currently at the Construction stage In Randwick is a project estimated to be $ 480000. This project Additional burial plots, inurnment walls, toilet block, landscaping comprising of new terrace walls, Chinese garden with a moon gate entry, a pond will cross the main pathway and cascade through rocks to the lower terrace, ornaments, rocks, seating and planting will follow traditional Chinese principles, a small pavilion structure between the lawn memorial area and the burial area, and associated site works in the north western sector. Click for more details...

OROOLONG PARK INDUSTRIAL DEVELOPMENT
481 (Lot 13 & 14) Greendale Rd (DP804525), Greendale, NSW 2745 Has Oroolong Park Industrial Development currently at Construction stage. Demolish an existing structure. Construction of a single storey industrial building with a part mezzanine level for the packing of eggs. The building will include a staff room & amenities on the ground floor, administrative & managerial offices at the mezzanine level. Bulk of the space will be refrigerated with the exception of a packing materials store & workshop for maintenance & minor repairs. Steel frame structure, colourbond cladding, aluminium framed windows & doors, low profile gabled roof. Associated parking for 35 vehicles & landscaping Click for more details...

GLEN MUNRO RD INDUSTRIAL SHEDS
Industrial Sheds (2) project at 11 (Lot 7) Glen Munro Rd (DP1018378), Muswellbrook, NSW 2333 In The Council Area Of Muswellbrook of Private. Construction of 2 industrial sheds for warehouse use. Associated office space. Carparking Click for more details...

INTEGRAL ENERGY SHELLHARBOUR FIELD SUPPORT CENTRE
Addition project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 7 (Lot 20) Buckleys Rd (DP1035074), Shell Cove, NSW 2529. Construction of an extension to the existing workshop incorporating new workshop bay, new vehicle wash bay & equipment room adjoining the existing with related demolition, civil & building services works. The new wash bat & workshop extension will be constructed from pre-finished colorbond steel sheeting on structural steel frames & concrete panel walls to match the existing. The new roof will be steel framed with colorbond steel roof sheeting to match the existing. All ground slabs will be in reinforced concrete. External works consist of areas of replacement pavement in reinforced concrete, an onsite storm water retention & re-use system incorporating 2 x 20,000 litre above ground storage tanks (one of the existing to be relocated) & installation of new sewer connection & pump out system. The existing water & air hose reel systems are to be modified & extend3ed into the new wash bay & workshop, this will involve the relocated of the existing water pressure washer & air compressor into the new equipment shed Click for more details...

CLUB RIVERS - RIVERWOOD LEGIONS CLUB
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project at 2 (Lot 101) Littleton St (DP786150), Riverwood, NSW 2210 of Club - Altns & Addns type of Addition development. Internal alterations to existing club. Proposed works are located in the existing mezzanine area located adjacent to the poker machine lounge. Provision of new stair & lift access from ground floor. Lift access to extend to lower floor level. Removal of section of existing metal roof to create internal courtyard space. Provision of glazed walls & airlock to separate courtyard space. Landscaped treatments to internal courtyard area. Click for more details...

ST GEORGE FAMILY MEDICAL CENTRE
Consulting Rooms - Altns & Addns Addition project In The Wagga Wagga Council Area. Alterations & additions to the consulting rooms within St George Family Medical Centre. Click for more details...

BUNNERONG RD MIXED DEVELOPMENT - TRANQUILITY
Residential (Units, apartments, flats, townhouses, villas) project at 483-485 (Lots 1587 & 1588) Bunnerong Rd (DP752015), Matraville, NSW 2036 for New. Demolition of existing dwelling. Construction of a part 3/part 6 storey mixed use development in 2 building forms containing 3 retail spaces of 153.71sq m & 22 residential units, 5 x 1, 14 x 2 & 3 x 3 bedroom. Podium courtyard area. face brick walls, alcubond cladding, hardwood timber pergolas, painted concrete balcony surrounds, clear anodised aluminium window & door frame, sliding louvre screens & sun screens. Basement carparking for 39 vehicles. Landscaping. Click for more details...

HUNGRY JACKS
Entertainment (Parks, Leisure grounds, Playgrounds) project at 48 Ballina Rd, Lismore, NSW 2480 for Renovations, Refurbishments etc.. Alterations to the existing Hungry Jacks restaurant. Click for more details...

AUSTRALIAN INTERNATIONAL ACADEMY
School - 2 Storey - Stage 1 project at 57-69 (Lot 3) Samantha Riley Dr (DP32271), Kellyville, NSW 2155 in the Education (Schools - primary, secondary (up to Yr 12)). Stage 1-works comprise a new 2 storey classroom building containing 12 classrooms & associated facilities, new single storey library & external works Click for more details...

STATION RD UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Auburn Council Area for New development. Demolition of existing structures. Construction of 3 & 4 storey residential flat buildings containing 14 units comprising 2 x 1, 10 x 2 & 2 x 3 bedroom units. Block A at the front of the site contains 8 units over 4 storeys. Block B at the rear of the site contains 6 units over 3 storeys. Basement carparking for 18 cars. Click for more details...

TAMWORTH REGIONAL COUNCIL
Currently at the Construction stage In Tamworth is a project estimated to be $ 265000. This project Scope of work includes: small extension to create more internal space for library use. Minor internal alterations. Re-fit & upgrade of toilet facilities. General upgrade to data & security systems. External siteworks/landscaping/paths. Click for more details...

LAHC - PORT MACQUARIE
Group Home project at 29-31 Gray St, Port Macquarie, NSW 2444 in the Residential (Student & group accommodation). Construction of a 5 bedroom group home. Associated siteworks Click for more details...

JINGELLIC ROAD RECONSTRUCTION
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Jingellic Rd, Jingellic, Holbrook, NSW 2644. Jingellic Road (Yarara Gap) reconstruction from Ch 25425 to Ch28839. Scope of work includes: site clearing, supply, delivery & unloading of all materials, clearing of vegetation, formation & earthworks, excavation (including rock excavation), placement of materials, trimming & preparation of subgrade, sub base & base course, including 1.5% lime stabilization of subgrade, supply & placement of pavement materials, supply & placement of geofabric, bitumen surfacing with prime & 2 coat seal, earthen drain & table drain works, concrete dish drain & slotted agricultural pipe, concrete catch drains above the top of cut batters, full reconstruction & reinstatement of property driveways, stormwater culverts, headwalls & associated drainage works, repair of existing box culvert, supply & construction of new box culverts, site restoration of services, supply & installation of guard rail, line marking, supply & installation of guide posts & marker posts, fencing reinstatement, maintenance during defects liability period. Click for more details...

COOPERS SHOOT & BANGALOW WATER SUPPLY RESERVOIRS
Reservoirs project at Old Bangalow Rd, Suffolk Park & Rankin Dr, Bangalow, NSW 2479 in the Public Utilities (Reservoirs). Design & Construction of new 10ML reservoir for Byron Bay & new 1.35ML reservoir for Bangalow. Construction of a reinforced concrete water supply reservoir, metal roof structure & associated fittings, gutters, downpipes, associated pipework including manifolds, cutovers, connections &/or bypasses & associated infrastructure including access stairs, new flow meter, scour drains, connecting pipework to supply & delivery mains. Click for more details...

WHALAN RESERVE
Whalan Reserve is currently at the Construction stage, valued at about $ 1600000 it is Constructions of new amenities building includes 4 large changing rooms, toilets, canteen, storage & meeting room. Click for more details...

BRUNSWICK HEADS HOT BREAD SHOP
Currently at the Construction stage In Byron is a project estimated to be $ 250000. This project Proposed alterations & additions to the existing shop. Associated car parking & landscaping. Click for more details...