MACIVER RAILWAY STATION
Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project at Nash St, MacIver, Perth, WA 6000 of Railway Station - Upgrade type of Renovations, Refurbishments etc. development. Works comprise upgrade to MacIver Railway Station facilities, modifications to existing shelters & modification to platform heights. Click for more details...

FREMANTLE HOSPITAL
State ownership Medical (Hospitals & associated buildings, mortuaries) project In The Fremantle Council Area for Renovations, Refurbishments etc. development. The works comprise the redevelopment of the Emergency Department (Block B3), and such other work as shown on the drawings or included in the specification. Click for more details...

KALGOORLIE RESERVOIR
New project of Civil Engineering (Pipelines) project at Johns Rd, nr West Kalgoorlie Industrial Estate, Kalgoorlie, WA 6430. It is proposed to construct new 400,000 kilolitre reservoir within Kalgoorlie-Boulder that will increase city's water storage capacity to 880,000 kilolitres within three years (increasing from present 12 days supply to more than three weeks). Reservoir will also improve water quality as water will be allowed to cool before being supplied to consumers. Reservoir will be excavated 250 m square & 6 m deep. Project will include associated pipelines, water treatment facilities & pumping station. Click for more details...

MOUNT KEITH NICKEL OPERATIONS - OPEN CUT MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Drill & Blast) project In The Wiluna Council Area for New development. Mining will be at the current rate of 95 million tonnes per annum. The depth of the pit will be eventually 600 metres. Click for more details...

WALLBROOK HILL PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project for New development. Resource estimate for the project is 12,338,000 tonnes @ 1.54 g/t gold for 609,100 ounces of gold. The measured category within this is 2,127,800 tonnes @ 1.40 g/t for 96,000 ounces of gold. This estimate includes the surrounding Yilgangi and Yerilla projects. The scoping study concluded that are large scale low cost operation is feasible. A positive financial return for both a heap leach and toll milling processing scenarios. Capital cost would be approx $7.5 million. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at Near, Collie, WA 6225 of Expansion Of Capacity type of New development. An expansion to 3.5 million tonnes per annum ( increase of 250,000 tonnes). To be undertaken over the next two years with minimum interruptions by utilising planned maintenance shutdowns. Includes additions to precipitation circuit, modifications to digestion area emission control system, additional baixite residue washing and disposal facilites, upgrade of power supply. Click for more details...

COSMO NEWBERRY REMOTE COMMUNITY SCHOOL
Currently at the Construction stage In Laverton is a project estimated to be $ 66000. This project Environmental upgrade - installation of verandahs & sun screens to transportable classrooms. Click for more details...

AHOY ROAD DEMOLITION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Demolition of existing buildings. Click for more details...

SHIRE OF SERPENTINE-JARRAHDALE ASPHALT
Shire Of Serpentine-Jarrahdale Asphalt is currently at the Tenders & Building stage, valued at about $ 50000 it is Supply & lay hot asphalt over 1 year period. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - UNDERGROUND DEVELOPMENT
A project in the WA Within City Of Greater Geraldon - Mullewa. Investigation of a decline from the base of the Central pit, allowing Central & West lodes to be mined concurrently. Click for more details...

EASTDENE CIRCLE GROUPED DWELLINGS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Stirling Council Area for New development. Construction of 3 grouped dwellings with garage. Click for more details...

ROBE RIVER REINSTATEMENT WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at North West Coastal Hwy (slk 957.6 - 959.5) at Robe River, approx 50 km west of, Pannawonica, WA 6716. This type is Floodways - Cement Stabilisation with State ownership. Scope of works comprises stabilisation of pavements. Works consist of supply & spreading of cements, cutting, pulverising, supply & adding of water & mixing of pavement layer. Stabilisation is required of 400 mm basecourse in two layers. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Oil refineries, Chemical Plants) project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 for New. Provision of temporary site power. Click for more details...

VILLAGE LIFE RETIREMENT VILLAGE
Private ownership Aged Care & Retired Developments (Aged units, seniors units) project In The City Of Greater Geraldton Council Area for New development. Construction of 54 (32 single storey & 22 x 2 storey) seniors' accommodation units comprising single bedroom, living area, small kitchenette with meals prepared for residents & served in communal central dining area. Communal facilities include kitchen, dining room, library & living room. Manager's unit located on first floor level above communal area. Construction of limestone external brickwork & metal deck roof. Click for more details...

KINGS PARK ROAD - AUTOMATIC IRRIGATION SYSTEM
Public Utilities (Water distribution systems, Drainage) project for Supply & Install development. Works to comprise of supply & installation of automatic irrigation system works along Kings Park Rd. Click for more details...

WATER CORPORATION - PORT HEDLAND DN600 PE PIPELINE
State ownership Public Utilities (Water distribution systems, Drainage) project In The Port Hedland Council Area for New development. Works to comprise of construction of DN600 PE pipeline between Bell St & Lot 954, Port Hedland. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - ELECTRICAL INSTALL FOR CARBONATION PLANT
Private ownership Mining - Subcontracts (Electrical installation) project In The Murray Council Area for New development. For the provision of electrical installation services for the carbonation plant. Click for more details...

TJIRRKARLI TJUKURLA & BACKSTONE ABORIGINAL COMMUNITIES RESIDENTIAL
A project in the WA Within Ngaanyatjarraku. Upgrade to 19 single detached houses at 3 separate aboriginal communities: 10 at Tjurrkarli, 3 at Tjukurla & 6 at Blacksone. Click for more details...

AUSTRALIND RISE RETIREMENT VILLAGE (EASTWELL ROAD AGED PERSONS' UNITS)
Lot 500 Eastwell Rd cnr Eliza Pl & Christina St, Australind, WA 6233 Has Australind Rise Retirement Village (Eastwell Road Aged Persons' Units) currently at Construction stage. To include construction of 107 aged persons' units comprising a mixture of single storey (40) & multi-storey (67) x 3 bedroom, 2 bathroom or 2 bedroom, 2 bathroom configurations, also communal facilities such as swimming pool, gym, arts & craft room. Click for more details...

PEACOCK STREET GROUPED DWELLINGS
Grouped Dwellings (3) New project In The Belmont Council Area. Construction of 3 x 3 bedroom family units of brick & tile with brick paved driveways & carports. Click for more details...

HAIG STREET GROUPED DWELLINGS
Currently at the Construction stage In Stirling is a project estimated to be $ 750000. This project Works to include the construction of 3 x 2 storey grouped dwellings with garages. Click for more details...

ST HILDA´S ANGLICAN SCHOOL FOR GIRLS
Education (Schools - primary, secondary (up to Yr 12)) project at 26 Bay View Tce, Mosman Park, WA 6012 of School - Addns type of Addition development. Contruction of a 51.5 metre pool & associated works comprising of bleacher seating, plant rooms, glazed & steel framed shade structures, change rooms, storage rooms & offices. Click for more details...

KILMURRAY WAY GROUPED DWELLINGS
80 (lot 221) Kilmurray Wy, Balga, WA 6061 Has Kilmurray Way Grouped Dwellings currently at Construction stage. Works to include the construction of 3 grouped dwellings. Click for more details...

VICTORIA WAY GROUPED DWELLINGS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Stirling Council Area for New development. Construction of 3 grouped dwellings with garages. Click for more details...

CITY OF PERTH - MOUNTS BAY ROAD RIVERWALL RECONSTRUCTION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for Renovations, Refurbishments etc. development. Works to include the reconstruction of the existing river wall for a distance of 330 metres. Click for more details...

MAIN ROADS WA - SOUTH WEST REGION BRIDGES 196,199, 231, 236, 244A, 456, 751, 3368A, 3566, 3777A
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various locations within the South West Region of WA, ., WA 6999 of Bridges - Refurbishment type of Renovations, Refurbishments etc. development. Works to comprise refurbishment works for Bridges 196, 199, 231, 236, 238, 244A, 456, 751, 3368A, 3566, 3777A at various locations within the South West Region of WA. Click for more details...

ROTTNEST ISLAND POWER STATION - GENERATORS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Cockburn Council Area of Generators (2) - Rebuild/Replacement type. The Rottenest Island Authority is seeking to engage a suitably qualified & experienced organisation to undertake the rebuild or replacement of 2 power generators at the Rottnest Island power station, in accordance with the required specifications, standard & codes. Click for more details...

ALBANY HIGHWAY WAREHOUSES
Industrial (Warehouses, cargo sheds, distribution centres) project at 1736-1738 (lot 55 & 56) Albany Hwy, Kenwick, WA 6107 for New. Works to include the construction of 22 warehouses. Some of the warehouses to be 2 storey approx 241sqm to 450sqm in size. There is to be 88 car parking bays, a delivery bay & a disabled parking bay to be located at the front of the buildings, 15 bicyle racks, 2.3 metre wide strip of landscaping at the front & also a 7.2m wide crossover located in the centre. Click for more details...

BANKSIA GROVE SECONDARY/SENIOR HIGH SCHOOL - STAGE 1
School project at Lot 8019 Joseph Banks Blvd, Cnr of Splenderns Av, Banksia Grove, WA 6031 In The Council Area Of Wanneroo of State. Works to include construction of the Banksia Grove Secondary School to be done in stages. Stage 1 to be ready to open for the school year in 2015 for Years 7 & 8 students. The school is to have air-cooling, state-of-the-art education facilities & to comprise of an administration block & Learning Community 2; Learning Community 1; performing arts; student services area; library; cafeteria; general classrooms & specialist areas for science; material technology, Food & Textiles, IT & Business; arts, health & physical education; oval; car parking & landscaping. Click for more details...

THE JETTY RESORT
New project of Hospitality (Hotels, Serviced Apartments) project at 1 The Esplanade, Esperance, WA 6450. To include replacement of all air conditioning units & removal of the existing units in the White Building of The Jetty Resort. Click for more details...

GRUYERE JOINT VENTURE GOLD PROJECT - CENTRAL BORE - ACCOMMODATION CAMP
A project in the WA Within Laverton. For the provision of an accommodation camp containing both temporary & permanent facilities to be located 6km southwest of the process plant. The works will comprise the supply & installation of 600 accommodation rooms consisting of 300 temporary rooms, support services buildings including administration, wet mess & dry mess & 300 permanent rooms. Click for more details...

COMRIE ROAD MIXED USE DEVELOPMENT
Retail (Shops, shopping centres & arcades, supermarkets) project for New development. May include the construction of a 2 storey mixed use development comprising of 2 commercial tenancies, restaurant & a shop on the ground floor & four multiple dwellings on the first floor also included in the works is construction of 35 grouped dwellings. The development will also have 18 carparking bays for visitors, residents & commercial bays & also 4 on-street carparking bays. Click for more details...

RAILWAY ROAD MIXED USE DEVELOPMENT
Currently at the Construction stage In Subiaco is a project estimated to be $ 8000000. This project May include the construction of a 6 level mixed use development with a shared lobby. The basement will comprise of car stacker pits, pumps & tank zone, transformer, storage & service zone of 115sqm. The ground floor will comprise of 2 restaurants, residential store rooms, lobby, 50 car park bays including car stacker bays & a disabled car park bay, bike racks, end of trip facilities & bin storage areas. The first & second floors will each comprise of 6 offices with kitchenettes, male/female toilets, accessible toilet & lobby. The third floor will comprise of 6 offices with kitchenettes, male/female toilets, accessible toilet & lobby. The fourth floor will contain 5 x 1 bedroom & 2 x 2 bedroom dwellings with balconies. The site currently contains buildings which will be demolished on Lots 28, 29 & the rear of Lot 27, a building to the front of Lot 27 (Chuggs) will be retained. Click for more details...

OXFORD STREET OFFICE DEVELOPMENT
Offices(10) - 3 Storey New project In The Vincent Council Area. Construction of a 3 storey office development to include on the ground floor: 2 x office tenancies with a total of 184.6sqm, undercroft car park containing 22 car park bays, foyer, store room, lift, end of trip facilities & bicycle parking. First floor to comprise of 4 x office tenancies with a total of 715.1sqm & the second floor to comprise of 4 x office tenancies with a total of 676.2sqm with each floor containing a lobby, balconies, male/female toilets & lunch room. Click for more details...

BISHOPSGATE STREET GROUPED DWELLINGS
A project in the WA Within Victoria Park. Works to include the construction of 3 grouped dwellings & the demolition of an existing dwelling. Click for more details...

KEEMORE WAY GROUPED DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) New project at 13 (Lot 248) Keemore Wy, Balga, WA 6061. This type is Grouped Dwellings(3) with Private ownership. Works to include the construction of 3 grouped dwellings with garages. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - PLUMBING DRAINAGE & HYDRAULICS
Plumbing/Drainage/Hydraulics project at 110km north of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of plumbing, drainage & hydraulics services. Click for more details...

WALTER ROAD GROUPED DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) New project at 20 (Lot 21) Walter Rd, Bassendean, WA 6054. This type is Grouped Dwellings(4) with Private ownership. Works to include the construction of 4 grouped dwellings. Click for more details...

BULLSBROOK DISTRICT COMMUNITY & LEARNING CENTRE/HALL/PAVILION
Community & Learning Centre/Hall/Pavilion New project In The Swan Council Area. Works proposed to include the construction of a new District Level Community & Learning Centre in Pickett Park Bullsbrook comprising of: staff offices, reception, customer service area, office space for community use, meeting & activity rooms, library, youth facility, creche, amenities, childrens' playground, storage, landscape works & associated works. Click for more details...

BETHESDA HOSPITAL - CARPARK/RETAINING WALL/LANDSCAPE
25 (Lot 13) Queenslea Dr, Claremont, WA 6010 Has Bethesda Hospital - Carpark/Retaining Wall/Landscape currently at Construction stage. Works to include the extension & resurfacing of the existing car park to accommodate 42 car parking bays, construction of a new pathway btwn the hospital & car parking area & construction of a 1 metre retaining wall to the northern & southern edges of the car parking area, revegetation of the forshore area with native plant species to the river's edge. Click for more details...

KELVIN ROAD ACCESS FASTENERS SHOWROOM
Currently at the Construction stage In Gosnells is a project estimated to be $ 471000. This project Works to include repairs to the showroom caused by fire damage. Click for more details...

MOLDAVIA STREET GROUPED DWELLINGS & RETAINING WALLS
Grouped Dwellings(3)/Retaining Walls New project In The Stirling Council Area. Works to include the construction of 3 grouped dwellings, retaining walls & fences. Click for more details...

RIVERSIDE WATERBANK PRECINCT - FORWARD WORKS - STAGE 2
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project for New development. Works to include Obstruction Removal works in Area D in Stage 2 to comprise of: earthworks excavations, back-fill & temporary works will be required to allow removal of in-ground obstructions that are located in Area D, decommissioning of the existing storage pond & reconstruction of road verge impacted by the works within the Causeway, disposal of existing concrete obstructions & unsuitable soil in line with environmental controls, installation of new western power HV services - civil works & duct installation, protection of existing site instrumentation & site monitoring equipment for the duration of the works. Click for more details...

YANCHEP SECONDARY SENIOR HIGH SCHOOL
Civil Engineering (Retaining walls, Seawalls) project for New development. To include forward works to be carried out for the construction of the Yanchep Secondary Senior High School comprising of clearing vegetation, rock excavation & earthworks, drainage infrastructure, main sewer installation, major retaining elements & associated works. Click for more details...

HALLS HEAD DISTRICT SHOPPING CENTRE
Shop - Fitout Renovations, Refurbishments etc. project In The Mandurah Council Area. Works to include an internal shop fitout. Click for more details...

FREMANTLE BOYS SCHOOL CONSERVATION & COMPLIANCE WORKS - STAGE 3
Education (Schools - primary, secondary (up to Yr 12)) project In The Fremantle Council Area of Conservation/Compliance Works - Altns & Addns - Stage 3 type. To include Conservation & Compliance Works at Fremantle Boys School to comprise of excavation & construction of new external deck, remedial works to Adelaide St masonry façade, remedial works to interior rooms 5, 6, 7, 8, 10, 11 & UWC, electrical & structural works, asbestos remedial & demolition works. Click for more details...

DURRANT AVENUE RETAINING WALLS
Private ownership Civil Engineering (Retaining walls, Seawalls) project In The Kwinana Council Area for New development. Works to include the construction of retaining walls for an estate development. Click for more details...

CITY OF PERTH COUNCIL HOUSE
Fountain - Remediation Works project at 27 St Georges Tce, Perth, WA 6000 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Fountain remediation works at the City of Perth Council House. Click for more details...

RESERVE ROAD MICROBREWERY & RESTAURANT
Reserve Road Microbrewery & Restaurant is currently at the Construction stage, valued at about $ 800000 it is Construction of 724sq m microbrewery & restaurant. Car parking for 37 vehicles to include 1 accessible car parking & 2 bus parking bays. Associated landscaping. Click for more details...

PUNDULMURRA TAFE
Pundulmurra Tafe is currently at the Construction stage, valued at about $ 90000 it is Air conditioner replacement for the Old Library & classrooms C1 & C1A at Pundulmurra TAFE. Click for more details...