State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Administration facilities Projects in NT®ion=⊂=2130 in region


JABIRU AREA SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of External Lighting Replacement For School type. Replace existing light fittings & switches. Click for more details...

BATCHELOR & LITCHFIELD NATIONAL PARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 750000. This project Various repairs & painting to various assets at Batchelor & Litchfield Park. Click for more details...

WICKHAM POINT TRANSMISSION LINE
State ownership Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Darwin City Council Area for New development. Construct 132 kV double circuit transmission line for power supply at Wickham Point. Click for more details...

TASSIE SHOAL METHANOL PROJECT - JETTY/OFFSHORE MOORINGS
Jetty/Offshore Moorings New project In The Darwin City Council Area. Key components of the Tasie Shoal project include a jetty (200 metres long for loading methanol onto export tankers); and two offshore moorings ( one on Tassie Shoal and one beside Tassie Shoal) for use by service boats, tugs and visiting fishing vessels. Click for more details...


Electrical Equipment/Instrumentation - Upgrading project at Region of, Katherine, NT 0850 In The Council Area Of Katherine Town of State. Period contract for general repairs & maintenance of electronic equipment, instrumentation & PLC's on PAWA installations. Click for more details...


Region of, Katherine, NT 0850 currently at Construction stage. 3 x 3 & 5 x 4 bedroom. Lightweight steel frame & steel clad construction, concrete floor, metal deck roof, aluminium framed windows, carports. Click for more details...


New project of Commercial Premises (Offices) project at 101 Pruen Rd (Prtn 2029 Hund of Bagot), Berrimah, NT 0828. Industrial workshops & offices. Workshops 390 sq m approx o'all. Offices 90 sq m approx o'all. Workshops - Steel portal frame. Offices -Pre-cast concrete, all with concrete floors, metal deck roof, aluminium framed windows, split airconditioning. Single seal carpark & landscaping. Click for more details...


Currently at the Construction stage In Darwin City is a project estimated to be $ 50000. This project Contract will consist of 5 separate parts with works located at Adelaide River, Batchelor & Rum Jungle Lake. Click for more details...

MOUNT TODD GOLD MINE
Mine - Mechanical Package - Wet Plant - Installation - Phase 2 - Expansion project at 45 km northeast of, Pine Creek, NT 0847 In The Council Area Of Katherine Town of Private. It is envisaged this facility will utilise a combination of flotation/regrind/leach methods. Contract to provide structural steelwork & mechanical services. Click for more details...

PROFESSIONAL TEAM
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various sites & Larapinta Dr, Alice Springs, NT 0870. Supply professional Engineer & Technical Officer with 5 to 12 years relevant experience to Alice Springs region for the supervision of contract construction of civil/roads projects generally on Larapinta Drive. Click for more details...

FRANCES BAY MOORING BASIN
Currently at the Construction stage In Darwin City is a project estimated to be $ 100000. This project Concrete repairs to Frances Bay Mooring Basin. Click for more details...


Mitchell's Chase project at SUBDIVISION - Residential - stage 4 1 Chung Wahg Tce, Palmerston, NT 0830 in the Civil Engineering (Residential Subdivision). To create 45 lots. Roads, drainage, water, sewerage & electrical services. Click for more details...

AUQUEST PROJECT - TOMS GULLY GOLD UNDERGROUND - RESOURCE
100 km southeast of, Darwin, NT 0800 Has Auquest Project - Toms Gully Gold Underground - Resource currently at Construction stage. The AuQuest project includes Toms Gully underground (proposed). The existing Quest 29 open cut operation. The Toms Gully CIP Plant and additional resources. Click for more details...

BERRIMAH CARAVAN PARK
Tourism (Caravan parks with assoc facilities, Camping grounds) project at Beaton Rd cnr Hidden Valley Rd (prtn 1679 Hund of Bagot), Berrimah, NT 0828 of Hostel/Caravan Park/Ancillaries type of New development. Subdivide to create 2 lots. Construction of 20 room hostel, caravan park & ancillaries. Sites for 70-80 caravans, 10 on site cabins, shop, reception. Swimming pool. Block-work and precast construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

TANAMI DOWNS JOINT VENTURE PROJECT
Tanami Downs Joint Venture Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is Tanami Downs is located approximately 25 km west of the +5 million ounce Callie gold deposit operated by Newmont Australia Ltd. Click for more details...

ALICE SPRINGS RESORT
Renovations, Refurbishments etc. project of Tourism (Tourist villages, Resort complexes) project at Stott Tce, Alice Springs, NT 0870. Soft refurbishing of existing rooms. Click for more details...

COONAWARRA WAREHOUSE/OFFICE
Commercial Premises (Offices) project at Prtns 1234 & 1912 Hund of Bagot, Coonawarra Rd, Winnellie, NT 0822 of Warehouse/Office Units type of New development. 11 warehouse/office units. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

PATERSON STREET REHABILITATION
Paterson Street Rehabilitation is currently at the Construction stage, valued at about $ 56000 it is Ground maintenance of nominated NT Government Buildings for 12 month period. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

PORTABLE FIRE EQUIPMENT/FIRE DOORS MAINTENANCE-KATHERINE REGION
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project at Various sites Region of, Katherine, NT 0850 of Portable Fire Equipment/Fire Doors Maintenance For Govt Assets type of Renovations, Refurbishments etc. development. Maintenance & servicing portable fire equipment & fire doors in Government Assets for 12 month period. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

RAPHAEL ROAD SHOWROOM SALES BUILDING
Currently at the Planning stage In Darwin City is a project estimated to be $ 200000. This project Construct showroom sales for equipment hire. Click for more details...

ROPER GULF SHIRE COMMUNITY UPGRADES
A project in the NT Within Katherine Town. Refurbishment of recreation hall - Numbulwar. Erect shade structure (approx 15m X 20m) - Numbulwar. Erect shade sails over playgrounds - Barunga, Beswick & Manyallaluk. Construct new basketball court and cover - Beswick. Click for more details...

ILIFFE STREET GATEWAY BUILDING
Currently at the Construction stage In Darwin City is a project estimated to be $ 1000000. This project Construction of 220 sqm single storey gateway office building. Click for more details...

WICKHAM POINT IMMIGRATION ACCOMMODATION FACILITY
Immigration Accommodation Facility New project In The Litchfield Shire Council Area. Construction of an immigration accommodation facility comprising 3 compounds of 1512 rooms in two storey modules, administration block, medical centre & amenities, basketball court, exercise equipment & football area. Click for more details...

VEREKER STREET SHOWROOM
Industrial (Warehouses, cargo sheds, distribution centres) project at 2 (Lot 2562) Vereker St, Humpty Doo, NT 0836 for New. Construction of showroom/sales shed. Steel framed & metal cladding. Parking for 16 cars. Click for more details...

AUSTRALIAN COMMUNICATIONS & MEDIA AUTHORITY HOWARD SPRINGS NORTHERN TERRITORY
A project in the NT Within Litchfield Shire. Site preparation/remediation works for replacement of ageing High Frequency Direction Finding (HFDF) system at existing sites in Bullsbrook, Western Australia, Capalaba, Queensland, Shoal Bay, Northern Territory & Richmond, Tasmania. Works include the demolition & removal of existing equipment hut, towers & antennas & site preparation works including civil works, mechanical & electrical services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - PRESSURE TESTING & FLUSHING SERVICES
A project in the NT Within Darwin City. For the provision of pressure testing & flushing services. Click for more details...

HUNGRY JACKS RESTAURANT DARWIN
103 Smith St & Daly St (Lot 3434), Darwin, NT 0800 Has Hungry Jacks Restaurant Darwin currently at Construction stage. Construction of a new Hungry Jack's Restaurant with drive-through service window. Construction of a 9 car single drive-through lane, canopies & service areas. Car parking for 20 vehicles. Associated landscaping. Click for more details...

PALMERSTON REGIONAL HOSPITAL HYDRAULIC SERVICES
A project in the NT Within Palmerston Town. Hydraulic services for Palmerston Regional Hospital. To include in-ground hydraulic services including excavation & backfilling for approximately 20,000sq m of hospital fitout. Storm water drainage system & waste water drainage system including trade waste. Cold water supply system (potable & non-potable systems), hot water supply system & fire hydrant & fire hose reel system. Sanitary ware, tap ware, plumbing & kitchen fixture installations. Penetrations, supports, seals & fire rating. Temporary construction services. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 Has Darwin Gateway Shopping Centre Stage 1 currently at Construction stage. Centre door hanging & carpentry sub-contractor for Gateway Shopping Centre Stage 1. To include construction of tiered Cinema seating. Click for more details...

BERGMAN CIRCUIT RESIDENTIAL DEVELOPMENT
New project of Residential (Units, apartments, flats, townhouses, villas) project at 5 Bergman Cct (lot 03108), Katherine, NT 0850. Construction of 7 x 3 bedroom duplexes, 1 x 3 bedroom single unit & 2 x 2 bedroom duplexes all in 2 storey buildings. To include 960sq m communal open space. Awnings, metal cladding, aluminium sun screens, aluminium framed windows, cement sheet cladding & metal roofing. Car parking for 67 cars to include 21 x double car garages & 25 visitor car parks. Associated landscaping. Click for more details...

JUNGAWA ROAD UPGRADE & SEAL
Roadworks - Reseals New project In The Darwin City Council Area. Upgrade & seal to the Jungawa Road between Ch6.5 & Ch9.326 in the Douglas-Daly region. Works to include earthworks, pavements & shoulders, drainage works & protection works. Construction of road formation by cut & fill earthworks, preparation & maintenance of subgrade, construction of gravel pavements & construction of culverts with protection works. Spray seal of single seal throughout length. Provision of traffic control. Click for more details...

DARWIN BOWLS CLUB CAR PARK
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) project at 8 Conacher St (Lot 5437), Fannie Bay, NT 0820 of Car Park - For Bowls Club type of Addition development. Construction of car park at the Darwin Bowls Club. Sealed car park for 64 vehicles with kerbing & guttering. Associated landscaping. Click for more details...

EAST POINT RESERVE GUN TURRET PROTECTION WORKS
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Darwin City Council Area of State ownership. Protection works to the Number 2 Gun Turret at the WWII East Point Reserve. To include the removal of existing stairs, handrails, balustrades & fencing. Supply & installation of 1200mm high metal piped fencing at 3 locations with welded base plates & welded metal handrails. Fabrication & installation of stairs with handrails & balustrades. Installation of reinforced concrete lintel. Repair works to 2sq m of spalling concrete with wire reinforcement, primer & non-shrink grout. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - CONTRACTOR CAMP
Roper & Wilton Rivers High Level Crossings & Road Upgrades - Contractor Camp is currently at the Construction stage, valued at about $ 3000000 it is Supply, installation & commissioning of contractor camp infrastructure for a 85 man accommodation camp to support the Roper & Wilton Rivers High Level Crossings & Road Upgrades. To include, power, water, sewage & communications systems. Click for more details...

LEANYER RECREATION PARK CASCADES & LAGOON RELINING
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Darwin City Council Area of Lagoon Pool - Relining type. Upgrade works to the Leanyer Recreation Park Cascades & lagoon relining. To include demolition of existing cascade pools & paved area. Replacement of pebblecrete surfacing at the main swimming/wading pool to include rehabilitation of expansion joints. Construction of 2 walk in wading pools, water play area with water play features & access ramps. Reinstatment of lower concrete paved areas, pathways & grassed seating area. Installation of circulation water supply pipe reticulation pumping system, pool drainage connections, surface drainage pits & sub-soil drainage. Re-connection of main filtered water supply to main pools. Associated landscaping. Click for more details...

TENNANT CREEK WATER SUPPLY & SEWERAGE INFRASTRUCTURE INFRASTRUCTURE MAINTENANCE & REPAIRS
Public Utilities (Treatment plants, Sewerage reticulation) project In The Barkly Shire Council Area of State ownership. Provision of repairs & maintenance works to water supply infrastructure & sewerage infrastructure at services locations within the Tennant Creek region. Water supply works to include repairs & maintenance to transmission & reticulated water mains, valves hydrants, water storage tanks & stands. Sewerage infrastructure works to include repairs & maintenance to rising mains, gravity sewers, pump station, access chambers & Septic Tank Effluent Pumping System. Associated repair works to tracks, hardstand, driveways, roadways & fencing. Click for more details...

GRAY PRIMARY SCHOOL WATER MAINS
22 Victoria Dr (Lot 1108), Gray, NT 0830 Has Gray Primary School Water Mains currently at Construction stage. Construction of water mains for fire services, potable water & irrigation uses. To include removal & capping of existing fire hydrants. Supply & installation of fire main with fire boosters & SS boosters. Supply & installation of potable water mains and irrigation water mains. Supply & installation of 2 x 1000l precast grease arrestor. Provision of 1.8m high site fencing. Click for more details...

BOWALI VISITOR CENTRE UPGRADE
A project in the NT Within West Arnhem Shire. Upgrade works to the Bowali Visitor Centre at Kakadu national Park. To include repair works to bux gutters, damaged ceiling & emergency lighting. Supply & installation of hardwood timber structures, waterproof floor membrane & slip resistant floor tiles. Click for more details...

MCMILLANS ROAD & VANDERLIN DRIVE IRRIGATION SYSTEMS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Darwin City Council Area of Roadworks - Irrigation Systems type. Construction of a telemetry irrigation system on McMillans Road between Bagot Road & Neal Street & on Vanderiln Drive between Mueller Road & Patterson Road. To include removal of exisitng poly pipes, sprinkler heads, valves, valve boxes & backflow prevention devices. Connection to water mains & existing controllers. Click for more details...

VICTORIA RIVER RESEARCH STATION AMENITIES BLOCK EXTENSION
Social (Amenities, Dressing rooms) project at Buchanan Hwy, Victoria River Downs, NT 0852 of Amenities Block - Extn type of Addition development. Extension of existing amenities at the Victoria Research Station. To include construction of amenities & laundry with steel stud frame, concrete footings & slab. To include electrical, drainage & plumbing works. Click for more details...

YIRRA HOUSE REMEDIAL UPGRADES
A project in the NT Within Litchfield Shire. Yirra House upgrade to include upgrade of the air-conditioning plant, ductwork & fire dampers, replacement of the roof & wall cladding, replacement of the bulk thermal insulation & vapour barrier, replacement of certain ceilings & provision of new two-way fire rated ceilings to single occupancy units & ensuites, electrical upgrades, modification of the existing & extension of the carpark with new asphalt, kerbing, concrete pavements & drainage, removal of concrete edging around garden beds. Construction of secure fence & gate to part of the car park, new drainage structures, secure mechanical plant enclosures, mechanical plant concrete slabs, erosion protection works, re-grading of the site & new landscaping works. Click for more details...

BUNTINE HIGHWAY RESHEETING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Resheeting of the Buntine Highway at various locations between CH401.63km-CH410.66. Click for more details...

CHARLES DARWIN UNIVERSITY - INTERNATIONAL HOUSE
Education (Tertiary - colleges, institutes, universities) project at ., Casuarina, NT 0810 of Amenities - Refurbishment type of Renovations, Refurbishments etc. development. Refurbishment of bathrooms located at Brown 4 International House. Click for more details...

STUART HIGHWAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area of Pavement - Rehabilitation type. Remove 150mm of base course and reserve to one side. Then remove 150mm of existing sub base and spoil. Replace with the retained gravel material, top up as required and stabilise with 3% cement and compacted 150mm deep layer to 95% MMDD. Construct a 150mm base course layer with complying type 2 gravel compacted 100% MMDD. Seal patches with a 14mm aggregate primer seal Click for more details...

LITCHFIELD NATIONAL PARK
Social (Amenities, Dressing rooms) project for New development. Construction of a new VIP pit toilet at Walker Creek, near camp 4 Click for more details...

ELITE PHYSIOTHERAPY
Medical (Surgeries, Medical centres) project for Renovations, Refurbishments etc. development. Conversion of an existing office into a medical clinic (Tenancy 2 & 3) to comprise 3 consulting rooms for physiotherapists & massage therapist, exercise/rehabilitation area, reception, office, staff rooms, laundry room & storage room. Car parking for 5 vehicles. Associated landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect