State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Airservices for personnel Projects in QLD®ion=⊂=2260 in region


POINCIANA & BLAKESLEY STREET SHOPS
Retail (Shops, shopping centres & arcades, supermarkets) project In The Sunshine Coast Regional Council Area of Supermarket/Shop type. Redevelopment of site including single storey shop building, mezzanine office level, Woolworths supermarket (2509sqm) and shop (100sqm). Lift. Decorative timber battens to entry feature, powdercoated aluminium, glazed shopfronts and colour coated metal roof. Basement parking for 125 cars. Click for more details...

JIMBOOMBA JUNCTION SHOPPING CENTRE REDEVELOPMENT
Shopping Centre project at 665-687 Cusack Ln (Lot2 RP220611, Lots4&5 RP880809), Jimboomba, QLD 4280 In The Council Area Of Logan City of Private. Retention & major refurbishment of existing buildings (Building A, B & C) & construction of new building with Coles supermarket & 3 speciality shops. Basement & above ground parking. Associated landscaping. Click for more details...

TRILOGY RESIDENCES - APARTMENTS
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construction of 3 residential buildings. Building 2A - 37 units x 5 storey (Boundary Street frontage). Building 2B - 30 units x 7 storey including basement parking (Hope Street). Building 2C - 54 units x 10 storey including podium & basement parking (Hope Street & Lewis Lane). Total parking for 151 cars. Associated landscaping. Click for more details...

RIVA ON CHEVRON UNITS
Residential (Units, apartments, flats, townhouses, villas) project at 1-3 (Lot 560-562) Stanhill Drv RP94914 & 6 Tarcoola Cres, Surfers Paradise, QLD 4217 of Units (21) - 8 Storey type of New development. Construction of 1 building of 8 levels. GFA Levels 1 & 2, at 259.3sqm (518.6sqm total), GFA Levels 3 - 7 ,5 at 390.9 sqm (1954.5 sqm), GFA Level 8, 1 at 372.7 sqm (372.7m). Bedroom levels 1 & 2:4 x 2 bedroom units over two floors, Bedroom levels 3-7, 3 x 2 bedrooms for 5 levels, Bedroom levels 8 , 2 x 3 for 1 level. Parking (basement) for 40 cars. Click for more details...

OLD ORCHARD - MERRYMAN'S FLAT
New project of Civil Engineering (Residential Subdivision) project at Palmwoods School Rd Lower Landershute Rd & Rifle Range Rd, Palmwoods, QLD 4555. Roadworks, stormwater drainage, water & sewerage reticulation for 31 lots approx . Total area of land 42.6 ha. Click for more details...

BP TRUCKSTOP
A project in the QLD Within Brisbane City. Pre-cast concrete, brick, structural steel, glass & metal roof. Click for more details...

DIRRANBANDI COTTON GIN
Earthworks For Cotton Gin project, Dirranbandi, QLD 4486 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Includes supply of 80,000 cu m gravel & 50,000 cu m of onsite earthworks. Click for more details...

SHAMROCK HOTEL
Currently at the Construction stage In Toowoomba Regional is a project estimated to be $ 300000. This project Alterations & additions to existing hotel. To include internal refurbishment to nightclub & additional amenities area. Click for more details...

ERNEST HENRY COPPER/GOLD OPERATIONS
Mining (Open Cut) project at East of, Cloncurry, QLD 4824 of Minesite - Resource Definition Drilling type of New development. Open pit copper-gold resources have increased by 32 million tonnes to 120 million tonnes. A new underground copper/gold resource of 5 million tonnes has also been established. Click for more details...

TEMPO - MIXED DEVELOPMENT
Commercial Premises (Commercial complexes - shops, offices) project at 12-26 (Lots 26-30) Donkin St 8-20A (Lot 1 & Lots 21-24) Anthony St 225 (Lot 2) Montague Rd RP 10760, RP 89736, SL 11593, RP 8973, West End, QLD 4101 for New. Construction of 5 storey office building (building 4) with 18 tenancies. Pre-cast concrete panels, dark glazing, lightweight spandrels, metal cladding. Basement parking for 21 cars. Click for more details...

ERROMANGO DRIVE UNITS
Currently at the Construction stage In Whitsunday Regional is a project estimated to be $ 900000. This project Construction of 6 units (73.21 sqm each) & 4 units (129.8 sqm each). Associated parking & landscaping. Click for more details...

CITYPORT - NORTH PROJECT
Cityport - North Project is currently at the Construction stage, valued at about $ 36000000 it is Stage 1 - Reef Fleet Plaza & Reef Fleet Terminal at the end of Spence St - providing places for all reef day tour operators & bus car park; drop-off point & retail facility. More berths also to be created at Marlin Jetty inside & outside newly installed wave barrier. Stage 2 - Spence St extended right through to Reef Fleet Terminal. A pedestrian promenade to eventually join up with Cityport South will go from waterfront side of The Pier Marketplace. Current car park in front of The Pier will be reconfigured to yield another 50 spaces. Stage 3 - development of a combined aquatic facility on reclaimed land north of The Pier Marketplace. Click for more details...

ENERGEX - BDS - BEAUDESERT SUBSTATION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at ., Beaudesert, QLD 4285 for New. Concrete basement for prefabricated building, associated earthworks, roadworks & civil works. Contract period 20 weeks approx. Click for more details...

AUSTRALIAN SUGAR INDUSTRY MUSEUM
Australian Sugar Industry Museum is currently at the Construction stage, valued at about $ 400000 it is Refurbishment of existing building. To include refurbishment of picture theatre to art gallery, cafe (100sq m) & shop. Landscaping. Click for more details...

TOLLINGTON ROAD UNITS DOUBLE ENTRY REFER PROJECT ID 4195710
Residential (Units, apartments, flats, townhouses, villas) project at 81 Tollington Rd, Bowen, QLD 4805 of Townhouses (5) - 2 Storey type of New development. Proposed construction of 5 townhouses in 5 separate buildings. Associated landscaping and parking. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

GOLD COAST HINTERLAND GREAT WALK
A project in the QLD Within Gold Coast City. Proposed construction & upgrade of facilities, within Lamington National Park, Springbrook National Park, Numinbah Forest Reserve, Gold Coast City Council Conservation Reserve & other associated areas. Click for more details...

PASHEN STREET TOWNHOUSES
A project in the QLD Within Brisbane City. Construction of 5 x 3 bedroom townhouses in 2 separate buildings. Rendered concrete block, weatherboard cladding, timber batten screens, metal roof. Garages. Associated landscaping. Click for more details...

STYX BASIN COAL PROJECT
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. 14m aggregate seams outlined during recent coal seam gas exploration, high head values of 34kj/kg swell to 7 1/2, prospective belt is 3km wide 20km long on the west side of the basin. Target is open cut and underground coking coal. Click for more details...

DEPARTMENT OF DEFENCE WESTERN STREET DEPOT
Military (Military installations & facilities) project In The Rockhampton Regional Council Area of Combined Exercise/Training Support Base type. Work to include: Upgrade of site connection & reticulation of mains power, water sewerage, fire, gas & communication trunk services. Construction of new light & heavy vehicles access points, road pavement, sealed & unsealed hardstands and pedestrian access. Additional tented accommodation areas in 500 person groups & a lesser amount of accommodation in permanent barracks buildings/self-contained accommodation. Camp support facilities - kitchens, laundries, ablutions, dining shelters, multipurpose training/administrative buildings. Directing & co-ordination facilities & communication infrastructure. Fencing & lighting. Aid Post (RAP) building & sports field & amenity facilities. Click for more details...

DICKENSON STREET APARTMENTS
Residential (Units, apartments, flats, townhouses, villas) project at 99-103 Dickenson Street, Carina, QLD 4152 for New. Construction of 4 X 1 and 8 X 2 Bedroom Apartments. Click for more details...

FORT FLINDERS ESTATE RESIDENTIAL SUBDIVISION STAGE 2
Currently at the Construction stage In Ipswich City is a project estimated to be $ 3600000. This project Reconfiguration into 45 residential lots, 1 drainage reserve, 3.059ha area, 0.187ha open space & 598m of new road. Click for more details...

MIDDLEMOUNT COAL OPERATIONS - STAGE 2 EXPANSION
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Isaac Regional Council Area of Operating Mine - Expansion type. A pulverised coal injection (PCI) & coking coal open cut mine based on an estimated resource of 122.6million tonnes (Mt). The stage 2 expansion project to increase production from 1.8million tonnes per year (Mtpa) to 5.4Mtpa of run-of-mine (RoM) coal for 23 years. Removal of overburden & coal to continue by conventional truck, shovel & excavator. To includes a 30kL/day package potable water treatment plant (WTP), a sewage treatment plant (STP), the 650m x 200m go line area (including office, crib facility, amenities, kitchen/dining area), flood protection levees & diversion of Roper Creek & Thirteen Mile Gully. Later upgrading of feed conveyors, coal stackers, screens, valves & control systems of the existing coal handling & preparation plant (CHPP) to increase capacity from 400 to 700 tonnes per hour (t/h) for 4Mt/y product coal. Extension of the existing vehicle workshop to include 4 additional covered & 2 outdoor bays with aprons. Additional 600,00l diesel & 1.2ML fuel storage facilities. Associated out-of-pit spoil dumps & additional haul/access roads. Possibility of a dragline & associated 200m x 200m construction pad. Later diversion of part of the Bingegang (Saraji) pipeline. Some of the additional 397 operational personnel expected to be accommodated in an extension to The MAC Middlemount village. Click for more details...

BRUCE HIGHTWAY ROADWORKS
Bruce Hightway Roadworks is currently at the Tenders & Building stage, valued at about $ 1000000 it is Supply & lay asphalt overlay of approximately 10 km in two section on the Bruce Highway between Bowen & Ayr. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - QUARRY MATERIALS
Quarry Materials - Supply project at Various locations, ., QLD 4999 in the Non-Construction Items (Supply/fabrication). Supply of quarry materials for earthworks & road works associated with the APLNG pipeline. Locations include: Miles, Wandoan, Lighthouse, Fairview, Cockatoo, Mungungal, Biloela/Callide, Mt Larcom & Gladstone. Click for more details...

WARREGO HIGHWAY (TOOWOOMBA-OAKEY) UPGRADE STAGE 1 PROJECT 265/18B/4
Roadworks - Upgrade - Stage 1 project at Warrego Hwy (Nugent Pinch Rd Torrington to, Charlton, QLD 4350 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). To include duplication of the Warrego Highway between approx chainage 8.2km & approx chainage 13.9km. Realign Charlton Pinch Road to Gowrie Junction Road Intersection to create a four-way intersection. Includes installation of traffic signals. Construction of grade separated intersection at Troys Road (Charlton Connection Road). Upgrade of existing heavy vehicle break down area at chainage 11.5km Right hand side. Construction of four-lane/four-way signalised intersection at O'Mara's & Steger Road. Installation of road lighting, landscaping & drainage work. Click for more details...

COMPTON VISTA OFFICE PARK CIVIL WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Brisbane City Council Area of Private ownership. Civil works for building pads, retaining walls and services. Click for more details...

KYABRA STREET UNITS
Units (48) - 8 Storey project at 6-8 Kyabra St (Lot 5 RP 130185), Newstead, QLD 4006 In The Council Area Of Brisbane City of Private. Removal/demolition of existing building. Construction of 8 storey residential building to include 48 units & 50sq m office tenancy on ground floor. Lift. 3 levels basement car parking for 54 cars. Associated landscaping. Click for more details...

BEENLEIGH ROAD 38 LOT SUBDIVISION STAGE 3
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at 1537 Beenleigh Rd, Kuraby, QLD 4112. Reconfiguration into 38 lots. Average size lots 450sq m - 500sq m. Construction of new road. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

THE VALE ESTATE SUBDIVISION STAGE 6
Residential Subdivision (35) Lots - Stage 6 project at 43-67 & 125 Gardiner Rd & 284, 288, 290, 292, 298, 308 & 316 Tallangandra Rd, Holmview, QLD 4207 In The Council Area Of Logan City of Private. Reconfiguration into 35 lots. Construction of new road. Click for more details...

NORTHLINE DISTRIBUTION WAREHOUSES
91 Smith St (Part Lot 1 SP 210914), Redbank, QLD 4301 Has Northline Distribution Warehouses currently at Construction stage. Construction of Distribution Centre for Northline. Building B (5050sq m) - 2 storey industrial building with warehouse & ancillary office. To include canteen & outdoor recreation area Building C (5020sq m) - 2 storey warehouse. 2010sq m breeze way connecting Buildings B & C. Building A (10828sq m) - Separate 2 storey industrial building for lease. with warehouse & ancillary office space. To include canteen & outdoor recreation area. Pre-cast concrete panels, metal sheet cladding, metal roller doors, steel framed awnings, horizontal sunshades, powdercoated aluminium framed glazing, steel framed metal roof. Parking for 126 cars. Concrete hardstand area. Associated landscaping. Click for more details...

PARK ROAD TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project In The Brisbane City Council Area of Private ownership. Retention of 2 existing dwellings. Construction of 4 x 3 bedroom 2 bathroom attached townhouses. Weatherboard cladding, timber balustrade, metal roof. Garages. Associated landscaping. Click for more details...

BALMORAL STATE HIGH SCHOOL TRADE TRAINING CENTRE
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a trade training centre. To include construction of a new facility with a focused theory area for engineering, furnishing & construction. Kitchenette/staffroom & amenities. New facility to include a small theory room, amenities & gantry. The refurbishment of an existing facility to provide construction & engineering workshop. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

COLLINGWOOD DRIVE & EAGLE STREET TRAFFIC SIGNALISATION
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) New project at Collingwood Dr & Eagle St, Collingwood Park, QLD 4301. This type is Signalisation with Local Govt ownership. Design & installation of traffic signalisation at the T intersection of Collingwood Drive & Eagle Street. Design to include concrete footpath & linemarkings. Installation of traffic signalisation, concrete foothpathing & linemarking. Click for more details...

CAIRNS REGIONAL COUNCIL SEWAGE PUMP STATION J UPGRADE
A project in the QLD Within Cairns Regional. Construction of works associated with the upgrade of the existing Sewerage Pump Station J located within Munro Martin Park on the corner of Grafton Street & Minnie Street. To include construction of a new 560OD PN16 PE100 rising main. Click for more details...

TOORBUL CARAVAN PARK SEWAGE TREATMENT SYSTEM UPGRADE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at 119 Esplanade South, Donnybrook, QLD 4510. Design & construction of upgrade to sewage treatment system at Toorbul Caravan Park. To include new on-site treatment plant. Rehabilitation of effluent irrigation area. Development of irrigation areas on the Toorbul Esplanade. Rehabilitation of sewerage collection system & sullage pits. Replacement of portable toilet discharge unit. Associated mechanical, electrical & civil works. Environmental rehabilitation. Click for more details...

PUMA SERVICE STATION CONVERSION
Renovations, Refurbishments etc. project of Industrial (Service stations) project at 509 Sandgate Rd, Clayfield, QLD 4011. Conversion of Matilda service station into Puma service station. To include new fuel pumps & canopy. New signage. External refurbishment to service station building. Associated landscaping. Click for more details...

LOCKYER VALLEY DISTRICT HIGH SCHOOL CLASSROOMS
Education (Schools - primary, secondary (up to Yr 12)) project at 100 William St, Gatton, QLD 4343 of Classrooms (7)/Staff Room type of New development. Construction of 7 General Learning Areas & upgrade of the staffroom at Lockyer District High School. Click for more details...

MACKAY HARBOUR ROAD EAST UPGRADE
Mackay Harbour Rd East, Mackay Harbour, QLD 4740 Has Mackay Harbour Road East Upgrade currently at Construction stage. Upgrade of Mackay Harbour Road East Road & intersection. To include adjustment of road & intersection geometry, reconstruction of existing pavements, modification of existing & installation of new concrete structures (driveways & kerbing), upgrade/replacement of existing street lighting, general earthworks & landscaping. Associated civil works. Click for more details...

SIR SAMUEL GRIFFIN DRIVE GUARDRAIL UPGRADE
Sir Samuel Griffith Dr, Mount Coot-Tha, QLD 4066 Has Sir Samuel Griffin Drive Guardrail Upgrade currently at Construction stage. Guardrail improvements along Sir Samuel Griffith Drive, Mount Coot-tha between the Simpsons Road intersection & the Summit Roundabout. Works to include extending sections of existing guardrail, replacement of damaged guardrail, removal of existing & installation of new end terminals & the installation of rub rails to all new & existing sections of guardrail. Click for more details...

LORENA JOINT VENTURE GOLD OPERATIONS RECOMMENCEMENT - MOBILE MINERAL PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. For the supply, commissioning & operation of a mobile mineral processing plant. Units to be constructed off-site & transported to site fully commissioned. Click for more details...

BOUNDARY STREET SERVICE STATION & RETAIL WAREHOUSE - STAGES 1 - 2
Industrial (Warehouses, cargo sheds, distribution centres) project for New development. Proposed construction of service station & retail warehouse in 2 stages. Stage 1 - Service station (212sq m) to include ancillary convenience shop, service yard, loading zone, covered petrol bowser area & 3 underground fuel storage tanks. Stage 2 - To include retail warehouse building 500sq m. Car parking for 30 vehicles. Associated landscaping. Click for more details...

NELLY BAY EAST CARDINAL BEACON REPLACEMENT
Currently at the Construction stage In Townsville City is a project estimated to be $ 163000. This project Nelly Bay East Cardinal Beacon Replacement. To include supply & fabricate 356mm x 12.7mm thick mild steel pile, transport pile & beacon components to work site, remove &dispose of the existing pile which consists of the lamp stand, ladder sections & ladder clamps, handle, pitch & drive 356 mm diameter pile, supply, fabricate & galvanize pile cap, cut pile & install weld-on pile cap, supply & install protection system supply, fabricate & install 1400 mm diameter work platform, supply, fabricate & install galvanized steel ladder, supply all fasteners & all bolt insulation products, supply a registered Surveyor to set out replacement beacon position. Associated works. Click for more details...

GYMPIE CIVIC CENTRE HERITAGE THEATRE
Local Govt ownership Entertainment (Theatres, Cinemas) project In The Gympie Regional Council Area for New development. Design, supply & installation of audio & visual services upgrade for the Heritage Theatre at Gympie Civic Centre. Audio system to include digital mixing desk, effects unit, stage boxes, amplifiers, speakers, cabling, microphones & receivers. Theatrical lighting to include DMX distribution, light fittings, new lighting desk. Associated works. Click for more details...

PEACE LUTHERAN COLLEGE PERFORMING ARTS CENTRE
Education (Schools - primary, secondary (up to Yr 12)) project at 60 Cowley St, Kamerunga, QLD 4870 for New. Construction of a new performing arts centre at Peace Lutheran College, Kamerunga. Associated site works & landscaping. Click for more details...

STONE RIDGE ESTATE SUBDIVISION STAGE 13
Civil Engineering (Residential Subdivision) project for New development. Reconfiguration into 30 lots. Average size lots ranging from 300sq m - 900sq m. Construction of road. Click for more details...

PARMAC 7 ELEVEN SERVICE STATION EVERTON HILLS
New project of Hospitality (Take-away Outlets) project at 997-1003 South Pine Rd (Lots 16-17 SP256503 & Lot 9 SP256501), Everton Hills, QLD 4053. Construction of 183sq m service station & 135sq m food & drink outlet (7 eleven). Concrete tilt up panels, ladder bracket, eaves gutter, directional signage, bollard, vehicle barrier, fence, bike rack, aluminium capping, gates, poster holder, aluminium framed glazed, metal deck roof, shade screening, blade signage wall, aluminium screen & canopy. Car parking for 14 vehicles to include 12 car parking & 2 accessible car parking. 284sq m landscaping. Click for more details...

GYMPIE & SOUTH BURNETT REGIONAL COUNCIL AREAS
Asphalt Resurfacing project at various locations in the Gympie and South Burnett Regional Council Areas, Gympie, QLD 4570 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). 2016/17 Asphalt Resurfacing on Various State Controlled Roads in Gympie and South Burnett Regional Council Areas. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect