State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Athletic Tracks Projects in TAS®ion=⊂=1411 in region


BRIDGE MAINTENANCE PAINTING 2002/2003
Bridge Maintenance Painting New project In The Various Council Area. Preparation & painting of structural steelwork, steel fences and/or light standards on nine (9) structures. All of these structures are presently coated with non-lead paint system. Click for more details...

SOUTH ARM ROAD WAREHOUSE
Warehouse - Extension Addition project In The Clarence Council Area. Addition to warehouse. Click for more details...

MIDLAND HIGHWAY JUNCTION IMPROVEMENTS
A project in the TAS Within Southern Midlands. Dedicated right turn lane with left turn deceleration lane. Click for more details...

DERWENT WATERS RESIDENTIAL CLUB
Private ownership Aged Care & Retired Developments (Retirement villages) project In The Glenorchy Council Area for Renovations, Refurbishments etc. development. Construction of approximately 15 independent living units. Masonry construction, tiled roof, concrete floors and aluminium windows. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project at Exeter WWTP/Exeter Golf Course, Exeter, TAS 7275. This type is Pipeline & Pump Station Construction with Local Govt ownership. Construction of pipeline & pump station. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

ROKEBY/TRANMERE SEWERAGE SCHEME
Trunk Mains & Foreshore Reticulation New project In The Clarence Council Area. Supply of all materials & construction of trunk main pipework comprising approx 1200 m of dual 225 mm, 250 mm & 300 mm dia uPVc pipework & associated works. Click for more details...

ROOKE STREET MALL REDEVELOPMENT - STAGE 2
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Rooke Street, Devonport, TAS 7310 for New. Redevelopment of Rooke Street mall, works include paving, street furniture, lighting and landscaping. Click for more details...

AVEBURY NICKEL PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at West of, Zeehan, TAS 7469 of Decline Development type of New development. The decline tunnel has a length in excess of 1,200metres and will access the upper sections of the Viking deposit. Detailed drilling will be carried out from the decline to evaluate the nickel mineralisation. The decline will also provide access to the higher grade upper sections for any early production. Click for more details...

BEACONSFIELD GOLD MINE JV - RESOURCE
5 West St, Beaconsfield, TAS 7270 Has Beaconsfield Gold Mine Jv - Resource currently at Exploration, Drilling, Survey & Assessment stage. An extensive RC drilling program is to target the North Please Creek tenements. UP to 20 RC holes to a depth of 200 metres will be drilled. Exploration is being undertaken in the area surrounding Beaconsfield mine. Two recent RC holes cut 0.8g/t gold over 35 metres, including 5.3g/t gold over 2 metres from 52 metres (hole BFRC17), and anomalous gold within the Johnsons Creek fault (hole BFRC18). Click for more details...

BEACONSFIELD NICKEL/CHROMITE PROJECT - RESOURCE
Private ownership Mining (Open Cut) project In The West Tamar Council Area for New development. This licence covers 34 square kilometres and covers defined nickel and cobalt laterite deposits and extensive chromite occurrences. Click for more details...

HUON HIGHWAY TRUCK & FUEL DEPOTS & LANDSCAPE SUPPLIES
Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) New project at 2896 Huon Hwy, Huonville, TAS 7109. This type is Truck Depot/Fuel Depot & Landscape Supplies with Private ownership. Construction of truck depot, fuel depot and landscape supplies business. Click for more details...

GET SMART HOMES HOUSING PROJECT
10-11 Hensby Ct, Ulverstone, TAS 7315 Has Get Smart Homes Housing Project currently at Planning stage. Construction of two x two bedroom units and four x one bedroom units. Brick veneer, metal roof, concrete floors, aluminium windows, carports and associated works. Click for more details...

OCEANA DRIVE UNITS
Lots 54 & 56, 636 & 638 Oceana Dr, Tranmere, TAS 7018 Has Oceana Drive Units currently at Construction stage. Construction of 3 bedroom, 2-storey units constructed of reinforced concrete, brick work, aluminium windows, metal roof, concrete and timber floors. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining (Open Cut) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

SAVOY PLACE MULTIPLE DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 3 Savoy Place, Youngtown, TAS 7249 of Dwellings (2) type of New development. Construction of two dwellings. Click for more details...

THE SWANSEA BARREL
Commercial Premises (Offices) project In The Glamorgan-Spring Bay Council Area of Private ownership. Partial demolition, alterations and additions to existing premises to provide cafe, wine bar, bottle shop and offices. Click for more details...

MONTAGU STREET WAREHOUSE
Warehouse New project In The Launceston Council Area. Metal cladding walls and roof, concrete floor and steel frame. Click for more details...

AURORA SPORTS STADIUM
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for New development. Construction of new indoor stadium, kitchen, change rooms, first aid area, child care area, amenities, disabled access and associated linkway. Precast concrete tilt panel, metal roof, timber and glazed areas. Click for more details...

HOBART AIRPORT HOTEL
Hospitality (Hotels, Serviced Apartments) project In The Clarence Council Area of Private ownership. Construction of a 78 bedroom hotel with reception, kitchen, function rooms and public amenities. Lightweight construction, steel frame, metal roof, concrete and timber floors. Click for more details...

ST JAMES' COLLEGE - BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at 25 Mary St, Cygnet, TAS 7112 for Renovations, Refurbishments etc.. Refurbishment and extension of the administration building. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Lyell Council Area of Private ownership. A 3 year contract commencing 1 October 2010 for the ongoing operations at My Lyell Mine which is expected to produce 2.7million tonnes per annum approx of ore by 250m development per month. To include mine development comprising decline & level development at variable grades (drill, blast, ground support, load, haul & dump or ore/waste); ore production (drill, blast, load, haul & dump of the stope ore); crushing & conveying of the ore from the primary crusher to the skip loading station plus dewatering from underground working areas to the settlers on 1780 level. Click for more details...

ESKLEIGH HOME
Scone Dr, Perth, TAS 7300 Has Eskleigh Home currently at Construction stage. Extension to the existing facility to provide four nursing home bedrooms. Brick veneer, metal roof, concrete floor and aluminium windows. Click for more details...

MORNINGTON ROAD WAREHOUSE
Warehouse New project In The Clarence Council Area. Construction of a warehouse. Click for more details...

ELIZABETH STREET COMMERCIAL/RESIDENTIAL DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project at 285 Elizabeth St, Hobart, TAS 7000 of Retail/Restaurant And Residential Development type of New development. Demolition and redevelopment for supermarket restaurant/take away food shop/shop, 6 flats, parking spaces and bike racks. Click for more details...

BARTON ROAD BRIDGE NO 3415
Barton Rd, Epping Forest, TAS 7211 Has Barton Road Bridge No 3415 currently at Construction stage. Design, documentation and construction of a new bridge across the Macquarie River on Barton Road 10.5 klms west of Epping Forest. The existing timber bridge is to be replaced with a permanent structure. Click for more details...

ROYAL GEORGE BRIDGE NO 1009
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Break O'Day Council Area of Bridge Replacement type. Design, documentation and construction of a new bridge across the Rockhouse Creek on Royal George Road, 2.8 klms west of Royal George. The existing timber bridge is to be replaced with a permanent structure. Click for more details...

RENSION BELL TIN OPERATIONS - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) New project at 15km northeast of, Zeehan, TAS 7469. This type is Decline Development/Underground Mining with Private ownership. A 3 year contract for underground mining. To include decline development of 6000m a year for 700,000tpa ore production. To utilise 3 development jumbos, 2 longhole rigs, 4 boggers & 3 trucks. Workforce of 130 personnel. Click for more details...

BELL BAY MAIN ROAD JUNCTION IMPROVEMENTS
A project in the TAS Within George Town. The works are located on the Bell Bay Main Road at the Temco Road junction and the Mobil Road junction. The works will upgrade these junctions to improve access by heavy vehicles, improve safety outcomes, improve transport efficiency and provide a consistent traffic environment along the road corridor. Click for more details...

NORTHBANK SILO REDEVELOPMENT
Private ownership Hospitality (Hotels, Serviced Apartments) project In The Launceston Council Area for New development. Redevelopment of the Kings Wharf grain silos into an 10 storey hotel with 79 rooms. Also to include a bar, café, restaurant, conference rooms, gym & a spacious atrium. The building extensions include a large promenade decking for outdoor dining. A pontoon will be built to moore pleasure boats. Materials include precast concrete panels, aluminium cladding, metal deck roof, aluminium windows and doors, steel frames, glazed lift shaft and glazed balustrades. Click for more details...

PENNY ROYAL GUNPOWDER MILL REDEVELOPMENT- STAGE 2
Penny Royal Gunpowder Mill Redevelopment- Stage 2 is currently at the Construction stage, valued at about $ 6000000 it is The redevelopment of the Penny Royal Gunpowder Mill to include the construction of 3 cafes/restaurants totalling 287sqm, a 160 sqm function room, a 115 sqm wine bar and 100 sqm distillery which will include retail, distillery and storage. Construction will also include an upgrade of the complex entry and pathways and alteration of the carpark. Click for more details...

TASSAL ROOKWOOD ROAD HATCHERY
New project of Industrial (Warehouses, cargo sheds, distribution centres) project at Rookwood Rd, Ranelagh, TAS 7109. Expansion to the existing Tassal facility. The new hatchery will be a metal clad building of approximately 90 m x 85 m and 7 metres tall at the apex. A second state of the art recirculating aquaculture system (RAC) will be constructed in the new building. The metal building will comprise extensive acoustic protection. Water used in the hatchery will be reused for agricultural irrigation. Click for more details...

CYGNET COAST ROAD TOURIST FACILITY DEVELOPMENT- STAGE 1
A project in the TAS Within Huon. Currently only stage 1 is in progress for a dwelling and a studio. Construction of a tourist facility comprising of 2 holiday cabins, 1 permanent and 1 temporary dwelling, a gallery/art studio and café. Click for more details...

BARNETT CLOSE DWELLINGS
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Break O'Day Council Area for New development. Construction of 5 dwellings consisting of 4 residential dwellings and 1 boatshed/recreational unit. Stormwater disposal, associated car parking spaces and onsite waste water management. Click for more details...

SCAMANDER AVENUE MIXED USE DEVELOPMENT
94 Scamander Av, Scamander, TAS 7215 Has Scamander Avenue Mixed Use Development currently at Construction stage. Construction of a mixed use development consisting of retail shops and 1 dwelling. Works include design and construction of associated carparking, including loading/unloading vehicle areas, signage design, character and form, and provision of infrastructure - general, as well as road/rail infratstructure. Click for more details...

WEST TAMAR SPRAY AND ASPHALT RESEALS PROGRAM 2015/16
Road Works New project In The West Tamar Council Area. Resealing program for 2015/16 works include: · 10 mm Spray reseal 37,319 sq m · 25 mm AC7 asphalt seal 6,890 sq m · Machine profiling for 25 mm asphalt seals 1164 sq m · 40 mm AC10 asphalt seals 1356 sq m · Asphalt for correction of surface shape (provisional quantity) 50 tonne Click for more details...

HOWRAH BOWLS CLUB INDOOR BOWLS FACILITY STAGE 1
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) New project at 11 Howrah Rd, Tranmere, TAS 7018. This type is Indoor Bowls Facility - Stage 1 with Local Govt ownership. Construction of Stage 1 of the Indoor Bowls Facility at the Howrah Bowls Club located at 11 Howrah Road, Tranmere. This project is an indoor bowls building of 2,054 sq metres, 49.5m by 41.5m, with pre-cast concrete wall panels. Click for more details...

ENCHANTED WALK PEDESTRIAN BRIDGE
Enchanted Walk Pedestrian Bridge is currently at the Construction stage, valued at about $ 63000 it is Parks and Wildlife Service is seeking quotation submissions from suitably qualified and experienced contractors to remove and replace the Enchanted Walk Pedestrian Bridge at Cradle Mountain. Click for more details...

SWANSTON BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Design and construction of a new single lane bridge or culvert on Swanston Road where it crosses the Little Swanport River to replace existing timber bridge. Click for more details...

NEW NORFOLK PRIMARY SCHOOL
Renovations, Refurbishments etc. project of Education (Schools - primary, secondary (up to Yr 12)) project at 8 Pioneer Av, New Norfolk, TAS 7140. Refurbishment of the New Norfolk Primary School to accommodate a one-room Kindergarten on the main campus. Click for more details...

MARC BRIQUETTE WAREHOUSE
Warehouse project at 44 Industrial Dr, Ulverstone, TAS 7315 in the Industrial (Warehouses, cargo sheds, distribution centres). Warehouse update for Marc Briquette including installation of a Silo and associated works. Click for more details...

GILMONT CLOSE DWELLINGS
A project in the TAS Within Launceston. Construction of 3 single storey dwellings comprising of 2 bedrooms. Materials include colorbond folded metal, roof cladding, glazing, face brick work, aluminium windows, panel lift doors & timber deck. Car parking for 6 cars. Associated landscaping. Click for more details...

GOLDEN FLEECE RIVULET & ARGONAUT ROAD BRIDGE NO 1941
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Break O'Day Council Area of Bridgeworks - Replacement type. Replacement of bridge No. 1941 to a new 34m long two-lane concrete bridge to include re-alignment on the downstream side of the existing 43m long single-lane timber bridge. Precast wingwall, precast concrete wind wall, precast pier panels & precast sheathing panel. Click for more details...

BASS HIGHWAY CAFE
A project in the TAS Within Waratah-Wynyard. Construction of a cafe, upgrade of existing roadside flower stall & vegetable stall. Materials to be used include wall cladding & selected stained glass window. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Renovations, Refurbishments etc. project of Aged Care & Retired Developments (Aged units, seniors units) project at 55 and 75 Gordons Hill Rd, Lindisfarne, TAS 7015. Modifications to six existing single bedroom units to make four double bedroom units at Fairway Rise Lifestyle Village. Click for more details...

JAPARA HEALTH CARE AGED CARE FACILITY
Addition project of Aged Care & Retired Developments (Aged care facilities) project at 58A & 58B Cormiston Rd, Riverside, TAS 7250. Construction of 15 bed, 3 storey addition to currently under construction 75 bed residential aged care. Construction of 10 extra car parks. Materials include concrete, timber cladding, stone cladding, glazing & metal sheet cladding. Associated Landscaping Click for more details...

HUON VALLEY COUNCIL ANNUAL TENDERS 2016/17
Currently at the Construction stage In Huon is a project estimated to be $ 200000. This project Exclusive Tender for Pavement Stabilisation on Selected Roads 2016-2017 Click for more details...

TOLLARD DRIVE SAFETY IMPROVEMENT UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Works to include the improvement of Tollard Court south access, provision of intersection turning lanes, channelisation of traffic lanes, removal of parking on western side, removal of kerb bulbs to improve road safett & the provision of cycle ways on both sides of the road. Click for more details...

WAIMEA HEIGHTS PRIMARY SCHOOL
A project in the TAS Within Hobart. Construction two general learning areas. Click for more details...

BELLEVALE ROAD BRIDGE
Bellevale Road Bridge is currently at the Construction stage, valued at about $ 700000 it is Works to include design & reconstruction of a bridge on Bellevale Road over the Jordan River. Click for more details...

BELLERIVE PRIMARY SCHOOL
Currently at the Construction stage In Clarence is a project estimated to be $ 396000. This project Works to include the construction of new amenities at Bellerive Primary School. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect