State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Backpacker Accommodation Projects in TAS®ion=⊂=313 in region


BITUMEN SURFACING CONTRACT
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various Locations, Municipality of, Waratah, TAS 7321. The contract comprises three separable portions, including spray seals, asphalt (including supply only of asphalt) and bituminous slurry seals. The contract also includes modified bitumen, and works associated with surface preparation. Click for more details...

COUNTRY CLUB CASINO - WATER GARDEN DEVELOPMENT
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project for Addition development. New gaming rooms & bar areas, concrete walls & floor, tiled roof. Click for more details...

LEGANA WWTP - EFFLUENT RE-USE SCHEME
Legana Wwtp - Effluent Re-Use Scheme is currently at the Construction stage, valued at about $ 202000 it is Supply & installation of an irrigation system. The works comprise the supply & installation of pumps, pipework, centre pivot irrigator & associated electrics to irrigate an area of about 50 hectares. Click for more details...

ABC LAUNCESTON
Commercial Premises (Offices) project In The Launceston Council Area of Offices & Studio Refurbishment type. Internal refurbishment to office, public spaces & radio station. Click for more details...

LILYDALE-SCOTTSDALE BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Launceston Council Area of Bridge Replacement (5) - Design & Construction type. Design and construction of four bridges north of Lilydale and one at Little Forester River. Demolition of existing timber bridge and construction of new concrete structure. Click for more details...

PUMP STATION NO 9 BYPASS PIPELINE
New project of Public Utilities (Water distribution systems, Drainage) project at Leven River, Ulverstone, TAS 7315. Construction of approximately one (1) klm of HDPE pipeline under the Leven River from Simplot (Mason Street, Ulverstone) via the Coastal Reserve to the Bass Highway Bridge. Click for more details...

WINSTEAD ROAD JUNCTION ROADWORKS
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Brighton Council Area for New development. Construction of dedicated right turn lane & left turn deceleration lane. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Public Utilities (Pumping Stations) New project at Exeter WWTP/Exeter Golf Course, Exeter, TAS 7275. This type is Pipeline & Pump Station Construction with Local Govt ownership. Construction of pipeline & pump station. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

CENTRELINK DEVONPORT
Commercial Premises (Offices) project In The Devonport Council Area of State ownership. Internal alterations to existing office. Click for more details...

COLLINSVALE LAGOON CONSTRUCTION
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Glenorchy Council Area for New development. The works consist of a lagoon approximately 50m x 50m with an earthern embankment 2m high and associated pipe works, access road and fencing. Click for more details...

HENTY GOLD OPERATIONS - MOUNT JULIA
Exploration Decline/Ramp Decline New project In The Zeehan Council Area. 15,000 -16,000 metres. It is anticipated that it will take 12 months approx to reach Mount Julia. Click for more details...

CENTRAL COAST COUNCIL OFFICES UPGRADE
Commercial Premises (Offices) project In The Ulverstone Council Area of Lift For Administrative Centre type. Supply & installation of hydraulic lift. Click for more details...

NORTH TERRACE RESTUARANTS
Private ownership Hospitality (Restaurants, Canteens) project In The Burnie Council Area for Addition development. Extensions and alterations to existing community building and for the purpose of two restaurants with boundary line variation and relaxation to car parking. Click for more details...

QUEECHY SEWAGE PUMPING STATION
Currently at the Construction stage In Launceston is a project estimated to be $ 3400000. This project The scope of works under this contract includes the supply, delivery and installation of all materials and equipment for the construction of a new sewage pumping station and covered storage that will pump flow (via a new rising main) to Hoblers Bridge Wastewater Treatment Plant. The pumping station and covered storage will include a below ground circular concrete structure divided into multiple chambers, installation of inlet and outlet pipework, three 22kw (approximate) variable speed pumps, pumping equipment, control systems, flushing systems, mechanical ventilation and an architecturally designed above ground control building. Two DN 375 Ductile iron cement lined, rubber ring, jointed PN 35 pipelines installed below ground and two 450 OD, PE 100, PN 10 butt fusion welded pipelines installed below ground surface that connect to a new PE rising main (installed under separate contract) to the existing Norwood Rising Main. A flowmeter and valve pit complete with two electromagnetic flow meters, actuated valves and control systems. Upgrading power supply and water supply to the site. A new access road to the pumping station. Significant earthworks and rock retaining walls. Landscaping of the site. Decommissioning of the existing pumping station and associated infrastructure and the existing open storage basin. Click for more details...

CO-OP MOTORS
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 267 Argyle Street, Hobart, TAS 7000 for New. Construction of 2 levels of concrete car parking deck. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

CAMBRIDGE STREET UNITS
Cambridge Street Units is currently at the Construction stage, valued at about $ 400000 it is Construction of three units, brick veneer, metal roof and concrete floors. Click for more details...

KING ISLAND SCHEELITE PROJECT - ELECTRICAL FOR PROCESSING FACILITY
Mining - Subcontracts (Electrical installation) New project at Near, Grassy, TAS 7256. This type is Electrical - For Processing Facility with Private ownership. For the provision of electrical installation for the processing facility. Click for more details...

THE ICON COMPLEX (FORMER MYER SITE) - STAGE 2
Hospitality (Restaurants, Canteens) project In The Hobart Council Area of Private ownership. Stage 2. To comprise a 3-level building fronting on Murray Street. Basement level and ground and level 1 specialty retail. Levels 2 and 3 will also be part of the Myer Store. Concrete construction. Click for more details...

LEGANA CHICKENFEED STORE
Private ownership Retail (Shops, shopping centres & arcades, supermarkets) project In The West Tamar Council Area for New development. Construction of a shop with variation of car parking requirements. Precast concrete and lightweight construction, metal roof and concrete floor. Click for more details...

MAC 01 HOTEL DEVELOPMENT
New project of Retail (Shops, shopping centres & arcades, supermarkets) project at Macquarie Wharf, Hunter St, Hobart, TAS 7000. Redevelopment of former wharf building into a 114 room hotel over three levels, with 3000 square metres of retail space for restaurant, cafes, a provedore with waterfront decking, gallery and an amphitheatre. A contemporary structure with feature steelwork and glazing. Click for more details...

SIW REGIONAL DISTRIBUTION CENTRE
A project in the TAS Within Northern Midlands. The new Launceston distribution centre will consolidate Statewide Independent Wholesalers four existing Tasmanian centres at Prospect, Breadalbane, Devonport and Hobart and will service more than 200 supermarkets and convenience stores across the state. Precast concrete walls, metal clad walls and roof, concrete slab floor and insulated panels. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

HORSHAM ROAD MULTIPLE DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 15 and 17 Horsham Road, Oakdowns, TAS 7019 for New. Construction of eleven multiple dwellings. Click for more details...

FORTH RIVER IRRIGATION SCHEME
Irrigation Scheme project at From FORTH to, Sheffield, TAS 7306 In The Council Area Of Kentish of State. The new irrigation scheme will deliver 19,000 ML p.a. to the communities of Forth, North Motton, Abbotsham, Sprent, Kindred, Melrose, Lower Barrington, Barrington and Sheffield with a irrigable area of 12,000 ha. Click for more details...

UTAS INSTITUTE FOR MARINE AND ANTARCTIC STUDIES BUILDING
Imas Building New project In The Hobart Council Area. Construction of an education and research facility. Concrete structure, metal roof and concrete floors. Click for more details...

CYGNET POLICE STATION
Police Station And Residence project at 71 Mary St, Cygnet, TAS 7112 In The Council Area Of Huon of State. Design and construction of a new police station and four bedroom residence including the demolition and removal of the existing police station. Click for more details...

KINGSTON VIEW DRIVE REALIGNMENT/KINGBOROUGH SPORTS CENTRE CAR PARKING
Road Works & Car Parking project at Kingston View Dr, Kingston, TAS 7050 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construction of the road realignment of Kingston View Drive and additional carparking at the Kingborough Sports Centre. Click for more details...

DELORAINE WASTEWATER TREATMENT PLANT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at ., Deloraine, TAS 7304. This type is Bulk Earthworks - Stage 1 with State ownership. This contract comprises the first stage of major upgrading work at the Deloraine Wastewater Treatment Plant. The contract includes the supply, placement, compaction and trimming of over 18,000 cubic metres of bulk fill material, the construction of open drains and site landscaping. Click for more details...

SULLIVANS COVE (HOBART) PUBLIC BERTHING FACILITY
Public Berthing Facility project at Elizabeth Street Pier, Hobart, TAS 7000 In The Council Area Of Hobart of State. Design and construction of a floating berthing facility adjacent to Elizabeth Street Pier. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Aged Care & Retired Developments (Aged units, seniors units) project In The Clarence Council Area of Nursing Home And Apartments type. Construction of a ninety bed nursing home and twenty two independent living apartments (1 and 2 bedrooms). Fibre cement sheet cladding, compressed metal panels, brick veneer, metal roof, concrete floors and aluminium windows. Click for more details...

STATEWIDE PROPERTY MAINTENANCE TENDERS
Medical (Hospitals & associated buildings, mortuaries) New project at Various locations statewide, ., TAS 7999. This type is Mechanical Maintenance with State ownership. Provision of preventative, corrective and statutory maintenance to its property portfolio on a state-wide basis for a period of three years. Click for more details...

GLENORCHY COUNCIL PANEL OF SUPPLIERS FOR CIVIL CONSTRUCTION
Various locations, Glenorchy, TAS 7010 Has Glenorchy Council Panel Of Suppliers For Civil Construction currently at Tenders & Building stage. A panel of contractors required for the supply of general civil construction services to handle project overflow works, assisting in dealing with peaks in demand. Click for more details...

ST ALOYSIUS CATHOLIC COLLEGE SENIOR SCHOOL
Industrial (Light Industry (Laundries, printing works, textiles, clothing)) project for Addition development. Alterations to existing library & seminar rooms over single level to convert to workshops. New small extension for MDT - a digital facility for art & design. Click for more details...

HOBART INTERNATIONAL AIRPORT NORTHERN END UPGRADE STAGE 1
Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project for Addition development. Stage 1 of a 4 staged upgrade. Northern end upgrade to existing airport also extension to the terminal. Tunnel expansion, baggage area upgrade, with extended roofline over the baggage area, new toilets and facilities. Click for more details...

LENAH VALLEY MEDICAL CENTRE UPGRADE
Medical Centre - Addns & Altns New project In The Hobart Council Area. Alterations & Extension to Consulting Rooms & Car Parking at the existing Medical Centre. Click for more details...

UNITED PETROLEUM SERVICE STATION
40 Gordon St, Sorell, TAS 7172 Has United Petroleum Service Station currently at Construction stage. Demolition of the existing service station and construction of a new building and canopy with replacement of fuel pumps and forecourt paving. A Take-away food premise and convenience store will also be constructed. Click for more details...

ROAD SPECIFIC MAINTENANCE - PAVEMENT RESURFACING 2015/16 - SOUTH
Roadworks - Pavement Resurfacing project at Various locations throughout South Tasmania, Hobart, TAS 7000 In The Council Area Of Hobart of State. This contract involves Sprayed Bituminous and Asphalt Surfacings with associated Pavement Marking; delivery of Spring and Autumn Resurfacing Preparation work at nominated sites in the Southern Region of the State Road and National Highway networks. The proposed contract period is 10 months. Click for more details...

TABLE CAPE ROAD RESIDENTIAL SUBDIVISION
Table Cape Road Residential Subdivision is currently at the Construction stage, valued at about $ 550000 it is Residential subdivision of 10 lots & associated civil works. Click for more details...

RED CROSS HOBART BLOOD DONOR CENTRE
Currently at the Construction stage In Hobart is a project estimated to be $ 1500000. This project Refurbishment & fitout works to the Hobart Red Cross Blood Donor Centre. Click for more details...

HUDSON FYSH DRIVE SELF STORAGE UNITS
Self Storage Units (42)/Subdivision (2) Lots project at 7 Hudson Fysh Dr, Western Junction, TAS 7212 In The Council Area Of Northern Midlands of Private. Construction of a warehouse facility for the use of 42 self storage units. Administration foyer entrance with 2 office rooms and associated amenities. Associated industrial subdivision and civil works. Concrete wall panels and floors. Steel sheet roofing. Click for more details...

MIDLAND HIGHWAY SAFETY UPGRADE ? WHITE LAGOON TO MONA VALE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Northern Midlands Council Area of State ownership. Widening of existing Midland Highway to provide alternating lengths of "2+1" lane arrangements between the northern entrance to Tunbridge and Mona Vale Road Click for more details...

CHANNEL HIGHWAY DWELLINGS
Channel Highway Dwellings is currently at the Construction stage, valued at about $ 400000 it is Construction of 3 single storey dwellings. Face brick work, aluminium framed windows & doors and pitched tiled roofing. Shared paved driveway. Click for more details...

ST PATRICKS COLLEGE
Carpark - Redevelopment project at 282-284 Westbury Rd, Prospect Vale, TAS 7250 in the Education (Schools - primary, secondary (up to Yr 12)). Car park redevelopment at St Patricks College, Prospect Vale. Click for more details...

ADVENTURE BAY BOAT RAMP
Adventure Bay Boat Ramp is currently at the Construction stage, valued at about $ 150000 it is Overlay & extension of the East Cove Boat Ramp, at Adventure Bay, Bruny Island. Works includes but not limited to the installation of an approximately 21 metre long by 4 metre wide by 150 mm thick concrete overlay to the existing concrete boat ramp, along with the construction of a 3 metre extension approx 250mm thick & associated rock protection works. Click for more details...

ULVERSTONE HEALTY CARE FACILITY
A project in the TAS Within Central Coast. Demolish the existing facility & construct a new Oral Health Services Tasmania facility located at the Ulverstone High School. The building works include construction of 2 x new dental surgeries, a steribay prep room, store rooms, reception/waiting area & staff amenities. Associated car parking & landscaping. Click for more details...

DORSET COUNCIL BITUMINOUS SEALING 2016/17
Currently at the Construction stage In Dorset is a project estimated to be $ 350000. This project Supply of various bituminous sealing works within the Dorset Municipality for the 2016/17 Financial Year. Click for more details...

BLUFF ROAD FITNESS EQUIPMENT
Fitness Equipment Installation project at Foreshore along Bluff Rd, Devonport, TAS 7310 In The Council Area Of Devonport of Local Govt. Expression of Interest for Bluff Road Fitness Equipment & associated infrastructure installed at the foreshore along Bluff Road in Devonport. Click for more details...

WILLIAM STREET STORMWATER UPGRADE STAGE 6
Public Utilities (Water distribution systems, Drainage) project for New development. Works to include William Street Stormwater Upgrade - Stage 6. Click for more details...

ACTON ROAD/SEVEN MILE BEACH ROAD INTERSECTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Acton Rd & Seven Mile Beach Rd, Seven Mile Beach, TAS 7170. This type is Roadworks - Upgrade with Local Govt ownership. Construction of a channelised right turn lane & associated works on the Acton Road/Seven Mile Beach Road Intersection. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect