State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Backpacker Accommodation Projects in TAS®ion=⊂=313 in region


UMINA PARK HOME FOR THE AGED
Aged Care & Retired Developments (Nursing homes) project In The Burnie Council Area of Home For The Aged - Upgrade type. Upgrading of the existing Laird-Smith & Kerslake wards. The development will include individual rooms, a lounge room area & dining room accommodation. Concrete blockwork, timber trusses, concrete floors, metal roof & aluminium windows Click for more details...

TASMANIAN MUSEUM & ART GALLERY
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Hobart Council Area of State ownership. Refurbishment & adaptation of customs building. Click for more details...


Service Station/Shop project at Cnr Racecourse Rd & Midland Hwy, Brighton, TAS 7030 In The Council Area Of Brighton of Private. Cavity blockwork with external renderering, canopy, concrete floor, glazing, metal roof, steel frame. Click for more details...

ROSEBERY BLOCK LAYING - RETAINING WALL
Not known, Rosebery, TAS 7470 Has Rosebery Block Laying - Retaining Wall currently at Tenders & Building stage. Construction of three large block walls, an area of approx 550 sq m and a final height of 18 m. Site access is limited & the work is situated adjacent to an operating crusher. Click for more details...

SOUTH ARM SECONDARY ROAD JUNCTION IMPROVEMENTS
A project in the TAS Within Clarence. Construction of dedicated right turn lane. Click for more details...

MOUNT CARMEL COLLEGE
361 Sandy Bay Road, Sandy Bay, TAS 7005 Has Mount Carmel College currently at Construction stage. Demolition, alterations and new construction works to an existing two storey building. Cement sheet cladding, metal roof, concrete floor and aluminium windows. Click for more details...

HUONVILLE WATER SUPPLY
Huonville Water Supply is currently at the Construction stage, valued at about $ 282000 it is A/ Construction of concrete clarifier. B/ Construction of 700 Kl clearwater storage washwater storage tank. Click for more details...

HENTY GOLD OPERATIONS - MOUNT JULIA
Exploration Decline/Ramp Decline New project In The Zeehan Council Area. 15,000 -16,000 metres. It is anticipated that it will take 12 months approx to reach Mount Julia. Click for more details...

ABC BUILDING - STAGE 1
Commercial Premises (Offices) project at Liverpool Street, Hobart, TAS 7000 of Office - Alterations type of Addition development. Internal & External Alterations Click for more details...

MEANDER VALLEY WWTP'S UPGRADE
Public Utilities (Treatment plants, Sewerage reticulation) project at Not known Carrick &, Deloraine, TAS 7304 of Mechanical Equipment For Treatment Plant type of New development. Supply & installation of mechanical equipment associated with the upgrading of Carrick & Deloraine Waste Water Treatment Plants effluent re-use facilities. Click for more details...

HUONVILLE HIGH SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Internal refurbishment. Click for more details...

TOOSEY COMMUNITY AND EXTENDED CARE FACILITY
Aged Care & Retired Developments (Aged care facilities) project for Renovations, Refurbishments etc. development. Internal alterations to existing nursing home. Click for more details...

SHEFFIELD AMBULANCE/SES FACILITY
13 Albert St, Sheffield, TAS 7306 Has Sheffield Ambulance/Ses Facility currently at Construction stage. Construction of ambulance/SES facility. Metal cladding walls and roof, concrete slab floor. Click for more details...

LAWRENCE DRIVE UNITS
A project in the TAS Within Devonport. Construction of two units with variation to setback. 1 x 2 bedroom and 1 x 3 bedroom, brick veneer, metal roof concrete and timber floors and aluminium windows. Click for more details...

CO-OP MOTORS
267 Argyle Street, Hobart, TAS 7000 Has Co-Op Motors currently at Construction stage. Alterations and additons to existing spare parts area. Click for more details...

AUTRALIAN RED CROSS DEVONPORT
Medical (Surgeries, Medical centres) project at 40 Oldaker Street, Devonport, TAS 7310 of Blood Collection Service - Fitout type of Renovations, Refurbishments etc. development. Fitout works to include ceilings, plastering, partitions, joinery, painting, floor coverings, plumbing, electrical and data services. Click for more details...

KING ISLAND SCHEELITE PROJECT - ELECTRICAL FOR PROCESSING FACILITY
Mining - Primary And Secondary Processing (Minerals Processing) New project at Near, Grassy, TAS 7256. This type is Electrical - For Processing Facility with Private ownership. For the provision of electrical installation for the processing facility. Click for more details...

SOUTH ARM HIGHWAY WAREHOUSE DEVELOPMENT
Industrial (Warehouses, cargo sheds, distribution centres) project In The Clarence Council Area of Private ownership. Construction of a warehouse (2000sqm) plus canopy (1000sqm.) Precast concrete panel walls, metal roof and concrete floor. Click for more details...

BELLERIVE POLICE STATION
Bellerive Police Station is currently at the Construction stage, valued at about $ 5349000 it is Alterations and additions to the existing Police Station including a new two storey extension, refurbishment of the existing station, construction of new outbuildings, fencing, site and civil works. Click for more details...

MARIA STREET SUB-STATION DEMOLITION
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Demolition of a 360sqm transcend sub-station workshop building located in close proximity to the southern boundary on the 6.229ha site. Click for more details...

WOODBRIDGE MARINE DISCOVERY CENTRE
Currently at the Construction stage In Kingborough is a project estimated to be $ 142000. This project Alterations and additions to the Marine Discovery Centre. Click for more details...

KANGAROO BAY RECREATIONAL SPORTING FACILITY
20 Kangaroo Bay Dr, Bellerive, TAS 7018 Has Kangaroo Bay Recreational Sporting Facility currently at Construction stage. Construction of a recreational sporting facility to include clubhouse, bar, social room, storage room, 4 change rooms, amenities and 2 external viewing decks. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Independent Living Units - Stage 3 project at 55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018 In The Council Area Of Clarence of Private. Construction of twenty nine two bedroom independent living units. Brick veneer, concrete floors, metal roof and aluminium frame windows. Click for more details...

MOUNT PLEASANT DETENTION BASIN DAM
Dam project at ., Launceston, TAS 7250 in the Civil Engineering (Dams). Removal of an existing farm dam, supply of fill and construction of a new stormwater detention basin dam, construction of precast inlet structure and outlet works. All works will be within private property. Click for more details...

COLLINS STREET CONSULTING ROOMS
Medical (Surgeries, Medical centres) project In The Hobart Council Area of Private ownership. Alterations for change of use of 121.8 square metres of Level 11 to consulting rooms for dental practitioners. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Aged Care & Retired Developments (Aged units, seniors units) project In The Clarence Council Area of Nursing Home And Apartments type. Construction of a ninety bed nursing home and twenty two independent living apartments (1 and 2 bedrooms). Fibre cement sheet cladding, compressed metal panels, brick veneer, metal roof, concrete floors and aluminium windows. Click for more details...

FAHAN SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) New project at Fisher Ave, Sandy Bay, TAS 7005. This type is Main Building Upgrade with Private ownership. Construction and refurbishment of an existing building over three levels. Click for more details...

RINGAROOMA VALLEY WATER SCHEME, RINGAROOMA & BRANXHOLM RESERVOIRS
Public Utilities (Water distribution systems, Drainage) project at Branxholm &, Ringarooma, TAS 7263 of Reservoirs (2) - Construction type of New development. Construction of treated water storage reservoirs at the towns of Ringarooma & Branxholm in north east Tasmania. This contract involves the civil, mechanical & electrical engineering works associated. Click for more details...

GORMANSTON ROAD RISING MAIN 4
Public Utilities (Water distribution systems, Drainage) project for New development. Design, supply, installation and commissioning of rising main 4 between Gormanston Road and Humphreys Rivulet for the Derwent Park Stormwater Harvesting and Industrial Re Use Project. Click for more details...

CASCADE BREWERY WASTEWATER TREATMENT PLANT
Cascade Brewery Wastewater Treatment Plant is currently at the Construction stage, valued at about $ 4700000 it is Installation of a new wastewater treatment plant to pre-treat wastewater. Click for more details...

TASTE OF TASMANIA
Sports (Pavilions, Grandstands, Stadiums/halls) project In The Hobart Council Area of Temporary Structures - Install/Dismantle type. Hire of temporary structures for the 2013/2014 Taste of Tasmania including delivery, installation and dismantling. Click for more details...

CARUTHERS BUILDING ST JOHNS PARK
Standby Generator project at 56 Collins St, New Town, TAS 7008 In The Council Area Of Hobart of State. Supply and installation of a new standby generator to service the Renal Unit within the Caruthers building at St Johns Park complete with associated building works and electrical upgrade. Click for more details...

ST JAMES CATHOLIC COLLEGE CYGNET
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 25 Mary St, Cygnet, TAS 7112. Redevelopment of existing college buildings 3,4,6 & 7, extensions and associated trade works and demolition of building 5. Works include refurbishment of primary general learning areas, construction of new student amenities, refurbishment of specialist learning areas for the arts, refurbishment of secondary general learning areas, provision of staff accommodation and amenities, new early years playground and provision of new entry points to the site. Click for more details...

BROOKE STREET FERRY PIER DEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Hobart Council Area of Pier Structure type. Construction of the pontoon level of the pier which will sit below water level is 40% complete. The entire concrete structure is likely to be in place at Brooke Street end 2014. The pier is being built at Incats Princes of Wales Dockyards. Click for more details...

NBN FIBRE INSTALLERS AND CIVIL CONTRACTORS
Currently at the Tenders & Building stage In Hobart is a project estimated to be $ 2000000. This project Request for quotation for telecommunications installers, service technicians and civil contractors Tasmania. Click for more details...

TASMAN HIGHWAY/EAST DERWENT HIGHWAY INTERCHANGE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Clarence Council Area of Road Works type. The construction of a new on-ramp for traffic from the East Derwent Highway onto the Tasman Highway and a dedicated lane from the East Derwent Highway to access Rosny Hill Road. The proposed contract period is 18 months. Click for more details...

DEVONPORT HIGH SCHOOL UPGRADE
High School Teaching & Gymnasium Facility - Upgrade project at 91 Best St, Devonport, TAS 7310 In The Council Area Of Devonport of State. Alterations and additions to the existing gymnasium building to provide change rooms, support facilities and general decoration. Click for more details...

ROSLYN AVENUE UNITS
130 Roslyn Av, Blackmans Bay, TAS 7052 Has Roslyn Avenue Units currently at Construction stage. Construction of 4 single storey units. 2 bedrooms. Shared driveway and 4 single car space garages. Mixed materials. Click for more details...

ELDERSLIE ROAD BRIDGE
Bridge - Refurbishment project at Elderslie Rd, Brighton, TAS 7030 In The Council Area Of Brighton of Local Govt. Refurbishment of Elderslie Road bridge, Brighton. Click for more details...

ST PAULS RIVER BRIDGE, ESK MAIN ROAD AND FINGAL RIVULET CULVERT REPLACEMENT
Esk Main Rd - St Pauls River Bridge - Fingal Rivulet, Fingal, TAS 7214 Has St Pauls River Bridge, Esk Main Road And Fingal Rivulet Culvert Replacement currently at Construction stage. The project involves the demolition and replacement of St Paul River Bridge and Fingal Rivulet Culvert, plus minor road works on the approaches on Esk Main Road. The proposed contract has three seperate portions with a total contract period of 48 weeks. Click for more details...

SACRED HEART CATHOLIC PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project for Addition development. Construction of a covered walkway and other minor works at Sacred Heart Catholic Primary School. Click for more details...

CRESSY DISTRICT HIGH SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a new administration area and redevelopment of existing learning areas to provide two flexible general learning areas for Year 11 & 12, with associated amenities and storage. Click for more details...

LAUNCESTON WASTE CENTRE
Launceston Waste Centre is currently at the Construction stage, valued at about $ 500000 it is Preparative works for the landfill extension Launceston Waste Centre. Works Include: - Removal of Vegetation - Undertake earthworks to achieve specified sub-grade & sub-soil drain - Supply & install drainage layer - Supply & Construct composite leachate barrier - Supply & install leachate subsoil drains including manholes and inspection shafts and tubes - Supply & installation of a steel shed - Compliance testing & reporting Click for more details...

ST MARYS DISTRICT HIGH SCHOOL
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for Renovations, Refurbishments etc. development. Redevelopment of an existing science laboratory and preparation room. Click for more details...

SCOTCH OAKBURN COLLEGE BOARDING HOUSE
Residential (Student & group accommodation) project In The Launceston Council Area of Private ownership. Alterations & additions to the existing boarding house. Associated car parking & landscaping. Click for more details...

BIG4 ST HELENS HOLIDAY PARK AMENITIES BLOCK
Social (Amenities, Dressing rooms) project In The Break O'Day Council Area of Private ownership. Construction of amenities block, entry wall & accessible bathroom to the existing holiday park. New pole sign & 3 flag poles. External cladding, fixed obscure glazing vented windows & modwood screen & deck. Associated car parking & landscaping. Click for more details...

WELLS PARADE & SUNCOAST AVENUE INTERSECTION IMPROVEMENTS
Wells Parade & Suncoast Avenue Intersection Improvements is currently at the Construction stage, valued at about $ 250000 it is Construct approximately 130sq m of new concrete footpath & 8 pedestrian ramps at the intersection of Wells Parade & Suncoast Avenue, together with the construction of new concrete perimeter kerbing around the roundabout at this location. Click for more details...

PEARSALL AVENUE STORMWATER UPGRADE
Pearsall Ave, Blackmans Bay, TAS 7052 Has Pearsall Avenue Stormwater Upgrade currently at Construction stage. Construct approximately 75 metres of DN600 diameter stormwater pipeline, together with associated minor civil works & site reinstatement, at Pearsall Avenue & Sunny Avenue, at Blackmans Bay. Click for more details...

EDWARD & CROMWELL STREETS RESIDENTIAL SUBDIVISION
1 Edward St & 1-13 Cromwell St, Perth, TAS 7300 Has Edward & Cromwell Streets Residential Subdivision currently at Construction stage. Construction of 18 residential lots. Associated civil works. Click for more details...

GLENDALE ROAD ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Glendale Rd, Sidmouth, TAS 7270 of Roadworks - Intersection Safety Improvement Works type of New development. Construction of roadworks and the sealing of approximately 50m of roadway from West Tamar Highway. Associated civil & drainage works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect