State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Banks Projects in NSW®ion=⊂=231 in region


GREAT WESTERN HWY VILLAS/TOWNHOUSES
Civil Engineering (Residential Subdivision) New project at 167-171 Great Western Hwy, Oxley Park, NSW 2760. This type is Villas (8)/Townhouses (2) - 2 Storey with Private ownership. Demolition of dwelling & sheds. Subdivision of land in 10 lots & access road with cul-de-sac. Construction of 2 x 2 storey townhouses & 8 single storey dual occupancies. Associated carparking & landscaping. Click for more details...

BLUE HILLS RETIREMENT VILLAGE
59-65 Kookaburra Rd, Prestons, NSW 2170 Has Blue Hills Retirement Village currently at Construction stage. Construction of 20 self care units, associated carparking & landscaping. Click for more details...

MAIN ST MIXED DEVELOPMENT
Private ownership Retail (Shops, shopping centres & arcades, supermarkets) project In The Blacktown Council Area for New development. Demolition of existing building and construction of a 14 storey mixed residential/commercial building containing 76 residential units, 7 x 1, 62 x 2 & 7 x 3 bedrooms and 200sq m of retail/commercial space over 5 levels of basement car parking for 164 vehicles. Associated landscaping. Click for more details...

SEVEN HILLS PUBLIC SCHOOL
School - Stage 1 project at 301 Seven Hills Rd cnr Old Windsor Rd, Seven Hills, NSW 2147 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construction of: administration building & 2 homebases; library, with WC & KLA store; 5 homebases & toilets. 14 space carpark & associated road, driveway crossover, footpath, landscaping, kerb & guttering, retaining walls, associated siteworks & services. Click for more details...

PRAIRIE VALE 38 LOT RESIDENTIAL SUBDIVISION
278-288 (Lot 350 & Lot 1) Prairie Vale Rd (DP813406 DP 752060), Prairiewood, NSW 2176 Has Prairie Vale 38 Lot Residential Subdivision currently at Construction stage. Proposed 38 lot residential subdivision & a public reserve. Click for more details...

BROKEN HILL MINE BASE METAL OPERATIONS - NORTH MINE EXTENSION
Mining (Open Cut) project In The Broken Hill Council Area of Resource - Base Metals type. Resource estimate is 4.2 Million tonnes @ 11.2% Zn, 13.7% Pb and 214 g/t Ag. Likely to include two open cut pits, a waste rock emplacement, a haul road, facilities, stockpiling and crushing areas and associated infrastructure. Click for more details...


A project in the NSW Within Warringah. Split-level building, office facilities, loading dock, car parking. Units range in size from 284 sq m. to 1025 sq m. Site area 4858 sq m. Click for more details...

TINGHA SEWERAGE
Public Utilities (Treatment plants, Sewerage reticulation) project In The Guyra Council Area of Sewerage type. Construction of a modified gravity sewerage scheme for the township of Tingha. Click for more details...

ACKROYD ST UNITS
Currently at the Construction stage In Port Macquarie-Hastings is a project estimated to be $ 550000. This project Construction of 7 x 2 bedroom units, associated carparking & landscaping. Walls full brick, concrete tile roof, concrete floor, timber frame. Click for more details...

ST JOHNS RD TOWNHOUSES
Townhouses (6) - 2 Storey project at 38 St Johns Rd (Lot 34 DP4640), Auburn, NSW 2144 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 6 x 2 storey by 3 bedroom townhouses. Basement carparking. Associated landscaping. Click for more details...

KIRBAN INDUSTRIAL SHED
Industrial (Warehouses, cargo sheds, distribution centres) project at 11-13 Kirban St, Gulargambone, NSW 2828 of Warehouse/Office/Workshop type of New development. To construct a 30m x 9m all steel gable roofed industrial shed with an office & workshop area. Click for more details...

PACIFIC HWY MIXED DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project In The Hornsby Council Area of Restaurants (2)/Office/Unit - Altns & Addns - 2 Storey type. Alterations & additions to an existing heritage building to provide additional commercial & residential floor space. The proposal involves the retention of the existing heritage item on the site & addition & modifications including: Basement/ground floor level, the construction of a basement carpark with provision of parking for 10 vehicles. Ground floor level, the enlargement of the existing ground floor level of the building & the creation of 2 restaurants. The provision of pedestrian access from Dural Street at this level is also proposed. Total area of the 2 restaurants would be 376 sq m. First floor level enlargement to provide commercial office space totalling 404 sq m gross leasable floor area. Second floor level as the creation of 1 x 2 bedroom residential unit at roof level being 143 sq m in area. Click for more details...

LAWSON ST OFFICE
Commercial Premises (Offices) project In The Sydney Council Area of Private ownership. Internal refurbishment of ground floor & levels 3 & 5. Click for more details...

MARIGOLD ST INDUSTRIAL DEVELOPMENT
A project in the NSW Within Bankstown. Demolition of existing. Construction of 2 warehouses. Warehouse 1: 340.9 sq m with office space of 52.5 sq m, Warehouse 2: 372.6 sq m with office space of 60 sq m. Also 92 sq m of loading space. Associated carparking for 8 cars Click for more details...

HASTINGS CO-OP SHOPPING CENTRE IGA
Retail (Shops, shopping centres & arcades, supermarkets) New project at 42 (Lot 101) Hastings St (DP1121341), Wauchope, NSW 2446. This type is Shopping Centre - Altns & Addns with Private ownership. Demolition of unused car repair station. Expansion of existing IGA supermarket, the existing supermarket has a GLA of 1,232sq m, which will be increased to 1,620sq m. The proposal also involves construction of 3 shops & a liquor outlet totalling 239sq m GLFA. Carparking for 43 vehicles. Click for more details...

STAR CITY CASINO
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project for Addition development. Alterations to balcony adjacent to Pyrmonts Restaurant to create an outdoor smoking area at Star City Casino. Click for more details...

ROSS RESERVE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Pyree St, Bangor, NSW 2234. This type is Park - Upgrade with Local Govt ownership. Proposed upgrade of recreation reserve, construction of playground, pathways, pedestrian access, landscaping. Click for more details...

OUR LADY STAR OF THE SEA SCHOOL
Private ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Gosford Council Area for Addition development. Construction of temporary classrooms. Click for more details...

HUME HIGHWAY UPGRADE - WOOMARGAMA TO MULLENGANDRA
Roadworks - Upgrade New project In The Various Council Area. Proposed upgrade of segment of Hume Hwy from Woomargama to Mullengandra, from approx 131km south of Gundagai to approx 141km south of Gundagai to achieve 4 lanes of dual carriageway. Click for more details...

BAYSWATER POWER STATION
Private ownership Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Muswellbrook Council Area for New development. Extension to the existing substation. Click for more details...

MERINDAH SERVICE CENTRE
Service Station - Refurbishment Renovations, Refurbishments etc. project In The The Hills Shire Council Area. Construction of a workshop building, new canopy and internal refurbishment and installation of 3 x underground tanks at existing service station. The internal refurbishment will include disabled toilet facilities within the proposed sales area. The re-design of the internals improves the usage of the existing building. The new sales area will have an area that will provide pre-packed food only, no food will be prepared or cooked in the premises. To install double wall fibreglass tanks: 3 x 55.00 litres, 2 of them split (30.000 litres & 25.000 litres), including new environmentally friendly double wall pipework & monitoring wells. No automotive LPG will be sold from this site. Install new multi product pumps under new canopy over. The canopy is an open structure (with no walls) at least 4.5m high & 0.9 m high fascias. Pollution control facilities will be provided for the new covered forecourt area. New workshop building which will include an entry for workshop at the rear of the existing building and rationalisation of the sales area and storage areas. The proposal will retain the existing driveway crossovers providing entry and exit points from the various streets, these will be upgraded and replaced as required. Associated carparking for 20 vehicles. Associated landscaping. Click for more details...

PEEL ST OFFICE - TREMAIN & PROWSE PROPERTY VALUERS
Commercial Premises (Offices) project for New development. Demolition of existing house. Construction of a new commercial office building. Carparking & landscaping. Click for more details...

OBLEY RD CARAVAN & MOTOR HOME PARK
Tourism (Caravan parks with assoc facilities, Camping grounds) project In The Dubbo Council Area of Caravan Park/Motor Home Park type. Construction of a new caravan park, camping ground & motor home park, to include 20 motor homes, 10 camping ground sites, 58 caravan sites, 12 cabins, a childs playground, swimming pool, amenities building & managers residence/office. Click for more details...

ISLES DR FACTORY UNITS
20 (Lot 56) Isles Dr (DP270060), North Boambee Valley, NSW 2450 Has Isles Dr Factory Units currently at Construction stage. Construction of 3 factory units. Carparking. Click for more details...

GREY GUM RD 8 LOT SUBDIVISION
New project of Civil Engineering (Residential Subdivision) project at 18 (Lot 181) Grey Gum Rd (DP1070007), Denman, NSW 2328. Proposed 8 lot rural/residential subdivision. Click for more details...

BARANGAROO - HEADLAND PARK & NORTHERN COVE MAIN WORKS
Entertainment (Parks, Leisure grounds, Playgrounds) project for New development. Main works for the creation of the Barangaroo Headland Park and North Cove, including: Demolition or modification (yet to be determined) of the Sydney Harbour Control Tower; shaping of the shoreline including creation of the Northern Cove; & detailed design of the Headland Park including the final landform; landscape design, stormwater strategy, services & infrastructure, pedestrian pathways, Globe St extension, carpark within headland, park amenities & heritage interpretation. Land formation utilising fill from Stage 1. Construction of structural earth retaining walls utilising sandstone based materials. Creation of a naturalistic shoreline & northern cove through excavation & formation of retaining walls using boulders. General landscaping & planting. Construction of a network of pedestrian pathways connecting the foreshore walkway & surrounding areas. Construction of a shoreline promenade (dual use pedestrian path and cycleway). Jetty/viewing platform & public wharf extending into the Northern Cove from the southern shoreline. Location & use of the former Sydney Water Sewage Pumping Station for the purposes of an amenities building. Construction of a space for a future use (cultural facility) comprising initially 75,000m3 & ultimately up to 100,000m3. Installation of relevant services & infrastructure. Construction of services & piping/pumping infrastructure associated with air conditioning system (cooling water inlet/outlet) for the future cultural facility & carpark. Site remediation for limited contamination of fill material. Construction of a carpark totalling up to 300 spaces. Click for more details...

ARTC MAIN NORTHERN RAILWAY - MINIMBAH THIRD TRACK PROJECT
A project in the NSW Within Singleton. Construction of approximately 30 km of new track & ancillary infrastructure to provide for a new Up Coal/Down Main track in a parallel configuration to the existing Main Northern Railway line and vehicle access tracks on both sides of the line. Relocation of turnouts from Minimbah & Branxton to Belford. Upgrade of maintenance siding turnouts at Branxton. Track reconditioning of existing Up Main at Greta and Branxton Stations and of the Branxton crossovers. Drainage - central & cess track drainage; amendments to 53 culverts for cross drainage; re-alignment of Sawyers Creek & other drainage works around new structures. A new rail underbridge at Stony Creek & Wollombi Road, Farley. Closure of the stock crossing at Farley. Demolition of the existing rail overbridge at Old North Road, Allandale. Construction of new rail underbridges at Allandale, Sawyers Creek, Greta, Black Creek, Belford,Jump Up Creek, Belford & for an unnamed tributary of Anvil Creek. Demolition & replacement of the existing rail underbridge at an unnamed tributary of Anvil Creek, Greta. Modification of the existing rail overbridge at Bridge Street, Branxton. Modifications to Lochinvar, Greta & Branxton Railway Stations Click for more details...

WOOLWORTHS SUPERMARKET
A project in the NSW Within Coffs Harbour. Alterations & additions to the existing Woolworths Supermarket. Click for more details...

TYNDALE CHRISTIAN SCHOOL BER PROJECT
Currently at the Construction stage In Blacktown is a project estimated to be $ 2500000. This project Construction of combined library & multi-purpose building replacing demountables Click for more details...

CINTRA PARK NETBALL AMENITIES & SEA SCOUT HALL
Amenities/Sea Scout Hall - Altns & Addns New project In The Canada Bay Council Area. Contract A - Construction of a 243sq m new amenities building at Cintra Park. Contract B - Alterations & additions to the 1st Yaralla Sea Scout hall - internal refurbishments to internal toilets & kitchen, including the construction of a concrete access ramp. Click for more details...

TRANGIE CENTRAL SCHOOL BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a new COLA Click for more details...

TAMWORTH COMMUNITY COLLEGE - HERITAGE ON PEEL
Addition project of Education (Tertiary - colleges, institutes, universities) project at 7/165-169 Peel St, Tamworth, NSW 2340. Alterations to the Flour Mill buiilding for use as a Community College. Click for more details...

ANTONIO PL DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project In The Griffith Council Area of Dwellings (3) type. Construction of 3 dwellings. Carparking & landscaping. Click for more details...

TUNCURRY TO FORSTER - STAGE 2
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project at between Tuncurry &, Forster, NSW 2428 of Transmissions Cable type of New development. Install a new 66kV cable beneath the bridge linking Tuncurry & Forster as well as removal & replacement of the existing cable trays supporting the existing 11kV cable between Tuncurry & Forster. The work site is predominately a marine environment comprising 47 spans of concrete bridge decking for a total length of 620m. The bridge decking is supported by pre stressed concrete beams, each approximately 13m in length and 1 steel fabricated span 23.2m long. Click for more details...

ELFORD WAY SUBDIVISION
New project of Civil Engineering (Residential Subdivision) project at Lot 8 Elford Way (DP1154959), Malua Bay, NSW 2536. Proposed 9 lot residential subdivision Click for more details...

LINCOLN ST SUBDIVISION
Residential Subdivision (17) Lots - Stage 1a project at Lot 18 Lincoln St (DP1113500), Gunnedah, NSW 2380 In The Council Area Of Gunnedah of Private. Proposed residential subdivision comprising Stage 1a: 17 lots. Click for more details...

EDEN & ZANE GRAY HOLIDAY PARKS
Tourism (Caravan parks with assoc facilities, Camping grounds) project at ., Eden, NSW 2551 of Moveable Dwellings (12) type of New development. Manufacture & installation of 12 moveable dwellings for Eden & Zane Gray holiday parks on the South Coast NSW Click for more details...

TRANSGRID UNDERGROUND CABLING
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Various Council Area of Underground Cables type. Design, manufacture, supply & installation of 330kV XLPE (cross-linked polyethylene) underground cable & associated accessories, sub-systems & civil works for: a single circuit between TransGrid's tunnel portal at Sydney Park & Haymarket substation; Twin circuits between the Holroyd & Rookwood road substations. The works are divided into 4 Separable Portions: Separable Portion 1-Design; includes all work associated with the design of the whole integrated cable systems, design of cable installation & special structures, and design of the GIS termination at Haymarket substation. Separable Portion 2 - Sydney Park to Haymarket Cable; includes all works for the single circuit 330kV cable installation predominately inside the 3.5km long MetroGrid tunnel between the Sydney Park tunnel shaft & Haymarket substation, including supply & installation of a GIS termination; the route length is approximately 3.7km in total. Separable Portion 3-Holroyd to Guildford Cable; includes all works for the double circuit 330kV underground cable predominately adjacent to the Canal Reserve Cycle Way between TransGrid?s Holroyd substation & Sydney Water's Guildford pipehead facility; the route length is approximately 7.0km in total. Separable Portion 4-Guildford to Rookwood Road Cable; includes all works for the double circuit 330kV underground cable predominately within the Sydney Water pipeline corridor between Guildford & TransGrid's Rookwood Road substation; the route length is approximately 8.5km in total. Click for more details...

MORRISON HOTEL
205-227 (Lot 1) George St (DP771884), The Rocks, NSW 2000 Has Morrison Hotel currently at Construction stage. Fitout & refurbishment of the internal components of the Morrison Hotel. The main bar, dining room and kitchen fittings will be replaced and upgraded in addition to new ceilings, floor levels and ramps. The existing internal walls to the gaming room will be removed with the existing platform and the associated bar area will be expanded with an additional lounge area. Reinstatement of the use of the existing George Street entry way via internal alterations. Replacement of existing awning fascia signage, a new wall mounted plaque sign above the corner entry doors. Works to the existing kitchen area include replacement of all existing stainless steel bench tops and appliances with new bench tops & appliances; ceramic wall tiles throughout kitchen area; painting of ceilings; epoxy flooring to kitchen area to replace existing tiling; door frame within corridor of the kitchen area and the opening by existing kitchen ramp area to be removed and replaced with new full height partition wall to kitchen area; full height partition wall to the kitchen area; additional cool room for kitchen within the existing plant room enclosed from dining area by a new full height partition wall. Works to main bar and dining area include:- sand polish existing timber flooring; new ceramic wall tiles to replace the existing mirror/timber panelling; new paint finish to existing walls and columns; removal of the existing bar joinery & floor tiles & replacement with a new smaller bar with front and top and tiled flooring; refrigerated wine storage area by the new bar; removal of timber panelling and the bar ledge to the masonry wall along the southern boundary; removal of bi-fold doors to the rear dining area & timber Venetian blinds to all windows; new painted ceilings to bulkheads and new ceiling lining to replace the existing pressed metal ceiling; removal of existing partial height timber partition and new raised timber flooring to recessed floor area partial height timber partition to match existing height. An interpretative zone threshold within the new raised floor level delineated in tiled floor finish to reflect the original entry to George Street; & replacement of the existing carpet inlay, tiles and timber glazed entry door to the hotel entry within new ramped tiled entry Area 3 ? Minor cosmetic works:- building works to the additional bar area include:-sand and re-polish existing timber floor; paint existing walls and columns; replace ceilings with new ceilings and paint; masonry wall to be partially removed for new doorway to the courtyard; install new handrails to existing stairs to comply with the BCA; removal of the existing timber partitions, timber Venetian blinds, timber benches, carpeting and platform; new full height partition wall by stairs down to bar lounge area. Click for more details...

ST JOHN'S COLLEGE WOODLAWN
St John's College Woodlawn is currently at the Construction stage, valued at about $ 3000000 it is Construction of a performing arts facility comprising a multi-purpose room to seat 190 patrons, a dance studio , workshop, foyer & associated facilities. Click for more details...

REECE PLUMBING SUPPLIES
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 245 (Lot 47) The Entrance Rd (DP2730), Erina, NSW 2250 for New. Construction of a building for the operation & trade/retail plumbing supplies. Comprising the building entrance, car parking facilities & pavement markings, ground office/reception areas, unisex disabled toilet including fixtures & fittings. Steel portal frame system, concrete slab, concrete panel walls & a metal colorbond roofing system. The site will be fully fenced. Click for more details...

TRINITY LISMORE LAVALLA TRADE TRAINING CENTRE
Education (Schools - primary, secondary (up to Yr 12)) project at 1 Dawson St & 11 Leycester St, Lismore, NSW 2480 for New. Construction of a Trade Training Centre (TTC). The TTC includes the construction of a commercial kitchen, preparation room & a teaching dining space & also the provision of equipment. Click for more details...

REID HOUSE
A project in the NSW Within Sydney. Alterations & additions to the ground, mezzanine & first floors of heritage Reid House, including new shopfronts to ground level tenancies, facade restoration works, construction of new mezzanine level balconies on King St facade & internal upgrade works to foyer. Works comprise reinstatement of the posted awning; construction of 4 external balconies at mezzanine level; replacement of shopfronts to King St; internal non-structural works to the foyer of Reid House; new window to the east side of the foyer. Click for more details...

LAWMANS FRAME & TRUSS MORUYA
Industrial (Factories & Factory Units) project In The Eurobodalla Council Area of Private ownership. Additions to factory. Click for more details...

MOGENDOURA CREEK BRIDGE
Bridge - Replacement New project In The Eurobodalla Council Area. Construction of 2 span single lane concrete bridge. Demolish & dispose of existing 4 span timber trestle structure. Click for more details...

NARRANDERA SPORTSGROUND
Coaches Box New project In The Narrandera Council Area. Construction of coaches box. Click for more details...

MCDONALDS AUBURN
Addition project of Hospitality (Take-away Outlets) project at 116 Parramatta Rd, Auburn, NSW 2144. Alterations & additions to the existing McDonalds restaurant including an extension of 113sq m to the existing building. Internal reconfiguration including new servery area, replacement & relocation of equipment, painting to match new decor, new feature walls, new server bench tops, new counter decor, new furniture, new training room & extension of storage area & reconfiguration of the seating. External alterations including new infill windows, relocation of doors, replacement of existing storage extension wall, replacement of existing server booth window, new outdoor seating & finishes, new server booth & other windows. Reconfiguration of carparking & drive-thru area including relocation of waiting bays. Click for more details...

MARION STREET CIVIL WORKS
Public Utilities (Water distribution systems, Drainage) project at Marion St, Bankstown, NSW 2200 for New. Road rehabilitation & drainage works. Scope of work includes: demolition & disposal of kerb & gutter & replacement of sections of existing footpath. Excavation & laying of drainage pipes 675mm, 750mm & 1050mm diameter approximately 192 meters long. Excavation, supply and laying of drainage pits. Construction of kerb & gutter. Construction of concrete footpath, kerb ramps & concrete vehicular crossings. Supply & laying of turf & topsoil to restore footway behind kerb & gutter & maintain turf for 6 weeks. Click for more details...

JOHN MATTHEWS NETBALL COMPLEX
Durham St, Bathurst, NSW 2795 Has John Matthews Netball Complex currently at Construction stage. Restoration of netball courts 1,2, 5 & 6 at the John Matthews Netball Complex. Scope of work includes: leveling & patch repairs to existing asphalt surfaces. Site set up & establishment. Supply & installation of a polyurethane/rubber/acrylic composite court system over the existing court surfaces & Line marking. Click for more details...

NARELLAN MEDICAL CENTRE
A project in the NSW Within Camden. Alterations & additions to & fitout of existing 2 storey commercial building to be used as a medical centre incorporating ancillary pharmacy. Ground floor comprises 17 general practice consulting rooms, pathology room, 4 bed treatment area, pharmacy, reception & administration areas, staff and patient amenities, waiting area, new entry facing Queen St, new lift. First floor comprises 7 specialist consulting rooms, dental clinic with 3 consulting rooms and support services, 4 bed physiotherapy unit, radiology unit incorporating 3 ultrasound rooms, Xray, CT scan and OPG scan modalities, administration areas, staff and patient amenities. New Lift. Painted walls, alucobond cladding, powdercoated louvres, powdercoated window frames, sheet metal pitched roof. Reconfiguration of an existing carpark for 82 vehicles. Landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect