State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Banks Projects in NT®ion=⊂=231 in region


WOODS INLET ECO RESORT & COMMERCIAL DEVELOPMENT
Retail (Shops, shopping centres & arcades, supermarkets) project at Woods Inlet Cox Peninsula, Darwin, NT 0800 for New. Proposed construction of an Eco Resort. To include 160 bungalows, general store, cafe, restaurant, wharf, marine museum, lagoons, backpackers dormitories, jetty, 18 hole golf course with clubhouse, town centre with retail precinct & 300 room international hotel, offices, swimming pool, indoor recreation facilities, a machinery workshop, water storage tanks, stables & interpretive centre. 60 tonne reverse osmosis desalination unit Click for more details...

SMITH STREET MALL
Smith Street Mall is currently at the Construction stage, valued at about $ 3500000 it is Whole of works will be awarded as one contract. Works comprise underground services, re-paving (in-situ concrete & clay pavers), steel weather protection structures, lighting, street furniture, landscaping, signage & artworks. Construction is planned to commence in second week of October with works up to & including paving level to be completed by Christmas & remainder to be completed by early March 1998. Click for more details...

MOUNT TODD GOLD OPERATIONS
Public Utilities (Treatment plants, Sewerage reticulation) project at 45 km nth east of, Katherine, NT 0850 of Plant Concrete Work For Mine type of New development. 1,700 cu m of civ9l concrete for gold mine establishment. Click for more details...

ST PAUL'S ANGLICAN CHURCH
A project in the NT Within Katherine Town. Construction of new building to seat between 200 - 250 people. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Northern Territory University - Casuarina Campus is currently at the Construction stage, valued at about $ 1500000 it is Conversion of existing building to accommodate general purpose teaching & staff offices. Click for more details...


Primary & Preschools - Stage 1 project at Fred's Pass, NT 8000 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Constructions of building platforms including site excavation & associated works. Click for more details...


Renovations, Refurbishments etc. project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at South Stuart Hwy Area of, Alice Springs, NT 0870. Widen formation & Seal Chainage 1596.83 kms to Chainage 1604.33 kms. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) New project at Region of, Katherine, NT 0850. This type is Houses (10) with Federal ownership. 5 x 3 & 5 x 4 bedroom. Panelized system construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

BATCHELOR & LITCHFIELD PARK REHABILITATION
Currently at the Construction stage In Darwin City is a project estimated to be $ 50000. This project Repairs & painting to various assets throughout Batchelor & Litchfield Park. Click for more details...

ORRTIPA THURRA COMMUNITY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) New project at Orrtita-Phurra (Bonya) Community (400 km north east Jervois) via, Alice Springs, NT 0872. This type is Electrical For Power Station with Local Govt ownership. Power station upgrade. Click for more details...

YUENDUMU HOUSING PROJECT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Yuendumu Community (280 km North West of Alice Springs) via, Alice Springs, NT 0872. This type is Services For Housing Project with Local Govt ownership. Drainage & roadworks for housing community. Click for more details...

JAWOYN ASSOCIATION
Werenbun Outstation 50kms North of Katherine (off Edith Falls Rd) Edith Falls, Katherine, NT 8999 Has Jawoyn Association currently at Construction stage. 2 x 3 bedroom houses, 3 sets of duplexes. Steel frame & steel clad on stumps, timber floor, metal deck roof, aluminium framed windows. Workshop/shed, steel frame & steel clad, concrete floor, metal deck roof. Click for more details...

AYERS ROCK RESORT - DESERT GARDENS HOTEL
, Yulara, NT 0872 Has Ayers Rock Resort - Desert Gardens Hotel currently at Construction stage. Work to include: Supermarket, shop fit outs & fronts, sails structure, carparking adjustments. Click for more details...

AYERS ROCK RESORT - DESERT GARDENS HOTEL
Tourism (Tourist villages, Resort complexes) project, Yulara, NT 0872 of Resort - Altns & Addns - Central Facilities type of Addition development. Construction of new kitchen, extensions to existing restaurants, extensions & upgrading of existing reception & foyer areas. Click for more details...

TJUWANPA OUTSTATION HOUSES
Houses (4) project at Tjuwanpa Outstations, ., NT 8999 in the Residential (Units, apartments, flats, townhouses, villas). 2 x 3 bedroom, block-work construction, concrete floor, metal deck roof, aluminium frames windows. 2 x 4 bedroom, steel framed construction on stumps, timber floor, metal deck roof, aluminium framed windows., Click for more details...

GURUNGU COUNCIL ABORIGINAL CORPORATION HOUSING PROGRAM
Residential (Units, apartments, flats, townhouses, villas) project In The Barkly Shire Council Area of Local Govt ownership. Construction of 2 x 3, 1 x 4 & 1 x 5 bedroom elevated houses. Steel frame & steel clad, timber floor, metal deck roof, aluminium framed windows., Click for more details...

COLLEGE ROAD DEVELOPMENT
Commercial Premises (Offices) project at 2 College Rd (Secn 4920 Hund of Bagot), Berrimah, NT 0828 for New. Construction of 8 warehouse units with ancillary offices & showroom in 5 buildings. Steel frame & steel clad, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

BATCHELOR MAGNESIUM PROJECT
Infrastructure project at Rum Jungle district 85 km south of, Darwin, NT 0800 in the Mining (Open Cut). Following completion of the Stage one Feasibility study, locations were selected for each of the facilities necessary for development of the Project. All available technical data relating to each site was compiled and reviewed. Some further exploration drilling was carried out. Based on this review it has been concluded that the sites seem suitable for the assigned purpose. Click for more details...

NORTH EDGE APARTMENTS
North Edge Apartments is currently at the Construction stage, valued at about $ 1000000 it is Redevelopment of former motel rooms into 24 multiple dwellings comprising 18 x 2 bedroom dwellings & 6 x 3 bedroom dwellings. Associated garaging for 2 cars & landscaping. Click for more details...

MAGISTRATES COURTS
Currently at the Construction stage In Darwin City is a project estimated to be $ 30000. This project Painting & some carpet replacement for Magistrates Court in Mid Level holding cells, Interview Room & Guards Area; Zone "A" Lower Ground Cells; Level 1 Administration Office Area & Public Toilets; basement car park. Click for more details...

CHANNEL ISLAND POWER STATION OIL STORAGE BUND/OFF-LOADING BAY/ACCESS ROAD
Oil Storage Bund/Off-Loading Bay/Access Road For Power Station project at Channel Island Power Station, Channel Island Region of, Darwin, NT 0800 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construct oil storage bund with associated pipework to existing oil/water separator, forklift truck access ramp, off-loading area, access road connection from existing road to off-loading area. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WONNGABILLA STREET - UPGRADE
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area for New development. Upgrade to seal road btwn CH: 0 km & CH: 0.37 km. Click for more details...

DARWIN CBD WATERFRONT CONVENTION & EXHIBITION CENTRE BUILDING
New project of Hospitality (Conference & reception centres & facilities) project at 25 The Esplanade, Darwin, NT 0801. Convention & Exhibition Centre building, seats 15,000 with 4,000 sq m of exhibition space & 500 sq m of function rooms. Click for more details...

RAPHAEL ROAD SHOWROOM SALES BUILDING
Currently at the Planning stage In Darwin City is a project estimated to be $ 200000. This project Construct showroom sales for equipment hire. Click for more details...

DESERT PEOPLES CENTRE (DESERT KNOWLEDGE AUSTRALIA) LIVING DESERT CENTRE
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project for New development. Living Desert Centre for Desert Knowledge Precinct. Click for more details...

DARWIN BOTANICAL GARDENS RAIN FOREST WALK BOARDWALKS
State ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Darwin City Council Area for Supply & Install development. Supply, deliver & intall replacement raised boardwalks. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - ROAD HAULAGE
Road Haulage New project In The Coomalie Community Council Area. For the provision of road haulage. Click for more details...

COSMO DEEPS UNDERGROUND GOLD PROJECT - PIT DEWATERING
40 km south east of, Adelaide River, NT 0846 Has Cosmo Deeps Underground Gold Project - Pit Dewatering currently at Construction stage. Detailed design is scheduled for completion late March 2008. The Company will need to hire pumps for the pit dewatering. Click for more details...

OUR LADY OF SCARED HEART COLLEGE LIBRARY & VISUAL ART CENTRE
Education (Schools - primary, secondary (up to Yr 12)) project for Renovations, Refurbishments etc. development. Internal remodelling and refurbishment of the Library & Visual Art Centre. Click for more details...

RANKEN ROAD ROADWORKS
Roadworks - Regravel project at Ranken Rd (Ch 111km - 124km), Tennant Creek, NT 0860 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Reshaping and compacting the existing pavement. Importing and compact a 150mm layer of gravel. Click for more details...

ACACIA HILL SPECIAL SCHOOL STAGE 3
Education (Schools - primary, secondary (up to Yr 12)) project at 80 (Lot 5651) Spearwood Rd, Sadadeen, Alice Springs, NT 0870 for New. Construction of main hydrotherapy pool building & separate plant room building including associated equipment & internal services. Installation of stormwater collect & discharge, service mains, external concrete pavements & concrete kerbing & disabled crossovers. Re-profiling & compaction of future carpark. Includes demolition & landscaping works. Click for more details...

CASUARINA CAMPUS CHARLES DARWIN UNIVERSITY
New project of Residential (Student & group accommodation) project at 7 (Lot 9199) Ellengowan Dve, Brinkin, NT 0810. Construction of 6 x 2 storey ancillary hostel accommodation buildings to an existing establishment in two stages. Concrete slab, concrete blockwork & metal cladding. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

STUART HIGHWAY RAIL OVERPASS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy & Santa Teresa Rd (Roger Vale Dr) approx 10.5km from, Alice Springs, NT 0870. Construction of rail overpass with double stack container clearances & allowing for 2 rail lines & road underneath. Associated civil & earthworks, electrical relocation, floodways, stormwater drainage including concrete lined channel & guard rail. Click for more details...

FLORINA ROAD SUBDIVISION
Residential Subdivision (25) Lots New project In The Katherine Town Council Area. Reconfiguration into 25 lots. Construction of new road. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 Has Darwin Gateway Shopping Centre Stage 1 currently at Construction stage. Construction of shopping centre. To include Woolworths supermarket, Big W discount store, specialty retail outlets, food court (2150) & cinema complex (4000sq m). Concrete panels, compressed fibre cement sheeting, shopfront glazing, steel framed awnings, metal sheet cladding, vertical blade fins. Parking for 1347 cars. Associated landscaping. Click for more details...

PALMERSTON HOTEL
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 50000000. This project Construction of 200 unit hotel in a 8 storey building. To include ancillary shops & offices. Concrete blockwork, glass & steel. 4 lifts. 2 loading bays. Parking for 240 cars. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - MAINTENANCE SERVICES
Private ownership Maintenance Contracts (Oil & gas facilities maintenance) project In The Darwin City Council Area for New development. For the provision of maintenance services for the Ichthys offshore & onshore assets. Click for more details...

TOFT ROAD INDUSTRIAL BUILDINGS
Industrial (Warehouses, cargo sheds, distribution centres) New project at 9 Toft Rd (Lot 11631), Tivendale, NT 0822. This type is Warehouses (2) with Private ownership. Construction of two single storey industrial buildings. To include 3 x warehouses (761sq m) with ancillary offices (246sq m) & staff amenities. Cement slab, metal cladding walls & metal roof. Parking for 16 cars. 3 loading bays. Associated landscaping. Click for more details...

THE HEIGHTS RESIDENTIAL SUBDIVISION STAGE 10
Civil Engineering (Residential Subdivision) project at Kooyonga Pde (Part Lots 11821 & 12402 Roystonea Ave), Durack, NT 0830 for New. Reconfiguration into 39 lots (250sq m - 800sq m). Construction of new roads. Click for more details...

DARWIN PRIVATE HOSPITAL EXTENSION
A project in the NT Within Darwin City. 3 storey extension of existing hospital. To include upgrade of existing operating theatre wards & construction of 4 additional operating theatres, central sterile supply department & plant room. Concrete slab, rendered concrete blockwork, painted concrete columns, aluminium louvres & window frames, metal awnings & sunshades, colour-coated roof & fascia. Extension of existing loading bay. Associated landscaping. Click for more details...

GOOD SHEPHERD LUTHERN COLLEGE ACCESS ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Litchfield Shire Council Area of Private ownership. Construction of an access road to connect Stow Road to the Good Shepherd Lutheran College, Howard Springs. To include vegetation clearing, removal of earth berm & re-alignment of open unlined drain. Widening of existing bus interchange area. Table drains & reinforced concrete box culverts. To include 2.5m wide drop off zone & 2.5m wide footpath. Parking for 17 cars. Associated landscaping. Click for more details...

KATHERINE RESEARCH STATION VEHICLE WASH DOWN FACILITY & ASSOCIATED WORKS
Wash Down Facility project at Stuart Hwy (Lot 4391), Katherine, NT 0850 In The Council Area Of Katherine Town of State. Construction of vehicle wash down facility at the Katherine Research Station located 4km East of Katherine. To include supply & installation of a light truck wheel & underbody washdown system with surrounding concrete apron. Supply & installation of sump pump with decontainment materials tank mounted on a concrete slab. Water storage header tank & disinfectant tank. Weather proof control board mounted on steel frame unit. Low voltage fuse bases & fuses to existing power pole. Weather proof switchboard mounted on existing power pole. Connection to overhead & underground power supplies. Supply & installation of a 30,000l poly rainwater tank with self supporting roof & metal guttering mounted on a concrete slab. Weatherproof LED security lighting. To include construction of 97m x 6m sealed access road to the wash down facility with 2 coat seal of 20mm/10mm aggregate. Click for more details...

SHOAL BAY TRACK UPGRADES
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Gunn Point Rd, Shoal Bay, NT 0830 of Track - Upgrades type of New development. Upgrades to the Shoal Bay Track at the Shoal Bay Coastal Reserve. To include the reconstruction of culverts & reformation of damaged areas of track. Click for more details...

NHULUNBUY HIGH SCHOOL MARINE TRADE TRAINING SHED
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 51 Matthew Flinders Wy, Nhulunbuy, NT 0880. Construction of a steel framed marine trade training centre at Nhulunbuy High School. To include boat parking area, chart room , simulation room, teacher office, workshop, equipment store, tool store & amenities. Steel stud wall frame with sheet metal cladding. Sheet metal roofing & roller doors. Acoustic walls tiles, ceramic floor tiles, concrete flooring with non slip finish, vinyl flooring & skirting. Aluminium framed sliding windows & louvres. Click for more details...

WOODS STREET HOSTEL CONVERSION
Hostel - 2 Storey - Conversion project at 87 Woods St (Lot 10562), Darwin, NT 0800 In The Council Area Of Darwin City of Private. Conversion of the Tracey Aged Care facility into a 45 room hostel. To include 42 ensuite rooms & 3 ensuite rooms with disabled access. Communal open space with swimming pool & outdoor seating. Conversion of existing building to convenience store & cafe with alfresco awning extension. Construction of circular drop of area. Car parking for 49 vehicles. Associated landscaping. Click for more details...

DESERT PARK
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Construction of a new ablution block & upgrade the eagle encounter. Scope of work includes: install an exposed aggregate floor (to match existing) 12 metres x 13 metres x 125mm thick to the floor area of the Eagle encounter shelter. Install 52 metre x 3metre x 125mm thick (with appropriate re-enforcing mesh) exposed aggregate path (to match existing) from the current path to the shelter entrance. Construct a small ablution block adjacent to the shelter. Construct a 12m x 2m exposed aggregate path to ablution block. Install bollard path lighting (possibly solar) along the path from Visitor Centre to the Shelter including the path to the ablution block. Install florescence lighting to the shelter. Install a refrigerated water bubbler to the shelter. Supply & install audio visual equipment to the shelter. Install an eagle mews (cage) adjacent to the shelter with water supply Click for more details...

HUNGRY JACKS RESTAURANT COOLALINGA
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 300000. This project Construction of a single storey restaurant to comprise bin room, cool room, plants room & 50 dining seats. Illuminated prefabricated red fascia light box, powder coated steel posts, frameless glazing & louvre doors. Car parking for 20 vehicles to include 17 car parks, 1 accessible car park & 2 waiting bays. Associated landscaping. Click for more details...

DALY RIVER ROAD
Roadworks - Culvert project at Daly River Rd, Litchfield Park, NT 0832 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Restoration of RCP 4 cells 1050 mm in diameter on Daly River road at chainage 58.98 k, inbound. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect