State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Canteens, Messes, Crib room Projects in NT®ion=⊂=2140 in region


YIMUYN MANJEER GOLD MINE - MOUNT TODD TENEMENTS
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 1000000. This project The first mortgagee is offering for sale by tender a number of exploration titles. These are highly prospective tenements near Mount Todd, located in the historic Pine Creek geosyncline. Potential also exists for base metal mineralisation. Click for more details...

NYIRRIPI AERODROME
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area of Airstrip - Upgrade type. Upgrade airstrip to CASA standards. Click for more details...

WOODS INLET ECO RESORT & COMMERCIAL DEVELOPMENT
Commercial Premises (Offices) project at Woods Inlet Cox Peninsula, Darwin, NT 0800 for New. Proposed construction of an Eco Resort. To include 160 bungalows, general store, cafe, restaurant, wharf, marine museum, lagoons, backpackers dormitories, jetty, 18 hole golf course with clubhouse, town centre with retail precinct & 300 room international hotel, offices, swimming pool, indoor recreation facilities, a machinery workshop, water storage tanks, stables & interpretive centre. 60 tonne reverse osmosis desalination unit Click for more details...

PARKS AUSTRALIA NORTH - KAKADU NATIONAL PARK
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area of Airconditioning Systems - Upgrade type. Programmed maintenance & repairs to airconditioning systems. Click for more details...

ROYAL DARWIN HOSPITAL & NIGHTCLIFF COMMUNITY CARE CENTRE
Medical (Hospitals & associated buildings, mortuaries) Renovations, Refurbishments etc. project at Darwin &, Nightcliff, NT 0810. This type is Hospital/Community Care Centre - Upgrading with State ownership. Repairs & maintenance of refrigeration & airconditioning equipment. Click for more details...


Shops (6) project at Proposed Lot 4556 (Town of Palmerston) Essington Ave, Gray, NT 0830 in the Retail (Shops, shopping centres & arcades, supermarkets). 2 large & 4 small shops. Steel frame & block-work construction, concrete floor, metal deck roof, aluminium framed windows, partial airconditioning, fire services. Carparking & landscaping. Click for more details...

LARAPINTA DRIVE PEDESTRIAN REFUGE
Pedestrian Refuge New project In The Alice Springs Town Council Area. Construct pedestrian refuge, install tactile ground surface indicators, remove existing linemarking, linemarking of median island, extension cycle path to join existing path & supply & install traffic control devices. Click for more details...

BRADSHAW FIELD TRAINING AREA
Bradshaw Station Timber Creek via, Katherine, NT 0850 Has Bradshaw Field Training Area currently at Construction stage. Civil component of project comprises of design & construction of 200 km roads & 2 airfields. Click for more details...

AUQUEST PROJECT - TOMS GULLY GOLD UNDERGROUND - RESOURCE
100 km southeast of, Darwin, NT 0800 Has Auquest Project - Toms Gully Gold Underground - Resource currently at Construction stage. The AuQuest project includes Toms Gully underground (proposed). The existing Quest 29 open cut operation. The Toms Gully CIP Plant and additional resources. Click for more details...

FAIRWAY WATERS
Military (Military housing & accommodation, Military colleges) project, Palmerston, NT 0830 for New. 2,3 & 4 bedroom each between 105 & 135 sq m approx. Mixture of block-work & steel construction, concrete floor, metal deck roof, aluminium framed windows. Carports & landscaping. Click for more details...

KATHERINE SHOWGROUNDS
A project in the NT Within Katherine Town. Supply & laying of all blockwork. Click for more details...

COLLEGE ROAD DEVELOPMENT
Commercial Premises (Offices) project at 2 College Rd (Secn 4920 Hund of Bagot), Berrimah, NT 0828 for New. Construction of 8 warehouse units with ancillary offices & showroom in 5 buildings. Steel frame & steel clad, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

TERRITORY HOUSING REHABILITATION
Housing - Upgrading project at Various locations Area of, Palmerston, NT 0830 In The Council Area Of Palmerston Town of State. Repairs to vacated dwellings for Territory Housing. Work to include carpentry, glazing, electrical services & plumbing. Click for more details...

ROADSIDE FURNITURE MAINTENANCE REGION OF DARWIN
A project in the NT Within Darwin City. Maintenance of Roadside furniture. Click for more details...

SMITH STREET DEVELOPMENT
New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Pt Lot 9177 (Proposed Lot 9206) Smith St, Alice Springs, NT 0870. Construction of steel framed warehouses for light industry. Click for more details...

POWER & WATER
Public Utilities (Water distribution systems, Drainage) project In The Various Council Area of General Engineering Services Consultants For Various Sites type. Panel contract for general engineering services for 2 year period. Click for more details...

LEANYER RECREATION PARK KIOSK FORECOURT COVERED AREA
A project in the NT Within Darwin City. Modifications to kiosk forecourt covered area. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Primary And Secondary Processing (Civil works at processing facilities) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Piping) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DARWIN STATE SQUARE PRECINCT
Consultancy For Precinct project at State Square, Darwin, NT 0801 in the Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls). Consultancy for State Square Precinct plan. Click for more details...

MCMILLANS ROAD OUTBOUND LANES ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at McMillans Rd btwn Charles Eaton Dr & Rothdale Rd, Darwin, NT 0800. This type is Outbound Lanes Roadworks - Rehabilitation with State ownership. McMillans Rd rehabilitation of outbound lanes between Charles Eaton Dr & Rothdale Rd. Click for more details...

LYONS CIVIL WORKS PHASE 1 - STAGE2 (STAGES 6-2) - DOUBLE ENTRY
A project in the NT Within Darwin City. Civil works including roads, drains & other service infrastructure including civil work Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

BATCHELOR SUBSTATION PROJECT - OXYGEN CONDUCTOR
Non-Construction Items (Supply/fabrication) project at Batchelor Road, Batchelor, NT 0845 of Oxygen Conductor - Supply & Deliver type of New development. Supply and delivery of an Oxygen Conductor. Click for more details...

POWER & WATER CORPORATION WEDDELL POWER STATION
Power Station project at Darwin River Dam Rd, Weddell, NT 0822 in the Public Utilities (Power stations, Substations, Windfarms, Phone exchanges). Construct new power station at Weddell, to service Darwin & Katherine, consisting of 2 identical sections. Click for more details...

KATHERINE RESEARCH STATION PATTERSON BUILDING EXTENSIONS (CONTRACT T07-1269)
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) Addition project at Katherine Research Station, 4391 Stuart Hwy, Katherine, NT 0851. This type is Research Building - Extn- Supply/Construct with State ownership. Supply materials & labour for extensions to existing building. Click for more details...

BATH STREET OFFICE BUILDING
Hospitality (Restaurants, Canteens) project In The Alice Springs Town Council Area of Office Building/Cafe - 3 Storey type. Construction of 3 storey office building. To include cafe. Concrete & steel frame walls & metal roof. Carparking for 59 cars. 1 loading bay. Associated landscaping. Click for more details...

LEARY STREET DUPLEX INCORPORATED INTO ID 1449696
Residential (Units, apartments, flats, townhouses, villas) New project at 9 (Lot 10183) Leary St, Bellamack, NT 0832. This type is Duplex with Private ownership. Construction of 2 x 2 bedroom multiple dwellings in a single storey building. Concrete slab, concrete block & metal roof. Carports, visitor parking & associated landscaping. Click for more details...

OLD TIMERS VILLAGE AGED CARE FACILITY UPGRADE PROJECT 3
Aged Care & Retired Developments (Aged care facilities) project at 245 (Lot 446) Stuart Hwy Connellan, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Alterations to the Rosetta Flynn bedrooms. Click for more details...

MUIRHEAD SUBDIVISION EXTERNAL WORKS & STORMWATER OUTFLOW
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Stormwater Outflow Infrastructure type. External works P & WC stormwater outflow infrastructure associated with Muirhead subdivision. Click for more details...

DARWIN LNG PLANT - MAINTENANCE CONTRACT
Private ownership Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Litchfield Shire Council Area for New development. Two year extension of an existing contract for onshore maintenance works including shutdowns. Click for more details...

SMITH STREET MOTEL CONVERSION
Smith Street Motel Conversion is currently at the Construction stage, valued at about $ 3000000 it is Conversion of 4 storey commercial building & construction of additional floor to provide 83 motel suites & an additional 2 x 2 bedroom units. To include 169sq m retail tenancies on ground floor. Swimming pool, amenities, bar & laundry facilities on ground floor. Concrete blockwork, glass & steel. Reconfiguration of car parking for 58 vehicles. Associated landscaping. Click for more details...

HOWARD EAST BOREFIELD EXPANSION ROAD & RISING MAIN
A project in the NT Within Litchfield Shire. Construction of road & pipe extension to service four existing bores in Howard East. To include 3.5km of rising main & 2.4km of side connectors with associated bends & fittings, submersible pumps, hose, sensors, manifold & control cabinet. Click for more details...

BICENTENNIAL ROAD RETAIL SHOWROOM
Retail Showroom New project In The Katherine Town Council Area. Construction of retail showroom (1844sq m). To include 5 separate display areas (96sq m each), internal warehouse (866sq m), sales office (37sq m), managers office (37sq m), workshop (30sq m), staff room (20sq m), amenities (48sq m) & entry foyer (47sq m). Concrete slab, colour-coated panelled parapet, precast concrete wall, glazed powdercoat aluminium showroom front, colour-coated finish wall panels & roof sheeting. Loading bay. Parking for 62 cars. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 Has Darwin Gateway Shopping Centre Stage 1 currently at Construction stage. Centre door hanging & carpentry sub-contractor for Gateway Shopping Centre Stage 1. To include construction of tiered Cinema seating. Click for more details...

NIGHTCLIFF MIDDLE SCHOOL MALE AMENITIES BLOCK UPGRADE
Currently at the Construction stage In Darwin City is a project estimated to be $ 174000. This project Upgrade works to the Male Amenities Block at Nightcliff Middle School, Rapid Creek. To include the removal of existing toilet cubicles, urinals & sinks. Removal of 10sq m of asbestos cement sheeting panel. Construction of 16 male toilet cubicles, CFC cubicle doors, 2 x stainless steel handwashing basins, 2 x stainless steel urinals & 3 x solid blockwork walls between urinals to 1400mm high. Supply & installation of 200mm x 200mm ceramic non-slip floor tiles, 300mm x 200mm ceramic wall tiles & 1200mm x 600mm ceiling tiles. Click for more details...

STOKES HILL WHARF PONTOON REFURBISHMENT
Pontoon - Refurbishment project at Stokes Hill Rd, Darwin, NT 0800 in the Civil Engineering (Docks & piers, wharves, boat ramps). Refurbishment of Dock 2 Pontoons at Stokes Hill Wharf, Darwin Waterfront. Click for more details...

SHOAL BAY TRACK UPGRADES
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Gunn Point Rd, Shoal Bay, NT 0830 of Track - Upgrades type of New development. Upgrades to the Shoal Bay Track at the Shoal Bay Coastal Reserve. To include the reconstruction of culverts & reformation of damaged areas of track. Click for more details...

MINJILANG GOVERNMENT EMPLOYEE HOUSING UPGRADES
Residential (Units, apartments, flats, townhouses, villas) project at Located Within, Minjilang, NT 0822 of Government Employee Houses (5) - Upgrades type of Renovations, Refurbishments etc. development. Refurbishment works to 5 Government Employee Houses located within Minjilang, Croker Island. To include painting of internal & external surfaces. Construction of concrete pathways. Supply & installation of gates. Strip & polish vinyl flooring. Click for more details...

ALICE SPRINGS REGION GOVERNMENT BUILDING AIR CONDITIONING PLANTS MAINTENANCE & REPAIRS
Maintenance & Repairs - For Air Conditioning Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Maintenance & repairs to air conditioning plants & associated equipment for various locations in the Alice Springs region. Locations to include community centres, art gallery, research centres, health clinics, police stations, primary & secondary schools. Click for more details...

TENNANT CREEK WATER SUPPLY & SEWERAGE INFRASTRUCTURE INFRASTRUCTURE MAINTENANCE & REPAIRS
Public Utilities (Water distribution systems, Drainage) project In The Barkly Shire Council Area of State ownership. Provision of repairs & maintenance works to water supply infrastructure & sewerage infrastructure at services locations within the Tennant Creek region. Water supply works to include repairs & maintenance to transmission & reticulated water mains, valves hydrants, water storage tanks & stands. Sewerage infrastructure works to include repairs & maintenance to rising mains, gravity sewers, pump station, access chambers & Septic Tank Effluent Pumping System. Associated repair works to tracks, hardstand, driveways, roadways & fencing. Click for more details...

DARWIN REGION BUS SHELTERS SOLAR LIGHTING SYSTEM
Solar Lighting - For Bus Shelters New project In The Darwin City Council Area. Supply & installation of a solar lighting system at 29 bus shelters located in Darwin, Palmerston & Virginia. To include removal of existing luminaries & switch isolation at bus stop 218 - Rapid Creek. Provision of traffic control. Click for more details...

CENTRAL ARNHEM ROAD REFORM & GRAVEL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Arnhem Rd, Nhulunbuy, NT 0880 of Roadworks - Reform & Gravel type of New development. Reformation & regravel of unsealed pavements on Central Arnhem Road CH403.1-407km & CH411.8?419.7km. Click for more details...

HUMPTY DOO PRIMARY SCHOOL
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Litchfield Shire Council Area for New development. Construction of a new car park at Humpty Doo Primary School. Scope of work includes: removal of portions of the existing verge & fence on the western side of Challoner Circuit near the Fred?s Pass intersection to make way for the construction of new parking bays. Construction of 22 new angle parking bays including earthworks. Construction of new pavement. Rectification/re-grading of portions of existing pavement, sealing & construction of new kerbs & inverts. Provision of pavement markings. Construction of new concrete footpath & concrete verge. Construction of new underground drainage pipes & pits. Relocation & protection of existing underground services & other associated works. Click for more details...

MULGA PARK ROAD GRAVEL RESHEETING
Roadworks - Resheeting project at Mulga Park Rd, Ghan, NT 0872 In The Council Area Of Macdonnell Shire of State. Reform & gravel resheet at various section from chainage 213.9km to chainage 223.18km Mulga Park Road, located 360km South West of Alice Springs. Scope of work includes: sandclay lift & reform pavement formation, gravel resheet x 8m wide, & reinstate floodways. Click for more details...

BEES CREEK PRESCHOOL
Currently at the Construction stage In Darwin City is a project estimated to be $ 1060000. This project Extension to existing Bees Creek Preschool. Scope of work includes: building works comprising partial demolition of the roof to an existing building; construction of an extension to the existing building; construction of a new covered roof over an existing path & relocation of shade umbrellas. Civil works comprising: clearing & grubbing; earthworks & construction of building pad; modifications to existing footpaths & construction of stormwater drainage system. Electrical, Mechanical and Hydraulics work comprises: termination and connection of existing services; provision of new services to accommodate the extension of the existing building & upgrading of existing services where required. Temporary Classroom comprises: supply & install a temporary classroom Click for more details...

DARWIN REGION BUS STOP SHELTERS
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darwin City Council Area for New development. Fabricate & install Type 15 Bus Stop Shelters at various locations in Darwin Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect