State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Canteens, Messes, Crib room Projects in NT®ion=⊂=2140 in region



Retail (Shops, shopping centres & arcades, supermarkets) project at Fitzgerald St (Lots 8634 4546 & 8636 Town of Nightcliff) & 365 Bagot Rd, Millner, NT 0810 for New. Block-work construction, concrete floor, metal deck roof, aluminium framed shop front windows, airconditioning. Carparking. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Retail (Shops, shopping centres & arcades, supermarkets) New project at Ellengowan Dve, Casuarina, NT 0810. This type is Commercial Building For University with State ownership. Building likely to contain: retail outlets, food & beverage outlets, function & conference facilities. Click for more details...


Subdivision - Residential New project In The Palmerston Town Council Area. Lease Area Proposed Lot Number Area (Hectacres) Bakewell A 4622 52.0, Rosebery B 4624 31.4, Rosebery C 4625 11.2, Bakewell D 4623 58.7. Roads, drainage, water, sewerage, electrical & landscaping. Click for more details...

WOODYCUPALDIYA ABORIGINAL CORPORATION
Woodycupaldiya Aboriginal Corporation is currently at the Construction stage, valued at about $ 670000 it is Construction of Infrastructure ( Roads, water supply, sewerage, power supply). Click for more details...


Public Utilities (Water distribution systems, Drainage) project at Borroloola & Robinson River Area of, Katherine, NT 0850 of Water Systems - Upgrading type of Renovations, Refurbishments etc. development. Day to day operation & maintenance of generation, distribution & water systems. Click for more details...

MOUNT TODD GOLD MINE
Mine - Mechanical Package - Wet Plant - Installation - Phase 2 - Expansion project at 45 km northeast of, Pine Creek, NT 0847 In The Council Area Of Katherine Town of Private. It is envisaged this facility will utilise a combination of flotation/regrind/leach methods. Contract to provide structural steelwork & mechanical services. Click for more details...

WAGAMAN PRIMARY SCHOOL
Social (Amenities, Dressing rooms) project for Addition development. Construct blockwork & metal clad roofed ablution block. Click for more details...

NIGHTCLIFF SHOPPING CENTRE
Woolworths Supermarket - Addns Addition project In The Darwin City Council Area. 350 sq m addition to existing store. Click for more details...

MELALEUCA ON MITCHELL
Backpackers Hostel/Shops (6) - 4 Storey New project In The Darwin City Council Area. Construction of 4 storey Back Packers Hostel comprising 98 strata titled units with 6 shops at street level 2 leisure decks, bar, kitchen & dining room. Click for more details...

TANAMI ROAD REHABILITATION
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Gravel resheet Chainage 455.7km - 465.7km & 480km - 490km & gravel resheet & salt stabilise Chainage 450.7km - 455.7km. Click for more details...

PARKS AUSTRALIA NORTH
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Infrastructure Works For Campground type. Work will consist of construction of campground roadworks, water supply delivery & reticulation mains, elevated & ground level water storage tanks as well as supply & installation of pumping equipment. Click for more details...

BROWNS POLYMETALLIC PROJECT - PROCESSING FACILITY
Processing Facility project at Approx 60 km south east of, Darwin, NT 0801 In The Council Area Of Darwin City of Private. The company had selected the Flubor hydrometallurgical process flow sheet for the treatment of the polymetallic resource to metals. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BATHURST ISLAND DEFENCE RADAR SITE
Bathurst Island Defence Radar Site is currently at the Construction stage, valued at about $ 2500000 it is Building works & services includes workshop & accommodation. Click for more details...

GURIG NATIONAL PARK CAPE DON LIGHTHOUSE COMPLEX HOUSES REPAIRS
Houses - Repairs Renovations, Refurbishments etc. project In The Darwin City Council Area. Repairs to houses within Cape Don Lighthouse Complex. Click for more details...

DARWIN REGION - ARNHEM HIGHWAY PAVEMENT REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Rehabilitation pavement between Ch: 100.400 km - Ch: 105.800 km. Click for more details...

MOUNT TODD GOLD MINE - CONTAINMENT WKS/HEAP LEACH PAD PUMP STATION/PUMPING MAIN
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at 45 km north east of, Katherine, NT 0850 of Containment Works/Heap Leach Pad Pump Station/Pumping Main - Construct type of New development. Containment works at the decommissioned Mount Todd Gold Mine. Click for more details...

WEST MACDONNELL NATIONAL PARK FACILITIES EXPANSION REMAINING PARKS
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Upgrade & expand existing walking tracks, car parks & other park facilities. Click for more details...

STUART'S WELL ROADHOUSE SERVICE ROAD EXTENSION
Service Road - Extn project at Stuart's Well within region of, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of State. Extension to roadhouse service road. Click for more details...

POWER & WATER CORPORATION - LUDMILLA WASTEWATER TREATMENT PLANT SWITCHBOARDS
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area for Supply & Install development. Supply & install switchboards for wastewater treatment plant. Click for more details...

ALICE SPRINGS REGION - TANAMI HIGHWAY BORES
Tanami Hwy, Alice Springs, NT 0870 Has Alice Springs Region - Tanami Highway Bores currently at Planning stage. Construct 3 bores for road maintenance. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

DEPARTMENT OF DEFENCE SHOAL BAY RECEIVING STATION
New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Shoal Bay Receiving Station, Rapid Creek Rd, Alawa, NT 0810. Upgrade & modifications of existing air conditioning systems. Provision of new air conditioning system to accommodate additional loads of approx 360 kW. Upgrade & modifications of the existing electrical reticulation systems & associated infrastructure to cater for additional equipment load. Upgrade & modifications of existing Uninterruptible Power Supply. Provision of a fully automatic fire suppression & control system in accordance with Defence Manual of Fire Protection Engineering & relevant Australian Standards. Refurbishment of existing workspaces to open-plan design. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - EARTHWORKS
Earthworks project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 in the Oil & Gas (Pipelines & associated contracts). For the provision of earthworks for the pipeline. Click for more details...

AUSTRALIAN IMMIGRATION DETENTION CENTRES
Australian Immigration Detention Centres is currently at the Planning stage, valued at about $ 1000000 it is The Department is seeking suitably qualified suppliers to be included on a panel to provide architectural services on various infrastructure projects relating to Immigration Detention Centres throughout Australia Click for more details...

FRANCES CREEK IRON - EAST ARM STOCKPILE EXPANSION
Iron Ore Facility - Upgrade project at 830 Berrimah Rd East Arm, Darwin Mc, NT 0822 In The Council Area Of Darwin City of Private. Increase of stockpile capacity to 450,000 tonnes. Project to include supply of mobile radial stackers & supply & installation of a conveyor & a tripper (1500tph capacity). Click for more details...

NORTHERN TERRITORY PANEL CONTRACT CONSULTANTS 'STIMULUS PACKAGE'
Education (Schools - primary, secondary (up to Yr 12)) project In The Various Council Area of Consultancy For Project Management type. Lead and Direct project teams comprising architectural, engineering, financial, cost planner, public relations expertise and client representation. Prepare functional design briefs. Chair individual School Project Committee's. Resolve any site issues. Be a member of tender assessment panels. Manage timing and cost of projects. Manage design and regional teams to ensure timely delivery. Review, monitor and report on progress of projects and project teams. Act as Superintendents or Principals Representative on contracts. Maintain detailed and accurate records of all correspondence in relation to contracts, project plan and other project detail. Ensure milestones are met. Ensure other program options are considered in designs, eg "Planet Savers". Have suitable laptop capability to remotely access your own office. Other services as required to deliver the Governments vision for the package. Click for more details...

VILLAS ON PARADE
Units (9) - 3 Storey project at 118 (Lot 9115, Town of Palmerston) Forrest Pde, Rosebery, NT 0832 In The Council Area Of Palmerston Town of Private. Construction of 8 x 2 bedroom & 1 x 3 bedroom units in 1 x 3 storey building & undercroft. To include balconies & air-conditioning, privacy screens. Associated carparking & landscaping. Click for more details...

QUARRY ROAD 24 LOT SUBDIVISION
Civil Engineering (Rural Subdivision) project In The Katherine Town Council Area of Private ownership. Civil works for 24 lot subdivision. Click for more details...

GUNBALANYA EARTHWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Oenpelli Rd, Gunbalanya, NT 0822. This type is Floodway/Earthworks with Local Govt ownership. Construction of a new floodway, associated earthworks & concreting to engineers specification & design on Oenpelli Road, Gunbalanya. Click for more details...

TIGER BRENNAN DRIVE CARRIAGEWAY DUPLICATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Tiger Brennan Dr, Stuart Park, NT 0820 for New. Duplication of carriageway - phase 1 on Tiger Brennan Drive between Dinah Beach Road & Woolner Road. Click for more details...

CASUARINA CAMPUS CHARLES DARWIN UNIVERSITY
New project of Residential (Student & group accommodation) project at 7 (Lot 9199) Ellengowan Dve, Brinkin, NT 0810. Construction of 6 x 2 storey ancillary hostel accommodation buildings to an existing establishment in two stages. Concrete slab, concrete blockwork & metal cladding. Click for more details...

JILKMINGGAN CHILD CARE CENTRE
Education (Kindergartens, day nurseries, child care centres) Renovations, Refurbishments etc. project at Lot 54 Jilkminggan via, Mataranka, NT 0852. This type is Child Care Centre with State ownership. Construction of child care centre. To include entry porch, activity room, sleep room, change room, staff programming office, kitchen, children's bathroom, staff bathroom, storage, laundry, drying yard & breezeway. Concrete slab, colour-coated wall cladding & roof. Associated landscaping. Click for more details...

PALMERSTON SOUTH ELEVATED WATER TANK
A project in the NT Within Palmerston Town. Construction of new 4ML concrete elevated water tank. To include all inlet & outlet pipework, distribution mains, valves, pits & controls. Associated power supply & electrical services including all cabling, metering, switchboards, telemetry power & lighting. Construction of amenities block. Concrete slab, stairway & steel roof structure. Installation of control system, CCTV & security system. Construction of domestic water infrastructure, tank cleaning systems, meters, booster pump, irrigation systems, hose points & fixtures. Associated access road & pavements, landscaping, fencing & drainage. Click for more details...

ICHTHYS GAS PROJECT - ONSHORE - SITE FACILITIES BLD1 - CEILINGS PARTITIONS & LININGS SUBCONTRACT
Ceilings/Partitions/Linings - Supply & Install New project In The Darwin City Council Area. Supply, delivery & installation of all new ceilings, partitions & linings to buildings in the gatehouse, operations & warehouse/workshop zones. Click for more details...

MUIRHEAD RESIDENTIAL DEVELOPMENT STAGES 5-7 LANDSCAPE ARCHITECT CONSULTANCY
Consultancy For Residential Subdivision (445) Lots - Stages 5-7 project at Lee Point Rd (Lot 11070), Muirhead, NT 0810 In The Council Area Of Darwin City of Private. Landscape design consultancy for stages 5 - 7 of Muirhead Estate. Reconfiguration into 445 lots. Stage 5 - 189 lots. Stage 6 - 143 lots. Stage 7 - 113 lots. Click for more details...

DUKE STREET UNITS
Residential (Units, apartments, flats, townhouses, villas) project at 29 Duke St (Lot 2999), Stuart Park, NT 0820 of Units (16) - 4 Storey type of New development. Construction of 9 x 2 bedroom & 7 x 3 bedroom units in four storey building with basement carparking. Cement slab, rendered concrete blockwork, metal roof. 1 lift. Parking for 32 cars. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - FLANGE MANAGEMENT SERVICES
Mining (Onshore - oil & gas) project In The Darwin City Council Area of Private ownership. For the provision of Flange Management Service for Ichthys Operations. To include but is not limited to the provision of - A flexible, scalable, & modular flange management service to meet the requirements of day to day operations & maintenance, campaign maintenance & shutdown work scopes, across both offshore & onshore facilities. Provision of competent service technicians to perform bolted flange disassembly & assembly. Provision of appropriate resources & support services for day to day operations & maintenance, shutdown & campaign scopes of work, both offshore & onshore. Coordination & development of flange assembly work packs & check sheets. Provision of engineering & technical support for flange assembly & related equipment. Provision of personnel & equipment to complete onsite flange machining. Provision of hire equipment, equipment repair & calibration services to support Company requirements. Click for more details...

PARAP POOL REDEVELOPMENT
Pool - Redevelopment project at 77 Ross Smith Ave, Parap, NT 0804 in the Commercial Premises (Offices). Redevelopment of the Parap Pool. To include construction of 50m FIDA competition & training pool, 25m multi-purpose indoor pool with access ramps for universal access & seating for 600 spectators & the ability to accommodate 1600 temporary seats. Construction of 11.5m high 33,0000sq m shade structure to cover pool areas. Pump room building with chemical store (270sq m), control room building (42sq m), pool store room building (42sq m), swim club building (42sq m). Reconfiguration of existing car park to accommodate parking 64 vehicles. Construction of administration building (450sq m) with kiosk/cafe, office, communications room, amenities, family room & first aid room. Associated landscaping. Click for more details...

CENTRAL ARNHEM ROAD REFORMATION & REGRAVEL CH255KM TO CH319KM
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Reformation & regravel of unsealed pavements on Central Arnhem Road between Ch255.75Km to Ch259.35Km, Ch260.8Km to Ch263.8Km & Ch310.7Km to Ch319Km. To include widening of table drains. Click for more details...

PALMERSTON REGIONAL HOSPITAL CONCRETE PLACING
Stuart Hwy (Section 4231 Hundred of Bagot S901068), Palmerston, NT 0830 Has Palmerston Regional Hospital Concrete Placing currently at Construction stage. Placing of conrete at the Palmerston Regional Hospital. To include minor formwork and reinforcing fix. Click for more details...

STUART HIGHWAY & STRICKLAND ROAD REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy & Strickland Rd, Adelaide River, NT 0846 for New. Rehabilitation works to the Stuart Highway between Ch107.6 & Ch109.3. To include drainage works to the Stuart Highway & the intersection with Strickland Road. Upgrade works to the Strickland Road intersection to include a left turning lane from the Stuart Highway to Strickland Road (South bound), right turning lane from the Stuart Highway to Strickland Road (North bound) & passing land in the Stuart Highway. Supply & lay top soil & grassing for 1m either side of roads. Provision of traffic control. Click for more details...

PLENTY HIGHWAY GRAVEL RESHEET
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Plenty Hwy, Alice Springs, NT 0870. This type is Roadworks - Resheeting with State ownership. Resheeting of the Plenty Highway between Ch382 & Ch393.5 located 450km North East of Alice Springs. To include reformation of existing pavement to create subgrade surface. Gravel resheeting to 150mm depth x 8m width. Reinstate table drains, offlet drains & blocks. Box out floodways & resheet to 300mm depth. Provision of traffic control. Click for more details...

ANGEL ROAD DUPLEX
Duplex project at 59 Angel Road (Lot 11287), Johnston, NT 0832 In The Council Area Of Palmerston Town of State. Proposed construction of 2 x 2 bedroom dwellings in a single storey building. To include gardens sheds, carports & verandas. Reinforced concrete slab, masonary block slab, plasterboard ceiling. Sheet metal roofing & cladding, aluminium framed glazed louvres & sliding doors. Exposed aggregate concrete driveway & total car parking for 4 cars. Associated landscaping. Click for more details...

WULAGI PRIMARY SCHOOL WATER MAINS
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of State ownership. Construction of new water mains for fire services, potable water & irrigation uses. To include removal & capping of existing fire hydrants. Construction of DN160 PN16 fire main with sluice valve. Construction of DN110 PN16 water supply main & DN75 PN16 irrigation supply main. Click for more details...

TIGER BRENNAN DRIVE, BENNETT STREET & CHUNG WAH TERRACE PATCHING & RESEALING
Roadworks - Reseal & Patching project at Tiger Brennan Dr, Bennett St & Chung Wah Tce, Palmerston, NT 0830 In The Council Area Of Palmerston Town of State. Resealing works to Tiger Brennan Drive, Bennett Street & Chung Wah Terrace. To include supply & lay A15E asphalt to 14mm. Provision of line marking & traffic control. Click for more details...

RANKEN ROAD RESHEETING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Resheeting & surface formation of Ranken Road from Ch55.28 to Ch59.28 & Ch61.29 to Ch69.29. Supply & lay surface formation to 200mm. Supply & lay gravel to 15mm thickness. Provision of traffic control. Click for more details...

BRIDGE STREET TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project for New development. Proposed construction of 2 x 2 storey x 3 bedroom townhouses. Aluminium framed glass louvre windows, wall cladding & custom orb roof. Car parking for 4 vehicles. Associated landscaping. Click for more details...

TIO STADIUM MARRARA
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Asphalt re-surfacing of AH Mat & Bonson Gate car parks. Works are to be carried out between the 29 May to 2 June 2017 & 5 June to 9 June 2017. Click for more details...

LATZ CRESCENT & GREVILLEA DRIVE RESIDENTIAL HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area of State ownership. Refurbishment of 2 residential dwellings, both properties comprise 4 bedrooms, 2 bathrooms located within the Alice Springs town centre Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect