State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Caravan parks with assoc facilities, Camping grounds Projects in TAS®ion=⊂=420 in region


LEWISHAM SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project at Not known, Lewisham, TAS 7173. This type is Reticulation/Pumping Station & Rising Main with Local Govt ownership. The work involves the supply, installation and testing of sewerage infrastructure serving approximately 150 properties via approximately 1600 m of carrier main, a pump station and 1100 m of rising main. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project In The Burnie Council Area of Dwellings (2) type. 2 x 2 bedrooms. Click for more details...

NORTAS P/L
Private ownership Industrial (Factories & Factory Units) project In The Clarence Council Area for New development. Bondor panels, portal frame, concrete slab floor. Click for more details...

REDWOOD ROAD HOUSES
Residential (Units, apartments, flats, townhouses, villas) project at 195-201 Redwood Rd, Kingston, TAS 7050 for New. Construction of eleven (11) grouped houses. Click for more details...

TURNERS BEACH SEWAGE LAGOONS EXTENSIONS
Civil Works New project In The Central Coast Council Area. Excavation, clay lining & embankment walls. Click for more details...

BANJO'S BAKERY & CAFE
Retail (Shops, shopping centres & arcades, supermarkets) project at 85-87 Main Rd, Moonah, TAS 7009 for Renovations, Refurbishments etc.. Internal refurbishment of existing premises. Click for more details...

ROYAL HOBART HOSPITAL REDEVELOPMENT - STAGE 2
Medical (Hospitals & associated buildings, mortuaries) Renovations, Refurbishments etc. project at 48 Liverpool St, Hobart, TAS 7000. This type is Block A - 8th Floor Occupational Therapy with State ownership. Internal refurbishment. Click for more details...

ANGLESEA BARRACKS REGIONAL TRAINING CENTRE
Military (Military installations & facilities) Renovations, Refurbishments etc. project at Anglesea Barracks & Dowsing Point, Glenorchy, TAS 7010. This type is Training Centre - Package 2 with Federal ownership. Minor refurbishment and alterations to existing buildings at Anglesea and Derwent Barracks Click for more details...

SAVAGE RIVER IRON ORE OPERATIONS
Currently at the Construction stage In Burnie is a project estimated to be $ 5000000. This project For the provision and maintenance of a fleet of trucks and excavators sufficient to load and haul 25 million tonnes of ore and waste per annum from the open pit operation at the Savage Iron Ore Mine in North west Tasmania for 5 years. Click for more details...

INGLEWOOD ROAD WATERMAIN REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project at Inglewood Rd, Hobart, TAS 7000 of Watermain Replacement type of New development. Construction of watermain. Click for more details...

AVEBURY NICKEL PROJECT - TRIAL MINING CONTRACT
New project of Mining (Underground - including longwall) project at 8 Km West of, Zeehan, TAS 7469. Trial mining of 5000 tonnes of ore. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Civil Engineering (Retaining walls, Seawalls) project In The Northern Midlands Council Area of Local Govt ownership. Works will include the demolition and removal of existing boundary fences, the construction of a low concrete wall and the erection of new boundary fencing on portions of wall. Click for more details...

TECHNOPARK INCUBATOR BUILDINGS REFURBISHMENT
Commercial Premises (Offices) project In The Glenorchy Council Area of Office - Refurbishment type. Refurbishment of existing buildings to provide new entry and administration support area. Includes new corridor roof, external works and paving. Click for more details...

AUTRALIAN RED CROSS DEVONPORT
Medical (Surgeries, Medical centres) project at 40 Oldaker Street, Devonport, TAS 7310 of Blood Collection Service - Fitout type of Renovations, Refurbishments etc. development. Fitout works to include ceilings, plastering, partitions, joinery, painting, floor coverings, plumbing, electrical and data services. Click for more details...

THE HAZARDS AT FREYCINET
Currently at the Construction stage In Glamorgan-Spring Bay is a project estimated to be $ 1800000. This project Construction of several dams and installation of pumps and pipework associated with the upgrade of the Coles Bay water supply for the proposed Hazards Resort Complex. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

CRADLE COAST MEDICAL CENTRE
Medical (Surgeries, Medical centres) project at Alexandra Road, Ulverstone, TAS 7315 for New. Construction of a medical centre. Precast concrete walls, concrete floors, metal roof and aluminium windows. Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Huon Valley Regional Water Scheme Project is currently at the Tenders & Building stage, valued at about $ 2000000 it is Construction of approximately 46 kilometres of pipeline using pipes supplied by others. Click for more details...

PARLIAMENT SQUARE HOBART REDEVELOPMENT
Currently at the Construction stage In Hobart is a project estimated to be $ 68000000. This project Construction of an office tower encompassing esd principles with 1 level of basement car parking, 2 lower ground levels for offices and some retail on the first lower ground level, retail at ground level with new shops, restaurants, bars and cafes and 16,000 square metres of office space over 8 levels above. The dining and entertainment precinct will total 4,500 square metres and have approximately 30 shops. Click for more details...

QUEECHY HIGH SCHOOL - BER PROJECT
161 Penquite Road, Launceston, TAS 7250 Has Queechy High School - Ber Project currently at Construction stage. Significant upgrade of science block and construction of outdoor learning area. Click for more details...

HOBART ROAD RETAIL PREMISES
Retail (Shops, shopping centres & arcades, supermarkets) project for New development. Demolition of a building and construction of a building to use as a shop. Click for more details...

SUPREME COURT
Public Buildings & Facilities (Law Courts) project at Salamanca Place, Hobart, TAS 7000 of Court - Alterations type of Renovations, Refurbishments etc. development. Minor works to address maintenance and operational requirements of both Supreme Court buildings, including installation of new roof membranes, sandstone and slate cleaning and repair, alterations to the main entrance doors and all secondary exit doors, internal alterations to the Jury Rooms including lighting and kitchenette facilities and works to the Criminal Court building to create two new Interview Rooms and repair light fittings and joinery in the two Criminal Courtrooms. Click for more details...

KMART PANEL OF BUILDING CONTRACTORS
Kmart Panel Of Building Contractors is currently at the Tenders & Building stage, valued at about $ 1000000 it is Kmart is going through a store refurbishment and renewal phase, with a key feature being the roll out of new look store designs. Kmart is seeking Expressions of Interest (EOI) from suitably qualified and experienced Building Contractors across all Australian states for prequalification as prospective tenderers to contribute to building and refurbishment projects throughtout Kmart department stores and Kmart Tyre & Auto Service stores (KTAS). Click for more details...

UTAS SCHOOL OF NURSING AND MIDWIFERY
School Of Nursing And Midwifery Renovations, Refurbishments etc. project In The Hobart Council Area. Change of use to Educational Establishment and alterations to the existing vacant Electrical Engineering and Waterworth Buildings, involving internal refurbishment of both buildings and a new link between them for use by the University of Tasmania's School of Nursing. Associated works include new landscaping around the immediate area of the buildings, new paving and hotmix surfaces, new planting, retaining walls and outdoor seating. A disability access parking space is proposed above the Electrical Engineering building with bike lockers and plant room being proposed below this building. Click for more details...

BRIGHTON COUNCIL RESEAL TENDERS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various Locations within the Municipality of, Brighton, TAS 7030 of Road Resealing type of New development. Resealing and new sealing of various roads within the Brighton Municipality. Click for more details...

RIDGLEY HIGHWAY ROAD RECONSTRUCTION - STAGE 2
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Ridgley Hwy, North of, Ridgley, TAS 7321. This type is Road Reconstruction with State ownership. Widen and provide an overlay to improve the structural capacity of the existing pavement together with other associated works. Click for more details...

BLACKMANS BAY CHILDRENS SERVICES OCEAN VIEW
Education (Kindergartens, day nurseries, child care centres) project for Addition development. Extension to existing child care centre, post tensioned concrete slab, steel columns, metal roof, cement sheet walls and double glazed windows. Click for more details...

SIMMONS PARK DRAINAGE UPGRADE
Simmons Park Drainage Upgrade is currently at the Construction stage, valued at about $ 902000 it is Supply and installation of a gross pollutant trap, footpaths, siteworks and upgrading of associated stormwater. Click for more details...

HOBART COUNCIL CENTRE
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Hobart Council Area of Amenities - Upgrade type. General upgrade of amenities in the Hobart Council Centre. Click for more details...

STATEWIDE PROPERTY MAINTENANCE TENDERS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) New project at Various locations statewide, ., TAS 7999. This type is Mechanical Maintenance with State ownership. Provision of preventative, corrective and statutory maintenance to its property portfolio on a state-wide basis for a period of three years. Click for more details...

BROOKE STREET FERRY PIER DEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Hobart Council Area of Pier Structure type. Construction of the pontoon level of the pier which will sit below water level is 40% complete. The entire concrete structure is likely to be in place at Brooke Street end 2014. The pier is being built at Incats Princes of Wales Dockyards. Click for more details...

NINE MILE ROAD HEAVY VEHICLE ROAD UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Nine Mile Rd near Howth, 11km east of Burnie, Howth, TAS 7316 of Roadworks - Upgrade type of New development. The project is a 3.5km upgrade of the Nine Mile Rd between Bass Hwy and Zig Zag Rd, Howth to allow HPVs. Works include widening from 4.8m to a 6m wide seal, 1m wide gravel shoulders, widening corners, utility relocation and line marking Click for more details...

ELIZABETH STREET MIXED USE DEVELOPMENT
327 Elizabeth St, North Hobart, TAS 7000 Has Elizabeth Street Mixed Use Development currently at Construction stage. Partial demolition and change of use from residential to part residential and part bed & breakfast, with associated extensions & renovation works. Click for more details...

MOUNT CARMEL COLLEGE
361-365 Sandy Bay Rd, Sandy Bay, TAS 7005 Has Mount Carmel College currently at Construction stage. Extensions & alterations to existing educational establishment. Demolition of 9 Quorn Street. Demolition of the northern ?Chapel? wing at 7 Quorn Street. As Stage 1, a new 2 storey extension replacing the ?Chapel? wing and converting the entirety of 7 Quorn Street to learning spaces & accompanying staff facilities for Year 7 & 8 students. As Stage 2, a 2 storey addition on 9 Quorn Street connecting to Stage 1, integrating teaching areas on the upper floor, whilst providing a dance studio & a kitchenette on the ground floor. Materials to be used include render & paint finish, aluminium framed windows & powdercoated finish, brickwork, metal roof & colorbond finish. Click for more details...

ST PAULS RIVER BRIDGE REPLACEMENT
St Pauls River, Avoca, TAS 7213 Has St Pauls River Bridge Replacement currently at Construction stage. Bridge replacement of the St Pauls River Bridge, Avoca & associated civil works. Click for more details...

AUSTRALIAN HONEY PRODUCTS PTY LTD
Honey Extraction Facility project at 111 Main St, Sheffield, TAS 7306 In The Council Area Of Kentish of Private. Construction of a 1600 sqm industrial building for use as a honey extracting facility. Concrete slab, insulated panels, metal deck roof and services including compressed air. Click for more details...

MEANDER VALLEY BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) New project at Various Bridges throughout the municipality of the Meander Valley, Westbury, TAS 7303. This type is Bridges (4) - Design/Construct with Local Govt ownership. Meander Valley Council invites tenders for the design and construction of the following bridges: - Bridge No 3471 Western Creek Tributary, Cheshunt Road, Western Creek - Bridge No 3764 Mole Creek Road, Shalstone Road, Mole Creek - Bridge No 4296 Chittys Creek, Reiffers Road, Meander - List No 0408 Coiler Creek Tributary, Brooklyn Road, Moltema. Click for more details...

EAST DERWENT HIGHWAY DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construction of 4 single storey dwellings. 3 bedrooms. Private timber decks. Shared paved driveway with single car space garages. Steel sheet roofing, brick face work and aluminium framed windows and doors. Click for more details...

REDWOOD ROAD UNITS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 358 Redwood Rd, Kingston, TAS 7050. Construction of a single storey multi-residential development to include 2 x 2 bedroom & 2 x 3 bedroom units. Roof cladding, wall cladding, concrete slab & glazed window. Car parking for 10 vehicles to include 8 residential & 2 visitor bays. Associated landscaping. Click for more details...

ROAD WIDEN & KERB (BETWEEN REIBEY TO HENN ST) CROWTHER STREET STAGE 2
Roadworks - Widening - Stage 2 New project In The West Tamar Council Area. Construction of roadworks on Crowther Street between Reibey & Henn Streets including road widening & kerbing works. Construction of 217m of concrete kerb & channel. Construction of approximately 360sq m of 300mm full depth road pavement. Construction of two urban asphalt driveways approximately 85sq m. Supply & installation of 65m DN 300 profiled Wall Polyethylene pipe. Supply & installation of six DN1050 manholes. Supply & installation of two side entry pit w/ 1830 lintel & general reinstatement. Click for more details...

LINDSAY TRANSPORT (TAS) PTY LTD
Currently at the Construction stage In Northern Midlands is a project estimated to be $ 150000. This project Construction of hay storage shed. Associated car parking & landscaping. Click for more details...

HOBART CITY COUNCIL SOLAR SYSTEMS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) New project at Council Buildings within, Hobart, TAS 7000. This type is Council Buildings Solar Systems with Local Govt ownership. Solar Systems - Supply & Installation to Council Buildings. Click for more details...

RIVERBANK PLACE VILLAS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The West Tamar Council Area for New development. Construction of 5 single storey villas x 2 bedrooms. Selected face brickwork, wall cladding, powdercoated aluminium window frames, awning sashes, locks & screens, roof sheeting & preformed metal fascia & gutter. Car parking for 13 vehicles to include 10 residential & 3 visitor bays. Associated landscaping. Click for more details...

ELIZABETH STREET OFFICE REFURBISHMENT
Currently at the Construction stage In Hobart is a project estimated to be $ 1093000. This project Refurbishment to the internal offices, levels 4 & 5, 22 Elizabeth Street, Hobart. Click for more details...

WATERHOUSE ROAD DAIRY
Currently at the Construction stage In Dorset is a project estimated to be $ 800000. This project Construction of dairy. Associated car parking & landscaping. Click for more details...

FLINDERS COUNCIL ROAD & RUNWAY WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Flinders Council Area of Roadworks/Runway type. Supply & delivery of the following services for road and runway works. Price per square meter to Supply Plant, Equipment, Materials & Labour to Stabilise, compact & final trim 21,500 square metres of in-situ material (Gravel Roads) with 3.6 kg per square metre of GP cement to a depth of 100mm. Stabilise, compact & final trim 10,000 square metres of in situ material (Gravel and Bitumen Roads) with 5.4 kg of GP cement & 5.4 kg of Quicklime per square metre to a depth of 150mm. Stabilise, compact & final trim including the provision of compaction testing 4,000 square metres in 4 separate large patches of in-situ material (Bitumen Airport Runway) with foam bitumen to a depth of 300mm. Need price for both 2 pct bitumen based on an MDD of 2.0t/m3 & 3 pct bitumen based on an MDD of 2.0t/m3 including 1 pct secondary binder (Quick Lime or cement) with spread rate to be determined after testing & mix design has taken place. Click for more details...

REYNOLDS ROAD BRIDGE AND LINK ROAD BRIDGE
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Design & reconstruction of Reynolds Road Bridge & Link Road Bridge. Associated civil & drainage works. Click for more details...

CAMBRIDGE ROAD ROADWORKS
Cambridge Road Roadworks is currently at the Construction stage, valued at about $ 474000 it is Proposed works to include the upgrade of Cambridge Road from Brookston Drive to Solandra Court to comprise of kerb & gutter replacement, a retaining wall & guard railing. Associated civil works. Click for more details...

OLD STATION ROAD UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Old Station Rd Lower, Snug, TAS 7054 of Roadworks - Reconstruction type of New development. Construction of roadworks to reconstruct approximately 400m of sealed road pavement including 300m of new kerb & channel along Old Station Road. Associated civil & drainage works. Click for more details...

KANGAROO BAY FORESHORE PROMENADE STAGE 2
Entertainment (Parks, Leisure grounds, Playgrounds) project at Kangaroo Bay, Hobart, TAS 7000 of Foreshore Promenade - Stage 2 type of New development. Construction of the Kangaroo Bay Foreshore Promenade stage 2. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect