State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Civil Maintenance, eg.grading etc. Projects in NT®ion=⊂=2370 in region


ALICE SPRINGS TOWN COUNCIL
Local Govt ownership Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Various period contracts: General building maintenance, construction of concrete footpaths, construction of paving in CBD, & sprayed bituminous surfacing. Click for more details...

GARRAK-JARRU/JABIRU/MITATJA REGION
Public Utilities (Water distribution systems, Drainage) project at Area of Port Keats, ., NT 8999 of Water Supply - Upgrade type of Renovations, Refurbishments etc. development. Installation & repairs of solar powered bore pumps, construction of pipelines, & erection of tanks & stands. Click for more details...

LITCHFIELD PARK
State ownership Entertainment (Parks, Leisure grounds, Playgrounds) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Repairs to various walking tracks. Click for more details...


Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Region of, Katherine, NT 0850 for Subcontract. Period contract for general repairs & maintenance of plumbing services on PAWA installations. Click for more details...

MITCHELL'S CHASE
New project of Civil Engineering (Residential Subdivision) project at Lot 4040 Chung Wah Tce (Town of Palmerston), Palmerston, NT 0830. To create 38 lots. Roads, water, sewerage & telephone services. Click for more details...


Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project for Renovations, Refurbishments etc. development. Painting of various Council Properties as required. Click for more details...

ROBERTSON BARRACKS PROGRAM OF WORKS STAGE 1
Barracks - Redevelopment project at Robertson Barracks via, Palmerston, NT 0831 in the Military (Military installations & facilities). Project to involve: Working accommodation, including office style buildings; vehicle & equipment storage facilities; armouries; amenities & ablutions; & carparking; modifications & upgrades to the Barracks High Voltage reticulation system; central emergency power supply & generator works; & assistance to obtain government approvals for elements of the works. Click for more details...

CHARLES DARWIN UNIVERSITY-ALICE SPRINGS CAMPUS
Ceilings/Lights - Replacement Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Replacement of suspended ceilings & lights. Click for more details...

DARWIN CBD WATERFRONT REDEVELOPMENT
Renovations, Refurbishments etc. project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Kitchener Bay Waterfront Precinct, Darwin, NT 0800. Demolition of all infrastructure located within area nominated. Click for more details...


Bathurst Island, NT 8999 currently at Construction stage. 1 x 2 & 1 x 3 bedroom. Click for more details...

RAAF BASE DARWIN
A project in the NT Within Darwin City. Development will comprise construction of new fuel farm comprising following works: one 2.5 megalitre F34(AVTUR/FS11) storage facility including storage tanks, pumps, pipework, valves, fittings & associated equipment. Aircraft hydrant refuelling system comprising pumping equipment, underground fuel reticulation system & associated electrical controls. Administration building including Fuel Quality Control Lab; & associated civil works, connection to engineering services & environmental protection facilities. These works will be delivered using Department of Defence Head Contract. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) New project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830. This type is Industrial Bldgs - 1 Basb - Apin - Stage 2 with Federal ownership. Industrial buildings for 1 BASB - Transport & Maintenance Companies. Click for more details...

FAIRWAY WATERS
Residential (Units, apartments, flats, townhouses, villas) project, Palmerston, NT 0830 of Houses (13) type of New development. 2,3 & 4 bedroom. Mixture of block-work & steel construction, concrete floor, metal deck roof, aluminium framed windows. Carports & landscaping. Click for more details...

PINE CREEK POWER STATION
Currently at the Construction stage In Katherine Town is a project estimated to be $ 56000. This project Day to day operations & maintenance of power station, water & sewer systems. Click for more details...

TI TREE OVAL
Social (Amenities, Dressing rooms) New project at Ti Tree Oval, Ti Tree, NT 0872. This type is Toilet Block with Local Govt ownership. Construction of toilet block/changerooms on oval. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

TJUWANPA OUTSTATION HOUSES
Houses (4) project at Tjuwanpa Outstations, ., NT 8999 in the Residential (Units, apartments, flats, townhouses, villas). 2 x 3 bedroom, block-work construction, concrete floor, metal deck roof, aluminium frames windows. 2 x 4 bedroom, steel framed construction on stumps, timber floor, metal deck roof, aluminium framed windows., Click for more details...

JILKMINGGAN COMMUNITY HOUSING PROGRAM
Jilkminggan Community Housing Program is currently at the Construction stage, valued at about $ 1000000 it is Construction of eight steel frame & steel clad elevated houses, CFC flooring, metal deck roof, aluminium framed windows. Capital renovations to three existing houses. Click for more details...

ALICE SPRINGS HOSPITAL
Trade Package For Electrical Services - Hospital - Redevelopment project at Gap Rd, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of State. Electrical services for hospital redevelopment. Click for more details...

JOINT DEFENCE FACILITY - PINE GAP
New project of Military (Military installations & facilities) project at Pine Gap Region of, Alice Springs, NT 0872. Installation & testing of new digital control system & new 2000 kW diesel generator set to work in synchronization with twelve existing diesel generator sets operating in two buildings. Existing power system supports critical 24 hour operation that shall remain on line during new construction. Tasks will include: Demolition of existing control system from existing building, designated "Utilities Building". Installation of new central control system in existing building, designated "Powerhouse". Digital control system will interface with 2400 volt switchgear & auxiliary systems. Installation of new inter-connecting ductbanks between two buildings. Click for more details...

LYONS COTTAGE
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of State ownership. Installation stormwater drainage & concrete repairs & maintenance. Click for more details...

WASTEWATER TREATMENT PLANT-EAST ARM WHARF
Wastewater Treatment Plant For Quarantine Washdown Facility project at East Arm Wharf Region of, Darwin, NT 0800 In The Council Area Of Darwin City of State. Proposed construction quarantine wastewater treatment plant to treat waste water from quarantine washdown facility. Click for more details...

PLENTY HIGHWAY WATER BORES
State ownership Public Utilities (Water distribution systems, Drainage) project In The Alice Springs Town Council Area for New development. Drill & construct 2 x water bores between Ch: 160.00 km & Ch: 240.00 km. Click for more details...

PALMERSTON ARTERIAL ROADS - IRRIGATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Supply & Install project at Within region of, Palmerston, NT 0831. This type is Irrigation Telemetry - Supply/Delivery/Installation/Commissioning with State ownership. Supply, delivery, installation & commissioning of irrigation telemetry. Click for more details...

BATCHELOR SUBSTATION PROJECT
Batchelor Rd, Batchelor, NT 0845 Has Batchelor Substation Project currently at Construction stage. The project comprises the construction of a new power distribution infrastructure in the Batchelor region to the proposed Compass Resources Brown Oxide mine. Development includes a new 132 kV transmission line of 3.7 km along Batchelor road, two new substations and a new 22 kV underground XLPE cable feeder of 10.6 km from Batchelor road to the mine site. Construction work will involve the design certification and installation of control room, disconnection uplift transport handling temporary storage and placement of all items from the Edith River substation that are to be relocated and reinstalled at Batchelor substation, erection of all electrical equipment, connection of the earth wire conductors to electrical equipment and testing of the completed earthing system, attachment of conductors and insulators to the landing structure, 132 kv transmission line erection and commissioning, electrical installation work not otherwise specified, installation of communications and 240 V power between the crib room and the control room. Click for more details...

POWER & WATER CORPORATION - DARWIN REGION REMOTE ABORIGINAL COMMUNITIES - CIVIL/HYDRAULIC WORKS/SERVICES
Power & Water Corporation - Darwin Region Remote Aboriginal Communities - Civil/Hydraulic Works/Services is currently at the Tenders & Building stage, valued at about $ 270000 it is Panel contract for provision of civil & hydraulic works & services to water & sewerage infrastructure for period of 36 months for remote Aboriginal communities within Darwin region. Click for more details...

EAST ARM PORT WHARF - REFERENCE ELECTRODE WELLS/SENSE CONNECTORS - STAGE 1
East Arm Port Wharf - Reference Electrode Wells/Sense Connectors - Stage 1 is currently at the Tenders & Building stage, valued at about $ 150000 it is Provision of (12) Reference Electrode Wells & Sense Connectors to Stage 1 Wharf, East Arm Port. Click for more details...

POWER & WATER CORPORATION - NORTHERN REGION WATER SUPPLY/SEWERAGE SYSTEMS INSTRUMENTATION/EQUIPMENT
Public Utilities (Treatment plants, Sewerage reticulation) Renovations, Refurbishments etc. project at Various sites within northern region of, Darwin, NT 0801. This type is Water Supply/Sewerage Systems Instument/Equipment - Install/Repairs/Service/Main with State ownership. Installation, repairs, service & maintenance to general instrumentation & control equipment for water supply & sewerage systems for 36 month period contract in northern region. Click for more details...

NIGHTCLIFF/PAVONIA WAY SHOPPING CENTRE UPGRADE
A project in the NT Within Darwin City. Construction, landscaping & minor civil works, including disabled access to shop frontages. Click for more details...

SHEPHERDSON COLLEGE MULTI PURPOSE COMMUNITY HALL BER PROJECT (INCORPORATED INTO ID 1155087)
Education (Schools - primary, secondary (up to Yr 12)) project at ., Galiwinku, NT 0822 for New. Construction of multi purpose facility/cyclone shelter. Concrete slab, concrete block, steel, clerestory aluminium louvre windows, solid core doors, cyclone enclosure for generator, colour-coated metal roof with cyclone fixtures. Click for more details...

COX PENINSULA REMEDIATION WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Private ownership. Remediation works at Section 34 & 50, Cox Peninsula. Click for more details...

DEPARTMENT OF DEFENCE - REMEDIAL WORKS
Military (Military installations & facilities) project for New development. Undertake remedial works to bring a range of facilities to top secret level at DW45 Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

LAMBRICK AVENUE VILLAS STAGE 3
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 2000000. This project Construction of 3 x 2 bedroom villas & 8 x 3 bedroom villas in 4 single storey buildings. Carparking for 22 cars. Associated landscaping. Click for more details...

AUSTRALIAN COMMUNICATIONS & MEDIA AUTHORITY HOWARD SPRINGS NORTHERN TERRITORY
A project in the NT Within Litchfield Shire. Site preparation/remediation works for replacement of ageing High Frequency Direction Finding (HFDF) system at existing sites in Bullsbrook, Western Australia, Capalaba, Queensland, Shoal Bay, Northern Territory & Richmond, Tasmania. Works include the demolition & removal of existing equipment hut, towers & antennas & site preparation works including civil works, mechanical & electrical services. Click for more details...

DAVIS COURT VILLAS
5 Davis Ct (Lot 11311) Roseberry, Palmerston, NT 0830 Has Davis Court Villas currently at Construction stage. Construction of 3 x 3 bedroom villas in 3 single storey buildings. Cement slab, rendered concrete blockwork, powdercoated aluminium glazing & colour-coated metal roof. Car parking for 8 vehicles. Associated landscaping. Click for more details...

TANAMI ROAD PAVEMENT REINSTATEMENT
New project of Public Utilities (Water distribution systems, Drainage) project at Tanami Rd, Alice Springs, NT 0870. Reinstatements of gravel pavements & floodways on Tanami Road from Ch 282 to Ch 685. Concrete Margins for flood-ways at Ch 282.15, Ch 320.52 & Ch 360.6. To include earthworks, easements, stabilisation & resealing of floodways. Click for more details...

LAMBRICK AVENUE CYCLEWAY BETWEEN ROYSTONEA AVENUE & HOWARD SPRINGS CYCLEWAY
Cycleway New project In The Palmerston Town Council Area. Construction of a 2.5Km cycleway on Lambrick Avenue from Roystonea Avenue to Howard Springs Cycleway. Concrete works, minor structural works, traffic signals & associated earthworks. Sealing, asphalt, aggregate, block work retaining wall, galvanised grab rail, grouted stone pitching, spoon drain & galvanised base plate. Click for more details...

SANDOVER HIGHWAY RESHEETING
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 468000. This project Resheeting of gravel pavement on Sandover Highway between Ch227.63km to Ch236.63km. To include preparation of existing pavement using the grade water roll method & resheet by importing & compacting a 150mm layer of sand-clay base material. Click for more details...

FLORINA ROAD NURSERY
Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project at 140 Florina Rd, Cossack, NT 0850 of Nursery type of New development. Construction of new Nursery. To include proprogation area, plant nursery, pump shed, 480sq m shed, 100sq m office, storage & water tanks. Wall cladding, roof cladding, roof & gable brackets, reinforced mesh & shade cloth. Associated car parking & landscaping. Click for more details...

VICTORIA RIVER RESEARCH STATION REFURBISHMENT
Victoria River Research Station Refurbishment is currently at the Construction stage, valued at about $ 235000 it is Refurbishment works to the Northern Territory's Department of Primary Industry & Fishery Victoria River Research Station, 257km West of Katherine. Full internal refurbishment of the research station to include electrical works, door frames, doors & locks. Works to include supply & installation of 150m x 90m x 10m steel angles to the underside of beams & bolt through the beam at 500mm. Construction of new ceiling, wall sheeting & insulation. Supply & installation of joinery, plumbing fixtures & floor coverings. Click for more details...

STUART HIGHWAY SHOULDER REPAIRS
Roadworks - Shoulder Repairs project at Stuart Hwy, Katherine, NT 0850 In The Council Area Of Katherine Town of State. Reconstruction of shoulders on the Stuart Highway between Ch340 & Ch400. Box out shoulders to 1.5m x 150mm & compact sub base to 95% MMDA. Supply & fill shoulders with base course & compact to 98% MMDD. Provision of traffic control. Click for more details...

ADELAIDE RIVER WAR CEMETERY INTERPRETIVE PAVILION
A project in the NT Within Coomalie Community. Construction of a interpretative pavilion at the Adelaide River War Cemetery. Demolition of existing pool fence & concrete slab. Construction of 100mm concrete slab with SL82 mesh. Pavilion to include sheet metal roof, aluminium benches, ceiling fan & 1800mm high aluminium slatted gate. 1800mm wide x 75mm deep concrete path with 75mm compacted sand. Associated landscaping. Click for more details...

ILPEYE IPLEYE SUBDIVISION UNDOOLYA ROAD & OONCHIUNPA ROAD INTERSECTION UPGRADE
Undoolya Rd & Oochiunpa Rd, Alice Springs, NT 0870 Has Ilpeye Ipleye Subdivision Undoolya Road & Oonchiunpa Road Intersection Upgrade currently at Construction stage. Upgrade works to the intersection of Undoolya Road & Oonchiunpa Road at the Ilpeye Ilpeye Subdivision. To include removal of existing stormwater pits & pipes. Supply & installation of stormwater pits & pipes. Preparation & trimming of subgrade surfaces. Construction of kerbing & guttering. Supply & lay pavement with prime coat & 7mm seal. Construction of reinforced concrete pathway. Supply & installation of guard rail & road signage. Provision of concrete pathway. Click for more details...

TAMINMIN COLLEGE AIR CONDITIONING UPGRADES
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 700000. This project Upgrades to the air conditioning system at Taminmin College. To include supply & installation of chiller. Click for more details...

GUNDAGAI ROAD UPGRADE
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Gundagai Rd, Katherine, NT 0850. Upgrade works to Gundagai Road between Ch21.85 & Ch27.35. To include grading of existing road surface to remove ruts, holes & depressions. Supply & lay gravel to 200mm depth & 4m depth. Reinstate table drains, offlet drains & table drain blocks. Click for more details...

UMBAKUMBA SCHOOL UPGRADES
Education (Schools - primary, secondary (up to Yr 12)) project In The East Arnhem Shire Council Area of Upgrades - For School type. Upgrade works to existing classrooms at Umbakumba School. To include rust treatment & painting of exposed steel work. Supply & lay vinyl floor covers & acoustic wall carpeting to various classrooms. Resurfacing of basketball court to include filling & patching of surface. Supply & lay 2 base coats, 1 acrylic resurfacer & 2 top coats. Click for more details...

NORTHERN GAS PIPELINE - VENT SILENCER
Non-Construction Items (Supply/fabrication) project at Tennant Creek to Mount Isa, ., NT 8999 of Vent Silencer type of New development. Works to include the design and supply a vent silencer for the Mount Isa compressor station. The vent silencer shall be mounted atop a vertical pipe stack, & be required to provide noise attenuation in accordance with the site requirements. Click for more details...

ARCHER TO PALMERSTON TRANSMISSION LINE
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project at Archer to, Palmerston, NT 0830 of Transmission Line type of New development. Construction and commissioning of a new 66kV underground transmission line from the underground/overhead termination pole installed by others at the western boundary of the Heights, the underground route shall continue east through the Heights sub division to the Roystonea Avenue road reserve where it will run parallel with the western property boundary at a proposed offset of 5m through to University Avenue. Click for more details...

WAGAMAN PRIMARY SCHOOL
Renovations, Refurbishments etc. project of Education (Schools - primary, secondary (up to Yr 12)) project at Lot 04050 Wagaman Tce, Wagaman, NT 0810. Construction of a new toilet block. Modifications to existing toilet block Click for more details...

FOUNTAIN HEAD ROAD
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Roadworks - Upgrade type. Culvert upgrade at chainage 3.18km east of Fountain Head Road. Works include removal of existing drainage structure (temporary works), salvage the two steel pipes without damaging the pipes, & replace with new box culvert 2 cells - 1200mm x 900mm, use old crossing as detour, gravel base, cement stabilisation, protection works, 2 coat road seal from chainage 3.146km to chainage 3.196km, installation of traffic signs. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect