State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks Projects in NT®ion=⊂=1791 in region


NORTHERN TERRITORY TENTED CAMP
Tourism (Tourist villages, Resort complexes) project for New development. Construction of Tented Camp for corporate & tourism groups. Click for more details...

ARALUEN THEATRE BOOM LIGHTS
Boom Lights - Replacement Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Replacement of theatre boom lights. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) Renovations, Refurbishments etc. project at Urban Regions of, Darwin, NT 0800. This type is Fire Detection Equipment - Package A - Maintenance with State ownership. Routine servicing & emergency repairs to fixed fire detection equipment - Package A Click for more details...

PARKS AUSTRALIA NORTH - ULURU-KATA TJUTA NATIONAL PARK
Plumbing Works/Gas Infrastructure Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Repairs & plumbing works & gas infrastructure. Click for more details...

LYONS SUBDIVISION DETACHED HOUSES
Residential (Units, apartments, flats, townhouses, villas) project at Lee Point Rd Lyons Suburb of, Darwin, NT 0909 of Detached Houses (20) - Stage 1 type of New development. Construction of 20 detached houses. Painted concrete block, metal roof. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Hospitality (Conference & reception centres & facilities) New project at Ellengowan Dve, Casuarina, NT 0810. This type is Commercial Building For University with State ownership. Building likely to contain: retail outlets, food & beverage outlets, function & conference facilities. Click for more details...


Industrial (Warehouses, cargo sheds, distribution centres) project for New development. 5 warehouses. 1 x 70 sq m, 1 x 79 sq m, 1 x 103 sq m, 1 x 108 sq m, & 1 x 166 sq m. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Paving, carparking for 13 cars. Landscaping. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
1st Aviation Regiment Robertson Barracks is currently at the Construction stage, valued at about $ 6500000 it is Construction of live-in accommodation for Other Ranks. Click for more details...

ULURU - BASE OF CLIMB
Public Utilities (Treatment plants, Sewerage reticulation) project at Uluru via, Alice Springs, NT 0872 of Rising Main For Toilet Block type of New development. Solar powered sewerage pump station rising main, water mains & civil works for new toilet block at Uluru (base of climb). Click for more details...

TASSIE SHOAL METHANOL PROJECT - EPCM CONTRACT
Oil & Gas (Topside - modules, platforms) project for New development. Construction and installation of the methanol priduction facilities on Tassie Shoal. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

WATER SUPPLY/SEWERAGE SYSTEMS REHABILITATION
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Plumbing, drainage & minor works to water supply & sewerage systems. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Currently at the Construction stage In Darwin City is a project estimated to be $ 6500000. This project Construction of live-in accommodation for SNCO/JO. Click for more details...

STUART HIGHWAY SHOULDER REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area of State ownership. Shoulder rehabilitation for various sections Stuart Highway btwn Ch: 1488.75 - Ch: 1502.36. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Primary And Secondary Processing (Piping) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

MARRARA FIRE STATION
Currently at the Planning stage In Darwin City is a project estimated to be $ 50000. This project Provide design & documentation consultancy for Marrara Fire Station. Click for more details...

WAITYAWANU (MT LIEBIG) PRIMARY SCHOOL FENCING
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Alice Springs Town Council Area of School Fencing type. Provide fencing to school grounds. Click for more details...

DARWIN REGION GOVERNMENT BUILDINGS PERIOD CONTRACT FIRE DETECTION SYSTEMS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area of State ownership. Maintenance of fixed fire detection systems of Northern Territory Government occupied buildings for 12 month period. Click for more details...

DARWIN PARLIAMENT HOUSE LEVEL 3 ZONE A - WALL/ASSOCIATED WORKS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at State Square, Darwin, NT 0801. This type is Wall/Associated Works with State ownership. Construct new wall over balustrade & associated works to Zone A, Level 3. Click for more details...

DARWIN REGION VARIOUS ROADS/HIGHWAYS RESEALS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Various secns Kakadu, Arnhem & Stuart Hwys & Cox Peninsula Rd, Darwin, NT 0800. This type is Roadworks - Upgrade with State ownership. Bituminous resurfacing of various highways & local roads within Darwin rural area. Click for more details...

GLYDE POINT INDUSTRIAL ESTATE CONSULTANCY
Civil Engineering (Industrial Subdivision) New project at Glyde Point Industrial Estate, Darwin, NT 0801. This type is Consultancy For Draft Environmental Impact Statement with State ownership. Consultancy to draft environmental impact statement. Click for more details...

DESERT PEOPLES CENTRE (DESERT KNOWLEDGE AUSTRALIA) LIVING DESERT CENTRE
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project for New development. Living Desert Centre for Desert Knowledge Precinct. Click for more details...

HUMPTY DOO PRIMARY SCHOOL AIR CONDITIONING UNITS - SUPPLY/DELIVER/INSTALL/COMMISSION
Fred's Pass Rd, Humpty Doo, NT 0836 Has Humpty Doo Primary School Air Conditioning Units - Supply/Deliver/Install/Commission currently at Construction stage. Supply, delivery, installation & commissioning of new airconditioning units for blocks B, F & X at Humpty Doo Primary School. Click for more details...

FLYNN DRIVE COMMUNITY HEALTH CLINIC STAGE 3 - AIRCONDITIONING UPGRADE
State ownership Medical (Surgeries, Medical centres) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Complete Stage 3 upgrade airconditioning for health clinic. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TOPSOIL REMOVAL
Oil & Gas (Pipelines & associated contracts) New project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. This type is Topsoil Removal with Private ownership. For the provision of topsoil removal services. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

DARWIN REGION BER SCHOOLS
A project in the NT Within Litchfield Shire. Construction of multi purpose facility/cyclone shelter. Concrete slab, concrete block, steel, clerestory aluminium louvre windows, solid core doors, cyclone enclosure for generator, colour-coated metal roof with cyclone fixtures. Click for more details...

BRAITLING PRIMARY SCHOOL BER PROJECT INCORPORATED INTO ID 1155089
Education (Schools - primary, secondary (up to Yr 12)) project at 80 Head St, Alice Springs, NT 0870 of Multi Purpose Learning Area type of New development. Construction of multi purpose learning area. Click for more details...

JABIRU DRIVE ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Jabiru Dve, Jabiru, NT 0886 of Roadworks - Access Upgrade type of New development. Upgrade access to Kakadu Lodge & Caravan Park Jabiru Drive, Jabiru. Sealing of a slip lane on either side of the premises to engineers specifications & design. Click for more details...

YARRALIN AIRSTRIP UPGRADE
A project in the NT Within Victoria Daly Shire. Upgrade of existing airstrip to provide near all-weather operation. To include lifting, pavement construction, sealing & associated ancillary works. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

DAWSON STREET WAREHOUSE OFFICE COMPLEX
Commercial Premises (Offices) project for New development. Construction of warehouse (1399sq m) & office (229sqm) complex. Cement slab, rendered concrete blockwork, metal roof. Parking for 23 cars. Associated landscaping. Click for more details...

FINNISS STREET MIXED USE DEVELOPMENT
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 6 Finniss St (Lot 1740), Darwin, NT 0800 of Units (76)/Offices (3)- 12 Storey type of New development. Construction of a 12 storey mixed use building with 3 office tenancies (324sq m) on ground floor & 76 units above. 12 x 1 bedroom, 52 x 2 bedroom & 12 x 3 bedroom units. 1 lift. Swimming pool & gymnasium. 3 levels of basement car parking. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - NON DESTRUCTIVE TESTING
Non-Construction Items (Other mining services) project In The Darwin City Council Area of Private ownership. For the provision of non destructive testing. Click for more details...

PRODUCE ROAD 15 LOT RURAL SUBDIVISION
New project of Civil Engineering (Rural Subdivision) project at 75 Produce Rd (Lot 5 Hundred of Strangeways), Humpty Doo, NT 0836. Reconfiguration into 15 rural lots. Minimum lot size 2ha. Construction of 2 access roads. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 500000. This project Supply & installation of a 1,100sq m pond water feature at the Gateway Shopping Centre. Click for more details...

ILPEYE ILPEYE SUBDIVISION PLAYGROUND EQUIPMENT & ESTATE SIGNAGE
Ilpeye Ilpeye Subdivision Playground Equipment & Estate Signage is currently at the Construction stage, valued at about $ 281000 it is Supply & installation of playground equipment, entry signage & associated works at White Gum Park for the recently upgraded Ilpeye Ilpeye town camp. To include demolition/removal of existing playground equipment, supply & installation of a rockasaurus, rockeby, monkey bars, balance beams, echidna springer 2 x fitness stations & associated signage, flying disk, sand spinner & double swings. Water bubbler, seating, shade structures, rubbish bins, site fencing & additional signage. Subgrade, cracker dust layer, underlay & wearing layer. Click for more details...

CENTRALIAN MIDDLE SCHOOL LABORATORY UPGRADE
Education (Schools - primary, secondary (up to Yr 12)) project at Milner Rd, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Upgrade works top the Block C Laboratory at the Centralian Middle School in Alice Springs. To include the demolition of existing laboratory, fittings & fixtures. Removal & capping of redundant services, Supply & installation of fixed furniture, lining & services. Patch & paint new & existing walls, doors & door frames. CFC sheeting, 50mm stud lined vinyl walls, blinds, splash back & aluminium framed windows. Vinyl flooring & carpet floor tiles. Click for more details...

FINKE DWELLINGS (NPARIH)
A project in the NT Within Macdonnell Shire. Construction of 4 x 3 bedroom dwellings at Finke under the National Partnership Agreement on Remote Indigenous Housing (NPARIH). To include verandas & evaporation cooling system. Aluminium framed sliding windows, vinyl flooring, ceramic floor tiles, insulated ceiling panels & concrete slab with waterproof membrane. Concrete blockwork walls, chainmesh fencing, sheet metal roofing & cladding. Associated landscaping & carparking. Click for more details...

JINGILI PRIMARY SCHOOL WATER MAINS UPGRADE
Education (Schools - primary, secondary (up to Yr 12)) project at 17 Rindberg St, Jingili, NT 0810 for New. Design & construction of water mains for potable water, fire services & irrigation uses at Jingili Primary School. Design team to include Architect Quantity Surveyor, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer & Stormwater Engineer. Click for more details...

ARUNGA PARK SPEEDWAY WATER RETICULATION SYSTEM UPGRADE
Public Utilities (Water distribution systems, Drainage) project for New development. Upgrade works to the water reticulation system at the Arunga Park Speedway. To include decommissioning & removal of existing water reticulation system. Supply & installation of new mains water supply system from water supply to Telegraph Station. Supply & installation of reticulation system to speedway complex. Click for more details...

LITCHFIELD COUNCIL ROAD SHOULDER REPAIRS
A project in the NT Within Litchfield Shire. Shoulder repair works to various roads located within Litchfield Shire Council. Click for more details...

KANGAROO STREET DWELLINGS
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 500000. This project Proposed construction of 2 x 1 storey x 4 bedroom dwellings. Flat sheet cladding, corrugated roof, render finish, aluminium glass doors & aluminium frame windows. Car parking for 2 vehicles. Associated landscaping. Click for more details...

WEST ARNHEM SHIRE
Private ownership Commercial Premises (Offices) project In The Darwin City Council Area for Addition development. Alterations & additions to an existing warehouse to comprise addition of office & caretaker's residence, relocation of entrance & installation of new stairs. Click for more details...

TENNANT CREEK REGION PUBLIC HOUSING DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 12 Bornite St, 19 Scheelite Cr & 18 Standley St, Tennant Creek, NT 0860 for New. Demolition of existing. Construction of 2 x 3 bedroom dwellings on Lot 1177, 18 Standley St & Lot 471, 19 Scheelite Cr & 1 x 3 bedroom dwelling on Lot 506, 12 Bornite St. Construction of car port & adjoining structures. Storage room/shed. Site works. Driveways & external paving. Landscaping Click for more details...

TANAMI ROAD CULVERT STRUCTURE
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for New development. Construction of culvert structure at Tanami Road chainage from 171.9km to 172.2km. Scope of work includes: 10 cell precast concrete culvert structure which consists of 1200 x 300 box culverts, a quantity of earthworks to channel the flow both upstream & downstream of the structure, & protection dump rock works detailed for the upstream & downstream ends in lieu of the standard reno mattress. Click for more details...

PINE CREEK POLICE STATION
., Pine Creek, NT 0847 Has Pine Creek Police Station currently at Construction stage. Scope of work includes: sealing the driveway & car park at front & rear with dense grade asphalt 40mm depth. Dismantling & removal of existing concrete footpath. Reconstruct the concrete footpath with reinforcement. Remove a tree at front driveway including stump & roots Click for more details...

TENNANT CREEK HOSPITAL
A project in the NT Within Barkly Shire. Removal & replacement of Ward vinyl in 3 stages Click for more details...

VICTORIA HIGHWAY
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Katherine Town Council Area for New development. Scope of work comprises: pavement rehabilitation and shoulder widening on Victoria Highway from chainage 80.000 km to chainage 82.220 km. Click for more details...

ROOM TO BREATHE
A project in the NT Within Central Desert Shire. Room to Breathe early works program for Engawala. Creation of new living spaces in existing homes Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect