State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Computer & telecommunication system for mine, scada Projects in NT®ion=⊂=2790 in region


DALY RIVER POLICE STATION
Paint/Floor Coverings Upgrade For Police Station project at Daly River Police Station, Daly River, NT 0822 In The Council Area Of Darwin City of State. Complete external repaint Police Station for Cell Block & house 2. Replace floor coverings within Visiting Officers Quarters (house 3). Click for more details...

ARCHITECTURAL/ENGINEERING & MISCELLANEOUS CONSULTANT SERVICES PANEL CONTRACT
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Various Council Area for New development. Consultants for Architectural, engineering & Miscellaneous Services Panel Contract - 1st Review. Click for more details...

ARCHITECTURAL/ENGINEERING & MISCELLANEOUS CONSULTANT SERVICES PANEL CONTRACT
State ownership Medical (Hospitals & associated buildings, mortuaries) project In The Various Council Area for New development. Consultants for Architectural, engineering & Miscellaneous Services Panel Contract - 1st Review. Click for more details...


Buscall Ave, Palmerston, NT 0830 currently at Construction stage. Extension of Buscall Ave between Chainage 675 kms - 1250 kms including roundabout. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Parks Australia North, ., NT 8999 Has Department Of The Environment & Heritage - Parks Australia North currently at Tenders & Building stage. Programmed maintenance to general services. Click for more details...

LARRIMAH POWER & WATER SUPPLY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Darwin City Council Area of Operation & Maintenance - Power & Water type. Day to day operations & maintenance of power, water systems & customer services at Larrimah for 12 month period. Click for more details...

GREENLEAVES SUBDIVISION
Residential (Units, apartments, flats, townhouses, villas) New project at Pt lot 8537 Burke St, Alice Springs, NT 0870. This type is Cluster Dwellings (12) with Federal ownership. 8 x 2 bedroom each 100 sq m approx. 4 x 3 bedroom each 140 sq m approx. Brick veneer construction, concrete floor, metal deck roof, aluminium framed windows. Carports, carparking & landscaping. Click for more details...


Currently at the Tenders & Building stage In Katherine Town is a project estimated to be $ 120000. This project 3 bedroom. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining (Open Cut) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

TANAMI DOWNS JOINT VENTURE PROJECT
Tanami Downs Joint Venture Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is Tanami Downs is located approximately 25 km west of the +5 million ounce Callie gold deposit operated by Newmont Australia Ltd. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Unincorporated North Council Area of Federal ownership. Repairs & maintenance of buildings. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

CHARIOT GOLD PROJECT
Mining Contract - Open Cut New project In The Barkly Shire Council Area. For the greater part, Chariot will be an underground mine. An open pit will be excavated to a depth of 45 m from which a portal for a decline will be established to access the orebody. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

WEST MACDONNELL RANGE TOURIST LOOP ROAD/NAMATJIRA DRIVE REHABILITATION
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 13324000. This project Comprising reconstruction of Namatjira Dr to two-lane road, sealed standard within existing road reserve from end of existing sealed secn near Glen Helen at CH: 86 km to northern end of seal near turn-off to Gosse's Bluff at CH: 134 km. Construction drainage structures suitable protected against flood erosion to provide safe network for tourist & commercial traffic, erosion control. Click for more details...

STUART TERRACE/SKINNER STREET SEWER CONNECTION/SIMPSON STREET FIRE HYDRANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area of Sewer Connection For Stuart Tce type. Construct sewer connections to Lot 1018 Stuart Tce & Lot 9328 Skinner St & installation fire hydrant to Lot 1018 Simpson St. Click for more details...

DESERT PEOPLES CENTRE (DESERT KNOWLEDGE AUSTRALIA) WORKSHOP BUILDING
A project in the NT Within Alice Springs Town. Workshop building for Desert Knowledge Precinct. Click for more details...

TI TREE RESEARCH STATION
Renovations, Refurbishments etc. project of Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project at Ti Tree Research Station, 180 km approx north of, Alice Springs, NT 0870. Renovate bathroom & laundry. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

HOPEFUL STAR GOLD PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Barkly Shire is a project estimated to be $ 5000000. This project Hopeful star was previously worked mine and there is still visible gold present. Drilling is to target defined BIF and quartz vein mineralisations. Click for more details...

EAST ARNHEM REGION - CAPITOL WORKS PROJECT CONSULTANCY
Residential (Units, apartments, flats, townhouses, villas) project at Various sites within East Arnhem region south of, Nhulunbuy, NT 0880 for New. Project management consultancy for the Indigenous Housing Authority of the Northern Territory(IHANT) Capitol Works Projects. Click for more details...

DARWIN BUS INTERCHANGE - GROUND INDICATORS/PAVING WORKS
Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) Supply & Install project at Intersection Cox Peninsula Rd & Stuart Hwy, Darwin, NT 0801. This type is Tactile Ground Indicators/Associated Paving Works - Supply/Install with State ownership. Supply & installation of tactile ground surface indicators & associated paving works for new Darwin Bus Interchange. Click for more details...

RAAF BASE DARWIN C17 HEAVY AIRLIFT FACILITIES AIRFIELD WORKS/ASSOCIATED FACILITIES
Federal ownership Military (Military installations & facilities) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Works for infrastructure support for C17 Globemaster III aircraft based at Amberley: aircraft aprons & taxiways & potentially runway works, explosive ordinance loading bays & associated taxiways, other associated airfield works (including but not limited to airfield lighting & air cargo/movement facilities), extension of existing Air Movements building to provide substantial cargo handling capacity, introduction of hjydrant refuelling into new apron, new vehicle washbay. Click for more details...

TERRITORY SAWS & HARDWARE SHOWROOM/SALES/WAREHOUSE EXTENSION
Private ownership Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project In The Darwin City Council Area for Addition development. Extensions to existing showroom, sales & warehouse. Click for more details...

ROYAL DARWIN HOSPITAL COWDY WARD HIGH DEPENDENCY AREA MODIFICATION (CONTRAC T07-1317)
New project of Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr, Casuarina, NT 0810. Modification of high dependency area within Cowdy Ward at Royal Darwin Hospital. Click for more details...

CHINESE SOUTH EXTENDED & MOTTRAMS GOLD MINE PROJECT
Mining - Support Facilities (Industrial buildings) project at Doulgas Station, Stuart Hwy, 12km North of Hayes Creek Wayside Inn, via, Pine Creek, NT 0847 for New. The company proposes to recommence gold mining operations. Mining is proposed to commence on two deposits within this area. The proposed mining development consists of two open cut pits and will employ conventional open cut excavation methods. No mineral processing will occur on these sites. The ore will be transported by road, approximately 62km south-east, for processing. The major components of the proposed Chinese South Extended and Mottrams development include: construction of two open cut mines, pit dewatering, water storage and management, stockpiling of ore, construction of access and haul roads; and construction of two waste rock storage facilites. Click for more details...

KATHERINE POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at McMinns Power Station, Katherine, NT 0850 for New. Remove existing and Supply with Install/Commissioning one (1) Main Central Fire Detection Panel. With minimal disruption to station fire dection and operations during cut-over, relocation and improvement of panel capacity. Supply, Route and Commission loop/comms cable from turbine Units for zone monitoring, Removal of fire systems cables that are no longer required. Confined Space competence (Minimum two persons) is required. Loop is for addressable system functionality is to be offered as an Optional Works Item. Provision of Maunals and Training of nominated site staff. Warranty and defects liability period is to be twelve (12) months on installed equipment. Operational testing required manufacturer or Australian Standards to be completed and documented. Above tests and periodic tests by existing period contractor (Wormald FS at present) will not void warranty or defects liability period. Click for more details...

DARWIN INTERNATIONAL AIRPORT EXPANSION
Addition project of Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project at Fenton Ct, Marrara, NT 0812. Expansion of airport to include additional new 2 storey terminal to the east & west ends of the current terminal duplicating existing structural form with retail precinct; dedicated goods delivery precinct, aircraft parking bays for planes. Click for more details...

BAKEWELL WOOLWORTHS SHOPPING CENTRE
A project in the NT Within Palmerston Town. Construction of Retail Development. Comprising a Supermarket (4795sq m), speciality retailers (1064sq m), drive- through fast food restaurant & service station. Cement slab, rendered concrete blockwork & metal roof. Parking for 337 cars. Associated landscaping. Click for more details...

ROPER GULF SHIRE COMMUNITY UPGRADES
A project in the NT Within Katherine Town. Refurbishment of recreation hall - Numbulwar. Erect shade structure (approx 15m X 20m) - Numbulwar. Erect shade sails over playgrounds - Barunga, Beswick & Manyallaluk. Construct new basketball court and cover - Beswick. Click for more details...

DARWIN GOVERNMENT HOUSE PERIMETER FENCING
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Jervois Rd, Darwin, NT 0800. This type is Perimeter Fencing with State ownership. Remove existing perimeter fence & replace with new fence on boundary along Jervois Rd. Click for more details...

JOHNSTON ESTATE TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project In The Palmerston Town Council Area of Townhouses (3) type. Construction of 1 x 2 bedroom & 2 x 3 bedroom multiple dwellings in 2 single storey buildings. Concrete slab, rendered & painted concrete block walls & metal deck roofing. Click for more details...

OLD TIMERS VILLAGE AGED CARE FACILITY REDEVELOPMENT PROJECT 2
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 4500000. This project Construction of new 20 bed wing as part of Flynn Lodge. Comprising 12 single rooms & 4 double rooms, sitting, dining & lounge areas. The existing Flynn Lodge to undergo minor internal reconfiguration of staff areas & common space. Construction of new kitchen building to service entire aged care service. Associated parking & landscaping. Click for more details...

SKY CITY CASINO ALTERATIONS & ADDITIONS STAGE 1
Licensed Club - Altns & Addns - Stage 1 project at 1 (Lot 5244) Casino Dr, The Gardens, NT 0820 In The Council Area Of Darwin City of Private. Internal fitout for Level 2 function areas & Electronic Gaming Machine West area for Casino. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Non-Construction Items (Freight - Air, Sea, Land) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

DEPARTMENT OF DEFENCE SHOAL BAY RECEIVING STATION FACILITIES UPGRADE
Rapid Creek Rd, Alawa, NT 0810 Has Department Of Defence Shoal Bay Receiving Station Facilities Upgrade currently at Construction stage. Upgrade works to the Shoal Bay receiving station to include electrical, fire & cooling systems upgrade. Replacement of underground HV power lines, transformer & internal electrical switch services. Upgrade works to cooling system, improvements to fire protection capabilities & removal of UPS. Replacement of elevated water tank & air conditioning plant. Click for more details...

MARGARET STREET APARTMENTS
Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area of Private ownership. Construction of 10 x 2 bedroom apartments in a 3 storey building with basement car parking. Concrete slab, rendered concrete blockwork & metal roof. Associated landscaping. Click for more details...

LEICHARDT STREET VILLAS
Residential (Units, apartments, flats, townhouses, villas) project In The Barkly Shire Council Area of Private ownership. Proposed construction of 2 x 2 bedroom villas in two single storey buildings. Concrete slab, lightweight board cladding & metal roof. Parking for 4 cars. Associated landscaping. Click for more details...

HIDDEN VALLEY TOURIST PARK CABINS
A project in the NT Within Darwin City. Construction of 3 x 2 bedroom standalone cabins. Elevated steel flooring system approx 600mm off ground, lightweight wall cladding & metal roof. Parking for 4 cars. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - FLANGE MANAGEMENT SERVICES
Mining (Onshore - oil & gas) project In The Darwin City Council Area of Private ownership. For the provision of Flange Management Service for Ichthys Operations. To include but is not limited to the provision of - A flexible, scalable, & modular flange management service to meet the requirements of day to day operations & maintenance, campaign maintenance & shutdown work scopes, across both offshore & onshore facilities. Provision of competent service technicians to perform bolted flange disassembly & assembly. Provision of appropriate resources & support services for day to day operations & maintenance, shutdown & campaign scopes of work, both offshore & onshore. Coordination & development of flange assembly work packs & check sheets. Provision of engineering & technical support for flange assembly & related equipment. Provision of personnel & equipment to complete onsite flange machining. Provision of hire equipment, equipment repair & calibration services to support Company requirements. Click for more details...

ASCHE STREET TOWNHOUSES
Townhouses (2) - 2 Storey project at Asche St (Lot 11706) & Lee Point Rd, Muirhead, NT 0810 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 2 x 3 bedroom townhouses in 2 storey building. Concrete slab, rendered blockwork & cladding, colour-coated metal roof. Parking for 4 cars. Associated landscaping. Click for more details...

MCMILLANS ROAD & KALYMNOS DRIVE
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at McMillans Rd & Kalymnos Dr, Darwin, NT 0800. Upgrade works at the intersection of McMillans Road & Kalymnos Drive, located northeast of Darwin CBD. Scope of work includes: removal and/or modification of portions of the existing median of McMillans Road, traffic islands, pavements & kerbs at the Kalymnos Drive intersection, new right turn lanes, pedestrian crossings, re-asphalting, new line markings & signs, & associated works. Click for more details...

TARAKAN COURT APARTMENTS
Apartments (31) - 4 Storey New project In The Palmerston Town Council Area. Construction of 30 x 3 bedroom & 1 x 4 bedroom units in 4 x 1 & 4 x 2 storey buildings. Communal area, storage, swimming pool & lift. Associated car parking & landscaping. Click for more details...

TI TREE SCHOOL B BLOCK AIR CONDITIONING UPGRADE
Ti Tree School B Block Air Conditioning Upgrade is currently at the Construction stage, valued at about $ 664000 it is Air conditioning upgrade to B Block at the Ti Tree School in Alice Springs. Works to include demolition of existing asbestos ceiling. Installation of new 600mm x 600mm ceiling suspension system & acoustic tiles with paint finish. Supply & installation of steel framed, plasterboard lined & acoustically insulated infill walls with paint finish. Upgrade to electrical service to accommodate new air conditioning system. Replacement of existing built up evaporative cooler plant with a air-cooled direct expansion type split air conditioning system. Click for more details...

FITZMAURICE DRIVE SUBDIVISION
Residential/Rural Subdivision (30) Lots project at 54 Fitzmauri Dr, 4 Timor Crt & 7 Glyde Crt (Lots 6959, 6960 & 6961), Leanyer, NT 0812 In The Council Area Of Darwin City of Private. Reconfiguration into 2 Policy Areas. Policy Area A (31,331sq m) to include 25 lots. Policy Area B to include 5 rural living lots (32,697sq m). Construction of road network to connect to adjacent land to the south. Click for more details...

NORTHERN GAS PIPELINE WATER TREATMENT SYSTEM
New project of Oil & Gas (Pipelines & associated contracts) project at Tennant Creek to Mount Isa, ., NT 8999. Design, manufacture, test & deliver a Water Treatment System for the Phillip Creek Compressor Station to operate remotely. Associated works. Click for more details...

JABIRU & GUNBALANYA
A project in the NT Within West Arnhem Shire. Upgrade to Jabiru health centre. Upgrades to Gunbalanya health centre & morgue Click for more details...

BUNTINE HIGHWAY
Roadworks New project In The Katherine Town Council Area. Pavement strengthening & widening from chainage 261.540km to 265.650km. Scope of work comprises: construction pavement & widening from single lane to double lane including sealing works not limited to earthworks, concrete works, drainage works & installation of associated road furniture & traffic control devices. Click for more details...

BEATRICE HILL FARM
Residential (Units, apartments, flats, townhouses, villas) project In The Litchfield Shire Council Area of State ownership. Removal of nominated existing accommodation demountable buildings including verandahs & transportable structures from Beatrice Hill Farm. Supply & installation of 2 new 3 bedroom accommodation demountable buildings. Click for more details...

WEST ARNHEM SHIRE DISASTER RESILIENCE
West Arnhem Shire Disaster Resilience is currently at the Construction stage, valued at about $ 100000 it is Proposed works to include stormwater management & water erosion rectification works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect