State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Computer & telecommunication system for mine, scada Projects in NT®ion=⊂=2790 in region


SMITH STREET MALL
Smith Street Mall is currently at the Construction stage, valued at about $ 3500000 it is Whole of works will be awarded as one contract. Works comprise underground services, re-paving (in-situ concrete & clay pavers), steel weather protection structures, lighting, street furniture, landscaping, signage & artworks. Construction is planned to commence in second week of October with works up to & including paving level to be completed by Christmas & remainder to be completed by early March 1998. Click for more details...

RAAF BASE DARWIN
Federal ownership Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Renovations & upgrading to include bathrooms, kitchens & verandahs. Click for more details...

CHARIOT GOLD PROJECT- MALBEC WEST
Mining (Exploration - Drilling) project at Via, Tennant Creek, NT 0860 of Resource - Gold type of New development. Interim resource has enabled an open pit to be designed with the base of the pit above the defined mineralisation. Click for more details...

WARRUWI COMMUNITY
A project in the NT Within Offshore. Construction of four dwellings & upgrading of seven existing dwellings. Click for more details...

EDNA BERYL GOLD PROJECT
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Includes sinking a shaft up to 150 m and associated drivage. Also includes moving 7,000 to 10,000 tonnes of ore. Click for more details...

WALER BARRACKS
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 7000000. This project 9 additional single soldiers' accommodation buildings. Steel frame with lightweight cladding, block-work infills, concrete floor, metal deck roof, aluminium louvred windows, individual split system airconditioning, fire services. Carports, individual lock-up stores. Carparking & landscaping. Click for more details...

ALI CURUNG DWELLINGS
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 70000. This project Environmental health repairs to various dwellings. Click for more details...

TANGENTYERE COUNCIL SEWERAGE CONTRACT
A project in the NT Within Alice Springs Town. Construction of gravity sewers at Ilpara, Karnte & Anthepe. Construction of 3 no pump stations & rising mains. Click for more details...

QUEST 29 GOLD OPERATIONS - NORTH KOOLPIN/TAIPAN
A project in the NT Within Darwin City. A six week open cut mining campaign. Click for more details...

ENVIRONMENT AUSTRALIA
Federal ownership Commercial Premises (Offices) project In The Darwin City Council Area for New development. Facility will house Office of Supervising Scientist (OSS), Parks Australia North (PAN) & Environmental Research Institute of Supervising Scientist (ERISS). Facility of approximately 2,000 sq m including 600 sq m laboratory space is to provide accommodation for about 50 personnel. It is to include research laboratories, administration facilities, office accommodation & storage space for samples & equipment. Laboratories are to facilitate special & varied activities & must be planned to meet specific functional interrelationships. They are mixture of wet & dry, indoor & outdoor facilities. Click for more details...

BATCHELOR MAGNESIUM PROJECT - WINCHESTER
Currently at the Early Planning stage In Darwin City is a project estimated to be $ 1000000. This project The company has had discussions with a number of possible suppliers. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Open Cut) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

KATHERINE TRAINING CENTRE J BLOCK SWITCHBOARDS
Currently at the Tenders & Building stage In Katherine Town is a project estimated to be $ 30000. This project Supply & upgrade switchboards for Katherine Training Centre J Block. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "A" (VERTICLE W/SADDLES)
Wickham Point Helium Plant - Ghe Storage Tank "a" (Verticle W/Saddles) is currently at the Construction stage, valued at about $ 2000000 it is For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "A" with saddles rated for 300 psig. Click for more details...

GOVERNMENT HOUSE
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project for Renovations, Refurbishments etc. development. Replace retaining wall North east corner. Click for more details...

NAMATJIRA DRIVE WATER BORES - DRILL/CONSTRUCT
Water Bores (2) - Drill/Construct New project In The Alice Springs Town Council Area. Drill & construct two water bores at Namatjira Dr. Click for more details...

NT GOVERNMENT ASSETS EAST ARNHEM REGION - MAINTENANCE SERVICES
East Arnhem Region within region of, Nhulunbuy, NT 0881 Has Nt Government Assets East Arnhem Region - Maintenance Services currently at Tenders & Building stage. Provision of maintenance services to government assets including building, plumbing & electrical works for 12 month period. Click for more details...

ALICE SPRINGS SOUTH WESTERN AREA GRADING/MINOR PAVEMENT REPAIRS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various sites within south western area of, Alice Springs, NT 0870. Grading & minor pavement repairs for 36 month period in south western area. Click for more details...

DEPARTMENT OF DEFENCE - NORTHERN TERRITORY/KIMBERLY DEFENCE REGION VARIOUS SERVICES SUBCONTRACTORS
A project in the NT Within Darwin City. Maintenance, engineering & building services in first instance, & subcontract services for hospitality, facility & support services to various locations within Northern Territory/Kimberly Defence Region. Click for more details...

ARNHEM HIGHWAY CARAVAN PARK/MOTEL/VILLAS/RESTARAUNT
(Lot 4) 350 Arnhem Hwy, Humpty Doo, NT 0836 Has Arnhem Highway Caravan Park/Motel/Villas/Restaraunt currently at Construction stage. Construction of caravan park of 60 sites (includes 40 sites with own amenities), 12 room Motel, 16 x 3 bedroom villas, restaurant/shop. Click for more details...

DARWIN AIRPORT CENTRAL
Showrooms/Offices/Recreation Centre project at McMillans Rd (cnr Osgood Dr, Bagot Rd), Marrara, NT 0812 in the Industrial (Warehouses, cargo sheds, distribution centres). Construction of showrooms, offices & recreation facilities. Associated car parking & landscaping. Click for more details...

DEFENCE SUPPORT HUB ROADWORKS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at ., Darwin, NT 0800. Construct an intersection and associated services in the Defence Support Precinct to allow access into the site. Click for more details...

LIQUORLAND BOTTLESHOP REFURBISHMENT
Retail (Shops, shopping centres & arcades, supermarkets) project In The Darwin City Council Area of Bottleshop - Refurbishment type. Refurbishment to 3 retail outlets at Palmerston, North lakes & CBD Darwin. Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Commercial Premises (Offices) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Mining - Primary And Secondary Processing (Piping) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

FINNISS STREET MIXED USE DEVELOPMENT
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 6 Finniss St (Lot 1740), Darwin, NT 0800 of Units (76)/Offices (3)- 12 Storey type of New development. Construction of a 12 storey mixed use building with 3 office tenancies (324sq m) on ground floor & 76 units above. 12 x 1 bedroom, 52 x 2 bedroom & 12 x 3 bedroom units. 1 lift. Swimming pool & gymnasium. 3 levels of basement car parking. Associated landscaping. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY SHUTDOWN
Gove Peninsula North West Arnhem Land via, Gove, NT 0880 Has Alcan Gove Bauxite Operations - Refinery Shutdown currently at Construction stage. Phased shutdown of refinery in order to suspend production. Click for more details...

DARWIN LNG PLANT - MAINTENANCE CONTRACT
Private ownership Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Litchfield Shire Council Area for New development. Two year extension of an existing contract for onshore maintenance works including shutdowns. Click for more details...

DARWIN LNG PLANT - MAINTENANCE CONTRACT
Private ownership Oil & Gas (Onshore processing facilities) project In The Litchfield Shire Council Area for New development. Two year extension of an existing contract for onshore maintenance works including shutdowns. Click for more details...

ROPER BAR IRON ORE PROJECT - MINING CONTRACT
Mining Contract project at Via St Vidgeon pastoral lease, 80km Southeast of Roper Bar via, Ngukurr, NT 0852 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). For the provision of mining services. Click for more details...

MUIRHEAD RESIDENTIAL DEVELOPMENT STAGES 5-7 LANDSCAPE ARCHITECT CONSULTANCY
Consultancy For Residential Subdivision (445) Lots - Stages 5-7 project at Lee Point Rd (Lot 11070), Muirhead, NT 0810 In The Council Area Of Darwin City of Private. Landscape design consultancy for stages 5 - 7 of Muirhead Estate. Reconfiguration into 445 lots. Stage 5 - 189 lots. Stage 6 - 143 lots. Stage 7 - 113 lots. Click for more details...

PIENING STREET WAREHOUSE
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Litchfield Shire Council Area for New development. Construction of a industrial warehouse building. To include warehouse & mezzanine level (610sq m) with ancillary office (13sq m). Cement slab, metal cladding walls & metal roof. Parking for 7 cars. 1 loading bay. Associated landscaping. Click for more details...

COOLALINGA CARWASH & TYRE CENTRE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Construction of carwash & 4 bay tyre fitting centre (146.2sq m). To include ancillary office (22.4sq m), storage area (18.3sq m), staff amenities (9.1sq m), waiting area (23.2sq m), lunchroom (15.3sq m) & mezzanine over lunchroom/amenities/part of office (38.6sq m). 3 carwash bays, 2 auto wash bays, 1 super wash bay, 4 vacuum bays & 2 dog wash bays. 5 waiting bays & 2 loading bays. Powdercoated light pole, roller doors, guardrails, suspended concrete slab, steel, capping, wall sheeting & louvres. Car parking for 12 cars. Associated landscaping. Click for more details...

COMMUNICATIONS CABLING UPGRADE - ADIN PROJECT
Cabling - Upgrade project at ., ., NT 8999 In The Council Area Of Various of Federal. Aeronautical Data Interchange Network (ADIN) Upgrade Communications Cabling Upgrade. Supply, installation & testing of the structured cabling at various sites across the country. The Aeronautical Data Interchange Network Upgrade Project will see the upgrade of all equipment, interfaces & associated software at the following sites: all ADIN site's; TNS operational sites (tower & VHF/ADS-B sites to be selected in the Execution Phase). 2 x enroute centres (interface changes from enroute to 2 remote sites only). 1 x control tower. 1 x VHF/ADS-B site. All TNS Control & Monitoring (C&M) sites. Infrastructure to include new hardware & software, potential replacement of recently installed network equipment, replacement of all end-of-life network equipment, wireless networking equipment & UPS for network devices. Air conditioning for network devices, equipment racks. Decommissioning & removal of old assets. New test & training platform including end user equipment & replacement of building cabling. Replacement of inter building cabling. Power over Ethernet (PoE). New Network Monitoring System (NMS) software including Manager of Managers software integration Network Access Controls. Interface changes to include Software changes. IT Policy & Security. Bring-Your-Own-Device (BYOD) integration & management. Wireless implementation & management. External telecommunications (WAN) to include Satellite bearers, radio link bearers & telecommunications carrier services. Click for more details...

PARAP POOL REDEVELOPMENT
Pool - Redevelopment project at 77 Ross Smith Ave, Parap, NT 0804 in the Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)). Redevelopment of the Parap Pool. To include construction of 50m FIDA competition & training pool, 25m multi-purpose indoor pool with access ramps for universal access & seating for 600 spectators & the ability to accommodate 1600 temporary seats. Construction of 11.5m high 33,0000sq m shade structure to cover pool areas. Pump room building with chemical store (270sq m), control room building (42sq m), pool store room building (42sq m), swim club building (42sq m). Reconfiguration of existing car park to accommodate parking 64 vehicles. Construction of administration building (450sq m) with kiosk/cafe, office, communications room, amenities, family room & first aid room. Associated landscaping. Click for more details...

NHULUNBUY PRIMARY SCHOOL EARLY CHILDHOOD UNIT SUSPENDED CEILING SYSTEM REPLACEMENT
45 Chesterfield Cct, Nhulunbuy, NT 0880 Has Nhulunbuy Primary School Early Childhood Unit Suspended Ceiling System Replacement currently at Construction stage. Replacement of existing suspended ceiling system to 5 rooms in the Early Childhood Unit at Nhulunbuy Primary School, East Arnhem Land. Works to include the replacement of existing asbestos ceiling in 2 rooms. Replacement of existing light fittings. Repair duct leakages. Replacement of air outlet registers. Aluminium, coated steel, plasterboard panels & fibrous plaster tiles. Click for more details...

PALMERSTON REGIONA HOSPITAL COMMUNICATIONS & SECURITY
213 Taylor Rd (Section 4231 Hundred of Bagot S901068), Holtze, NT 0829 Has Palmerston Regiona Hospital Communications & Security currently at Construction stage. Provision of communications & security services for the Palmerston Regional Hospital. To include supply & installation of communications & security works. Final & trade cleans. Full commissioning Click for more details...

ARALUEN ARTS CENTRE MEZZANINE & OFFICE
Commercial Premises (Offices) project for Addition development. Construction of a new mezzanine level office, meeting room & amenities at the Araluen Arts Centre, Alice Springs. To include steel framed carpet tiled floor. Steel framed plaster board lined walls & ceilings. Ducted air conditioning & insulation. Metal framed Dormer windows. Extension & upgrades to existing mechanical, electrical, fire & hydraulic services. Click for more details...

ROPER HIGHWAY PAVEMENT WIDENING
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Roper Hwy, Katherine, NT 0850. Pavement & seal widening of the Roper Highway at 6 locations totaling 12.1km. Locations to include Ch55.3 - Ch58, Ch60.4 - Ch64, Ch68.4 - Ch69.5, Ch73 - Ch74.5, Ch95.3 - Ch97.5 & Ch98.1 - Ch 99.1. To include supply & laying of type 2/20 natural gravel base course. Single coast of S10E bitumen seal with 14mm aggregate & second coat with 7mm aggregate to property accesses. Replacement of culverts. Provision of traffic control. Click for more details...

AMPILITWATJA SCHOOL ABLUTION BLOCK
Ampilitwatja School Ablution Block is currently at the Construction stage, valued at about $ 366000 it is Design & construction of a relocatable ablutions block at Ampilitwatja School, located 325km North East of Alice Springs. To include earthworks & relocation of existing demountable structure. Pre-stressed concrete floor, ceramic floor tiles, LED lighting & solid core doors. Veranda areas with fixed shelving, washing machine & dryer. Concrete pavement with 120 cubic meters of 100mm thick reinforced concrete. Click for more details...

AMANBIDJI & BULLA SFNT HOUSING UPGRADES
Residential (Units, apartments, flats, townhouses, villas) project at Various Locations, Amanbidji, NT 0852 of Houses (31) - Upgrades type of Renovations, Refurbishments etc. development. Upgrade works to 10 dwelling in Amanbidji & 21 dwellings at Bulla under the National Partnership Agreement for Stronger Futures in the NT (SFNT). To include removal & replacement of louvers, solar hot water units & vinyl flooring. Supply & installation of ceramic floor & skirting tiles. Patch & make good existing block work wall. Painting of ceilings, external walls & internal walls. Repair works to vent pipes & damaged roof sheets at 2 lots. Click for more details...

TOM BROWN ROUNDABOUT & STUART HIGHWAY RESHEETING
Stuart Hwy & South Tce, Alice Springs, NT 0870 Has Tom Brown Roundabout & Stuart Highway Resheeting currently at Construction stage. Resheeting of the Tom Brown Roundabout & approaches of Stuart Highway, Bradshaw Terrace, South Terrace & Gap Road. To include shoulder widening on the Stuart Highway between Ch1474 & Ch1475. Supply & lay SAMI seal at 1.61l/sq m, 7mm seal coat & 14mm aggregate. Provision of line marking. Provision of traffic control. Click for more details...

GEORGE BROWN BOTANICAL GARDENS TOILET BLOCK
Social (Amenities, Dressing rooms) project at Geranium St, The Gardens, NT 0820 of Amenities Block type of New development. Construction of a amenities block at the George Brown Botanical Gardens. To include 2 x male, 2 x female, 1 x disabled toilet & 3 x hand basins. Construction of concrete slab, strip footings, steel roof beams & sheet metal roofing. Ripple iron perforated panels, internal blockwork & aluminium louvers. Concrete pathway & stairs. Click for more details...

ENGAWALA REMOTE COMMUNITY HOUSING UPGRADE
Renovations, Refurbishments etc. project of Residential (Units, apartments, flats, townhouses, villas) project at Various Locations Within, Engawala, NT 0872. Upgrade works to 12 dwellings at various locations in Engawala. To include painting of internal & external surfaces. Supply & installation of vinyl flooring, ceramic floor tiles & plasterboard ceiling. Associated electrical, mechanical & plumbing works. Click for more details...

STUARTS WELL INTERSECTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Additional works to Stuart's Well intersection. Click for more details...

KATHERINE HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Gorge Rd, Katherine, NT 0850 for New. Installation of new ceiling grid system & replacement of ceiling tiles in Maternity Unit at Allan Bromwich Foyer. Works include: removal of existing ceiling tiles. Install a new suspended ceiling grid system. Install new LED lights, smoke alarms & thermal detectors. Click for more details...

ALICE SPRINGS HOSPITAL
Hospital - Electrical Upgrade project at Gap Rd, Alice Springs, NT 0870 in the Medical (Hospitals & associated buildings, mortuaries). Replace power supply cable to distribution board DB4 from transformer TX3. The site of the works is the Biomed car park Click for more details...

NORTH STUART HIGHWAY
A project in the NT Within Alice Springs Town. North Stuart Highway pavement rehabilitation works between chainage 1375.42 & chainage 1481.10 Click for more details...

NHULUNBUY PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project In The East Arnhem Shire Council Area of Netball Courts - Upgrade type. Upgrade of existing netball courts. Scope of work includes: preparation of existing asphalt outdoor netball & basketball courts & associated bitumen surfaces of approximately 2134sq m & apply a new acrylic sports surface & line marking Click for more details...

WEST ARNHEM SHIRE DISASTER RESILIENCE
West Arnhem Shire Disaster Resilience is currently at the Construction stage, valued at about $ 100000 it is Proposed works to include stormwater management & water erosion rectification works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect