State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Computerised systems for processing equipment Projects in NT®ion=⊂=2419 in region


KINTORE JOINT VENTURE PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Alice Springs Town Council Area of Resource - Gold type. Geochemical surveys over the Worman Rocks area in the Kintore Joint Venture detected only scattered low level gold anomalism. The survey has significantly downgraded the project's prospectivity. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Education (Kindergartens, day nurseries, child care centres) Renovations, Refurbishments etc. project at Urban Regions of, Darwin, NT 0800. This type is Fire Detection Equipment - Package A - Maintenance with State ownership. Routine servicing & emergency repairs to fixed fire detection equipment - Package A Click for more details...

ROYAL DARWIN HOSPITAL
Currently at the Construction stage In Darwin City is a project estimated to be $ 38000. This project Repairs to pathways & roofs. Click for more details...


House (1) project at Willowra via, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of Local Govt. 3 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

RAAF BASE DARWIN
A project in the NT Within Darwin City. Refurbishment to include painting, tiling, cabinet making, window repairs, plumbing & electrical work. Click for more details...

CHARIOT GOLD PROJECT - WARREGO TREATMENT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) New project at West of, Tennant Creek, NT 0860. This type is Long Lead Equipment Items with Private ownership. Consep are supplying the concentrator. Orders for cyclones, silo and mill linings likely to be placed shortly. Click for more details...


is currently at the Construction stage, valued at about $ 30000 it is Construction of multi use safari camp centre. Click for more details...

UBIRR ROCK - KAKADU NATIONAL PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Roadworks For Park type. Work comprises construction of 3 No concrete floodways on Ubirr Rock access road, reconstruction of Ubirr Rock carpark utilizing brick pavers laid on constructed FCR base & compacted subgrade. Construction of following items of work are also required: Site drainage, fencing, drainage culverts & sign posting. Click for more details...

SUNSET COVE
Sunset Cove is currently at the Construction stage, valued at about $ 5000000 it is Roads & all services including power, water, sewerage, telephone services for 65 lots. Click for more details...

ALICE SPRINGS HOSPITAL-SPECIAL CARE NURSERY
Alice Springs Hospital-Special Care Nursery is currently at the Tenders & Building stage, valued at about $ 30000 it is Construct new bathroom area for Alice Springs Hospital Special Care Nursery. Click for more details...

TANAMI GOLD OPERATIONS
Mining (Open Cut) project at 650 km northwest of, Alice Springs, NT 0870 of Mines - Open Cut/Infrastructure type of New development. Work to date includes resource definition, pit planning, metallurgical testwork & scoping studies (on several deposits). Area contains Jim's Find, Jim's South, Dogbolter & Redback deposits with a total estimated resource of 4.6mt grading 3.4gpt gold. Initial mining involving 7 small pits is envisaged with an average strip ratio of 9:1. Earlier drilling results included 8m grading 76.5gpt gold from Dogbolter's main zone. First deposits to be mined to also include the Harleys area. Mining reserves currently estimated at 2mt grading 3.8gpt gold with potential to prove up additional reserves. Haulage of ore to the plant site approximately 8 km distant & up to 25 km (Jim's Find deposit) is included in this tender. Original contract period is for 2 years with a 2 year option. These deposits to be mined to various depths up to 110m for this 1mtpa operation. Haulage roads to be constructed as mine site are developed. Click for more details...

JILKMINGGAN COMMUNITY HOUSING PROGRAM
Jilkminggan Community Housing Program is currently at the Construction stage, valued at about $ 1000000 it is Construction of eight steel frame & steel clad elevated houses, CFC flooring, metal deck roof, aluminium framed windows. Capital renovations to three existing houses. Click for more details...

CLUB ALICE
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project In The Alice Springs Town Council Area of Sporting Complex/Residential Subdivision For Golf Club - Redevelopment type. Plans are to expand with an extra 18 holes, plus new 18 hole short course under lights. Likely to include bowling greens, squash & tennis courts. Urban development would include: child care centre, swimming pool, barbecue areas, convenience store, function & gaming rooms, bars, gyms & offices as well as houses. Golf club rooms would be relocated & extra 18 holes & housing development would be built on north side of Stephens Road between Lasseters Hotel Casino & existing housing in new suburb in Mt John Valley. Click for more details...

ALICE SPRINGS HOSPITAL
Trade Package For Ceilings - Hospital - Redevelopment project at Gap Rd, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of State. Ceilings for hospital redevelopment. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Support Facilities (Industrial buildings). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

STUART HIGHWAY REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Upgrade to pavements & bitumen sealing of entrances to existing Rest Areas. Click for more details...

HEALTH STAFF DWELLINGS
Dwellings (2) New project In The Alice Springs Town Council Area. Construct 2 (2) houses. Click for more details...

DEFENCE HOUSING RESIDENTIAL MAINTENANCE
Residential Maintenance For Defence Houses (1,700) project at Various sites Region of, Darwin, NT 0800 in the Residential (Units, apartments, flats, townhouses, villas). Provision residential maintenance services for homes in Darwin area managed by DHA. Maintenance services required: carpentry (including cabinet making), wet seal application, carpet cleaning, ceramic tiling, cleaning & pool maintenance. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

EAST ARM LEPROSARIUM MONUMENT
Monument project at Berrimah Rd, East Arm, Darwin, NT 0800 In The Council Area Of Darwin City of State. Construct & fabricate monument. Click for more details...

POWER & WATER ALL CENTRES QUANTITY SURVEYING SERVICES - CONSULTANCY
Commercial Premises (Offices) New project at All Centres within region of, Darwin, NT 0800. This type is Consultancy For Quantity Surveying Services with State ownership. Panel contract for quantity surveying services for period of 36 months for Power & Water all centres. Click for more details...

AQUASCENE KIOSK ADDITION
Kiosk - Addn project at Lot 6574 Doctors Gully Rd, Larrakeyah, NT 0820 in the Hospitality (Restaurants, Canteens). Kiosk addition to outdoor entertainment (fish feeding) facility. Click for more details...

LYONS CIVIL WORKS PHASE 1 - STAGE2 (STAGES 6-2) - DOUBLE ENTRY
A project in the NT Within Darwin City. Civil works including roads, drains & other service infrastructure including civil work Click for more details...

POWER & WATER CORPORATION ALL CENTRES ENGINEERING SERVICES CONSULTANCY
Public Utilities (Treatment plants, Sewerage reticulation) New project at Various locations within Northern Territory, ., NT 8999. This type is Engineering Services Consultancy with State ownership. Engineering services consultancy for 36 month period panel contract for all Power & Water Corporation centres. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Oil & Gas (Onshore processing facilities) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

DEPARTMENT OF DEFENCE SHOAL BAY RECEIVING STATION
New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Shoal Bay Receiving Station, Rapid Creek Rd, Alawa, NT 0810. Upgrade & modifications of existing air conditioning systems. Provision of new air conditioning system to accommodate additional loads of approx 360 kW. Upgrade & modifications of the existing electrical reticulation systems & associated infrastructure to cater for additional equipment load. Upgrade & modifications of existing Uninterruptible Power Supply. Provision of a fully automatic fire suppression & control system in accordance with Defence Manual of Fire Protection Engineering & relevant Australian Standards. Refurbishment of existing workspaces to open-plan design. Click for more details...

HASTINGS OVER MINDIL SOUL & SPIRIT ON THE AVENUE MIXED DEVELOPMENT
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 129 (Lots 07466& 07468) Stuart Hwy cnr 10 Salonika St, Parap, NT 0820 for New. Construction of 2 residential towers x 14 storey totalling 300 units. Tower 3 (10 levels) for 144 units, Tower 4 (10 levels) for 156 units comprising of 134 x 1 bedroom, 142 x 2 bedroom & 24 x 3 bedroom. To be constructed over commercial precinct with offices (15,000 sqm) & 2 storey podium with shops, restaurants & cafes. Two levels basement parking. 25 m lap pool, gymnasium, barbecue area. Associated parking & landscaping. Click for more details...

CHARLES DARWIN UNIVERSITY SPORT & RECREATION
Sports Facility/Medical Clinic project at Casuarina Campus Lakeside Drive, Darwin, NT 0800 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Construction of gymnasium, medical centre & amenities. Click for more details...

CENTRAL DESERT SHIRE COUNCIL SERVICE DELIVERY CENTRES
New project of Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project at Lajamanu Yuendumu Yuelamu Nyirripi Laramba Harts Range Willowra, Ti Tree, NT 0872. Work at 9 service delivery centres includes: alterations to existing infrastructure, erection of shade structure/sails & concrete paths. Click for more details...

OLD PIRATE GOLD PROJECT - TRIAL MINING
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Central Desert Shire Council Area for New development. A project based on a Resource Estimate of 1.88 million tonnes at 11.96 g/t gold for 723 800 ounces gold. Trial mining will include the extraction of 10 000 tonnes of gold bearing material, installation of a pilot plant & tailings facility, associated site works & ground water extraction. Pilot plant will include 15tph gravity gold plant including crushers, coarse gold jig, ball mill Knelson gravity concentrator & tabling/gold room. Click for more details...

POLGLASE CIRCUIT RESIDENTIAL DEVELOPMENT
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Palmerston Town Council Area for New development. Construction of 17 x 3 bedroom villas in eight single storey buildings. Cement slab, metal cladding walls & metal roof. Parking for 34 cars. Associated landscaping. Click for more details...

BUNTINE HIGHWAY PAVEMENT STRENGTHENING & WIDENING
Roadworks - Pavement Strengthening/Widening project at Buntine Hwy, Katherine, NT 0850 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construction & sealing of 4 sections of pavement on Buntine Highway from chainage 107.96km to 283.018km. To include construction of floodways & drainage structures. Associated insitu stabilisation, spray sealing & protection works. Click for more details...

ARNHEM HIGHWAY & ANZAC PARADE ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Arnhem Hwy & Anzac Pde Lambells Lagoon, Darwin Dc, NT 0820 of Roadworks - Intersection - Upgrade type of New development. Construction of a new left turn slip lane for the intersection at Arnhem Highway & Anzac Parade Darwin Region. To include stormwater drainage, pavement, culverts & concrete. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Steel Trusses project at 5, 15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 In The Council Area Of Palmerston Town of Private. Design & fabrication of steel truss restaurant roofs for the Gateway Shopping Centre. Click for more details...

DARWIN SHADE INFRASTRUCTURE ON SEA WALL
Shade Infrastructure - For Sea Wall New project In The Darwin City Council Area. Design & construction of a 350m shaded structure along the sea wall. Click for more details...

TABLELANDS HIGHWAY REDECKING OF PLAYFORD RIVER, BOREE CREEK & WHITEHOLE CREEK BRIDGES
State ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Barkly Shire Council Area for New development. Redecking of Playford River, Boree Creek & Whitehole Creek Bridges on Tablelands Highway at Ch55, Ch100 & Ch105km). To include the removal of the existing precast concrete bridge decks & replacement with stronger precast decks, installation of W-beam guardrail, provision of double coat seal as well as minor patch repair of several headstocks & replacement of missing or damaged bridge signs. Click for more details...

VICTORIA RIVER RESEARCH STATION REFURBISHMENT
Victoria River Research Station Refurbishment is currently at the Construction stage, valued at about $ 235000 it is Refurbishment works to the Northern Territory's Department of Primary Industry & Fishery Victoria River Research Station, 257km West of Katherine. Full internal refurbishment of the research station to include electrical works, door frames, doors & locks. Works to include supply & installation of 150m x 90m x 10m steel angles to the underside of beams & bolt through the beam at 500mm. Construction of new ceiling, wall sheeting & insulation. Supply & installation of joinery, plumbing fixtures & floor coverings. Click for more details...

GOOD SHEPHERD LUTHERN COLLEGE ACCESS ROAD
Education (Schools - primary, secondary (up to Yr 12)) project In The Litchfield Shire Council Area of Private ownership. Construction of an access road to connect Stow Road to the Good Shepherd Lutheran College, Howard Springs. To include vegetation clearing, removal of earth berm & re-alignment of open unlined drain. Widening of existing bus interchange area. Table drains & reinforced concrete box culverts. To include 2.5m wide drop off zone & 2.5m wide footpath. Parking for 17 cars. Associated landscaping. Click for more details...

DARWIN REGIONAL HOSPITAL REFURBISHMENT OF HOUSES
Medical (Hospitals & associated buildings, mortuaries) project at 8 Paracelsus Rd & 13 Burnett Rd, Tiwi, NT 0810 for Renovations, Refurbishments etc.. Refurbishment works to 2 elevated houses, House 13 Burnett Road & House 8 Paracelsus Road at the Royal Darwin Hospital. Removal of existing fence & replacement with 1800mm high chainmesh fence. Removal of existing ceramic floor tiles in bedroom, bathroom & kitchen areas. Removal & replacement of kitchen sink, stove, benches & cupboards. Removal & replacement of WC, vanity basin, splash back, bath tub & shower. Removal of asbestos sheeting from bath & WC. Supply & installation of ceramic floor tiles, air conditioning & light fittings. Make good & reseal timber floor. Click for more details...

HENRY WRIGLEY DRIVE SHARED PATH
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Darwin City Council Area of Shared Path type. Construction of a shared bike path along the side of Henry Wrigley Drive between McMillans Road & the Department of Infrastructure road reserve boundary. To include replacement of street lights. Provision of traffic control. Click for more details...

SMITH STREET NAB BUILDING LEVEL 3 FITOUT
Commercial Premises (Offices) Renovations, Refurbishments etc. project at Smith St, Darwin, NT 0800. This type is Offices - Fitout with State ownership. Refurbishment of the existing Department of Business offices on the 3rd floor of the NAB Building in Smith Street, Darwin. To include the fitout of open office areas, offices, meeting rooms, interview rooms, store rooms & amenities. Modifications to existing electrical, mechanical, hydraulic, fire & ICT services. Removal of existing walls, doors, joinery & flooring. Installation of acoustic treatment overlay with 100mm polyester insulation. MDF laminate, plasterboard bulkhead, aluminium framed doors & windows. Carpet tiles, ceramic tiles & plasterboard splash back. Click for more details...

TARAKAN COURT UNITS BUILDING 2
New project of Residential (Units, apartments, flats, townhouses, villas) project at 11 Tarakan Ct, Johnston, NT 0832. Construction of building 2 of the Tarakan Court Development. To include 6 x 1 bedrooms units, 35 x 2 bedroom units & 6 x 3 bedroom units in a 4 storey building with balconies & aluminium sliding doors & frosted glass panels. Aluminium framed sliding windows, aluminium framed windows & plasterboard ceilings. Sheet metal roofing & aluminium wall cladding. Chain mesh fencing to ground level units. Car parking for 96 vehicles. Associated landscaping. Click for more details...

LEANYER RECREATION PARK CASCADES & LAGOON RELINING
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project In The Darwin City Council Area of Lagoon Pool - Relining type. Upgrade works to the Leanyer Recreation Park Cascades & lagoon relining. To include demolition of existing cascade pools & paved area. Replacement of pebblecrete surfacing at the main swimming/wading pool to include rehabilitation of expansion joints. Construction of 2 walk in wading pools, water play area with water play features & access ramps. Reinstatment of lower concrete paved areas, pathways & grassed seating area. Installation of circulation water supply pipe reticulation pumping system, pool drainage connections, surface drainage pits & sub-soil drainage. Re-connection of main filtered water supply to main pools. Associated landscaping. Click for more details...

PHILPOTT STREET TOWNHOUSES
Townhouses (2) - 2 Storey New project In The Darwin City Council Area. Proposed construction of 2 x 2 storey x 3 bedroom townhouses. Aluminium framed glass louvre windows, wall cladding & custom orb roof. Car parking for 4 vehicles. Associated landscaping. Click for more details...

NTARIA SCHOOL - BLOCK A
Education (Schools - primary, secondary (up to Yr 12)) project for Renovations, Refurbishments etc. development. Removal of existing roof on Block A. Lay & fix new colourbond roof cladding & associated roof plumbing works (including 4 X Whirly Bird roof ventilators). Scope of work includes: installation of roof sarking & R 3.0 insulation, replacement of water damaged ceiling tiles, replacement of damaged bird boards x 12. Installation of security grilles at vandal entry points. Installation of rain water storage tanks & the connection of the tanks to the roof plumbing accessories. Click for more details...

YIRRKALA SCHOOL
Court - Refurbishment project at ., Yirrkala, NT 0880 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Court resurfacing: pepare existing asphalt outdoor basketball & tennis courts & associated bitumen surfaces & apply a new acrylic sports surface and line marking. Fencing upgrade: remove & dispose of existing perimeter fencing (not including existing posts/footings). Install new hot dip galvanised Straining wire, chain mesh fencing, PA gates & locking furniture. Click for more details...

WURRUMIYANGA MORGUE
Social (Religious Buildings, civil chapels) New project at Lot 737, Wurrumiyanga, Darwin, NT 0800. This type is Morgue with State ownership. Construction of a new morgue Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX
Sports (Race track (motor)) project for Renovations, Refurbishments etc. development. Safety upgrade at the Hidden Valley Motor Sports Complex Click for more details...

DARWIN REGION ROADWORKS
Darwin Region Roadworks is currently at the Construction stage, valued at about $ 2356000 it is Urban asphalt replacement on various roads & highways in the Darwin region Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect