State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Computerised systems for processing equipment Projects in NT®ion=⊂=2419 in region


UMBAKUMBA COMMUNITY
Building Services For Community Renovations, Refurbishments etc. project In The Darwin City Council Area. The following services are required: Carpentry, plumbing, electrical, plant operators & painters. Click for more details...

DALY RIVER POLICE STATION
Paint/Floor Coverings Upgrade For Police Station project at Daly River Police Station, Daly River, NT 0822 In The Council Area Of Darwin City of State. Complete external repaint Police Station for Cell Block & house 2. Replace floor coverings within Visiting Officers Quarters (house 3). Click for more details...

MT BUNDEY TRAINING AREA
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at 120km sth east of, Darwin, NT 0800. This type is Roads - Stage Two Package with Federal ownership. Construction of 17km of unsealed road. Click for more details...


Duplex (1) For Single Men's Quarters In The Alice Springs Town Council Area. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...


Proposed lot 4621 (Town of Palmerston), Yarrawonga, NT 0830 currently at Construction stage. Portal steel frame construction, concrete floor, metal deck roof. Click for more details...

WOODYCUPALDIYA ABORIGINAL CORPORATION
Woodycupaldiya Aboriginal Corporation is currently at the Construction stage, valued at about $ 670000 it is Construction of Infrastructure ( Roads, water supply, sewerage, power supply). Click for more details...

FIRST STREET/LINDSAY STREET ROUNDABOUT
Roundabout project at First St & Lindsay St, Katherine, NT 0850 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Construct roundabout on First Street & Lindsay Street. Click for more details...

MITCHELL STREET/THE ESPLANADE CONVENTION CENTRE
Private ownership Commercial Premises (Commercial complexes - shops, offices) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Expansion of existing conference centre & general upgrade & refurbishment to existing buildings. Click for more details...

ALICE SPRINGS RESORT
Resort - Upgrade - Final Stage project at 34 Stott St, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of Private. New bar to accommodate upto 40 patrons in contemporary setting of booths, tables & bar seating. Palms Restaurant refurbishment will get new decor, furniture & fittings, doors to pool deck. Revamped conference facilities in Gum Tree Lounge & upgrading accommodation. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Public Buildings & Facilities (Fire Stations, SES) Renovations, Refurbishments etc. project at Palmerston, Darwin rual area incl Batchelor, Nhulunbuy, Groote Eylandt &, Darwin, NT 0800. This type is Fire Detection Equipment - Package B - Maintenance with State ownership. Routine servicing & emergency repair to fixed fire detection - Package B. Click for more details...

ULURU - BASE OF CLIMB
Public Utilities (Water distribution systems, Drainage) project at Uluru via, Alice Springs, NT 0872 of Rising Main For Toilet Block type of New development. Solar powered sewerage pump station rising main, water mains & civil works for new toilet block at Uluru (base of climb). Click for more details...

BATCHELOR & LITCHFIELD PARK REHABILITATION
Currently at the Construction stage In Darwin City is a project estimated to be $ 50000. This project Repairs & painting to various assets throughout Batchelor & Litchfield Park. Click for more details...

BORROLOOLA HOUSING
Houses (6) project, Borroloola, NT 0854 In The Council Area Of Katherine Town of Local Govt. Construction of 3 & 4 bedroom houses. Krusscrete construction, steel framed floor, metal deck roof, aluminium framed windows. Click for more details...

WALER BARRACKS
Military (Military housing & accommodation, Military colleges) project at Waler Barracks, Palmerston, NT 0830 for New. Group of rank & file accommodation units. Click for more details...

DARWIN NAVAL BASE
Naval Base - Redevelopment New project In The Darwin City Council Area. Project comprises (but not limited) to design & construction of: New 148 m long wharf for patrol boats, realignment of cope points & extension of existing wharf to cater for landing craft, realignment of existing boat ramp, provision of three additional minor war vessel hardstand, provision of additional fuel storage & fuel reconditioning facilities, extension of services to new wharf (water, power, communication, fuel, waste discharges etc). Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

MARTHAKAL HOMELANDS RESOURCE CENTRE
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construct 1 x 3 bedroom steel framed house at Dolnji Outstation & renovation existing houses at various outstations. Click for more details...

ALICE SPRINGS REGION REST AREAS/TRUCK BAYS
Alice Springs Region Rest Areas/Truck Bays is currently at the Construction stage, valued at about $ 296000 it is Maintenance roadside rest areas & truck bay facilities for 12 month period. Click for more details...

HERMANNSBURG SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project In The Alice Springs Town Council Area of Airconditioning - Remove/Supply & Install type. Remove existing evaporative coolers & 1 RAC & associated works. Supply & install refrigerated airconditioning. Click for more details...

WASTEWATER TREATMENT PLANT-EAST ARM WHARF
Wastewater Treatment Plant For Quarantine Washdown Facility project at East Arm Wharf Region of, Darwin, NT 0800 In The Council Area Of Darwin City of State. Proposed construction quarantine wastewater treatment plant to treat waste water from quarantine washdown facility. Click for more details...

BATCHELOR SUBSTATION PROJECT
Batchelor Rd, Batchelor, NT 0845 Has Batchelor Substation Project currently at Construction stage. The project comprises the construction of a new power distribution infrastructure in the Batchelor region to the proposed Compass Resources Brown Oxide mine. Development includes a new 132 kV transmission line of 3.7 km along Batchelor road, two new substations and a new 22 kV underground XLPE cable feeder of 10.6 km from Batchelor road to the mine site. Construction work will involve the design certification and installation of control room, disconnection uplift transport handling temporary storage and placement of all items from the Edith River substation that are to be relocated and reinstalled at Batchelor substation, erection of all electrical equipment, connection of the earth wire conductors to electrical equipment and testing of the completed earthing system, attachment of conductors and insulators to the landing structure, 132 kv transmission line erection and commissioning, electrical installation work not otherwise specified, installation of communications and 240 V power between the crib room and the control room. Click for more details...

RYANS BEND ROAD ROADWORKS
Currently at the Planning stage In Katherine Town is a project estimated to be $ 75000. This project Gravel resheeting of various locations along Ryans Bend Rd between CH: 70 km & CH: 80 km. Click for more details...

BURNSIDE GOLD OPERATIONS - FOUNTAIN HEAD - RESOURCE
Private ownership Mining (Open Cut) project In The Katherine Town Council Area. Indicated resource is 1,985,000 tonnes @ 1.7 g/t for 106,100 ounces of Au and an inferred resource of 661,000 tonnes @ 1.6 g/t for 34,000 ounces of Au. Click for more details...

DARWIN AIRPORT INN
Hospitality (Hotels, Serviced Apartments) project In The Darwin City Council Area of Hotel - 6 Storeys type. Construction of a new 3 star hotel in 6 storey building with 121 suites plus an additional 50 beds in 6 dormitory rooms. Click for more details...

BAKEWELL WOOLWORTHS SHOPPING CENTRE
A project in the NT Within Palmerston Town. Construction of Retail Development. Comprising a Supermarket (4795sq m), speciality retailers (1064sq m), drive- through fast food restaurant & service station. Cement slab, rendered concrete blockwork & metal roof. Parking for 337 cars. Associated landscaping. Click for more details...

LEE POINT ROAD HOUSES
A project in the NT Within Darwin City. Construction of 50 single storey dwellings as part of stage 10 of the Lyons Estate. Associated parking & landscapng. Click for more details...

HOMEMAKER VILLAGE OFFICE BUILDING
Commercial Premises (Offices) project for New development. Construction of offices/showroom in a 2 storey building. Click for more details...

EAST ARNHEM REGION GAPUWIYAK SCHOOL SCIENCE CENTRE BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of the The Shirley Nirrpurranydji Science Centre. Click for more details...

CHANNEL ISLAND ROAD INDUSTRIAL VILLAGE
Industrial (Warehouses, cargo sheds, distribution centres) project at 1235 (Lot 1864) Channel Island Rd Wickham Point via, ., NT 8999 of Warehouses/Depots type of New development. Proposed industrial hub buildings comprising warehouse style, with small office components, depots, storage yards, sheds, caretakers residence, carparking. Click for more details...

CHARLES DARWIN CENTRE (PASPALEY BUILDING)
Retail (Shops, shopping centres & arcades, supermarkets) project In The Darwin City Council Area of State ownership. Redevelopment of former Paspaley Building to house major government tenant (9970 sqm Level 6 to Level 15) in 5 green star rating building. To include other office, commercial & retail space, including Paspaley Pearl Properties (1984 sqm Levels 16 & 17). The building will present as two distinct parts - a tower with a lens-shaped floor plate, & a 5 level podium wrapping around & behind the base of the tower. The podium is configured to retain the heritage colonnade. Podium to includedate parking at levels 1,2 & 3 & some office space. The building will contain 16,170 sqm of office space above ground & 900 sqm of retail space at ground level. 1 level of basement parking. Click for more details...

TI TREE ROADHOUSE TRUCK STOP FACILITIES UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy (approx CH 1301.3km), Ti Tree, NT 0872 for New. Upgrade existing truck stop facilities at Ti Tree Roadhouse on Stuart Highway. To include drainage, underground stormwater drain, road signage, street lighting, landscaping & earthworks. Click for more details...

ICHTHYS MAIN CIVIL WORKS (CVL3) - GRE/GRVE PIPING INSTALLATION
Oil & Gas (Pipelines & associated contracts) project for New development. Contract for installation & spooling of 16km of DN 150mm-900mm glass reinforced vinyl ester (GRVE) & DN 1050mm-1800mm glass-fibre reinforced epoxy (GRE) pipes. Contract to also include lamination of rubber ring jointing at the Ichthys Onshore LNG facilities project. Click for more details...

ICHTHYS GAS PROJECT - MAIN CIVIL WORK (CVL3) - TEMPORARY WORKS DESIGN REV1 CONSULTANCIES
Ichthys Gas Project - Main Civil Work (Cvl3) - Temporary Works Design Rev1 Consultancies is currently at the Construction stage, valued at about $ 250000 it is For the provision of Temporary Works Design along with Construction Methodologies associated with CVL3 Main Civil Works project on the Ichthys Project Onshore LNG facilities. Click for more details...

GRAY PRIMARY SCHOOL BLOCK E AIR CONDITIONING
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 468000. This project Removal of existing Block E air conditioning systems & provision of new air conditioning systems. Provision of 1 aircooled chiller & 2 chilled water airhandling units. Associated pipework, wiring & plant areas. New Mechanical Services Switchboard & electrical upgrades. Automatic control systems. Ducted air distribution systems including sheetmetal internally insulated supply & return ductwork & proprietary fabric ductwork systems. Modifications to existing classroom lights, projectors & other exposed services to suit new ductwork. New electrical submain & distribution board to serve Block E. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Social (Amenities, Dressing rooms) project at 5, 15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 for New. Supply & installation of joinery/toilet partitions to Woolworths, Big W & centre amenities. Click for more details...

ALI CURUNG GOVERNMENT EMPLOYEE HOUSING
Dwelling New project In The Barkly Shire Council Area. Construction of a 4 bedroom Government Employee dwelling in Ali Curung. To include driveway, fencing, free standing metal shed & carport. Metal roof sheeting, steel & reinforced concrete. Associated landscaping. Click for more details...

SUNSET PARK SEAWALL
Sunset Park Seawall is currently at the Construction stage, valued at about $ 514000 it is Construction of 155m solid concrete sea wall around the perimeter of Sunset Park. Associated landscaping. Click for more details...

ADELAIDE RIVER WAR CEMETERY INTERPRETIVE PAVILION
A project in the NT Within Coomalie Community. Construction of a interpretative pavilion at the Adelaide River War Cemetery. Demolition of existing pool fence & concrete slab. Construction of 100mm concrete slab with SL82 mesh. Pavilion to include sheet metal roof, aluminium benches, ceiling fan & 1800mm high aluminium slatted gate. 1800mm wide x 75mm deep concrete path with 75mm compacted sand. Associated landscaping. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - CONTRACTOR CAMP
Roper & Wilton Rivers High Level Crossings & Road Upgrades - Contractor Camp is currently at the Construction stage, valued at about $ 3000000 it is Supply, installation & commissioning of contractor camp infrastructure for a 85 man accommodation camp to support the Roper & Wilton Rivers High Level Crossings & Road Upgrades. To include, power, water, sewage & communications systems. Click for more details...

GUNBALANYA GOVERNMENT EMPLOYEE HOUSING UPGRADE 2
Gunbalanya Government Employee Housing Upgrade 2 is currently at the Construction stage, valued at about $ 805000 it is Refurbishment works to 13 Government Employee houses located within Gunbalanya, West Arnhem Land. To include painting of internal & external surfaces. Removal of vinyl flooring & replacement with ceramic floor tiles. Replacement of bathroom & kitchen fittings & fixtures. Replacement of doors with solid core doors. Supply & installation of car port with concrete slab. Click for more details...

COX COUNTRY CLUB CLUBHOUSE ALTERATIONS & ADDITIONS
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Belyuen Shire Council Area of Private ownership. Alterations & additions to the clubhouse at Cox Road Country Club. Associated landscaping. Click for more details...

LITCHFIELD NATIONAL PARK FLORENCE FALLS 4WD CAMPGROUND UPGRADES
Campground - Upgrades project at Litchfield Park Rd, Litchfield Park, NT 0832 in the Entertainment (Parks, Leisure grounds, Playgrounds). Upgrade works to the Florence Falls 4WD campground at Litchfield National Park. To include construction of a new sealed access road to the campground, construction of various new campgrounds & upgrade of existing campgrounds at the site, construction of a new ablution building at the site including the provision of water services & waste water treatment system & the demolition of the existing toilet building, repair & upgrade of drainage throughout the site, construction of concrete steps into the Florence Falls plunge pool, upgrading of the existing walking track between the campground & plunge pool to provide access for quad bikes. Associated civil works. Click for more details...

CENTRAL ARNHEM ROAD REFORM & GRAVEL
Central Arnhem Rd, East Arnhem, Nhulunbuy, NT 0880 Has Central Arnhem Road Reform & Gravel currently at Construction stage. Reformation & regravel of unsealed pavements on Central Arnhem Road CH480.22-487.22km. Associated civil works. Click for more details...

NORTHERN GAS PIPELINE CONTROL & SWITCHROOM BUILDINGS
Mining - Support Facilities (Administration facilities) New project at Warrego & Mount Isa, ., NT 8999. This type is Control/Switchroom Buildings with Private ownership. For the provision of 2 control room buildings at Warrego & Mount Isa. Click for more details...

PALMERSTONE SENIOR COLLEGE
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 149000. This project Replacement of Lift 2 at Palmerston Senior College Click for more details...

BARUNGA & PIGEON HOLE SCHOOLS
Education (Schools - primary, secondary (up to Yr 12)) New project at Central Arnhem Rd & 45kms off the Brutine Hwy, Katherine, NT 0850. This type is Basketball Court/Shade Structures with State ownership. Barunga School - construction of a new basketball court, line marking & blackboard, ring & support structure & solid shade structure over the entire court. Pigeon Hole School - solid structure over entire court, removal of existing free standing light; supply & installation of new lighting including protective shields Click for more details...

DESERT PARK
Social (Amenities, Dressing rooms) project for New development. Construction of a new ablution block & upgrade the eagle encounter. Scope of work includes: install an exposed aggregate floor (to match existing) 12 metres x 13 metres x 125mm thick to the floor area of the Eagle encounter shelter. Install 52 metre x 3metre x 125mm thick (with appropriate re-enforcing mesh) exposed aggregate path (to match existing) from the current path to the shelter entrance. Construct a small ablution block adjacent to the shelter. Construct a 12m x 2m exposed aggregate path to ablution block. Install bollard path lighting (possibly solar) along the path from Visitor Centre to the Shelter including the path to the ablution block. Install florescence lighting to the shelter. Install a refrigerated water bubbler to the shelter. Supply & install audio visual equipment to the shelter. Install an eagle mews (cage) adjacent to the shelter with water supply Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect