State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Docks & piers, wharves, boat ramps Projects in TAS®ion=⊂=1743 in region


COAL RIVER VALLEY WATER RECYCLING SCHEME
Pipe Supply For Gravity System project at Coal River near, Richmond, TAS 7025 In The Council Area Of Richmond of Local Govt. Supply and delivery of pipes, valves and fittings. Click for more details...

TOTALISATOR AGENCY BOARD
Tab Agency - Upgrade Renovations, Refurbishments etc. project In The Devonport Council Area. Internal refurbishment of existing TAB. Click for more details...


A project in the TAS Within Hobart. Infill to existing 2nd floor. Glass, steel & concrete construction. Click for more details...

OONAH PROJECT
Mining (Open Cut) project In The West Coast Council Area of Resource - Base Metals type. The licence embraces the old Oonah tin-copper-silver mine, which produced relatively small tonneages of ore in the period 1890-1918. Mineralisation comprised vein quartz-siderite-sulphides in the northerly trending Galena and Stannite Lodes worked to a depth of almost 200 m in brecciated black shale and basic volcanics. Metallurgical testing has indicated it is feasible to produce a concentrate, but its saleability needs to be established. Click for more details...

OCEANA DRIVE CONSTRUCTION
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Clarence Council Area for New development. Work includes road pavement, kerb & channel, drainage works, concrete footpaths. Click for more details...

HUONVILLE WATER SUPPLY
Huonville Water Supply is currently at the Construction stage, valued at about $ 282000 it is A/ Construction of concrete clarifier. B/ Construction of 700 Kl clearwater storage washwater storage tank. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Underground - including longwall). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

BUSHY PARK TOURISM FACILITY
Tourism Facility/Visitor Accommodation project at Glenora Road, Bushy Park, TAS 7140 In The Council Area Of Derwent Valley of Private. Boundary adjustment, tourism facility and visitor accommodation comprising restaurant, interpretation centre, accommodation and associated siteworks. Staged development. Click for more details...

SOUTH EAST TASMANIA RECYCLED WATER SCHEME
Public Utilities (Water distribution systems, Drainage) project for New development. Supply of valves and fittings for the extension of the Coal River Valley Reuse Scheme. Supply of DN600mm DICL fittings and valves for the Malcolms Hut Road pipeline extension. Click for more details...

SOUTH EAST TASMANIA RECYCLED WATER SCHEME
A project in the TAS Within Clarence. Supply of approximately 6000 metres of DN630mm polyethylene pressure pipe for construction of a future pipeline. Click for more details...

CHARBOODAY DRIVE WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project for New development. Metal cladding walls and roof, steel frame and concrete floors. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Reservoir project at Forthside, Forth, TAS 7310 In The Council Area Of Devonport of State. Construction of a new concrete, aluminium roofed reservoir, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of an access road to the reservoir site, clearing, grubbing and excavation works, importation of structural fill, construction of a 1ML (approx) reinforced concrete water storage reservoir, construction of an aluminium clad roof, inlet, outlet, overflow and scour and drainage pipelines, platforms and ladders, hardstand/access track and open drain around the reservoir, installation of a stock proof fence, miscellaneous civil works and provision of shop and as-executed drawings. Click for more details...

ALBERT HALL
Lift - Installation project at 45 Tamar St (Corner Cimitiere St), Launceston, TAS 7250 in the Social (Community centres, Clubs (unlicensed), Youth centres, Day respite). Replacement of existing goods lift with a passenger lift, works involve excavation, underpinning, demolition, steel fabrication and all that is required in the construction of a three level passenger lift within an existing building. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Aged Care & Retired Developments (Retirement villages) New project at 55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018. This type is Independent Living Units (23) - Stage 4 with Private ownership. Construction of twenty three, two and three bedroom independent living units. Brick veneer, concrete floors, metal roof and aluminium framed windows. Click for more details...

GEORGE TOWN WASTE WATER TREATMENT PLANT
Currently at the Construction stage In George Town is a project estimated to be $ 350000. This project Provision of portable sludge dewatering equipment for use at waste water treatment plants in Northern Tasmania. The equipment will initially be installed and commissioned at the George Town waste water treatment plant. This contract involves the design, supply, installation, testing and commissioning of a belt filter press, sludge feed pumps, polymer dosing system and dewatering sludge convey equipment. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018 Has Fairway Rise Lifestyle Village currently at Construction stage. Construction of a multi purpose centre. Brick veneer, metal roof, concrete floors. Click for more details...

LEWIS STREET UNITS - STAGE 1
Units (2) project at 24 Lewis St, Longford, TAS 7301 in the Residential (Units, apartments, flats, townhouses, villas). Construction of two single storey two bedroom units plus study. Brick veneer and cement sheet weatherboards, metal roof, concrete floors and double glazed aluminium windows, plus attached garage. Click for more details...

CENTRAL COAST COUNCIL MAINTENANCE TENDERS
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) New project at Various locations within The Municipality of Central Coast, Ulverstone, TAS 7315. This type is Maintenance Contracts with Local Govt ownership. Supply of the following for the period 2013-2015 throughout the Central Coast municipal area. Maintenance of essential safety and health features and measures- fire inspections. Maintenance of essential safety and health features and measures- electrical inspections. General electrical maintenance and security services. Expressions of Interest for- general plumbing maintenance and general building maintenance. Click for more details...

OLD STATION ROAD REHABILITATION
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Kingborough Council Area for New development. Design and construction of Old Station Road Rehabilitation. Click for more details...

PENGUIN REGIONAL ATHLETICS CENTRE REDEVELOPMENT
Local Govt ownership Sports (Athletic Tracks) project In The Central Coast Council Area for New development. Resurfacing of the existing athletics track. Click for more details...

BRIGHTON COUNCIL RE-SEAL TENDERS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Brighton Council Area of Road Re-Sealing And Sealing type. Re-sealing and new sealing of various roads within the Brighton Municipality. Click for more details...

LADY BARRON WATER TREATMENT PLANT
Currently at the Construction stage In Flinders is a project estimated to be $ 5500000. This project Design and construction of a new water treatment plant at Lady Barron on Flinders Island. Click for more details...

PENGUIN ROAD RESIDENTIAL SUBDIVISION
New project of Civil Engineering (Residential Subdivision) project at 109 & 115 Penguin Rd, Ulverstone West, TAS 7315. Residential subdivision of 36 lots. Civil works include roads & services. Click for more details...

BARNETT CLOSE DWELLINGS
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Break O'Day Council Area for New development. Construction of 5 dwellings consisting of 4 residential dwellings and 1 boatshed/recreational unit. Stormwater disposal, associated car parking spaces and onsite waste water management. Click for more details...

UNITED PETROLEUM SERVICE STATION
40 Gordon St, Sorell, TAS 7172 Has United Petroleum Service Station currently at Construction stage. Demolition of the existing service station and construction of a new building and canopy with replacement of fuel pumps and forecourt paving. A Take-away food premise and convenience store will also be constructed. Click for more details...

FAHAN MIDDLE SCHOOL
1 Fisher Av, Sandy Bay, TAS 7005 Has Fahan Middle School currently at Construction stage. Upgrade & addition to general learning areas at the existing Fahan Middle School, Lower Sandy Bay. Increase in size to 470 sqm. Works to include upgrade to lower ground floor. Timber & metal framed construction. Partitioning, ceilings, painting, carpet, operable walls. Electrical services & hydraulics. Click for more details...

ROYAL HOBART HOSPITAL ENABLING WORKS
Commercial Premises (Offices) project at 48 Liverpool St, Hobart, TAS 7000 for New. Decant Enabling Works EW1 Construction of the temporary facility for the Liverpool Street forecourt a two storey modular mental health and general medicine inpatient facility of approximately 3000 sqm. Includes single and double rooms with en-suites, patient amenities and recreation spaces, therapeutic and staff areas. EW4 for the temporary facility at Liverpool St forecourt. To include the completion of structural concrete and steel elements to support the new temporary Mental Health building of 3000 sqm approx. Minor demolition and asbestos removal. EW5 Refurbishment works for Clinical Areas - Levels 1 and 2 - H Block. Fitout and services to new Q and N classrooms and level 1 ICU. Also refurbishment of level 2 to provide new gym, therapeutic clinical consult spaces. Also lightweight demolition, asbestos removal and subsequent fitout and services installation. EW6 Refurbishment works for office areas. Ground level, level 2 & level 4, including conversion of existing laboratory, clinical spaces into executive offices and associated administration and meeting areas. Work includes lightweight demolition, asbestos removal and then fitout and services installation. Click for more details...

BRIGHTON COUNCIL, TASMAN COUNCIL AND SORELL COUNCIL ROAD RESEALING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Re-sealing & new sealing of various roads within Brighton, Tasman & Sorell Municipalities. Click for more details...

BRITTONS ROAD DWELLINGS
Dwellings (3) New project In The Circular Head Council Area. Construction of 3 single storey dwellings. 2 bedrooms. Timber verandah's. Shared paved driveway. 3 single car space garages & 3 visitor parking spaces. Associated landscaping. Click for more details...

WEST TAMAR SPRAY AND ASPHALT RESEALS PROGRAM 2015/16
Road Works New project In The West Tamar Council Area. Resealing program for 2015/16 works include: · 10 mm Spray reseal 37,319 sq m · 25 mm AC7 asphalt seal 6,890 sq m · Machine profiling for 25 mm asphalt seals 1164 sq m · 40 mm AC10 asphalt seals 1356 sq m · Asphalt for correction of surface shape (provisional quantity) 50 tonne Click for more details...

HORSETAIL FALLS TRACK UPGRADE PART A
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The West Coast Council Area of State ownership. Parks and Wildlife Service is seeking tender submissions from suitably qualified and experienced contractors to upgrade the Horsetail Falls Walking track near Queenstown. The upgrade will include the construction of small pedestrian bridges, gravel walking tracks and elevated timber walkways. Click for more details...

HUNGRY JACKS KINGSTON
Convenience Restaurant New project In The Kingborough Council Area. Redevelopment of existing Flying Wok Restuarant into new Hungry Jacks 1 Westside Circle, Kingston. Click for more details...

TASCOAST JOINERY WAREHOUSE
Commercial Premises (Offices) project at 5-7 Molly CT, St Helens, TAS 7216 for New. Construction of a warehouse building with associated offices for the use of Tascoast Joinery. Click for more details...

ST MARYS DISTRICT HIGH SCHOOL
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for Renovations, Refurbishments etc. development. Redevelopment of an existing science laboratory and preparation room. Click for more details...

COOEE PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) New project at Bass Hwy, Cooee, TAS 7320. This type is Flexible Learning Area with State ownership. Construction of a new flexible performance space. Click for more details...

WILMOT ROAD WORKSHOP & OFFICES
Currently at the Construction stage In Huon is a project estimated to be $ 200000. This project Construction of a new workshop including saw waste production & disposal area & offices. 4 bay car park area. Material to include cladding. Associated landscaping. Click for more details...

OLSENS EGG SORTING SHED
A project in the TAS Within Launceston. Works to include the replacement of an existing egg sorter by a larger machine in a purpose built shed. Materials to be used include roof cladding & a shed structure. Click for more details...

SOUTHERN CHRISTIAN COLLEGE
Southern Christian College is currently at the Construction stage, valued at about $ 1500000 it is Construction of a new general learning area with 3 classrooms and a science laboratory and refurbishment of an existing terrapin building. Click for more details...

DANA DRIVE UNITS
Currently at the Construction stage In Devonport is a project estimated to be $ 1250000. This project Construction of 5 x 1 storey, 2 bedroom dwellings. Units 1 & 5 with single bay carport. Materials to include roof tiles, metal fascia, brick veneer, cladding & aluminium window frames. Associated landscaping. Click for more details...

SNUG VILLAGE AGED CARE FACILITY
Social (Religious Buildings, civil chapels) project at 13-17 Beach Rd, Snug, TAS 7054 for New. Construction of a new chapel building & covered walkway & extension to the existing dining room at Snug Village aged care facility. Associated car parking & landscaping. Click for more details...

VICTORIA SQUARE PLAYGROUND UPGRADE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 53 Wellington St, Longford, TAS 7301 of Playground Upgrade type of New development. Replacement of the playground equipment on Longford Village Green with a contemporary destination play space & younger children's playground. Stage 1 of a 3 stage project. A variety of play equipment for ages 1 through to 8. Click for more details...

MORNINGTON PARK WASTE HYDRO BLASTING FACILITY
Public Utilities (Treatment plants, Sewerage reticulation) project In The Clarence Council Area of Private ownership. Construction of a hydro blasting facility at the Mornington Park Waste Transfer Station. Materials will include, composted and clean-fill materials, a clay base, loaded tyres, rock filters and a concrete retaining wall. Click for more details...

LIENA ROAD BRIDGEWORKS
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Design & construct of Bridge No 782 on Liena Road, Mersey River. Click for more details...

GLEN HUON ROAD DAIRY FARM
Food & Beverage Processing (Abattoirs, Breweries, Dairies, Canneries, Bakeries, Wineries) project at 1092 Glen Huon Rd, Glen Huon, TAS 7109 of Dairy Farm/Shed type of New development. Proposed construction of dairy farm to include workshop machinery shed & hay shed. Timber wall cladding, roller door & steel roof cladding. Associated car parking & landscaping. Click for more details...

SOMERSET CBD UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Waratah-Wynyard Council Area of Roadworks/Landscaping type. Supply of all plant, labour & materials for the construction of the Somerset CBD Upgrade . The Contract works comprise reconstruction of kerbs, footpaths, road pavement & associated infrastructure including landscaping & street furniture. Click for more details...

RIVERSIDE PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a new shared footpath & verandah. To include slab work. Click for more details...

PEARSALL AVENUE STORMWATER UPGRADE
Pearsall Ave, Blackmans Bay, TAS 7052 Has Pearsall Avenue Stormwater Upgrade currently at Construction stage. Construct approximately 75 metres of DN600 diameter stormwater pipeline, together with associated minor civil works & site reinstatement, at Pearsall Avenue & Sunny Avenue, at Blackmans Bay. Click for more details...

DEVIL ENCLOSURE FIVE MILE BEACH
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Hobart Council Area of Tasmanian Devil Enclosure type. Construction & erection of an approximately 20 hectare enclosure with a common fence dividing the enclosed space into two 10 hectare enclosures to contain Tasmanian Devils from the insurance population prior to release of these animals into the wild. Click for more details...

CIRCULAR HEAD WAR MEMORIAL SWIMMING POOL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 35 King St, Smithton, TAS 7330 for New. Demolition of Circular Head War Memorial Swimming Pool & reinstatement of the site to lawn & gardens. Associated civil works. Click for more details...

ME WAH RESTAURANT FITOUT
Renovations, Refurbishments etc. project of Hospitality (Restaurants, Canteens) project at 410 Sandy Bay Rd, Sandy Bay, TAS 7005. Fitout for the Me Wah Restaurant at Wrest Point Hotel Casino. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect