ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Minerals Processing) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BINJARI COMMUNITY
Social (Amenities, Dressing rooms) project at Binjari Community, Katherine, NT 0852 of Ablutions/Storage Building type of New development. Design, construct & deliver one ablution & storage building. Click for more details...

MOUNT BUNDY PROJECT - GOLD RESOURCE
Mining (Open Cut) project In The Coomalie Community Council Area of Resource - Gold type. Indicated resource estimate is 15,141,000 tonnes of ore @ 1.34 g/t Au for 652,278 ounces of gold and an inferred resource of 1,461,000 tonnes of ore @ 1.23 g/t Au for 57,773 ounces of gold at an 0.7 cut off. Click for more details...

STUART HIGHWAY REHABILITATION
Resurfacing - Upgrade project at Various areas btwn Hook Rd & Shiers St (Ch: 4.44 km - 7.38 km), Darwin, NT 0800 In The Council Area Of Darwin City of State. Asphalt resurfacing. Click for more details...

TASSIE SHOAL METHANOL PROJECT - ACCOMMODATION & CONTROL PLATFORM
Oil & Gas (Topside - modules, platforms) project for New development. Key components of the Tassie Shoal Methanol project include accommodation and control platform for personnel living quarters. Click for more details...

BERRIMAH ROAD WEIGHBRIDGE COMPLEX
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darwin City Council Area for New development. Construct weighbridge complex inclusive of civil works, weighbridge building & base. Click for more details...

ALICE SPRINGS HOSPITAL
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 200000. This project Structural steel for hospital redevelopment. Click for more details...

JULALIKARI BURAMANA IHANT HOUSING PROGRAM
Residential (Units, apartments, flats, townhouses, villas) project at Wogyala Region of, Tennant Creek, NT 0862 for New. Construction of 1 x 2, & 1 x 3 bedroom houses. Steel frame & steel clad on stumps, CFC floors, metal deck roof, aluminium framed windows. Click for more details...

PATERSON STREET REHABILITATION
Paterson Street Rehabilitation is currently at the Construction stage, valued at about $ 56000 it is Ground maintenance of nominated NT Government Buildings for 12 month period. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Commercial Premises (Offices) New project at Robertson Barracks, Darwin, NT 0800. This type is Administration Building For Command Precinct - Major Works - Package 3 with State ownership. Construct Administration building for Command Precinct. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Civil Services (Power stations, Power generation). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Robertson Barracks, Darwin, NT 0800 Has 1st Aviation Regiment Robertson Barracks currently at Construction stage. Construct 2 stores, 1 workshop & vehicle shelters. Click for more details...

MOUNT HARCUS PROJECT - VARIOUS MINERALS RESOURCE
South east of Pipalyatjara, 200 km from, Yulara, NT 0872 Has Mount Harcus Project - Various Minerals Resource currently at Exploration, Drilling, Survey & Assessment stage. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

DESERT PEOPLES CENTRE (DESERT KNOWLEDGE AUSTRALIA) DESERT PEOPLES CENTRE
State ownership Education (Tertiary - colleges, institutes, universities) project In The Alice Springs Town Council Area for New development. Desert Peoples Centre incorporating Administration & Canteen facilities (Buildings 1a & 1b), Wellbeing & Human Services facilities (Buildings 3a, 3b & 3c) & associated siteworks for Desert Knowledge Precinct. Click for more details...

ALICE SPRINGS CULTURAL PRECINCT KITCHEN CELLAR
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) Renovations, Refurbishments etc. project at Cultural Precinct, Larapinta Dr, Alice Springs, NT 0870. This type is Screens/Water Proofing Kitchen Cellar/Associated Works For Cultural Precinct with State ownership. Install steel screens, water proofing kitchen cellar & associated works. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "B"
Oil & Gas (Onshore processing facilities) project at Wickham Point, Darwin, NT 0909 of 136,000 Lt Ghe Storage Tank "b" (Vertical W/Saddles) type of New development. For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "B" with saddles rated for 300 psig. Click for more details...

HOPEFUL STAR GOLD PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Barkly Shire is a project estimated to be $ 5000000. This project Hopeful star was previously worked mine and there is still visible gold present. Drilling is to target defined BIF and quartz vein mineralisations. Click for more details...

WEST MACDONNELL NATIONAL PARK FACILITIES EXPANSION REMAINING PARKS
State ownership Entertainment (Parks, Leisure grounds, Playgrounds) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Upgrade & expand existing walking tracks, car parks & other park facilities. Click for more details...

STUART HIGHWAY RESURFACING
Highway Resurfacing New project In The Katherine Town Council Area. Bitumen resurfacing secn of Stuart Hwy btwn CH: 219.9 km & CH: 222.5 km. Click for more details...

FAMILY COURT OF AUSTRALIA - OFFICE INTERNAL ALTERATIONS
Commercial Premises (Offices) project at TCG Building 80 Mitchell St, Darwin, NT 0800 for Renovations, Refurbishments etc.. Internal alterations to existing office within Family Court of Australia. Click for more details...

NIGHTCLIFF/PAVONIA WAY SHOPPING CENTRE UPGRADE
A project in the NT Within Darwin City. Construction, landscaping & minor civil works, including disabled access to shop frontages. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY LAYDOWN AREAS
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Temporary Laydown Areas currently at Construction stage. For the provision of temporary laydown areas for the 275 km pipeline. Click for more details...

JASPER CREEK ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Jasper Gorge, Katherine, NT 0850. This type is Roadworks - Culvert with State ownership. Design, supply and installation of temporary strengthening supports to the existing multi cell reinforced concrete culvert in Jaspers Gorge at Jaspers Creek. Click for more details...

EAST ARM WHARF CIVIL WORKS
., Darwin, NT 0800 Has East Arm Wharf Civil Works currently at Construction stage. Upgrade & seal a reclaimed area at the wharf to provide additional hardstand area, increasing storage capacity at the port. Approx 220,000 cu m of fill will be placed at the 6.3 ha site with the first 32,000 cu m currently being transported. A further 300,000 cu m of fill will be used to reclaim Pond F at the Port to provide more hardstand area under the port expansion. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

STUART HIGHWAY RAIL OVERPASS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy & Santa Teresa Rd (Roger Vale Dr) approx 10.5km from, Alice Springs, NT 0870. Construction of rail overpass with double stack container clearances & allowing for 2 rail lines & road underneath. Associated civil & earthworks, electrical relocation, floodways, stormwater drainage including concrete lined channel & guard rail. Click for more details...

DEPARTMENT OF DEFENCE SHOAL BAY RECEIVING STATION FACILITIES UPGRADE
Rapid Creek Rd, Alawa, NT 0810 Has Department Of Defence Shoal Bay Receiving Station Facilities Upgrade currently at Construction stage. Upgrade works to the Shoal Bay receiving station to include electrical, fire & cooling systems upgrade. Replacement of underground HV power lines, transformer & internal electrical switch services. Upgrade works to cooling system, improvements to fire protection capabilities & removal of UPS. Replacement of elevated water tank & air conditioning plant. Click for more details...

THE HEIGHTS DURACK NEIGHBOURHOOD CENTRE
The Heights Durack Neighbourhood Centre is currently at the Construction stage, valued at about $ 1500000 it is Construction of community centre with a sales & information centre. To include an office (79.9sq m), 2 x multifunctional workshop spaces (110sq m), exhibition & storage spaces with shared amenities & kitchenette. Concrete slab, rendered concrete blockwork & metal roof. Parking for 14 vehicles. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Oil & Gas (Pipelines & associated contracts) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

KURRINGAL COURT RESIDENTIAL REDEVELOPMENT STAGES 1-5
Residential (Units, apartments, flats, townhouses, villas) project at 1 Kurringal Ct (Lot 4664), Fannie Bay, NT 0820 of Residential Redevelopment (162) Units - 4 Storey - Stage 1-5 type of New development. Construction of 162 x 1, 2 & 3 bedroom units in 5 x 4 storey buildings. Stage 1: 34 units - 7 x 1 bedroom, 22 x 2 bedroom & 5 x bedroom units. Stage 2: 39 units - 8 x 1 bedroom, 26 x 2 bedroom & 6 x 3 bedroom units. Stage 3: 25 units - 7 x 1 bedroom, 12 x 2 bedroom & 6 x 3 bedroom units. Stage 4: 34 units - 7 x 1 bedroom, 24 x 2 bedroom & 3 x 3 bedroom units. Stage 5: 28 units - 7 x 1 bedroom, 20 x 2 bedroom & 2 x 3 bedroom units. Wall cladding, roof sheeting, barge capping & fascias, powder coated adjustable louvres, aluminium batten screens, perforated mesh & timber fencing. Car parking for 292 vehicles. Associated landscaping. Click for more details...

DORLING STREET DUPLEX
Duplex project at 22 Dorling St (Lot 11411), Muirhead, NT 0810 In The Council Area Of Darwin City of Private. Construction of 2 x 4 bedroom duplex villas in single storey building. Concrete slab, colour-coated metal wall cladding, rendered blockwork, colour-coated metal roof. Parking for 4 cars. Associated landscaping. Click for more details...

PARAP POOL REDEVELOPMENT
Pool - Redevelopment project at 77 Ross Smith Ave, Parap, NT 0804 in the Social (Amenities, Dressing rooms). Redevelopment of the Parap Pool. To include construction of 50m FIDA competition & training pool, 25m multi-purpose indoor pool with access ramps for universal access & seating for 600 spectators & the ability to accommodate 1600 temporary seats. Construction of 11.5m high 33,0000sq m shade structure to cover pool areas. Pump room building with chemical store (270sq m), control room building (42sq m), pool store room building (42sq m), swim club building (42sq m). Reconfiguration of existing car park to accommodate parking 64 vehicles. Construction of administration building (450sq m) with kiosk/cafe, office, communications room, amenities, family room & first aid room. Associated landscaping. Click for more details...

ROYAL DARWIN HOSPITAL BUILDING 13 PATHOLOGY AIR CONDITIONING UPGRADE STAGE 2
Medical (Hospitals & associated buildings, mortuaries) New project at Rocklands Dr (Lot 9731), Tiwi, NT 0810. This type is Air Conditioning - Upgrade - For Hospital Building - Stage 2 with State ownership. Stage 2 upgrade of air conditioning system for Building 13. To include the supply, installation, testing, commission & maintenance of run-around coils to serve the existing AHUs A1. Provision of associated control systems. Click for more details...

PALMERSTON REGIONAL HOSPITAL - TOWER CRANES
Medical (Hospitals & associated buildings, mortuaries) project In The Palmerston Town Council Area of Cranes - For Hospital type. Installation & commissioning of tower cranes for the construction of the Palmerston Regional Hospital. To include maintenance works & provision of crane operators. Decommissioning & removal of cranes upon completion. Click for more details...

BATHURST ISLAND COMMUNITY CENTRE
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) New project at Tipungwati Cres (Lot 827), Bathurst Island, NT 0822. This type is Community Centre with Private ownership. Construction of a community centre at Tipungwati Crescent, Bathurst Island. To include 11.2sq m kitchen, 3.9sq m store room, laundry & amenities. 45.6sq m open plan office, 13.1sq m conference room, 8.9sq m training room & 10.59sq m meeting room. Tile flooring. 27.6sq m timber decking & 47.4sq m back timer deck. Car parking for 5 cars. Associated landscaping. Click for more details...

ADELAIDE RIVER CEMENT WATER MAIN REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project at Stuart Hwy, Adelaide River, NT 0846 for New. Replacement of an asbestos cement water main on the Stuart Highway Service Road, Adelaide River. Click for more details...

CENTRALIAN MIDDLE SCHOOL BUS INTERCHANGE
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a bus interchange within the Centralian Middle School to be accessed via Milner Road. To include space for 16 buses, student waiting area & student interchange area. To include removal of existing pavement & fencing. Construction of 2.5m wide pedestrian access pathways. Supply & installation of shade structures over interchange area & waiting area. Construction of swale drains & subsoil drains. Supply & installation of 2.4m high perimeter fencing. Provision of traffic control. Associated landscaping. Click for more details...

TARA SFNT HOUSING UPGRADES
Houses (18) - Upgrades Renovations, Refurbishments etc. project In The Barkly Shire Council Area. Upgrade works to 18 dwelling in Tara under the National Partnership Agreement for Stronger Futures in the NT (SFNT). To include removal & replacement of windows, air conditioning units & vinyl flooring. Supply & installation of ceramic floor & skirting tiles, 10mm plasterboard wall linings, shelving & cupboards. Patch & make good existing block work wall. Painting of ceilings, external walls & internal walls. Demolition of existing kitchen & installation of new kitchen at 5 dwellings. Click for more details...

PALMERSTON REGIONAL HOSPITAL HEADWORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project for New development. Headworks for the Palmerston Regional Hospital at Holtze. Construction of a 500m sub arterial road (Gylde Point Road), 680m collector road (Holtze Collector Road), 250m access road & 180m access road. To include earthworks, roadworks, stormwater drainage, electrical reticulation, street lighting, conduits & electrical infrastructure. Construction of DN375 DICL water main from the intersection of Thorngate Road & Wallaby Holtze Road to the Holtze Collector Road. Provision of traffic control. Click for more details...

ILPEYE IPLEYE SUBDIVISION UNDOOLYA ROAD & OONCHIUNPA ROAD INTERSECTION UPGRADE
Undoolya Rd & Oochiunpa Rd, Alice Springs, NT 0870 Has Ilpeye Ipleye Subdivision Undoolya Road & Oonchiunpa Road Intersection Upgrade currently at Construction stage. Upgrade works to the intersection of Undoolya Road & Oonchiunpa Road at the Ilpeye Ilpeye Subdivision. To include removal of existing stormwater pits & pipes. Supply & installation of stormwater pits & pipes. Preparation & trimming of subgrade surfaces. Construction of kerbing & guttering. Supply & lay pavement with prime coat & 7mm seal. Construction of reinforced concrete pathway. Supply & installation of guard rail & road signage. Provision of concrete pathway. Click for more details...

PMARA JUNTA BASKETBALL COURT
A project in the NT Within Central Desert Shire. Construction of a basketball court located within Pmara Jutunta. Click for more details...

GARDEN CEMETERY CHAPEL
Social (Religious Buildings, civil chapels) project at Norris Bell Ave, Arumbera, NT 0870 for New. Construction of steel framed chapel at the Garden Cemetery, Arumbera. To include amenities, kitchenette, celebrant room, viewing room & veranda. Supply & instillation of stud walls with plasterboard lining, concrete blockwork walls, sheet metal roofing & metal louvers. Click for more details...

JAPE HOMEMAKERS VILLAGE ANACONDA SHOWROOM REFURBISHMENT STAGE 7
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project for Renovations, Refurbishments etc. development. Refit of Anaconda retail showroom within Jape Homemakers village. Click for more details...

ZUCCOLI SUBDIVISION STAGE 2F
Civil Engineering (Residential Subdivision) project for New development. Reconfiguration into 75 lots. Construction on new road. Associated landscaping & services. Click for more details...

GALIWINKU POLICE STATION
Public Buildings & Facilities (Police Stations) New project at Elcho Island, Galiwinku, NT 0822. This type is Ablution Block with State ownership. Construction of a transportable ablutions block including connection to sewer at Galiwinku Police Station. Demolition 15lm of existing fencing and install 116m x 2100 high chain wire fencing including gates Click for more details...

DALY RIVER FLOOD RESPONSE
A project in the NT Within Katherine Town. Scope of work: clear fallen vegetation from off the existing roadway. Roadways:rip the existing pavement, wet mix to 150mm, layout, shape & trim to a achieve 3% cross fall and compacted to 95% MMDD to form a 6.00 meter sub grade layer. Win, load & cart gravel to achieve a 6.00 metres wide x 150 mm deep base course layer, compacted to 95% MMDD. Construct new table, off let drain & blocks to adequately shed the water from the road surface. Car park area: re-sheet the parking areas at the boat ramp Click for more details...

MILINGIMBI ROAD
Roadworks New project In The East Arnhem Shire Council Area. Milingimbi Road, road repairs. Scope of work includes: road repairs, shoulder maintenance & minor bitumen sealing component. Click for more details...

FINKE GORGE
Steel Works project at Tyler Pass & Gosse Bluff (T'Norala), Alice Springs, NT 0870 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Steel stimulus works package for Tylers Pass & Gosse Bluff (T'Norola) Click for more details...

DARWIN SOLAR FACILITIES
Darwin Solar Facilities is currently at the Construction stage, valued at about $ 462000 it is Clearing, grubbing & fencing of Solar Facilities at Wurrumiyanga (Bathurst Island), Pirlangimpi (Garden Point) & Milikapiti (Snake Bay) Click for more details...

STUART HIGHWAY
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy, Alice Springs, NT 0870. Shoulder repair various sections between chainage 25.2 km - chainage 34.2 km. Works include: Remove &store road furniture to be reinstated on completion of the works; Cut longitudinal existing fretted seal edge using a mechanical cutter; Reform insitu shoulder to form a vertical even plain & a minimum shoulder of not less than 1.5m wide; Import Type 3 top up material at 100mm compacted depth. Blend both insitu & imported materials to form a uniformed homogenised blend of base material ensuring an overall compacted depth of not less than 200mm; Wet-mix the blended material, compact & grade shoulder to match existing & trim shoulders to applicable levels; Install guide posts & re-instate any posts/signs removed to complete the works; Retain all grassed batters and do not grade excess material out over the grassed batters; Include tangent at intersections where applicable. Click for more details...