State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Factories & Factory Units Projects in QLD®ion=⊂=740 in region


SECOND AVENUE SHOWROOM AND MEDICAL CENTRE
Showroom/Medical Centre project at Lot 1 Second Ave RP169528 & Lot 11 Maud St RP60444, Maroochydore, QLD 4558 in the Industrial (Warehouses, cargo sheds, distribution centres). Demolition of old church & 2 existing dwellings construction of 900sq m showroom/office and 500sq m medical centre. Concrete slab on ground, pre-cast concrete panels, glass shopfronts, lightweight feature panels, steel framed metal roof. Basement parking. Associated landscaping. Click for more details...

WALAN STREET & BRISBANE ROAD COMMERCIAL/RESIDENTIAL BUILDING
Walan Street & Brisbane Road Commercial/Residential Building is currently at the Planning stage, valued at about $ 800000 it is Demolition of existing buildings & construction of one building for shops, restaurant, fast-food & unlicensed indoor recreation (ground floor 350 sqm) & upper levels for 2 x 3 bedroom & 1 x 2 bedroom units. Concrete slab, rendered & painted concrete block & colour-coated metal roof. Parking for 23 cars. Associated landscaping. Click for more details...

MUSGRAVE ROAD WAREHOUSE
55 Musgrave Rd, 90A Boyland Ave (Lot 1 SP101894), Coopers Plains, QLD 4108 Has Musgrave Road Warehouse currently at Construction stage. Construction of 2 storey industrial building with 2 warehouse units. Stage 1: 4516sq m warehouse & 250sq m office. Stage 1: 4035sq m warehouse & 570sq m office. Reinforced concrete floor, pre-cast concrete panels, aluminium framed office front, steel framed metal awnings over office windows, metal roller doors, steel framed metal roof. Total parking for 98 cars. Associated landscaping. Click for more details...

DOUGLAS SHIRE COUNCIL
Hot Mixed Asphalt project at Various sites within shire via, Mossman, QLD 4873 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Supply & lay hot mixed asphalt for 12 month period from 1 July 2002 to 30 June 2003 inclusive. Click for more details...

THE RESERVE
Subdivision - Residential - Stage 5 project at Ney Rd (Lot 1 RP891128), Capalaba, QLD 4157 in the Civil Engineering (Residential Subdivision). Roadworks, stormwater drainage, water & sewerage reticulation. Number of lots not disclosed. total area of land 31.5 ha. Click for more details...

FREDERICK STREET UNITS
A project in the QLD Within Brisbane City. Construction of 2 x 2 & 3 x 3 bedroom units in 3 separate buildings. Concrete slab, rendered concrete block, timber batten screens, & metal roof. Associated parking & landscaping. Click for more details...

BRIDGEWATER QUAYS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Brisbane City Council Area for New development. 1, 2 & 3 bedroom units. Concrete slab, masonry with applied finish & colour- coated metal roof Mechanical ventilation. Basement carpark with security system. Fire hose & reel & extinguishers. Landscaping. Click for more details...

BRIDGEWATER BROADWALK
Units (21) - 3 Storey project at Baildon St Wharf St & Rotherhan St, Kangaroo Point, QLD 4169 in the Residential (Units, apartments, flats, townhouses, villas). 2 & 3 bedroom. Concrete block & metal roof. Basement parking for 32 cars. Click for more details...

KENSINGTON
Civil Engineering (Residential Subdivision) project for New development. Roadworks, stormwater drainage, water & sewerage reticulation for 98 lots. Area of land 18 ha. 16 week contract period. Click for more details...

UPPER COOMERA SERVICE STATION & COMMERCIAL COMPLEX
A project in the QLD Within Gold Coast City. Construction of service station with fast food outlet (160sq m) & paypoint with retail space & petrol pumps under a central canopy. Rendered concrete block, aluminium framed glass shopfronts, steel framed canopy. concrete hardstand area. Construction of 2 commercial buildings with retail warehouses & showrooms. concrete slab, pre-cast panels with textured paint finish & glazed shopfronts. Parking for 193 cars. Landscaping. Click for more details...

CALOUNDRA ROAD & DANIEL STREET VEHICLE SALES PREMISES
New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 45 Caloundra Rd & 20 Daniel St (Lots 1 & 2 RP 186662), Caloundra West, QLD 4551. Construction of new showroom & workshop. Parking for 16 cars. Associated landscaping. Click for more details...

UNIVERSITY OF QUEENSLAND
New project of Education (Tertiary - colleges, institutes, universities) project at Glasshouse Rd, St Lucia, QLD 4067. To house 14 boats, 300 sq m of storage. Click for more details...

ST GEORGE COTTON GIN NO 2
Thallon Rd, St George, QLD 4487 Has St George Cotton Gin No 2 currently at Construction stage. Suspended concrete floors, steel frame, cast in-situ concrete walls & pits. 19 week contract period. Click for more details...

TEE TREE GROVE
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Brisbane City Council Area for New development. 86 x 2 & 3 bedroom townhouses each with ensuite. Concrete slab, brick & tile roof. Lock-up garages & open parking bays for total of 284 cars. Landscaping. Area of land 2.319 ha. Click for more details...

CENTRAL PLAZA THREE - OFFICE BUILDING
Commercial Premises (Offices) project In The Brisbane City Council Area of Private ownership. Construction of 14 storey commercial building. To include 685sq m retail & cafe space on ground floor & 13 levels of office space (12703 sq m) above. Off form concrete, pre-cast concrete panels, textured paint finish, powdercoated aluminium louvres, alpolic finish, curtain glass walls. 3 levels of basement parking. Associated landscaping. Click for more details...

WHARFSIDE
Hospitality (Restaurants, Canteens) project for New development. New residential development for 44units on vacant land adjoining the AML&F Woolstores, conversion of existing warehouse to units, commercial tenancy lower level, closure to Florence Street to create outdoor dining area, pedestrian piazza & associated landscaping. Click for more details...

RYAN CATHOLIC COLLEGE
Currently at the Construction stage In Townsville City is a project estimated to be $ 200000. This project Works to include roadworks, earthworks, extensions to water supply, drainage & sewerage works. Click for more details...

SINTRA DEVELOPMENT GROUP
Site not disclosed via, Bundall, QLD 4217 Has Sintra Development Group currently at Tenders & Building stage. Preparation for townhouse site. Earthworks, stormwater, roadworks, water & sewerage. Click for more details...

DEPARTMENT OF MAIN ROADS - ROADWORKS
A project in the QLD Within Fraser Coast Regional. Minor works contract. Click for more details...

MARYBOROUGH HOSPITAL - HYDROTHERAPY POOL
New project of Medical (Hospitals & associated buildings, mortuaries) project at 185 Walker St, Maryborough, QLD 4650. Construction of hydrotherapy pool & gymnasium building. Click for more details...

THE RIDGE ON BINNA BURRA - HOLISTIC EDUCATIONAL ECO VILLAGE
Education (Tertiary - colleges, institutes, universities) project for New development. Proposed development of a holistic educational retreat within a sustainable holiday community. 66 x single & 2 storey units, dining room & cafe, library, meeting rooms, teaching spaces, creative arts & meditation facilities, wellness spa & treatment rooms, japense style baths buried into the rockface. Includes walking tracks, camping ground, waste water recycling & organic garden (for permaculture education). Access via tree top bridge leading to a centre with an art gallery, craft shop, tea rooms, organic & local produce co-operative & nursery. Click for more details...

BEENLEIGH & DISTRICT BAPTIST CHURCH
Social (Religious Buildings, civil chapels) New project at 79 (Lot 2) Pheasant Ave RP886061, Beenleigh, QLD 4207. This type is Church with Private ownership. Construction of a new 400 seat worship centre. Pre-cast concrete panel, aluminium louvers and glazing, metal sheeting and metal roof. Additional parking for 57 cars and associated landscaping. Click for more details...

DENHAM STREET OFFICE FITOUT
Denham Street Office Fitout is currently at the Construction stage, valued at about $ 250000 it is Office Fit - Electrical, Data, Telecommunications, Fire and Security Systems. Click for more details...

MCINNES FIELD ESTATE SUBDIVISION STAGE 1 RELEASE 2
New project of Civil Engineering (Residential Subdivision) project at Douglas McInnes Dve, Laidley, QLD 4341. Reconfiguration into 52 lots. Constructon of new road. Click for more details...

BRISBANE SUPREME & DISTRICT COURT COMPLEX
Public Buildings & Facilities (Law Courts) project at 304 George St, Brisbane, QLD 4000 for Renovations, Refurbishments etc.. Building Retrofits Plumbing Services. Click for more details...

INDIGENOUS ENVIRONMENTAL HEALTH INFRASTRUCTURE PROGRAM MABUIAG ISLAND SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) project at ., Mabuiag, QLD 4875 of Sewerage Treament Plant type of New development. Construction of a reticulated sewerage scheme. The works include: Approximately 2.7km of 150mm diameter gravity sewer. 60 Manholes. 2 sewage pump stations. 1740m of sewer rising mains. Package STP. 1900m of house drains. 720m effluent pipeline (200m onshore, 520m offshore). Ocean outfall. Click for more details...

SOUTH WEST QUEENSLAND PIPELINE STAGE 3 EXPANSION
Mining - Support Facilities (Accommodation - units, housing, group accom.) project In The Maranoa Regional Council Area of Gas Pipeline - Stage 3 type. As part of the QSN Link project (QSN3), construction of a 935km loop pipeline parallel to the existing South West Queensland Pipeline (SWQP) between Wallumbilla & Moomba. Construction also at the Wallumbilla hub of 2 additional compressor stations at existing scraper station sites & an upgrade to the existing Wallumbilla compressor station. The pipeline is anticipated to have a diameter of between 400-500mm approx. Construction crews will be housed in temporary construction camps that will be progressively moved ahead of construction activity. Each main camp will house up to 200 people & the smaller fly camps will house up to 150 people. Each camp will contain accommodation units & mess & recreation huts. Click for more details...

SOUTH PINE SPORTS COMPLEX STAGE 1
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 620 South Pine Rd, Brendale, QLD 4500. Construction of AFL field & civil works. To include lighting, electrical work & landscaping. Click for more details...

WITMACK ROAD INDUSTRIAL BUILDING
A project in the QLD Within Toowoomba Regional. Proposed construction of a 2 storey industrial building with office. Steel clad walls sheeting with metal sheet roofing. Parking for 22 cars. 513sq m proposed landscaping. Click for more details...

ZILLMERE ROAD UNITS
Units (9) - 3 Storey project at 319-323 Zillmere Rd (Lot 4 RP 65890, Lot 18 RP 26169), Zillmere, QLD 4034 in the Residential (Units, apartments, flats, townhouses, villas). Removal/demolition of 2 existing dwellings & construction of 9 units. Rendered & painted concrete walls, metal batten screens, metal roof. Associated parking & landscaping. Click for more details...

BRISBANE CITY COUNCIL SOUTH REGIONAL BUSINESS CENTRE
26 Lillian Ave (Lot 11 SP 155728), Salisbury, QLD 4107 Has Brisbane City Council South Regional Business Centre currently at Planning stage. Proposed construction of new BCC regional business centre to provide office space for Community Development Services, Development Assessment, Local Asset Services, Council's Contact Centre, SES & Brisbane Transport. Spilt face concrete block, profiled metal cladding, feature full height glazing, metal louvre screens, glass balustrade, metal fins, solar photovoltaic panels on steel frame. 1 level basement parking for 92 cars. At grade parking for 50 cars. Associated landscaping. Click for more details...

MORANBAH NORTH COAL OPERATIONS - CRANE SUPPLY
A project in the QLD Within Isaac Regional. Contract supply of cranes to the 4.5million tonne per annum (Mtpa) Moranbah North underground coal operations. A 3 year contract to cover all maintenance works at the mine. Click for more details...

GOLD COAST LIGHT RAIL STAGE 2
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at From Southport to, Helensvale, QLD 4212 for New. Design & construction of 7.3km extension of Gold Coast Light Rail from Gold Coast University Hospital to Helensvale. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LNG PLANT - CIVIL & CONCRETE WORKS
New project of Oil & Gas (Onshore processing facilities) project at South of Laird Point, Curtis Island, QLD 4680. Civil & concrete services associated with installation of 2 x 160,000 cubic metre capacity liquefied natural gas (LNG) tanks. Click for more details...

EDGEWATER RESIDENCES STAGE 2
Residential (Units, apartments, flats, townhouses, villas) project at 29-49 Varsity Pde (Lot 124 & 125 SP2064069), Varsity Lakes, QLD 4227 of Units (30)/Townhouses (10) - 2 & 3 Storey - Stage 2 type of New development. Construction of 30 x 2 & 3 bedroom units in 3 storey building & 10 x 2 & 3 bedroom 2 storey townhouses. Parking for 80 vehicles. Swimming pool & barbecue terrace. Concrete slab, cement block, steel truss, metal roofing. Associated parking. Click for more details...

STONEWOOD VILLAS STAGE 1
New project of Residential (Units, apartments, flats, townhouses, villas) project at Lot 24 Oak St, Chinchilla, QLD 4413. Construction of 20 x 2 & 3 bedroom 2 bathroom townhouses in 8 separate buildings. Painted concrete block, timber framed stainless steel wire balustrades, metal roof. Garages. Swimming pool. Gymnasium. Associated landscaping. Click for more details...

ST MARGARET MARYS COLLEGE ADMINISTRATION BUILDING & CLASSROOMS STAGES 2 & 3
Currently at the Construction stage In Townsville City is a project estimated to be $ 300000. This project Construction of additional facilities at existing college. Stage 2 - 2 storey administration building with 3 flexible learing areas above. New performing Arts building. Conversion of former Arts building to learning support area. Conversion of former administration buildng to staff & student support area. Stage 3 - Construction of specialty centre of Pastic/Electronic trades, Graphics & Science. Redevelopmetn of Music & Business Education facilities. Construction of new gymnasium. Click for more details...

BACK HILL DRIVE UNITS
6 Back Hill Dr, Coral Cove, QLD 4670 Has Back Hill Drive Units currently at Construction stage. Construction of 9 x 2 bedroom units in 7 seperate single storey buildings. Car parking for 15 cars. Associated landscaping. Click for more details...

FULTON HOGAN ASPHALT PLANT NARANGBA DEPOT STAGES 1 - 3
Currently at the Construction stage In Moreton Bay Regional is a project estimated to be $ 10000000. This project Construction of asphalt manufacturing plant with 240t/hour production capacity in 3 stages. Stage 1 - Construction of asphalt plant & hardstand. Stage 2 - Construction of 300sq m office & amenities building. Stage 3 - Construction of workshop building & roofed truck wash. Completion of asphalt hardstand & car parking. Click for more details...

UNIVERSITY OF QUEENSLAND ST LUCIA CAMPUS MACGREGOR BUILDING REFURBISHMENT
Education (Tertiary - colleges, institutes, universities) Renovations, Refurbishments etc. project at Sir Fred Schonell Dr, St Lucia, QLD 4067. This type is Macgregor Building - Refurbishment with Private ownership. Conversion of teaching space on level 3 of Macgregor Building (Building 64) into office space. Click for more details...

PEGGY BANFIELD PARK STAGE 1
New project of Social (Amenities, Dressing rooms) project at Mount Low Pky, Bushland Beach, QLD 4818. Construction of a new park to include fitness circuit, pedestrian connections. Upgrade existing rugby league fields to include earthworks, laser grade, new top soil & seed two existing playing fields to improve drainage. Dog off leash areas to include irrigation, amenities to service the dog off-leash area & small & large dog off leash areas. New combined all ages play space to include fenced shaded small child area, teenage agility equipment, junior play opportunities & footpath access. BBQ/Picnic shelters to include electric BBQ & 2 double table shelters. Netball courts to include 4 grass courts & irrigation. Associated landscaping, construction & civil works. Click for more details...

PHILIP STREET RIGHT TURN LANE UPGRADE
Roadworks New project In The Gladstone Regional Council Area. Upgrade of the right turn lane off Philip Street into Archer Street, Gladstone. Click for more details...

WILLIAM JOLLY BRIDGE INTERNAL PIER REPAIR
Currently at the Construction stage In Brisbane City is a project estimated to be $ 800000. This project Internal concrete repairs to piers 2, 3 & 4 on William Jolly Bridge. Click for more details...

ALDRIDGE STATE HIGH SCHOOL HOSPITALITY REFURBISHMENT
Block I - Refurb project at Boys Ave, Maryborough, QLD 4650 In The Council Area Of Fraser Coast Regional of State. Upgrade to hospitality Block I at Aldridge State High School. Click for more details...

DALBY STATE SCHOOL MUSIC BLOCK & MARY ROULSTON ROOM REFURBISHMENT
Education (Schools - primary, secondary (up to Yr 12)) project at 155 Cunningham St, Dalby, QLD 4405 of Music Block - Refurbishment type of Renovations, Refurbishments etc. development. Refurbishment of Dalby State School music block & Mary Roulston room. To include construction of new timber framed wall & solid core door. Supply & installation of air conditioning systems. Patch & repair existing ceiling. Click for more details...

MOUNT BRISBANE ROAD CULVERT RECONSTRUCTION
Mount Brisbane Rd, Mount Pleasant, QLD 4521 Has Mount Brisbane Road Culvert Reconstruction currently at Construction stage. Reconstruction of 3 causeways along Mount Brisbane Road, Mount Pleasant. To include 200mm thick concrete slab & 150mm thick concrete batter. Provision of scour protection & earthworks. Provision of traffic control. Associated landscaping. Click for more details...

CALOUNDRA DEPOT REFURBISHMENT
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Industrial Ave, Caloundra, QLD 4551 for Renovations, Refurbishments etc.. Refurbishment of the existing Mooloolah Meeting Room located at the Caloundra Depot. Scope of work comprises conversion of the existing meeting room into a Forward Command Centre from which disaster management activities can be safely performed. Click for more details...

YERONGA STATE SCHOOL
122 Park Rd, Yeronga, QLD 4104 Has Yeronga State School currently at Construction stage. Construction of a new Music & General Learning Area Centre Click for more details...

GLADSTONE STATE HIGH SCHOOL
Classroom Block - 2 Storey project at 30 Dawson Rd, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of State. Construction of a new building containing 8 new general learning classrooms. Click for more details...

NORTH LAKES BUSINESS PARK MSPACE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) New project at 88 Flinders Pde (Lot 86 SP275734), North Lakes, QLD 4509. This type is Warehouse/Service Industry/Commercial Services/Catering Premises with Private ownership. Construction of mixed commercial & industrial development to include warehouse, service industry, commercial services & catering premises across 5 buildings over 22 tenancies on a vacant site. Unit 1 - 80.5sq m ground & 20sq m mezzanine level. Unit 2 - 80.5sq m ground & 20sq m mezzanine level. Unit 3 - 80.5sq m ground & 20sq m mezzanine level. Unit 4 - 80.5sq m ground & 20sq m mezzanine level. Unit 5 - 86sq m ground & 20sq m mezzanine level. Unit 6 - 36sq m ground level. Unit 7 - 36sq m ground level. Unit 8 - 36sq m ground level. Unit 9 - 36sq m ground level. Unit 10 - 36sq m ground level. Unit 11 - 59.3sq m ground level. Unit 12 - 87.3sq m ground & 40sq m mezzanine level. Unit 13 - 95sq m ground & 35sq m mezzanine level. Unit 14 - 91sq m ground & 40sq m mezzanine level. Unit 15 - 55.6sq m ground & 20sq m mezzanine level. Unit 16 - 65.2sq m ground & 30sq m mezzanine level. Unit 17 - 48.2sq m ground level. Unit 18 - 63sq m ground level. Unit 19 - 63sq m ground level. Unit 20 - 63sq m ground level. Unit 21 - 63sq m ground level (catering premises). Unit 22 - 71.7sq m ground & 30sq m mezzanine level. Colour coated metal roof sheeting, translucent roof sheeting, roller shutter door & metal awning. Signage. Car parking for 44 vehicles. 375.1sq m landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect