State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls Projects in NT®ion=⊂=510 in region


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

POWER & WATER
Power & Water is currently at the Tenders & Building stage, valued at about $ 30000 it is Drill, construct & test pump production bore. Click for more details...

FLYNN DRIVE COMMUNITY HEALTH CENTRE
Medical (Surgeries, Medical centres) project at 10 (lot 04440) Flynn Dr, Alice Springs, NT 0870 of Minor Building Works For Health Centre type of Renovations, Refurbishments etc. development. Various building works including painting, tiling & minor carpentry work. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Parks Australia North, ., NT 8999 Has Department Of The Environment & Heritage - Parks Australia North currently at Tenders & Building stage. Programmed maintenance & repairs to electrical systems. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Electrical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

CITY ZONE SUBSTATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at City Zone Substation, McMinn St, Darwin, NT 0800 for Renovations, Refurbishments etc.. Remove all asbestos bearing materials from exterior walls/surfaces of McMinn St-City Zone substation & subsequent repainting & making good all affected surfaces. External window shades shall also be replaced with aluminium louvres. Click for more details...

RAPHAEL ROAD WAREHOUSE/SHOWROOM
Currently at the Construction stage In Darwin City is a project estimated to be $ 100000. This project Construct warehouse with showroom. Click for more details...

ATLEE CREEK PROJECT
New project of Mining (Open Cut) project at Approximately 580 km west of, Alice Springs, NT 0870. A Rab drilling programme has commenced at the Atlee project 200 km south-east of the Granites Mine. Click for more details...


Industrial (Warehouses, cargo sheds, distribution centres) project In The Darwin City Council Area of Private ownership. Block-work construction, concrete floor, steel sheeting roofing, aluminium framed windows, airconditioning to office, fire services. Mezzanine level. Carparking & landscaping. Click for more details...

ANMATJERE COMMUNITY GOVERNMENT COUNCIL
Houses (5) New project In The Central Desert Shire Council Area. 2 at Laramba, 2 at Engawalla & 1 at Ti Tree. 3 bedroom. Concrete block construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...


Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Katherine Town Council Area of State ownership. General electrical repairs & maintenance in Katherine region. Click for more details...

RAAF BASE DARWIN
Military (Military installations & facilities) project at RAAF Base, Darwin, NT 0800 of Mobile Control/Reporting Unit - Relocation type of New development. Proposed building works: New permanent facilities to accommodate maintenance, administrative, logistics, training & operation activities. Hardstands & services infrastructure. Click for more details...

MUSEUM & ART GALLERIES OF THE NT-DISCOVERY CENTRE
Aluminium Ceiling Replacement For Museum & Art Galleries Renovations, Refurbishments etc. project In The Darwin City Council Area. Replace aluminium ceiling with new suspended gyprock ceiling, lighting system & associated works. Click for more details...

SCATURCHIO STREET MIXED DEVELOPMENT
Commercial Premises (Offices) project at 16 (lot 9962) Scaturchio St, Casuarina, NT 0810 of Units (13)/Offices - 3 Storey type of New development. Construct 3 storey building containing 13 x 1 bedroom units, ground level offices & 39 basement car parks. Concrete floors, blockwork & glazed walls, metal roof. Click for more details...

ELANG-KAKATUA OIL OPERATIONS
A project in the NT Within Darwin City. Includes the removal of all subsea facilities and waste disposal at the Elang-Kakatua fields. Click for more details...

WATER SUPPLY/SEWERAGE SYSTEMS REHABILITATION
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Plumbing, drainage & minor works to water supply & sewerage systems. Click for more details...

WATER/SEWERAGE INFRASTRUCTURE REHABILITATION
Hydraulic - Upgrading For Water & Sewerage Infrastructure project at Southern Region of, Alice Springs, NT 0872 In The Council Area Of Alice Springs Town of State. Period contract for repairs & maintenance of PAWA Water & Sewerage infrastructure in southern region - Hydraulic. Click for more details...

JOINT DEFENCE FACILITY - PINE GAP
New project of Military (Military installations & facilities) project at Pine Gap Region of, Alice Springs, NT 0872. Installation & testing of new digital control system & new 2000 kW diesel generator set to work in synchronization with twelve existing diesel generator sets operating in two buildings. Existing power system supports critical 24 hour operation that shall remain on line during new construction. Tasks will include: Demolition of existing control system from existing building, designated "Utilities Building". Installation of new central control system in existing building, designated "Powerhouse". Digital control system will interface with 2400 volt switchgear & auxiliary systems. Installation of new inter-connecting ductbanks between two buildings. Click for more details...

CHANNEL ISLAND POWER STATION
A project in the NT Within Darwin City. Landscaping & laying rock in various locations. Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Darwin City Council Area of Compliance Works (New)/Facilities (Replacement) - Stage 5 type. Provision low voltage reticulation & main switchboard at mud racing circuit, replace main switchboard at top entry to Motor Sports House, alterations to reticulation associated with demolition. Click for more details...

OPEN EDUCATION CENTRE
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Replace supply air ductwork in top floor ceiling space of building as well as supply & install new cushion heads, remove solar hot water panels & support stand from roof. Remove old hot water storage vessel & both circulating pumps. Install new 200 litre electrically heated storage vessel & one magnetic drive circulating pump. Replace rusted roof sheeting under solar panels that are being removed. Click for more details...

DARWIN EAST ARM WHARF - FIRE PROTECTION
Mining - Primary And Secondary Processing (Minerals Processing) New project at East Arm Wharf, Darwin, NT 0800. This type is Fire Protection-Design/Supply/Install/Commission Fire Fighting Equipment with Private ownership. Design, supply, install and commissioning of a fully operational wharf-based fire protection system for bulk liquid vessel loading and unloading operations. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Subcontracts (Electrical installation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

NORTHERN TERRITORY GOVERNMENT BUILDING ASSETS
Building Assets - Repairs/Maintenance project at Within region of, Alice Springs, NT 0871 in the Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls). Repairs & maintenance to NT Government Building Assets for 12 month period. Click for more details...

LYONS CIVIL WORKS PHASE 1 STAGE 1 (STAGES 1 - 5)
Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area of Local Govt ownership. Civil works including roads, drains & other service infrastructure. Click for more details...

ALICE SPRINGS SOLAR CITY DEVELOPMENT
Solar Power Installation - Houses - Stage 1 New project In The Alice Springs Town Council Area. Convert Alice Springs to Solar City. Scope of works consists of 12 initiatives over seven years costing $28 million. First initiative will install 3,200 photo voltaic panels on 230 dwellings & solar hot water systems to 1,000 dwellings. There will also be 7,000 public consultations assisting smarter energy use. Click for more details...

STRATEGIC INTERVENTIONS HOUSING PROGRAMME CONSULTANCY
Strategic Interventions Housing Programme Consultancy is currently at the Planning stage, valued at about $ 50000000 it is To establish the design standards & output specifications, provide guidance to the Package Project Managers & Program Manager on all aspects of design, have a limited design sign-off role, manage the cross fertilisation of lessons learned & maintain a design library for all design reference materials & design documents for the Program. Click for more details...

BERRIMAH ROAD WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Darwin City Council Area of Private ownership. Construction of a warehouse to include railway track running into warehouse. Parking for 6 cars. Associated landscaping. Click for more details...

LITCHFIELD SHIRE COUNCIL ROADWORKS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at ., Yarrawonga, NT 0830. 70 of 2008: Maintenance grading of roads within Litchfield Council. 71 of 2008: Sealing of new and resealing existing pavements within Litchfield Council boundaries. 73 of 2008: Asphalt pavement patching within Litchfield Council Boundaries. Click for more details...

SADADEEN PRIMARY SCHOOL MULTI PURPOSE LEARNING AREA BER PROJECT
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 1031000. This project Construction of Multi Purpose Learning Area. Click for more details...

WANGURI PRIMARY SCHOOL MULTI PURPOSE LEARNING AREAS BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) New project at 46 Gsell St, Wanguri, NT 0810. This type is Multi Purpose Learning Areas with State ownership. Construction of Multipurpose Learning Area Click for more details...

KATHERINE REGIONAL CULTURAL PRECINCT STAGE 1B
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at 108 (Lot 3002) Chambers Dr & Lot 3238 Stuart Hwy, Katherine, NT 0850 for Addition. Stage 1B to include: stage, backstage areas, offices, meeting rooms, storage & amenities. Click for more details...

EAST ARNHEM REGION VARIOUS SCHOOLS SOLAR POWER PANELS & SYSTEMS BER PROJECT
Currently at the Tenders & Building stage In Various is a project estimated to be $ 2000000. This project Supply, delivery, installation & commissioning of solar power panels & systems Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

LAJAMANU HEALTH CLINIC & HOUSES
Residential (Units, apartments, flats, townhouses, villas) project at ., Lajamanu, NT 0852 of Health Clinic/Houses (2) type of New development. Construction of Health Clinic & 2 x 2 bedroom houses. Associated parking & landscaping. Click for more details...

THE HEIGHTS RESIDENTIAL SUBDIVISION STAGES 3 & 4
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 16000000. This project Stage 3 - 29 residential lots & 2 public open space sites. Stage 4 - 24 residential lots & 1 public open space site. Click for more details...

FARRAR BOULIVARD VILLAS
A project in the NT Within Palmerston Town. Construction of 7 x 3 bedroom villas in 3 single storey buildings. Cement slab, rendered concrete blockwork & metal roof. Parking for 14 cars. Associated landscaping. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

NHULUNBUY HIGH SCHOOL INSULATED CHILLED WATER PIPE BRANCHES
Education (Schools - primary, secondary (up to Yr 12)) project at 20 Matthew Flinders Wy, Nhulunbuy, NT 0880 for New. Supply, installation & re-commissioning of replacement insulated chilled water system branch pipework at Nhulunbuy High School. To include decommissioning, disconnection, removal & disposal of all existing & failing insulated chilled water branch pipes & associated components. Click for more details...

DOUGLAS DALY RESEARCH FARM CATTLE RAMP & FENCING
Douglas Daly Research Centre (Lot 2640), Douglas Daly, NT 0822 Has Douglas Daly Research Farm Cattle Ramp & Fencing currently at Construction stage. Construction of unloading ramp for livestock at the Douglas Daly Research Farm. To include supply & laying of gravel fill, subgrade, sub base, base course to 95% modified dry density. Supply & installation of handrails 115mm x 42mm x 2.5mm. Construction of block work retaining wall. Office maintenance to include removal of Air Conditioning units, painting of walls & doors, relaminate bench tops & installation of new kitchen sink fixtures. Supply, installation & erection of 1200mm high chain mesh fench to 8 houses to include gates. Click for more details...

LITCHFIELD NATIONAL PARK TOLMER FALLS VISITOR AREA
Entertainment (Parks, Leisure grounds, Playgrounds) project for New development. Upgrade works to the Tolmer Falls Site at Litchfield National Park. To include construction of elevated function shelter, 4 x picnic shelters & ablutions block. Conversion of existing ablutions block to picnic shelter. Refurbishment works to existing boardwalk & lookout shelter with aluminium decking, plastic handrails & kickboards. Installation of solar bollard system. Construction of 3.5m wide gravel track to new campsite area. Replacement of existing concrete pathway to include reinstatement of concrete inverts. Construction of 3m high elevated 10000l water tank with concrete footings, painted steel ladder & platform with railings & kickboards. Associated landscaping Click for more details...

KATHERINE SEWERAGE PLUMBING & SEWERAGE MAINTENANCE & REPAIRS
Public Utilities (Treatment plants, Sewerage reticulation) project at Located Within, Katherine, NT 0850 of Sewerage & Plumbing - Maintenance & Repairs type of New development. Repairs & maintenance works to general plumbing, drainage, roofing, sewerage, sewerage treatment plants, water filters, gas fittings & valves located within the Katherine Region. Click for more details...

NORTHERN GAS PIPELINE - HP & LP FLARE PACKAGE
Hp/Lp Flare Package New project In The Various Council Area. For the provision of a flare system for each of the blowdown systems for the Phillip Creek, NT Compressor Station. Click for more details...

WURRUMIYANGA AIRPORT SUBDIVISION
Civil Works/Drainage - Upgrade New project In The Tiwi Islands Shire Council Area. Various repairs to the Airport Subdivision at Wurrumiyanga including: 3 floodway extensions; grouted stone pitching; concrete drop structures; kerbing; general concrete & other works; signage; topsoiling & grassing Click for more details...

MUSEUM AND ART GALLERY OF THE NORTHERN TERRITORY
Museum - Thermal Plant New project In The Darwin City Council Area. Construction of a new thermal plant system at the Museum and Art Gallery of he Northern Territory. Scope of work includes: decommissioning, removal & relocation of the existing thermal plant systems serving the facility. Provision of new chilled water pumps, new condenser water pumps, new cooling towers, new feed & expansion system, new chilled water, condenser water reticulation systems, and new DDC controls for complete & operating systems. Installation of a new chiller provided by others Click for more details...

ERNEST GILES ROAD
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 395000. This project Gravel resheet & drainage repairs to various sections of Ernest Giles Rd Click for more details...

ELLIOTT URBAN PUBLIC HOUSING
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 967000. This project Construction of 1 x 3 bedroom dwelling on Lot 144 & 1 x 3 bedroom dwelling on Lot 151, Elliott Click for more details...

ALICE SPRINGS BUS STOPS
Bus Stops New project In The Alice Springs Town Council Area. Construction of infrastructure upgrades to existing bus stops in the Alice Springs town area, including earthworks, concreting, supply and installation of shelters, seats, tactile ground surface indicators and other items. The locations are Memorial Ave, Araluen, Stuart Highway & Len Kittle Dr, Ilparpa Click for more details...

KEEP RIVER ROAD
A project in the NT Within Katherine Town. Drilling, construction, airlifting & water quality testing of up to six water bores for the purpose of road construction between the NT/WA Border & Legune Station southern boundary for 27km of roadway upgrades to seal the road. One of these bores is required as a potable water supply for a construction camp. The site of the works is from the Northern Territory/Western Australia border Chainage 0.00 along the Keep River Plains Road to Chainage 27.64 (Legune Station boundary). Click for more details...

ELITE PHYSIOTHERAPY
Medical (Surgeries, Medical centres) project for Renovations, Refurbishments etc. development. Conversion of an existing office into a medical clinic (Tenancy 2 & 3) to comprise 3 consulting rooms for physiotherapists & massage therapist, exercise/rehabilitation area, reception, office, staff rooms, laundry room & storage room. Car parking for 5 vehicles. Associated landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect