State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects in NT®ion=⊂=731 in region


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Tankage, Silos) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

PARKS AUSTRALIA NORTH - ULURU-KATA TJUTA NATIONAL PARK
Plumbing Works/Gas Infrastructure Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Repairs & plumbing works & gas infrastructure. Click for more details...

DUNDEE BEACH SCHOOL
Airconditioning Unit Replacement For School project at Main Classroom, Namarada Dr (lot 3084), Dundee Beach, Darwin, NT 0800 In The Council Area Of Darwin City of State. Replace airconditioning unit for main classroom. Click for more details...

NT GOVERNMENT ASSETS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Various Council Area of Cadastral Surveying Services type. Panel contract for provision cadastral surveying services for 3 year period. Click for more details...

MT BUNDEY TRAINING AREA
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at 120km sth east of, Darwin, NT 0800. This type is Roads - Stage Two Package with Federal ownership. Construction of 17km of unsealed road. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Hospitality (Conference & reception centres & facilities) New project at Ellengowan Dve, Casuarina, NT 0810. This type is Commercial Building For University with State ownership. Building likely to contain: retail outlets, food & beverage outlets, function & conference facilities. Click for more details...


New project of Residential (Units, apartments, flats, townhouses, villas) project at Connell's Lagoon Barkly Region Area of, Tennant Creek, NT 0860. Construction of kit homes. Click for more details...


A project in the NT Within Palmerston Town. Layout of shops/offices subject to requirements of lessee. Concrete frame, pre-cast concrete & block-work infills, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire services, lifts, stairs. Basement carparking. Click for more details...

ANMATJERE COMMUNITY GOVERNMENT COUNCIL
Houses (7) New project In The Alice Springs Town Council Area. 3 bedroom each 100 sq m approx. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

ROBERTSON BARRACKS
Federal ownership Social (Religious Buildings, civil chapels) project In The Litchfield Shire Council Area for New development. An Australian rules oval & rugby pitch either side of Barracks entrance accompanied by change rooms & carparks. Religious centre, Military Museum. Click for more details...

MOUNT BLEECHMORE PROJECT - VERMICULITE RESOURCE
Mining (Open Cut) project at 100 km north east of, Alice Springs, NT 0870 of Resource - Vermiculite type of New development. The Mount Bleechmore vermiculite prospect is part of the Strangways diamond project area, and was discovered as part of a drilling programme for that area. Click for more details...

THORAK ROAD NURSERY
Thorak Road Nursery is currently at the Construction stage, valued at about $ 300000 it is Construction of plant nursery. Steel frame & shade cloth with PVC piping for irrigation of plants. Machinery shed. Steel frame & steel clad, concrete floor, metal deck roof. Click for more details...

HARTS RANGE PROJECT-MOUNT RIDDOCH/KONGO/COPPER KING/COPPER QUEEN
Harts Range Project-Mount Riddoch/Kongo/Copper King/Copper Queen is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is A helicopter supported stream sediment sampling programme was completed in mid April as follow-up to the anomalous results returned from the 2002 reconnaissance programme. Click for more details...

COASTAL PLAINS-FOGG DAM
State ownership Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Remove existing wall cladding & roofing material, remove existing timber wall frames & timber roof purlins, supply & install new metal wall girts & roof purlins & supply & install new metal wall cladding, work will include provision personal access door. Click for more details...

WAGAMAN PRIMARY SCHOOL GROUNDS MAINTENANCE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Darwin City Council Area of Grounds Maintenance For School type. Grounds maintenance contract. Click for more details...

DARWIN REGION URBAN/RURAL AREAS - BITUMEN RESURFACING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Darwin Region urban & rural areas bitumen resurfacing of various roads & highways. Click for more details...

STUART HIGHWAY - VARIOUS STUCTURAL & CIVIL WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area of Visitor Facilities/Sealed Accesses/Shelter/Various Items type. Upgrade visitor facilities, construct sealed accesses, shelter & various items from Teamster Memorial to Mount Polhill on Stuart Hwy within Alice Springs Region. Click for more details...

DARWIN BUSINESS PARK - SECURITY SURVEILLANCE CAMERAS/EQUIPMENT
Darwin Business Park - Security Surveillance Cameras/Equipment is currently at the Planning stage, valued at about $ 100000 it is Supply & Installation of security surveillance cameras & equipment to Darwin Business Park. Click for more details...

LYONS CIVIL WORKS PHASE 1 - STAGE2 (STAGES 6-2) - DOUBLE ENTRY
A project in the NT Within Darwin City. Civil works including roads, drains & other service infrastructure including civil work Click for more details...

BURNSIDE GOLD OPERATIONS - FOUNTAIN HEAD - RESOURCE
Private ownership Mining (Open Cut) project In The Katherine Town Council Area. Indicated resource is 1,985,000 tonnes @ 1.7 g/t for 106,100 ounces of Au and an inferred resource of 661,000 tonnes @ 1.6 g/t for 34,000 ounces of Au. Click for more details...

BATTEN ROAD (ROADS TO RECOVERY PROGRAM) CULVERTS/EARTHWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area of State ownership. Install culverts & earthworks at various locations. Click for more details...

ALICE SPRINGS WESTERN AREA MAINTENANCE GRADING/MINOR PAVEMENT/DRAINAGE REPAIRS
Maintenance Grading/Minor Pavement/Drainage - Repairs New project In The Alice Springs Town Council Area. Maintenance grading, minor pavement & drainage repairs for 36 month period in western area. Click for more details...

ALICE SPRINGS WATER SUPPLY/SEWERAGE INFRASTRUCTURE CIVIL/HYDRAULIC WORKS
Civil/Hydraulic Works project at Within region of, Alice Springs, NT 0870 in the Public Utilities (Water distribution systems, Drainage). Civil & hydraulic works & services relating to water supply & sewerage infrastructure for 36 month period. Click for more details...

BERRIMAH ROAD WAREHOUSE
Mining - Support Facilities (Industrial buildings) project In The Darwin City Council Area of Private ownership. Construction of a warehouse to include railway track running into warehouse. Parking for 6 cars. Associated landscaping. Click for more details...

XAVIER COMMUNITY EDUCATION CENTRE & MURRUPURTIYANUWU CATHOLIC SCHOOL
Classrooms/Administration - Altns & Addns project at ., Bathurst Island, NT 0822 In The Council Area Of Tiwi Islands Shire of Private. Design and Construct - (1) New Classrooms and administration building. (2) Renovations to existing buildings. Click for more details...

DARWIN AIRPORT WEST WING OFFICE REFURBISHMENT
Office - Refurbishment Renovations, Refurbishments etc. project In The Darwin City Council Area. Modifications to office, Darwin West Wing, Darwin Airport. Click for more details...

VANDERLIN DRIVE COMMERCIAL & RESIDENTIAL COMPLEX (FORMER BUNNINGS SITE)
Private ownership Commercial Premises (Commercial complexes - shops, offices) project In The Darwin City Council Area for New development. Proposed construction for commercial strip along Vanderlin Drive comprising 2 storey commercial building (870 sqm), two single storey retail buildings (745 sqm), 3 x 3 storey apartment blocks with 26 x 2 bedroom & 16 x 3 bedroom dwellings. Ground level parking with 158 bays. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

THE HEIGHTS DURACK NEIGHBOURHOOD CENTRE
The Heights Durack Neighbourhood Centre is currently at the Construction stage, valued at about $ 1500000 it is Construction of community centre with a sales & information centre. To include an office (79.9sq m), 2 x multifunctional workshop spaces (110sq m), exhibition & storage spaces with shared amenities & kitchenette. Concrete slab, rendered concrete blockwork & metal roof. Parking for 14 vehicles. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - POP TESTING
Non-Construction Items (Other mining services) project at Blaydin Point, via, Darwin, NT 0800 for New. For the provision of pop testing services. Click for more details...

NUMBULWAR HEALTH CLINIC STAGE 1
New project of Medical (Surgeries, Medical centres) project at Lot 141 Township of Numbulwar, Numbulwar, NT 0852. Construction of Stage 1 of a health clinic at Numbulwar. To include emergency room, x ray room, drug storage room, clinical store, reception area, dental room & renal room. 4 x general consulting rooms, 2 x interview rooms, 2 x children's consulting rooms, managers office & general office. Cement slab, metal cladding walls, rendered concrete blockwork, roller shutters, sheet metal roofing & perforated metal panels. To include construction of access road & connection of services including electrical, communications, security, water reticulation & sanitary drainage. Car parking for 18 cars. Associated landscaping. Click for more details...

GROOTE EYLANDT MANGANESE MINE EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) New project at Groote Eylandt, Groote Eylandt, NT 0822. This type is Sands Benefication Plant with Private ownership. Extension to facility to increase the capacity by 0.5Mt/a by re-processing manganese ore stored in tailings stockpiles. Works to include detailed design, supply, fabrication, construction & commissioning of a sands beneficiation plant, port stockpile expansion & associated infrastructure. Click for more details...

CIVIC PARK PUBLIC AMENITIES
Social (Amenities, Dressing rooms) project for New development. Design & construction of male & female public amenities at Civic Park, Darwin. Click for more details...

NT BEVERAGES WATER BOTTLING PLANT EXTENSION
Factory - Extn Addition project In The Darwin City Council Area. Proposed construction of an extension to existing factory to provide Water Bottling Plant & plastic Extrusion Technique (PET) bottle manufacturing area. To include an undercover depressed loading dock, insulated lined door & steel fabricated framework. Colour coated roof, walls & garage roller doors. Car parking for 22 cars. Associated landscaping. Click for more details...

PORT KEATS ROAD REINSTATEMENT & RESHEETING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Port Keats Rd, Wadeye, NT 0822. This type is Roadworks - Reinstatement/Resheeting with State ownership. Port Keats Road - Reformation & Resheeting of Pavement at Various Chainages including Ch25.00-km To Ch27.00-km. Ch40.00-km To Ch41.00-km. Ch88.00-km To Ch90.00-km. Works to include raising the existing formation by not less than 200-mm by widening & deepening table drains to form a sub-grade & importation of base gravel materials for Resheeting of not less then 200-mm of compacted base. Reformation to allow for a 9.00-m formation ? 6.00-m pavement & 1.5-m shoulder both sides. Convert table drains to allow sheet-flow. Reform Existing Pavement by winning material from outer batters & table drains. Using won materials to form up pavement to sub-grade standard ? To achieve depth of not less than 200mm compacted depth. Win, Load, Haul & place Base Course material on the prepared Subgrade to not less than 200mm compacted depth. Water bind, compact & trim. Click for more details...

HIDDEN VALLEY MOTORSPORTS COMPLEX CIVIL & EROSION CONTROL UPGRADES STAGES 1-4
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at 171 Hidden Valley Rd (Section 06196), Berrimah, NT 0828 for New. Civil & erosion control works to remediate existing flood damage & minimise future damage at Hidden Valley Motor Sports Complex over 4 stages. Stage 1: Retention Basins in Northern Carpark ? Provide 8 hour retention dams for a Q100 storm event across the 3 watercourses in the northern carpark. Stage 2: Turn 1 Erosion Control ? Erosion control measures between turn 1 & turn 2. Stage 3: Turn 1 Surface Runoff ? Earthworks need to be done to recontour & provide levee banks to redirect stormwater runoff away from the track at turn 1. Stage 4: Turn 2 to 4 Embankment ? A proposed 600mm high rock barrier & reworked drain behind the current 1 Line of Protection (1LoP). Currently the stormwater runoff overflows at the existing kerb along the speedway pit area on to the racetrack below. Crushed rock, subgrade, grouted stone pitching & bitumen seal. Click for more details...

HENRY WRIGLEY DRIVE SHARED PATH
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Darwin City Council Area of Shared Path type. Construction of a shared bike path along the side of Henry Wrigley Drive between McMillans Road & the Department of Infrastructure road reserve boundary. To include replacement of street lights. Provision of traffic control. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - BRIDGE CONSTRUCTION
Currently at the Construction stage In Katherine Town is a project estimated to be $ 10000000. This project Construction of a 5 span rendered concrete bridge over the Wilton River on the Roper Highway. To include headstocks, beam, deck slab, kerbs, approaches & railings. Click for more details...

ARLTUNGA ROAD RESHEETING
Arltunga Rd, Alice Springs, NT 0870 Has Arltunga Road Resheeting currently at Construction stage. Resheeting of Arltunga Road, located 90km East of Alice Springs. To include clearing & grubbing of existing road formation. Resheet gravel to 150mm depth x 8m width. Reinstatement of trapezoidal table drains, offlets & table drains. Provision of traffic control. Click for more details...

ALAWA PRIMARY SCHOOL PLAYGROUND
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Design & construction of a playground for upper primary students at Alawa Primary School. To include supply & installation play equipment, shade sails, rubber & sand soft fall. Concrete kerbing & drainage. Relocation of existing tables. Click for more details...

MILINGIMBI STAFF ACCOMMODATION
., Milingimbi, NT 0822 Has Milingimbi Staff Accommodation currently at Construction stage. Construction of new staff accommodation building in Milingimbi for East Arnhem Regional Council. Scope of work includes: demolition of existing house. Construction of a new 2 bedroom house. Infrastructure upgrade Click for more details...

NORTHERN GAS PIPELINE WATER TREATMENT SYSTEM
New project of Oil & Gas (Pipelines & associated contracts) project at Tennant Creek to Mount Isa, ., NT 8999. Design, manufacture, test & deliver a Water Treatment System for the Phillip Creek Compressor Station to operate remotely. Associated works. Click for more details...

CALVERT ROAD FLOODWAYS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area of Floodways type. Construction of 2 40mx8m reinforced concrete floodways on Calvert Road CH194.67km. Click for more details...

BUCHANAN HIGHWAY
Buchanan Highway is currently at the Construction stage, valued at about $ 252000 it is Re-sheeting in various locations on the Buchanan Highway from Ch61.17km to Ch79.19km Click for more details...

DRIPSTONE MIDDLE SCHOOL
Public Utilities (Water distribution systems, Drainage) New project at Lot 7422, Tiwi, NT 0810. This type is Drainage/Oval - Upgrade with Local Govt ownership. Drainage swale & oval upgrade Click for more details...

NUMBULWAR ROAD
Roadworks project at Numbulwar Rd, Katherine, NT 0850 In The Council Area Of Katherine Town of State. Re-sheeting of the Numbulwar Road between chainage 74 km to 80 km Click for more details...

ROOM TO BREATHE
Residential (Units, apartments, flats, townhouses, villas) Addition project at ., Ngukurr, NT 0852. This type is Early Works Program with State ownership. Room to Breathe early works program for Ngukurr. Creation of new living spaces in existing homes Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of State ownership. Construction of package 3 for a new water main for Hidden Valley Motor Sports Complex. Scope of work consists of: new water main, 250 diameter (ND) HDPE. Five new irrigation points & 5 house connections. Approval of the new water main construction by PWC. New internal meter assembly (Non-PWC) Click for more details...

STUART HIGHWAY
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Alice Springs Town Council Area of State ownership. Upgrading of the street lighting on the south of Stuart Highway at the intersections for Commonage Road, Ross Highway & Ilparpa Road in Alice Springs. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect