State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects in TAS®ion=⊂=731 in region


LAUNCESTON GENERAL HOSPITAL - QUEEN VICTORIA UNIT
Electrical Services For Obstetrics Wing/Renal Unit New project In The Launceston Council Area. Electrical services associated with the relocation of Queen Victoria Hospital to Launceston General Hospital campus. Click for more details...

JOHNSTON ROAD EXTENSION (STATION RD RE-ALIGNMENT)
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The St Leonards Council Area of Roadworks type. Roadworks, new bridge & culvert, construction of roundabout at Penquite Rd end of Station Rd. Click for more details...

TI-TREE BEND HIGH VOLTAGE SUBSTATION REPLACEMENT
Currently at the Tenders & Building stage In Launceston is a project estimated to be $ 0. This project Supply, installation & commissioning of replacement high voltage (HV) substation equipment at the Ti-Tree bend wastewater treatment plant for the provision of long term operations and maintenance services of electrical assets. Click for more details...

RBF OFFICE EXTENSION
Addition project of Commercial Premises (Offices) project at 39 Sandy Bay Rd, Sandy Bay, TAS 7006. Alterations and additions to existing building to provide an additional level. Masonry veneer construction, steel frame roof. Click for more details...

SPUR HILL RESERVOIR ROOF
Local Govt ownership Public Utilities (Reservoirs) project In The Central Coast Council Area for New development. Design & construction of an aluminium reservoir roof & associated platforms, ladders & hatches. Click for more details...

DOMINIC COLLEGE/PRIMARY SCHOOL CAMPUS
New Primary School Campus New project In The Glenorchy Council Area. New Primary School Campus including 6 new buildings, carpark & sports court. Brick veneer, metal roof, concrete floors, aluminium windows. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project at Exeter WWTP/Exeter Golf Course, Exeter, TAS 7275. This type is Pipeline & Pump Station Construction with Local Govt ownership. Construction of pipeline & pump station. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

ROYAL HOBART HOSPITAL REDEVELOPMENT STAGE 2
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at 48 Liverpool Street, Hobart, TAS 7000. Major internal refurbishment, includes demolition. Click for more details...

UNITED MILK TASMANIA LTD
Currently at the Construction stage In Devonport is a project estimated to be $ 500000. This project Roadway, water & fencing. Click for more details...

WREST POINT HOTEL CASINO
Main Casino - Refurbishment Renovations, Refurbishments etc. project In The Hobart Council Area. Internal Refurbishment of Main Casino Gaming Area Click for more details...

DERWENT WATERS RESIDENTIAL DEVELOPMENT
Aged Care & Retired Developments (Retirement villages) project for New development. Brick veneer & blockwork construction, tiled roof, concrete slab, aluminium windows. Click for more details...

PRINCESS CREEK TAILINGS DAM - MOUNT LYELL
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Lyell Council Area for New development. The dam is a zoned earth/rock fill embankment, with current height of 42 metres. The planned lift is 5 metres, requiring excavation, movement and placement of approximately 230,000 cubic metres of clay and rock. Other components include excavation of a spillway, embankment and spillway foundation works, construction of roads, installation of decant structure and rehabilitation of exhausted borrow pits. Click for more details...

HOBART MIDCITY HOTEL
Hospitality (Hotels, Serviced Apartments) project at 96 Bathurst St, Hobart, TAS 7000 of Hotel Refurbishment type of Addition development. Internal alterations and demolition to provide new gaming lounge. Click for more details...

SMITHTON HIGH SCHOOL REDEVELOPMENT
School - Altns And Addns project at Mill Rd, Smithton, TAS 7330 in the Education (Tertiary - colleges, institutes, universities). Alterations and additions to existing buildings in three areas. Building 1A - first floor, Building 1B and Building 1C West to create new classrooms (GLA) and associated works. Click for more details...

CARBEEN STREET GROUP HOME
Residential (Units, apartments, flats, townhouses, villas) New project at 1 Carbeen St, Mornington, TAS 7018. This type is Group Home with State ownership. Construction of a 4 bedroom group home. Brick veneer, metal roof, concrete floors, aluminium windows. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

THE SWANSEA BARREL
A project in the TAS Within Glamorgan-Spring Bay. Construction of additional level for offices and function centre. Click for more details...

MAIB GROUP HOUSE COMPLEX STAGE 1
Dwelling And Units project at 186 Main St and Cornelia Street,, Ulverstone, TAS 7315 In The Council Area Of Central Coast of State. Construction of a conjoined six bedroom dwelling and four x two bedroom units. Brick veneer, concrete floors, metal roof, landscaping and associated roadworks. Click for more details...

WELLINGTON CENTRE DEVELOPMENT
Retail (Shops, shopping centres & arcades, supermarkets) project In The Hobart Council Area of Supermarket/Shops/Car Parking/Offices type. Construction of a multi storey commercial development comprising a basement supermarket (2,500 sqm), ground floor retail (3,00 sqm), seven levels of car parking approximately 540 spaces (21,000 sqm) and four levels of offices (5,100 sqm). Precast concrete walls, curtain wall glazing, structural steel frame, metal roof and concrete floors. Click for more details...

ST ALOYSIUS CATHOLIC COLLEGE STAGE 1A
St Aloysius Catholic College Stage 1a is currently at the Construction stage, valued at about $ 2500000 it is Construction of a learning centre. Click for more details...

UTAS MORRIS MILLER LIBRARY - STAGE 2
Demolition And Enabling Works For Library Fitout - Phase 1 project at Churchill Avenue, Sandy Bay, TAS 7005 In The Council Area Of Hobart of State. Demolition and enabling works associated with the fitout of existing library. Click for more details...

ESPLANADE RECONSTRUCTION
A project in the TAS Within West Coast. Reconstruction of a section of Esplanade. Click for more details...

UTAS MEDICAL SCIENCE PRECINCT STAGE 2
Education (Tertiary - colleges, institutes, universities) project at 6-16 Bathurst St, 55 Campbell St and 15-17 Liverpool St, Hobart, TAS 7000 of Medical Research And Education Complex type of New development. Construction of a second building and associated structures on the site making up Stage 2 of the University of Tasmania's Medical Science Precinct. The primary building consists of six storeys, has a total floor area of 8573sqm and has been designed to integrate with the previously constructed Stage 1 building with frontages to Bathurst Street, Liverpool Street and Brooker Avenue. The building combines educational, consulting room, office, research facility uses and will contribute to the accommodation of approximately 1600 staff and students across the overall precinct. Click for more details...

BREAK O'DAY COUNCIL ROAD RESEALING
Road Works project at Various Locations within the Municipality of Break O'Day, St Helens, TAS 7216 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). The works involve the bituminous two coat seal and resealing of roads and streets within the Break O?Day Municipality with a bituminous spray seal. Click for more details...

SOUTHERN MIDLANDS ROAD MAINTENANCE PORGRAM 2011/2012
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Insitu stabilisation and pavement reconstruction works to various roads in the municipal area. Click for more details...

THREE CAPES TRACK
A project in the TAS Within Tasman. Construction of four portions of the walking track, 4.8 kms, 3.8 kms, 2.7 kms and 2.9 kms in length. This includes clearing the track corridor, ground preparations, drainage and subsurface and surface works. Click for more details...

MACQUARIE HARBOUR HISTORIC SITE
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Repair works to flood damaged walkways, viewing platform and jetty at Sarah Island, Macquarie Harbour Historic Site, Strahan. Click for more details...

CORUMBENE RETIREMENT VILLAGE
13-21 Lower Rd and Lot 3 (C/T 141791/3) Lower Rd, New Norfolk, TAS 7140 Has Corumbene Retirement Village currently at Construction stage. Retirement Village - Staged 24 independent living units and clubhouse. Click for more details...

BUNNINGS SUPERSTORE KINGSTON
Private ownership Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project In The Kingborough Council Area for New development. Construction of a Bunnings Warehouse requiring relaxation of height maximum and associated vegetation removal, infrastructure and carparking, includes road modifications of Channel Highway and Spring Farm Road. Materials include precast concrete panel, aluminum framed windows, compressed cerment, mesh fence,metal sheet cladding,shade cloth, sail canopy, landscaping and watertank. Click for more details...

TASMAN HIGHWAY/EAST DERWENT HIGHWAY INTERCHANGE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Clarence Council Area of Road Works type. The construction of a new on-ramp for traffic from the East Derwent Highway onto the Tasman Highway and a dedicated lane from the East Derwent Highway to access Rosny Hill Road. The proposed contract period is 18 months. Click for more details...

KANGAROO BAY ROADWORKS - STAGE 2
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Rosny Hill Rd, Bligh St and kangaroo Bay Dr, Rosny Park, TAS 7018. This type is Road Works with Local Govt ownership. Civil works to modify the intersection between Rosny Hill Road, Bligh Street and Kangaroo Bay Drive includes new road pavement and associated works. Click for more details...

BARNETT CLOSE DWELLINGS
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Break O'Day Council Area for New development. Construction of 5 dwellings consisting of 4 residential dwellings and 1 boatshed/recreational unit. Stormwater disposal, associated car parking spaces and onsite waste water management. Click for more details...

ROYAL YACHT CLUB TASMANIA
Boat Ramp/Floating Pontoon - Upgrade/Installation New project In The Hobart Council Area. Upgrade of existing boat ramp & installation of new floating pontoon on the adjacent shore edge. Click for more details...

AUSTRALIAN HONEY PRODUCTS PTY LTD
Honey Extraction Facility project at 111 Main St, Sheffield, TAS 7306 In The Council Area Of Kentish of Private. Construction of a 1600 sqm industrial building for use as a honey extracting facility. Concrete slab, insulated panels, metal deck roof and services including compressed air. Click for more details...

BURNIE NETBALL CENTRE UPGRADE
Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)) project at 15-23 Howe St, Park Grove, TAS 7320 of Netball Centre - Upgrade type of New development. Upgrade to the existing Burnie Netball Centre. Works include 3 new netball courts and 12 new court-side shelters. Click for more details...

WILLIAM STREET STORMWATER UPGRADE STAGE 5
Stormwater - Upgrade project at William St, Devonport, TAS 7310 in the Public Utilities (Water distribution systems, Drainage). Stormwater upgrade on William Street, between Eugene Street & North Street. Click for more details...

GRAY STREET KERB & PATHWAY REPLACEMENT
Kerb & Pathway - Replacement New project In The West Tamar Council Area. Gray Street, Riverside kerb & pathway replacement. The work includes the following: construction of 205 m of kerb & channel/driveway cross over's type KC, construction of 125 m of 1.35 m concrete pathway, construction of 9 driveways, general reinstatement & 6 month maintenance period. Click for more details...

TARREMAH SCHOOL CLASSROOMS
Currently at the Construction stage In Kingborough is a project estimated to be $ 250000. This project Construction of a new classrooms to be used as a science laboratory. Materials to be used include colorbond sheet roofing, double glazed aluminium framed windows & doors, scyon matrix sheet cladding & timber. Click for more details...

BELLERIVE BEACH PARK STAGE 2
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Queen, Derwent and Beach Sts, Bellerive, TAS 7018 of Park Development - Stage 2 type of New development. Construction of the Plaza Picnic Project at Bellerive Beach Park. Works include picnic shelters, BBQs, concrete paths, lighting, irrigation and landscaped areas. Click for more details...

EDINBURGH PARK COMMUNITY CENTRE KITCHEN UPGRADE
120 Gravelly Beach Rd, Gravelly Beach, TAS 7276 Has Edinburgh Park Community Centre Kitchen Upgrade currently at Construction stage. Upgrade the kitchen at Edinburgh Park Community Centre including removal & replacement of the existing kitchen wall linings, removal & replacement of existing cabinetry with new including stainless steel benchtops c/w integrated sinks & splashbacks, construction of new internal framing, suspended ceiling, pantry & servery, fitting of supplied kitchen equipment & relocation of main entry doors. Click for more details...

PROSPECT VALE PARK
2 Harley Pde, Prospect Vale, TAS 7250 Has Prospect Vale Park currently at Construction stage. Project No. 7682 Prospect Vale Park, Training, Soccer & AFL Ground Upgrades, including irrigation, drainage & resurfacing. Click for more details...

BURNIE TENNIS CENTRE COURT UPGRADE
Sports (Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)) project In The Burnie Council Area of Tennis Court - Upgrade type. Construction of the Burnie Tennis Centre - Court Upgrade. Click for more details...

PATRIARCH DRIVE WAREHOUSES
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Kingborough Council Area for New development. Construction of 2 warehouses to include 3 units (warehouse 1) & 8 units (warehouse 2). Clear roof sheeting, powdercoated aluminium framed windows, metal door frames, concrete panels & roller door. Car parking for 23 vehicles. Associated landscaping. Click for more details...

KENTISH MUNICIPALITY FLOOD WORKS
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various locations within the Municipality of, Sheffield, TAS 7306 for New. Construction works to include bridgeworks comprising Dasher River (Beulah Road), Bull Creek (Dolcoath Hill Road) & Mersey River Bridges (Mersey Lea Road, Kellys Cage Road & Dynans Bridge Road), Wilmot Road, Lower Wilmot. Click for more details...

WIVENHOE SHOWGROUND
Currently at the Construction stage In Burnie is a project estimated to be $ 150000. This project Lighting Upgrade at Wivenhoe Showground. Click for more details...

HUON VALLEY COUNCIL ANNUAL TENDERS 2016/17
Currently at the Construction stage In Huon is a project estimated to be $ 200000. This project Exclusive Tender for Pavement Stabilisation on Selected Roads 2016-2017 Click for more details...

OTAGO LAGOON & COASTAL RESERVES ACTIVITY PLAN
A project in the TAS Within Brighton. Works to include resurfacing the existing track with gravel around Otago Lagoon. Construction of a gravel walking track at the Western End of Otago Bay Coastal Reserve. Installation of signage around the reserve. Installation of new outdoor seating at two locations in the reserves. Installation of play equipment at the grassy point at the Eastern End of Otago Bay Coastal Reserve. Undertake a feasibility study into developing a coastal walking track link between Otago Lagoon Reserve & Woodville Bay. Landscaping around the Reserves. Click for more details...

BARETTA WASTE MANAGEMENT CENTRE
New project of Public Utilities (Water distribution systems, Drainage) project at 1922 Channel Hwy, Margate, TAS 7054. Supply all materials, plant, & labour & any other services to undertake construction of four (4) separate building (roof) project parts. The works includes roof storm water collection & piped disposal system to the existing site storm water system located at the Barretta Waste Management Centre, Margate. Click for more details...

MONTANA ROAD SHEDS
Montana Road Sheds is currently at the Construction stage, valued at about $ 300000 it is Extensions of bondor panel shed (58.275sq m) & 2 new bison sheds (225sq m & 382.5sq m) to the existing factory. Colour coated metal building. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect