State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Ice Rinks Projects in TAS®ion=⊂=1450 in region


TASMANIA FIRE SERVICES
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Hobart Council Area of State ownership. Security services associated with the construction of administration block & new statewide control room. Click for more details...


New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Abbottsfield Rd, Claremont, TAS 7011. Reconstruction of approx 200 m of roadway, kerb & channel. Includes minor stormwater work. Click for more details...

ST VIRGIL'S COLLEGE
195 Main Rd, Austins Ferry, TAS 7011 Has St Virgil's College currently at Construction stage. Construction of a new food technology and general learning area building. Brick construction, metal roof, steel frame, aluminium windows. Click for more details...

MERTON RESERVOIR
Public Utilities (Reservoirs) project In The Glenorchy Council Area of Local Govt ownership. Design, construction & commissioning of a 4.5 ml water storage reservoir. Click for more details...

PEGGS CREEK BRIDGE REPLACEMENT
Not known, East of, Stanley, TAS 7331 Has Peggs Creek Bridge Replacement currently at Construction stage. Replace existing bridge with precast concrete box culvert. Click for more details...

MAY SHAW NURSING CENTRE REDEVELOPMENT STAGE 2A
Aged Care & Retired Developments (Nursing homes) project In The Glamorgan-Spring Bay Council Area of New Nursing Wing type. Additional nursing wing. Click for more details...

MOUNT LYELL COPPER/GOLD OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at 2 km northeast of, Queenstown, TAS 7467 of Ore Crushing Plant - Study/Install /Operate type of New development. The Mount Lyell mine utilizes the sub-level caving method for mining the ore. The ore is processed through a conventional crushing, grinding, flotation and filtration circuit to produce copper concentrates which are exported. Expressions of interest are invited from interested parties who can undertake a study to increase the ore crushing capacity to the desired level between 3.2 to 3.5 Mtpa, install the necessary plant & equipment to achieve the same and operate it for a period of 6 months to prove the new capacity. At the end of this period, the plant will be handed over to Copper Mines of Tasmania for an agreed consideration. Click for more details...

UNITED MILK TASMANIA LTD
Currently at the Construction stage In Devonport is a project estimated to be $ 500000. This project Roadway, water & fencing. Click for more details...

COPPING WASTE MANAGEMENT SYSTEM
A project in the TAS Within Sorell. Supply of all materials & construction of an access road approx 3.5 klm in length from the Arthur Highway to the Copping Waste Management Centre. Click for more details...

UNIVERSITY OF TASMANIA - GROWTH FACILITY UPGRADE
State ownership Education (Tertiary - colleges, institutes, universities) project In The Hobart Council Area for New development. Construction of four glasshouses. Steel & glass construction, concrete floors. Click for more details...

WEST PARK PENGUIN HABITAT
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Burnie Council Area of Penguin Habitat Enclosure type. Concrete block, timber & corrigated iron construction. Click for more details...

DERWENT WATERS RESIDENTIAL DEVELOPMENT
Aged Care & Retired Developments (Retirement villages) project for New development. Brick veneer & blockwork construction, tiled roof, concrete slab, aluminium windows. Click for more details...

EASTSIDE LUTHERAN COLLEGE
Currently at the Construction stage In Clarence is a project estimated to be $ 860000. This project Works include new classrooms, science laboratory and internal alterations to existing areas. Masonry construction, concrete floor and metal roof. Click for more details...

TOOSEY COMMUNITY AND EXTENDED CARE FACILITY
Aged Care & Retired Developments (Aged care facilities) project for Renovations, Refurbishments etc. development. Internal alterations to existing nursing home. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Open Cut). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - MINING CONTRACTORS COMPOUND
New project of Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project at Near, Grassy, TAS 7256. For the provision of mining contractors compound. Click for more details...

BROWNS ROAD WAREHOUSE DEVELOPMENT STAGE 1
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Kingborough Council Area of Private ownership. Construction of one showroom, two warehouses and a motor repair workshop. Concrete tilt up concrete panels, steel wall cladding, metal roof, concrete floors and roller shutter doors. Click for more details...

BROOKER INN
A project in the TAS Within Glenorchy. Internal refurbishment of existing accommodation rooms into offices. Works include partitions, plastering, carpet and printing. Click for more details...

KING ISLAND SCHEELITE PROJECT - CIVIL WORKS FOR PROCESSING PLANT BUILDING
A project in the TAS Within King Island. For the provision of civil works for the processing plant building. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

TRIABUNNA DISTRICT HIGH SCHOOL - BER PROJECT
A project in the TAS Within Glamorgan-Spring Bay. Refurbishment of existing buildings and multi purpose hall. Click for more details...

EAST LAUNCESTON PRIMARY SCHOOL - BER PROJECT
18 Mary Street, East Launceston, TAS 7250 Has East Launceston Primary School - Ber Project currently at Tenders & Building stage. Construction of a library and conversion of classrooms into a new kindergarten. Click for more details...

GLENORA DISTRICT HIGH SCHOOL - BER PROJECT
Currently at the Construction stage In Derwent Valley is a project estimated to be $ 525000. This project Extension of multi purpose hall. Click for more details...

WOODBRIDGE MARINE DISCOVERY CENTRE
Currently at the Construction stage In Kingborough is a project estimated to be $ 142000. This project Alterations and additions to the Marine Discovery Centre. Click for more details...

BREAK O'DAY COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Public Utilities (Water distribution systems, Drainage) New project at Various Locations with the Municipality of Break O'Day, St Helens, TAS 7216. This type is Civil Construction Works with Local Govt ownership. Civil construction works for Break O'Day Council up to the value of $100,000 (excluding GST) per project for a three year period, between 31 January 2012 and 31 December 2014. Tenderers may submit prices for any of the work categories and may tender for more than one category provided that the company has the experience and capacity to carry out the works. Works under this tender would involves the following *Asphalt works *Road and footpaths *Kerb and Channel *Traffic islands *Drainage works *Landscaping *Pipe Cracking *Pipe Relining *Line Marking *Day Works *Communication conduit. Click for more details...

RISDON PRISON VEGETABLE PROCESSING CENTRE
A project in the TAS Within Clarence. Internal alterations and additions to existing prison. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018 Has Fairway Rise Lifestyle Village currently at Construction stage. Construction of a multi purpose centre. Brick veneer, metal roof, concrete floors. Click for more details...

TEN MILE TRACK BRIDGE NO 1580
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Design and construction of a new single span concrete bridge including demolition of existing timber bridge. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

WESTBURY ROAD UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Meander Valley Council Area for New development. Construction of four units & associated drainage works at 304-08 & 320 Westbury Road. Includes demolition of existing dwelling. Click for more details...

BASS HIGHWAY DUPLICATION TASMANIA
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. The proposed project is to duplicate the Bass Highway between Birralee and Exton along 3.2 km. Currently a single carriageway section linking two sections of dual carriageway. This will create a consistent dual carriageway. New wire rope roadside safety barriers. Extend stock underpass - boundary setbacks within 50 m of Category 1 road within 50 m of watercourse. Vegetation removal. Click for more details...

BROOKSTON DRIVE TOWNHOUSES
A project in the TAS Within Clarence. Construction of 2 double storey townhouses. Click for more details...

HOBART INTERNATIONAL AIRPORT NORTHERN END UPGRADE FRONT OF HOUSE STAGE 2
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Clarence Council Area of Federal ownership. Car park and civil works for Hobart International Airport. Click for more details...

DELORAINE SEWERAGE AND STORMWATER DRAINAGE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Meander Valley Council Area for New development. Construction of new sewerage and stormwater drainage infrastructure to service industrial land at East Goderich Street, Deloraine. Click for more details...

PROSPECT HIGH SCHOOL
30-32 Ralph St, Prospect, TAS 7250 Has Prospect High School currently at Construction stage. Modernisation of existing school buildings and construction of new hospitality facilities. Click for more details...

LEWIS STREET VILLA UNITS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 27 Lewis St, Longford, TAS 7301. Construction of 4 single villa units. To comprise 3 bedrooms. Shared driveway with 5 single space car ports and 1 visitor parking space. Face brickwork, timber cladding & steel sheet roofing. Click for more details...

MEANDER VALLEY COUNCIL ANNUAL SUPPLY CONTRACT
Currently at the Construction stage In Meander Valley is a project estimated to be $ 900000. This project Construction of Kerb and Channel throughout various locations within the municipality of Meander Valley. Click for more details...

BEACH ROAD RETAINING WALL REPLACEMENT - STAGE 1
Currently at the Construction stage In West Tamar is a project estimated to be $ 250000. This project Replacement of retaining wall, Gravelly Beach Road Stage 1. Works include: Compulsory Option 'A' - Construction of 83.5x1.2m Mass Concrete Footing 300mm thick - Supply & placement of Bridge Pro `Verti-Block' Retaining Wall System (269 Units) - Supply approx 96m3 of N25 Concrete infill & partial backfill Option 'B' - Construction of 82.2x1.2m Mass Concrete Footing 300mm thick - Supply & placement of Rocla `MassBloc' Retaining Wall (179 Units) - Supply approx 110m3 of No Fines Concrete backfill General - Removal & disposal of existing concrete/rock/timber retaining wall (Approx 82m) - Construction of 185m2 of Asphalt Footpath, @ 2.0m wide - Supply & install 82.5m of Pedestrian fence - General reinstatement Click for more details...

RHEBAN ROAD RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project In The Glamorgan-Spring Bay Council Area of Residential Subdivision (7) Lots type. Residential subdivision of 7 lots and associated civil works. Click for more details...

PERTH STRUCTURE PLAN
Local Govt ownership Retail (Shops, shopping centres & arcades, supermarkets) project In The Northern Midlands Council Area for New development. Council is seeking proposals from suitable consultants to undertake the Perth Structure Plan Project. The primary purpose of the project is to establish a preferred pattern for the staged residential development and urban consolidation of Perth with the impending new alignment of the Midland Highway. Click for more details...

LYELL HIGHWAY ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Lyell Hwy south of Ouse Rd, Ouse, TAS 7140 of Roadworks - Reinstatement type of New development. Construction of road reinstatement on the Lyell Highway south of Ouse Road. Works to include the reinstatement of approximately 2.5km of the Lyell Highway with a combination of overlays, inlays & full depth reconstruction. Click for more details...

HOBART CITY COUNCIL SOLAR SYSTEMS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) New project at Council Buildings within, Hobart, TAS 7000. This type is Council Buildings Solar Systems with Local Govt ownership. Solar Systems - Supply & Installation to Council Buildings. Click for more details...

SCOTTSDALE HIGH SCHOOL TRADE TRAINING CENTRE
Trade Training Centre - Addn project at 20 Coplestone St, Scottsdale, TAS 7260 in the Education (Schools - primary, secondary (up to Yr 12)). Addition to the existing Scottsdale High School Trade Training Centre building to house a commercial teaching kitchen. Click for more details...

MORNINGTON ROAD WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Clarence Council Area of Private ownership. Construction of 600sq m warehouse to include 2 units with offices. Materials to include precast concrete panel, roof cladding, steel framed awning & steel roller doors. Car parking for 8 vehicles. Associated landscaping. Click for more details...

MACQUARIE WHARF NO. 1 HOTEL
Civil Engineering (Docks & piers, wharves, boat ramps) project at 18 Hunter St, Hobart, TAS 7000 of Wharf type of New development. Construction of wharf to include external decks & shade structures. Materials to include timber deck, galvanised steel pipe handrail, frameless glazed screens fixed to stainless steel posts, timber board stairs & aluminium stair nosings. Associated landscaping. Click for more details...

WINDSOR PARK RIVERSIDE STGE 3
Currently at the Construction stage In West Tamar is a project estimated to be $ 300000. This project Carpark Construction at Windsor Park, Riverside (Stage 3). Scope of works includes Construction of approximately 1600 sqm of Car-park. 300m of Concrete Kerb `type KC & BK'. 415 sqm of Concrete Footpath. Two Coat Spray Seal (Approx 1620m2). Supply & installation of 17m of DN300 `Profiled Wall Polyethylene' Stormwater pipe, two (2) Side Entry Pits & one (1) DN1050 benched Manhole. Click for more details...

WELLS PARADE FOOTPATH RECONSTRUCTION
Wells Parade Footpath Reconstruction is currently at the Construction stage, valued at about $ 250000 it is Construction of footpath reconstruction along Wells Parade, Blackmans Bay between Hazell & Carinya Streets. Works to include supply of all materials, plant & labour to construction approximately 120m of new concrete footpath, together with pedestrian & driveway crossovers & other associated minor civil works & general site remediation upon completion. Click for more details...

GORDONS HILL ROAD ROADWORKS
A project in the TAS Within Clarence. Works to include the upgrade of Gordons Hill Road to comprise of kerb & gutter & bus stop relocation. Associated civil works. Click for more details...

ELINGA STREET DRAINAGE
Elinga St, Howrah, TAS 7018 Has Elinga Street Drainage currently at Construction stage. Works to include the upgrade of the Elinga Street Stormwater Main. Associated civil works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect