State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums Projects in NT®ion=⊂=1420 in region


COMPREHENSIVE MAINTENANCE CONTRACT
Renovations, Refurbishments etc. project of Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project at Various locations, ., NT 8999. Spotless, a whole Australian owned multi-service company currently holds the Comprehensive maintenance Contract in the Northern Territory & Kimberley Region. Spotless manage both planned & unplanned works for the Department of Defence. An invitation to tender is offered to suitably qualified subcontractors to join a Panel to provide general building maintenance services & to pre-quality for Defence projects. Click for more details...

KATHERINE HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Katherine Hospital Kitchen, Katherine, NT 0850 for Supply & Install. Supply & install airconditioning system with insulating ceiling panels to kitchen area of the Katherine Hospital. Click for more details...

BATCHELOR & LITCHFIELD NATIONAL PARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 750000. This project Various repairs & painting to various assets at Batchelor & Litchfield Park. Click for more details...

TIMBER CREEK PROJECT
Timber Creek Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 10000000 it is In 2004 kimberlite had been put through an on-site rented Dense Media Separation plant and the heavy mineral concentrate produced shipped to the Company's diamond recovery facility in South Africa for final diamond recovery. Rehabilitation of the areas where previous bulk sampling had been undertaken is planned. Click for more details...

ST PHILIP'S COLLEGE
Private ownership Education (Tertiary - colleges, institutes, universities) project In The Alice Springs Town Council Area for New development. To be constructed above music, drama, general learning facilities. Block-work & steel construction, metal deck roof, aluminium framed windows, airconditioning. Click for more details...

AYERS ROCK RESORT - SAILS IN THE DESERT HOTEL
Ayers Rock Resort - Sails In The Desert Hotel is currently at the Construction stage, valued at about $ 1000000 it is Specialised work including joinery finishes. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Road - Upgrading type. Reformation & regravelling. Click for more details...

GARRAK-JARRU/JABIRU/MITATJA REGIONS
A project in the NT Within Unincorporated North. Installation & repairs of solar powered bore pumps, construction of pipelines, & erection of tanks & stands. Click for more details...

PINE CREEK GEOSYNCLINE/ MT TYMN
Resource - Gold New project In The Katherine Town Council Area. A recent comprehensive drilling programme demonstrated that the resource previously outlined was less continuous than the earlier drilling had indicated & cannot be readily traced from drill section to drill section. A new geological resource of 1.1 million tonnes @ 1.4 gpt has been calculated for the Central Hill area & the South Hill area has shown a calculated resource of 150 000 tonnes @ 2.0 gpt. Click for more details...

WALER BARRACKS
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Waler Barracks, Palmerston, NT 0830 for New. Extension of trunk roads & engineering services (water, power, storm water, communications & sewer). Click for more details...

FAIRWAY WATERS
A project in the NT Within Palmerston Town. 1n excess of 100 ha. Approx 1,100 lots - 200 lots to be developed per year over 6 years as residential blocks & portion of land will be developed as 9 hole extension of golf course. Approx 40 per cent of developed lots will be purchased by Defence Housing, remainder to be sold on open market. Defence Housing proposes to construct 740 dwellings for Defence personnel & their families. The dwelling mix will be 20 per cent units, 20 per cent courtyard homes & the remaining 60 per cent traditional homes. Overall development likely to include 1600 dwellings. Block, brick, tile & some metal cladding. Golf course to include club rooms, community facilities including creche & preschool facilities. Click for more details...

LANDSCAPING/IRRIGATION REHABILITATION - DARWIN REGION
Currently at the Tenders & Building stage In Darwin City is a project estimated to be $ 5286000. This project Performance based period contract for landscape & irrigation repairs & maintenance of Government Road Reserve Area "A". Click for more details...

NGUIU-BATHURST ISLAND HOUSING
Nguiu Aboriginal Community, Bathurst Island, NT 0822 Has Nguiu-Bathurst Island Housing currently at Construction stage. Comprising roadworks, stormwater drainage & power services to 7 new staff housing lots. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

DUNDEE BEACH SCHOOL
Currently at the Construction stage In Darwin City is a project estimated to be $ 50000. This project Repairs & maintenance to school buildings including internal/external painting, replacement floor coverings & decking timber. Removal & repair all shade structure membrane within Dundee Beach School. Click for more details...

WALLACE ROCKHOLE COMMUNITY GOVERNMENT COUNCIL
Currently at the Tenders & Building stage In Alice Springs Town is a project estimated to be $ 500000. This project General housing & building maintenance, plumbing repairs & septic tank maintenance, general electrical installation & maintenance, airconditioner servicing. Click for more details...

ANMATJERE HOUSING
Residential (Units, apartments, flats, townhouses, villas) project at Ti-Tree & surrounding communities Region of, Alice Springs, NT 0870 for Renovations, Refurbishments etc.. Review existing housing stock manged by Anmatjere Council to determine housing needs at Pmara Jutunta, Nturiya, Alyuen & Yanginj Communities. Click for more details...

LEANYER RECREATION PARK KIOSK FORECOURT COVERED AREA
A project in the NT Within Darwin City. Modifications to kiosk forecourt covered area. Click for more details...

POWER & WATER
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project at Include Palmerston, Cox Peninsula, Adelaide River, Batchelor &, Darwin, NT 0800 for Renovations, Refurbishments etc.. Manual metal arc welding to electrical infrastructure including power poles, steps, cross-arms & minor metal fabrication. Work to be undertaken in connection with Power & Water personnel engaged on maintenance & upgrade of overhead electrical reticulation system. Click for more details...

ALICE SPRINGS CULTURAL PRECINCT KITCHEN CELLAR
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) Renovations, Refurbishments etc. project at Cultural Precinct, Larapinta Dr, Alice Springs, NT 0870. This type is Screens/Water Proofing Kitchen Cellar/Associated Works For Cultural Precinct with State ownership. Install steel screens, water proofing kitchen cellar & associated works. Click for more details...

TI TREE RESEARCH STATION
Renovations, Refurbishments etc. project of Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project at Ti Tree Research Station, 180 km approx north of, Alice Springs, NT 0870. Renovate bathroom & laundry. Click for more details...

ALICE SPRINGS HOSPITAL PROFESSIONAL OFFICERS QUARTERS BATHROOM
Renovations, Refurbishments etc. project of Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870. Refurbishment of Professional Officers Quarters Block 1 bathroom. Click for more details...

WONNGABILLA STREET - UPGRADE
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area for New development. Upgrade to seal road btwn CH: 0 km & CH: 0.37 km. Click for more details...

TENNANT CREEK POWER STATION BUNDING/POND
Civil Engineering (Dams) project In The Barkly Shire Council Area of Bulk Fuel Bunding/Oil/Water Seperator Pond - Design/Construct type. Design & construct bulk fuel bunding & oil/water separator pond. Click for more details...

BATCHELOR SUBSTATION PROJECT - INDOOR SWITCHING ROOM
Currently at the Construction stage In Darwin City is a project estimated to be $ 719000. This project Design, construction, testing and commissioning of a 22 KV Transportable Indoor Switching Room. Click for more details...

BORROLOOLA & BARKLY AREAS - AIR CONDITIONING SYSTEMS
State ownership Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Barkly Shire Council Area for Renovations, Refurbishments etc. development. Provision of air conditioning systems within Borroloola & Barkly areas for 12 month period. Click for more details...

COSMO DEEPS UNDERGROUND GOLD PROJECT - PIT DEWATERING
40 km south east of, Adelaide River, NT 0846 Has Cosmo Deeps Underground Gold Project - Pit Dewatering currently at Construction stage. Detailed design is scheduled for completion late March 2008. The Company will need to hire pumps for the pit dewatering. Click for more details...

EAST ARM WHARF PORT FACILITIES CONSULTANCY
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at ., Darwin, NT 0800 for New. Works comprise: Filling of a bulk minerals stockpile area to the North East of the existing East Arm Wharf quay line. Filling & Armouring of an offshore supply base area. Filling a hardstand area for use by Defence. New rail spur providing access to the new stockpile area. New blocks (to be filled by the developer)for LDC extension of Muramats Road. Extension of the East Arm Wharf Northwest (two new berths). Dredging associated with all the above = dredged spoil to be piped or barged to onshore disposal ponds or disposed offshore at a nominated spoil site. Construction of an area to the North East of the existing wharf quay line for temporary stockpiling of fill material (behind a sand bund). Click for more details...

CHARLES DARWIN UNIVERSITY 11 ORANGE BUILDING
Education (Tertiary - colleges, institutes, universities) project for Renovations, Refurbishments etc. development. First Floor of Building 11 Orange refurbishment Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

WEST ARNHEM COLLEGE TRADE TRAINING CENTRE (JABIRU AREA SCHOOL)
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 40 Waterhouse Rd (Lot 00895), Jabiru, NT 0866. Construction of engineering facility. To include: 3 bay workshop, covered open bay, amenities, classroom & self contained visiting officers quarters. Portal frame, masonry blockwork. Associated landscaping. Click for more details...

TI TREE ROADHOUSE TRUCK STOP FACILITIES UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Stuart Hwy (approx CH 1301.3km), Ti Tree, NT 0872 for New. Upgrade existing truck stop facilities at Ti Tree Roadhouse on Stuart Highway. To include drainage, underground stormwater drain, road signage, street lighting, landscaping & earthworks. Click for more details...

TERRACE GARDENS AGED CARE FACILITY EXTENSION
Aged Care & Retired Developments (Nursing homes) project for Addition development. Extensions to existing wings at Terrace Gardens Residential Aged Care Centre. To include 32 rooms to provide 88 beds. Demolition of 2 existing staff buildings. Extensions to Jasmine House to include 12 additional single rooms with ensuites, nurse station, lounge/dining area & service facilities. Extensions to Gardenia House to include 16 additional single rooms with ensuites, nurse station, lounge/dining area & service facilities. Covered walkways & stairs to connect Gardenia House & Jasmine House. Construction of 4 stand alone buildings with 6 independent living rooms. Extensions to existing common room, laundry & kitchen. Construction of staff amenities & outdoor area. Internal upgrade to administration building & new entrance canopy. Replacement of perimeter fencing with 1.8m - 2m high tubular fencing. Construction of new car park for 28 vehicles & associated roundabout. Associated landscaping. Click for more details...

TIO STADIUM MICHAEL LONG ACCOMMODATION FACILITY
A project in the NT Within Darwin City. Construction of short-term accommodation facilities. Accommodation consists of 8 bedrooms & 32 beds, dorm style accommodation supported by kitchen facilities. Concrete slab, lightweight & metal wall cladding & metal roof. Associated landscaping. Click for more details...

DEPARTMENT OF DEFENCE SHOAL BAY RECEIVING STATION FACILITIES UPGRADE
Rapid Creek Rd, Alawa, NT 0810 Has Department Of Defence Shoal Bay Receiving Station Facilities Upgrade currently at Construction stage. Upgrade works to the Shoal Bay receiving station to include electrical, fire & cooling systems upgrade. Replacement of underground HV power lines, transformer & internal electrical switch services. Upgrade works to cooling system, improvements to fire protection capabilities & removal of UPS. Replacement of elevated water tank & air conditioning plant. Click for more details...

THE HEIGHTS RESIDENTIAL SUBDIVISION STAGE 10
Civil Engineering (Residential Subdivision) project at Kooyonga Pde (Part Lots 11821 & 12402 Roystonea Ave), Durack, NT 0830 for New. Reconfiguration into 39 lots (250sq m - 800sq m). Construction of new roads. Click for more details...

TARAKAN COURT APARTMENTS
Apartments (31) - 4 Storey New project In The Palmerston Town Council Area. Construction of 30 x 3 bedroom & 1 x 4 bedroom units in 4 x 1 & 4 x 2 storey buildings. Communal area, storage, swimming pool & lift. Associated car parking & landscaping. Click for more details...

PALMERSTON REGIONAL HOSPITAL LIFTS
Medical (Hospitals & associated buildings, mortuaries) New project at 213 Taylor Rd (Section 4231 Hundred of Bagot S901068), Holtze, NT 0829. This type is Lifts - For Hospital with State ownership. Installation of lifts at Palmerston Regional Hospital. To include the supply & installation of lifts. Allowance for builders lift fitout during construction. Final & trade cleans. Click for more details...

GARDENS ROAD CATTLE GRID
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Gardens Rd, Alice Springs, NT 0870. This type is Cattle Grid with State ownership. Construction of a cattle grid on the Gardens Road, located 50km North of Alice Springs. To include saw cutting of existing pavement & excavation of materials. Installation of steel reinforcement. Supply & pour concrete apron & headwalls. Installation of concrete grid panels. Reinstate fencing, strainers, side gate & signage. Provision of traffic control. Click for more details...

GROOTE EYLANDT REMOTE COMMUNITY HOUSING DUPLEX
Residential (Units, apartments, flats, townhouses, villas) New project at ., Groote Eylandt, NT 0822. This type is Duplex with State ownership. Design & construction of a 2 x 3 bedroom remote community housing duplex on lots 192 & 193 at Groote Island. To include the demolition of existing dwellings. Click for more details...

ROYAL DARWIN HOSPITAL COOLING TOWER FAN REPLACEMENT
Medical (Hospitals & associated buildings, mortuaries) project In The Darwin City Council Area of State ownership. Replacement of the fan assembly at the Building 10 cooling tower 1 at the Royal Darwin Hospital, Tiwi. To include the removal & decommissioning of existing fan assembly, redundant ancillaries & control components. Supply & installation of new fan assembly to include ancillaries & control components. Replacement of existing access platform. Click for more details...

KATHERINE SEWERAGE PLUMBING & SEWERAGE MAINTENANCE & REPAIRS
Public Utilities (Water distribution systems, Drainage) project at Located Within, Katherine, NT 0850 of Sewerage & Plumbing - Maintenance & Repairs type of New development. Repairs & maintenance works to general plumbing, drainage, roofing, sewerage, sewerage treatment plants, water filters, gas fittings & valves located within the Katherine Region. Click for more details...

NORTHERN GAS PIPELINE EARLY WORKS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Design Consultancy - Pipeline - Gas - Early Works type. Design consultancy for early works for the Northern Gas Pipeline at the Warrego Compressor Station & Mica Creek. To include fencing, bulk earthworks & hardstand area. Provision of underground services. Underground drainage, storm water drainage & run-off control. Site access from adjacent public roads. Click for more details...

ILPEYE ILPEYE SUBDIVISION OPEN DRAINS
Public Utilities (Water distribution systems, Drainage) project In The Alice Springs Town Council Area of State ownership. Construction of 3 open drains at the Ilpeye Ilpeye subdvision. To include excavation, compaction, final trimming & shaping. Supply & installation of grouted stone pitching & reno mattresses. Construction of 200mm thick concrete causeway. Click for more details...

TIWI ISLAND OFFICE & AMENITIES
Social (Amenities, Dressing rooms) project In The Offshore Council Area of Private ownership. Construction of an office & amenities building approximately 50sq m. Click for more details...

WEST ARNHEM SHIRE
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area for Addition development. Alterations & additions to an existing warehouse to comprise addition of office & caretaker's residence, relocation of entrance & installation of new stairs. Click for more details...

WURRUMIYANGA GOVERNMENT EMPLOYEE HOUSING
Duplex project at Lot 746, Wurrumiyanga, Darwin, NT 0800 in the Residential (Units, apartments, flats, townhouses, villas). Construction of a 1 x 2 bedroom duplex residence on Lot 746 in Wurrumiyanga. Fencing & gates. Concrete driveway, patio, paths & mowing strips. Landscaping. Connection of external services including electrical, communications, water & sewerage disposal. Internal services including electrical, air conditioning, mechanical ventilation, water & sewerage disposal. Design & construction of a proprietary steel garden shed inclusive of concrete slab & power connection. Click for more details...

ROOM TO BREATHE
Early Works Program project at ., Gapuwiyak, NT 0880 In The Council Area Of East Arnhem Shire of State. Room to Breathe early works program for Gapuwiyak. Creation of new living spaces in existing homes Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX
Public Utilities (Water distribution systems, Drainage) project at 171 Hidden Valley Rd, Berrimah, NT 0828 for New. Construction of package 4- (Mud Racing Track) for a new water main for Hidden Valley Motor Sports Complex. Scope of work consists of: new water main, 250 diameter (ND) HDPE; new irrigation points (5) and house connections (5) as directed; new internal meter assembly (Non-PWC) Click for more details...

WILLOWRA ROAD
Willowra Rd, Alice Springs, NT 0870 Has Willowra Road currently at Construction stage. Reform & gravel resheet various sections at Willowra Rd. Scope of work includes: sandclay lift, reform & gravel resheet various sections, & reinstate drainage. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect