State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Industrial buildings Projects in QLD®ion=⊂=2170 in region


WOODBECK STREET MATURE AGED UNITS
Aged Care & Retired Developments (Aged units, seniors units) project at Cnr Woodbeck St & Pine Ave ( Lot 31 RP 800473), Beenleigh, QLD 4207 of Aged Units (16)/Community Centre - Stage 3 type of New development. 16 Single bed units. Construction period 20 weeks approx. Click for more details...

DALRYMPLE BAY COAL TERMINAL - EXPANSION
Private ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Mackay Regional Council Area for New development. Expansions to 60 million tonnes per annum. Click for more details...

STAR TRACK EXPRESS - MULTIGROUP DISTRIBUTION SERVICES
Lot 12 Ebbern St, Darra, QLD 4076 Has Star Track Express - Multigroup Distribution Services currently at Construction stage. 6,000 sqm 6 bay warehouse with 150 sqm office & associated hard stand area. Concrete slab, Concrete tilt-up panels, structural steel portal frame, Roll-up doors, metal roof. Associated landscaping. Click for more details...

STOCKLAND EARLVILLE CINEMAS
Currently at the Construction stage In Cairns Regional is a project estimated to be $ 4500000. This project Concrete frame building. To be airconditioned. Area of land 11.13 ha. Click for more details...

HIBISCUS RETIREMENT VILLAGE
Civil Works project at 89 (Lot 999 & Lot 298) Darragh St 54 Barrett St Qulin St SP 106638 RP 905633, Bracken Ridge, QLD 4017 In The Council Area Of Brisbane City of Private. To include internal roadworks, stormwater, drainage, water sewerage reticulation. Click for more details...

PACIFIC HIGHWAY (REEDY CREEK TO TUGUN)
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Gold Coast City Council Area of State ownership. Duplication of 9.2 km approx existing 2 lanes; 4 lane extension, 1.7 km approx long of Southport-Beenleigh Rd between Reedy Creek Rd & Pacific Hwy including grade separated interchange near existing quarries; grade separated interchange at junction of Pacific Hwy & Southport-Burleigh Rd; noise amelioration measures, landscaping & lighting. Click for more details...

FLINDERS PARADE UNITS
Units (22) - 2 Storey project at 1-3 Flinders Pde (Oaka Ln & Goondoon St), Gladstone, QLD 4680 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 22 x 2 bedroom units each with ensuites & balconies. Concrete block, select lightweight cladding, metal roof. Associated parking & landscaping. Click for more details...


Service Station/Shop/Carwash project at 2494 Logan Rd, Eight Mile Plains, QLD 4113 In The Council Area Of Brisbane City of Private. Rezoned from Future Urban to Particular Development. Automatic & manual car wash. Concrete , glass & metal roof. Area of land 5,069 sq m. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project In The Gold Coast City Council Area of Private ownership. Brick veneer & concrete tile roof. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project In The Gold Coast City Council Area of Private ownership. Federation style. Face brick & tile roof. Area of land 1,366 sq m. Click for more details...

WINSTON GLADES
Subdivision - Residential - Stage 18(B) project at Ash St, Flinders View, QLD 4305 In The Council Area Of Ipswich City of Private. Roadworks, stormwater drainage, water & sewerage reticulation for 20 lots. Click for more details...

MOORVALE COAL PROJECT
Mining Contract project at 10 km south of Copabella mine Bowen Basin via, Nebo, QLD 4742 In The Council Area Of Isaac Regional of Private. Life of mine contract. (Approximately 10 years based on current knowledge of the resource). Click for more details...

VICTORY COLLEGE
Education (Schools - primary, secondary (up to Yr 12)) New project at 173-175 (Lot 2) Old Maryborough Rd, Gympie, QLD 4570. This type is Classroom/Amenities - Stage 2 with Private ownership. Construction of a classroom and additional amenities. Suspended concrete slab, concrete block, steel frame, timber truss roof. Click for more details...

BLANCK STREET WAREHOUSE
Warehouse - 2 Storey project at 21 (Lot 22) Blanck St SP 169236, Ormeau, QLD 4208 In The Council Area Of Gold Coast City of Private. Construction of single storey industrial building with 2 warehouse tenancies. Reinforced concrete floor, pre-cast concrete panels, metal roller door, aluminium framed glazing, steel framed metal roof. Associated parking & landscaping. Click for more details...

BRUCE HIGHWAY (MACKAY-PROSERPINE)
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 7695000. This project The provision of pavement rehabilitation, realignment, overtaking lane and new rail overpass bridge at The Leap. Click for more details...

PINE WATER SEWER AND MANHOLE REHABILITATION
Public Utilities (Treatment plants, Sewerage reticulation) project for New development. Design and installation of sewer pipeline and manhole rehabilitation systems. Works to include CCTV inspections, cleaning and installation of suitable pipeline and manhole restoration system. Click for more details...

PARKSIDE BUSINESS PRECINCT SPRINGFIELD TOWER OFFICE BUILDING
Office Building - 9 Storey project at Sinnathamby Blvd, Springfield, QLD 4300 in the Commercial Premises (Offices). Construction of 9 level office building. To include 3 banking tenancies on ground floor (198 sqm, 325 sq m & 275 sq m each) , cafe & lobby. Public plaza. each floor to provide 700-900 sq m of floor space. Pre-cast concrete, steel, glass. 3 levels of basement parking. Landscaping. Click for more details...

DEPARTMENT OF MAIN ROADS CLONCURRY
Bitumen Surfacing New project In The Cloncurry Shire Council Area. Preparation of existing road surface for placement of slurry material. Supply, hauling, spreading & placement of all materials associatd with the process. Click for more details...

OXLEY CENTRAL COMMERCIAL CENTRE
Private ownership Hospitality (Restaurants, Canteens) project In The Brisbane City Council Area for New development. Demolition of existing shopping centre & construction of new integrated commercial centre with supermarket, specialty retail stores & cafes on ground floor & office space above. Pre-cast concrete panels, curtain glass wall, powdercoated horizontal aluminium shading devices, metal roof. 2 levels of parking. Associated landscaping. Click for more details...

PENINSULA DEVELOPMENT ROAD RESEAL (TENDER NO PEND/768)
Reseal project at Peninsula Development Rd from Spring Ck to The Springs Ck Via, Mareeba, QLD 4880 In The Council Area Of Tablelands Regional of State. Class 170 Reseal for a 15250m section. The total area of works is approximately 129625sqm. Click for more details...

BRISBANE ROAD SERVICE STATION & COFFEE SHOP
A project in the QLD Within Ipswich City. Construction of commercial building with 2 tenancies. Tenancy 1 - 24 hour Shell service station with Coles Express (200sq m) & central canopy over 8 fuel dispensers. Tenancy 2 - cafe or fast food with drive thru facility. Painted concrete precast panels, metal sheeting panels, acm fascia panels, painted column cladding, painted fibre cement, painted fibre cement shopfront awning, colour back glass, fixed ladder with security screen/lock & insulated metal panel roofing. 2750sq m concrete hardstand. At grade car parking for 28 vehicles. 532sq m landscaping. Click for more details...

DEPARTMENT OF PROJECT SERVICES APARTMENTS
New project of Residential (Units, apartments, flats, townhouses, villas) project at Chermside, Stafford, QLD 4053. For the construction of 11 units at Chermside. Click for more details...

GRENORIE DRIVE CABINS
Residential (Units, apartments, flats, townhouses, villas) project In The Toowoomba Regional Council Area of Private ownership. Constuction of holiday cabin development to include 4 cabins each 137.5 sq m. Associated parking & landscaping. Click for more details...

PINE MOUNTAIN ROAD INDUSTRIAL DEVELOPMENT
217 Pine Mountain Rd (Part Lot 2 RP 135220), Brassall, QLD 4305 Has Pine Mountain Road Industrial Development currently at Construction stage. Construction of additional industrial building on site with 4 x 480sq m warehouse units. Reinforced concrete floor, steel frame, concrete panels, metal cladding, metal roller door, steel framed metal roof. Associated parking & landscaping. Click for more details...

TITANS SPORTS TRAINING FACILITY
Sports Complex/Offices New project In The Gold Coast City Council Area. Construction of a sports training facility including gymnasium, amenities, 1/2 size olympic pool, thermal pool, retail merchandise area, & 5 levels of offices. Click for more details...

WOODRIDGE STATE SCHOOL MULTI PURPOSE HALL & RESOURCE CENTRE BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) New project at cnr Wembley Rd & Railway Pde, Logan Central, QLD 4114. This type is Multi Purpose Hall/Resource Centre with State ownership. Construction of new multi purpose hall & resource centre. Click for more details...

MOTHER OF GOOD COUNSEL PRIMARY SCHOOL LIBRARY CLASSROOMS & TUCKSHOP BER/BGA PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project In The Cairns Regional Council Area of Private ownership. Construction of new library, new classroom, & new tuckshop & extension & refurbishment to existing administration building Click for more details...

KIN KIN RANGE UPGRADE
Roadworks - Upgrade project at Kin Kin Range Between Pinbarren &, Kin Kin, QLD 4571 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Installation of 1200mm culvert by jacking methods & supply of jacking bands & timber packing. Click for more details...

LITTLE CREEK ESTATE SUBDIVISION STAGES 12-14
Civil Engineering (Residential Subdivision) project for New development. Reconfiguration into 45 lots. Stage 12 15 lots. Stage 13 15 lots. Stage 14 15 lots. Click for more details...

CHARLTON UNMANNED FUEL STOP
Service Station project at 10797 Warrego Hwy (Lot 206 AG3678), Charlton, QLD 4350 In The Council Area Of Toowoomba Regional of Private. Retention of existing dwelling for use as office. Construction of unmanned refueling station with 4 fuel dispensers under central canopy. Fuel storage tanks. 2470sq m concrete hardstand area. 4643sq m gravel hardstand area. Click for more details...

GLENVIEW ESTATE RESIDENTIAL SUBDIVISION STAGES 3-5
Residential Subdivision (71) Lots - Stages 3-5 New project In The Toowoomba Regional Council Area. Reconfiguration into 71 lots in 3 stages. Stage 3 - 30 lots. Stage 4 - 26 lots. Stage 5 - 15 lots. Construction of new road. Click for more details...

JIMBOOMBA PARK REDEVELOPMENT
Currently at the Construction stage In Logan City is a project estimated to be $ 3743000. This project Jimboomba Park redevelopment. To include construction of sporting facilities for pony club, netball, rugby league & touch football fields at Jimboomba Park. Improved park facilities, playground equipment & skate park facilities. Associated civil works. Click for more details...

CAIRNS AQUARIUM
Currently at the Construction stage In Cairns Regional is a project estimated to be $ 50000000. This project Construction of 3 level Aquarium. To include 25m of acrylic underwater viewing tunnels, oceanarium, amphitheater, viewing areas, waterfall exhibit, retail store, reflection pool 69 tanks, 525sqm 200 seat aquarium themed restaurant & function centre, kiosk & kiosk seating. To include glass panels, 18m x 11.5m blue glass tiled atrium, white polished precast concrete with pattern, feature blue performance glazing, white aluminium louvres, white rendered finish, white rendered blockwork fence, glazed roof, sand blasted glass sunscreen. Lifts. Associated landscaping. Click for more details...

ENDEAVOUR COLLEGE CLASSROOM BLOCK & LIBRARY
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 12 Charles St, 38 Power St (Lot 27 C 17945), Cooktown, QLD 4871. Construction of new 2 storey classroom block with 2 classrooms, library & amenities block. To include covered ball court & walkways. Additional parking for 22 cars. Associated landscaping. Click for more details...

GLENALVA TERRACE UNITS
A project in the QLD Within Brisbane City. Removal/demolition of existing dwelling. Construction of a 3 storey residential building to include 16 x 2 bedroom units. Concrete slab, timber screen fencing, sun hoods, cover battens, rendered & painted block wall, aluminium framed glass doors & windows & metal roof sheeting. Car parking for 20 cars. Associated landscaping. Click for more details...

ARCARE TAIGUM AGED CARE FACILITY
Aged Care & Retired Developments (Aged care facilities) project In The Brisbane City Council Area of Private ownership. Construction of 2 storey 92 bed aged care facility. To include lounge & activity areas, dining rooms, treatment & medical rooms, wellness centre with physiotherapy centre & hair salon, administration & staff training area, cafe & theatrette. Concrete block, board cladding, aluminium framed glazing, feature cladding, glass balustrades, stainless steel wire trellis, metal roof. Surface car parking for 42 vehicles. Associated landscaping. Click for more details...

BRISBANE RACING CLUB EAGLE FARM INFIELD PART 1 REDEVELOPMENT
Sports (Race track (other)) project In The Brisbane City Council Area of Private ownership. Construction of stables for the Brisbane Racing Club. Works to include construction of stables, tie up stalls, feed storage areas, offices, washdown rooms, horse walkers & sand roll areas. Steel Louvers, precast concrete walls, composite roof sheeting, steel columns, steel gates. Associated works including bitumen & landscaping. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at ., Curtis Island, QLD 4680 of Septic Pump Out type of New development. For the provision of Septic Pump Out Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

HILLCREST CHRISTIAN COLLEGE EARLY LEARNING CENTRE & ADMINISTRATION BUILDING
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of new 2 storey Early Years classrooms & administration building. To include extension to car park & associated services. Click for more details...

ST MARYS CATHOLIC COLLEGE BLOCK A & B REFURBISHMENT
St Marys Catholic College Block A & B Refurbishment is currently at the Construction stage, valued at about $ 350000 it is Refurbishment of existing staff room & general learning areas in Blocks A & B at St Mary's Catholic College, Cairns. Click for more details...

BRISBANE AIRPORT CYCLEWAY & SHARED PATHWAYS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Lomandra Dr & Viola Pl, Brisbane Airport, QLD 4007. Construction of new 550m cycle path linking Lomandra Drive to Viola Place & new 300m shared pathway for cyclists & pedestrians linking BNE service station with the international terminal roundabout. Click for more details...

ROWLAND COURT RESERVOIR
Reservoir New project In The Toowoomba Regional Council Area. Construction of 3 x 100kl capacity concrete reservoirs. To include supply & install access hatches, ladder, railings, bridges, davit base & accessories coupled with level control valve. Supply & construction of permanent pipework inclusive of all bends, concrete support slabs, thrust blocks, supports, pipe penetrations, valves & fittings. Associated earthworks. Click for more details...

BOUNTY BOULEVARD AURORA BOULEVARD & FIDLER STREET INTERSECTION UPGRADE
A project in the QLD Within Moreton Bay Regional. Road widening & alteration of the existing median on the southern (Bounty Boulevard) leg of the intersection, line marking to reallocate lanes & the installation of bicycle storage areas on all legs. Works to include gravel pavement widening, asphalt surfacing, Installation of kerb & channel, concrete pathway, kerb ramps, traffic signal modifications, storm water drainage & line marking. Associated landscaping. Click for more details...

PUBLIC TRUST OFFICE CHILLER & PLANT DECK REPLACEMENT
Commercial Premises (Offices) project at 438 Flinders St, Townsville, QLD 4810 of Office - Plant Deck/Air Conditioning type of New development. Townsville Public Trust office chiller & plant deck replacement. To include the demolition of the existing plant deck, disconnection & removal of the existing chillers & supply & installation of new plant deck & the new chillers. Click for more details...

ALDI MORAYFIELD
Retail (Shops, shopping centres & arcades, supermarkets) project at 24 Dickson Rd, Morayfield, QLD 4506 of Supermarket - Refurb & Extn type of Renovations, Refurbishments etc. development. Refurbishment & extension of existing Aldi store at Morayfield. To include extension of cashier benches & packing benches. Installation of main distribution board, electrical meter board & trolley bays. Signage. Stainless steel columns, plasterboard, structural steel & cement. Associated civil works. Click for more details...

BUNDABERG, FRASER COAST, GYMPIE, NORTH BURNETT & SOUTH BURNETT REGIONAL COUNCIL AREAS
Reseal Roadworks project at various locations in Bundaberg, Fraser Coast, Gympie, North Burnett and South Burnett Regional Council Areas, ., QLD 4999 In The Council Area Of Various of State. 2016/2017 variable rate reseals in Bundaberg, Fraser Coast, Gympie, North Burnett and South Burnett Regional Council areas Click for more details...

CHARTERS TOWERS SCHOOL OF DISTANCE EDUCATION
School - Air-Conditioning - Upgrade project at 15-23 Brisk St, Charters Towers, QLD 4820 in the Education (Schools - primary, secondary (up to Yr 12)). Upgrade of existing DX air-conditioning system to new chilled water system Click for more details...

BALONNE HIGHWAY
Balonne Highway is currently at the Construction stage, valued at about $ 3623000 it is Pavement rehabilitation and drainage works on the Balonne Highway from Bollon to Cunnamulla Click for more details...

NORTH WEST CHANNEL
A project in the QLD Within Moreton Bay Regional. North West Channel Front Lead Construction 2017. Scope of work includes: supply & installation of a front leading light navigation aid structure to the North West Channel in Moreton Bay Click for more details...

YORKEYS KNOB STATE SCHOOL AIR CONDITIONING UPGRADE
Education (Schools - primary, secondary (up to Yr 12)) project In The Cairns Regional Council Area of Air Conditioning - Upgrade type. Replacement of air-conditioning & electrical upgrade. Scope of work includes: replacement of existing air conditioning systems. Installation of air conditioning in classrooms without existing air conditioning. Related electrical upgrade works. Related general building work including insulation installation Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect