STRANGWAYS PROJECT - DIAMOND RESOURCE
Mining (Underground - including longwall) project for New development. Two short 60 metre HQ diamond drillholes are in progress to obtain samples for determination of mica flake size. Core from the first 31 metres is estimated to contain over 60 per cent vermiculite. Click for more details...

YIMUYN MANJEER GOLD MINE - MOUNT TODD TENEMENTS
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 1000000. This project The first mortgagee is offering for sale by tender a number of exploration titles. These are highly prospective tenements near Mount Todd, located in the historic Pine Creek geosyncline. Potential also exists for base metal mineralisation. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) Renovations, Refurbishments etc. project at Urban Regions of, Darwin, NT 0800. This type is Fire Detection Equipment - Package A - Maintenance with State ownership. Routine servicing & emergency repairs to fixed fire detection equipment - Package A Click for more details...

CHARLES POINT ROAD OFF ROAD CYCLE PATH
Currently at the Tenders & Building stage In Darwin City is a project estimated to be $ 30000. This project Construct off road cycle path. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
A project in the NT Within Unincorporated North. Programmed maintenance & repairs to water supply, sewerage & fuel infrastructure. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Hospitality (Conference & reception centres & facilities) New project at Ellengowan Dve, Casuarina, NT 0810. This type is Commercial Building For University with State ownership. Building likely to contain: retail outlets, food & beverage outlets, function & conference facilities. Click for more details...

RAAF BASE DARWIN
Federal ownership Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Renovations & upgrading to include bathrooms, kitchens & verandahs. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for Renovations, Refurbishments etc. development. Reconstruct & edge seal shoulders & drainage between 62.21kms & 70.51kms. Click for more details...

MCARTHUR RIVER BASE METALS MINE
A project in the NT Within Katherine Town. 38 week contract envisaged to construct the Batten Creek bridge and approaches. Click for more details...

WATARRKA NATIONAL PARK - KATHLEEN SPRINGS
A project in the NT Within Alice Springs Town. Replacement of infrastructure at the Day Use area, Walk & Viewing Platform area destroyed by recent fire. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 of 2 Cav Facilities - Expansion - Apin - Stage 2 type of Addition development. ASLAV supply facility plus additional hangar space & office. Click for more details...

TANAMI GOLD OPERATIONS - LEGS
Approximately 650 km northwest of, Alice Springs, NT 0870 Has Tanami Gold Operations - Legs currently at Early Planning stage. Drilling immediately south of the Legs Pit during February and March yielded pleasing results. On the basis of this programme, a southern extension of the current pit is presently being designed. Mineralisation at Legs remains open to the south. A resource has also been identified below the abandoned Battery and Bastille pits close to the treatment plant. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

HASTINGS OVER MINDAL
Residential (Units, apartments, flats, townhouses, villas) New project at Pt lots 4669 & 5344 Salonika St & Goyder Rd (Town of Darwin), Parap, NT 0820. This type is Flats (84)/Carpark - 8 Storeys - Stage 1 with Private ownership. Construction of 84 x 3 bedroom flats in 2 x 8 storey buildings including podium car park. To include associated recreational facilities & utilising green technology & energy efficient principles. Click for more details...

BATCHELOR INSTITUTE OF INDIGENOUS TERTIARY EDUCATION
Residential Blocks (10) - Refurbishment - Remaining Stages Renovations, Refurbishments etc. project In The Darwin City Council Area. Work involves: plumbing, floor coverings, cabinet making & electrical. Click for more details...

MITCHELL CENTRE
Currently at the Construction stage In Darwin City is a project estimated to be $ 60000000. This project Construction of multi storey development to include retail on ground floor, carparking structure, 10 floors of office space & police station comprising of watch-house, cells & 24 hour shop-front. Tenancies to include Coles supermarket, 40 specialty shops, restaurant precinct & parking for 650 vehicles. Click for more details...

ALICE SPRINGS HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870 for Subcontract. Carpentry for hospital redevelopment. Click for more details...

GATEWAY RESORT
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 1200000. This project Headworks for Tourist Development including roads, sewer, water, fire main & electrical services. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

STUART HIGHWAY PAVEMENT REHABILITATION
Public Utilities (Water distribution systems, Drainage) project at Stuart Hwy (Btwn Ch: 1381 km & Ch: 1383 km) 108 km north of, Alice Springs, NT 0870 of Pavement Rehabilitation type of Renovations, Refurbishments etc. development. Pavement rehabilitation & associated drainage works for 2 km of Stuart Highway between Ch: 1881 km & Ch: 1383 km. Click for more details...

BELYUEN COMMUNITY WATER STORAGE TANK
Supply & Install project of Public Utilities (Water distribution systems, Drainage) project at Belyuen Community 140 km approx south west of, Darwin, NT 0800. Supply & install one (1) 450 kL nominal capacity water storage tank. Click for more details...

CHANNEL ISLAND POWER STATION - WATER PUMPS VARIOUS
Within region of, Darwin, NT 0909 Has Channel Island Power Station - Water Pumps Various currently at Tenders & Building stage. Upgrade & replacement of low pressure feed water pumps. Click for more details...

CHANNEL ISLAND POWER STATION CONTROL ROOM AIRCONDITIONING
A project in the NT Within Darwin City. Provision of stand by air conditioning to control rooms. Click for more details...

AQUASCENE KIOSK ADDITION
Kiosk - Addn project at Lot 6574 Doctors Gully Rd, Larrakeyah, NT 0820 in the Hospitality (Restaurants, Canteens). Kiosk addition to outdoor entertainment (fish feeding) facility. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining (Open Cut) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

WESTLANE CARPARK LIFTS
A project in the NT Within Darwin City. Modifications to lifts at Westlane carpark Click for more details...

JACANA HOUSE WOOD STREET OFFICE BUILDING & SHOPS
New project of Retail (Shops, shopping centres & arcades, supermarkets) project at 39-41 (Lots 2387 & 2388) Wood St, Darwin, NT 0800. Construction of a 10 storey office building with 371sq m retail on ground floor. Basement parking for 128 cars. Associated landscaping. Click for more details...

UMBAKUMBA BASKETBALL COURT
Groote Eylandt, Umbakumba, NT 0822 Has Umbakumba Basketball Court currently at Construction stage. Design & Build steel structure with colorbond metal roof over an existing basketball court. Click for more details...

KATHERINE CENTRAL CHILDRENS SPORTSGROUND/PLAYGROUND
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) New project at Adjacent skatepark, Katherine, NT 0850. This type is Sportsground/Playground with Local Govt ownership. Supply & construction of coloured concrete footpath (180 m x 1.4 m). Supply & installation of 210 m x 1.8 m high chain mesh security fencing including minimum 300 mm extension for the placement of two barbed wire strands over the top of the chain mesh. Click for more details...

ST JOHN'S COLLEGE LANGUAGE CENTRE BER PROJECT
Language Centre project at 10-54 Salonika St, The Gardens, NT 0820 In The Council Area Of Darwin City of Private. Language Centre Click for more details...

TIO STADIUM MARRARA AMENITIES BLOCK
Social (Amenities, Dressing rooms) New project at ., Darwin, NT 0800. This type is Amenities Block with State ownership. Construction of amenities block. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

THE HEIGHTS RESIDENTIAL SUBDIVISION STAGES 5-9
Civil Engineering (Residential Subdivision) project for New development. Stage 5 - 49 residential lots. Stage 6 - 31 residential lots. Stage 6a - 14 residential lots & 1 open space site. Stage 7 - 27 residential lots & 1 public open space site. Stage 7a - 12 residential lot sites including 2 multiple dwelling sites. Stage 8 - 40 residential lots & 1 open space site. Stage 9 - 48 residential lots including 1 multiple dwelling site. Click for more details...

TOUPEIN STREET WAREHOUSE & OFFICES
Warehouse/Office - 2 Storey project at 37 Toupein Rd (Lot 8565) & McCourt Rd, Yarrawonga, NT 0830 in the Industrial (Warehouses, cargo sheds, distribution centres). Proposed construction of a 2 storey warehouse & office facility with 2 tenancies. Tenancy 1: 136sq m showroom, reception, 2 x kitchenette, amenities, 537sq m warehouse, 2 x meeting rooms & 6 x offices covering 188sq m. Tenancy 2: 2 x offices, reception, 270sq m warehouse & 139sq m mezzanine. Metal roof sheeting, concrete slab, external wall cladding, base apron walling, pre-cast concrete panels, masonry block, bitumen, steel frame awning, automatic roller shutter & vented ridge system. Car parking for 27 cars. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Darwin Gateway Shopping Centre Stage 1 is currently at the Construction stage, valued at about $ 500000 it is Tiling sub-contract for the Gateway Shopping Centre. To include tiling of the mall, centre amenities, Woolworths & Big W. Click for more details...

NATHAN RIVER ROAD RESHEETING
Nathan River Road Resheeting is currently at the Construction stage, valued at about $ 223000 it is Resheeting works to Nathan River Road from Ch3.7 to Ch10.7. To include removal of existing pavement. Construction 95% MMDD sub grade layer by creating wet mix to 150mm, layout, shape & trim. Supply & lay gravel to 8m width x 150mm depth to create base course layer. Compact to 95% MMDD. Construction of new table off let drains & blocks. Click for more details...

TENNANT CREEK SPEEDWAY INFRASTRUCTURE UPGRADES
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area for New development. Design & construction of upgrade works at the Tennant Creek Speedway. To include control tower/canteen building, pathways & safety fencing. Retaining walls & concrete ramp. 50m of rising main to connect to existing septic system. Click for more details...

LEANYER RECREATION PARK CASCADES & LAGOON RELINING
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Darwin City Council Area of Lagoon Pool - Relining type. Upgrade works to the Leanyer Recreation Park Cascades & lagoon relining. To include demolition of existing cascade pools & paved area. Replacement of pebblecrete surfacing at the main swimming/wading pool to include rehabilitation of expansion joints. Construction of 2 walk in wading pools, water play area with water play features & access ramps. Reinstatment of lower concrete paved areas, pathways & grassed seating area. Installation of circulation water supply pipe reticulation pumping system, pool drainage connections, surface drainage pits & sub-soil drainage. Re-connection of main filtered water supply to main pools. Associated landscaping. Click for more details...

BATCHELOR INSTITUTE ELECTRICAL SERVICES MAINTENANCE & REPIARS
Education (Tertiary - colleges, institutes, universities) Renovations, Refurbishments etc. project at Nurndina St, Batchelor, NT 0845. This type is Electrical Services - Maintenance & Repairs with Private ownership. Maintenance & repair works to electrical services at the Batchelor Institute of Indigenous Tertiary Education. Click for more details...

ALAWA PRIMARY SCHOOL PLAYGROUND
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Design & construction of a playground for upper primary students at Alawa Primary School. To include supply & installation play equipment, shade sails, rubber & sand soft fall. Concrete kerbing & drainage. Relocation of existing tables. Click for more details...

HOWARD SPRINGS PRIMARY SCHOOL ASSEMBLY HALL REFURBISHMENT
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 298000. This project Design & refurbishment of the assembly hall & stage area at the Howard Springs Primary School. To include demolition of existing security panels. Replacement of stage doors & vinyl flooring. Supply & installation of new ceiling & ceiling fans. Click for more details...

ALICE SPRINGS CIVIC CENTRE SOLAR SYSTEM
A project in the NT Within Alice Springs Town. Supply & installation of a 75kw solar photovoltaic system at the Alice Springs Civic Centre. To include stainless steel fixings & associated cabling & switch gear. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining (Onshore - oil & gas) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...

PALMERSTONE SENIOR COLLEGE
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 149000. This project Replacement of Lift 2 at Palmerston Senior College Click for more details...

ROYAL DARWIN HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr, Darwin, NT 0800 of Rising Main - Upgraqde type of New development. Upgrade the rising main in Building 13 - Pathology Click for more details...

NTURIYA REMOTE COMMUNITY HOUSING
Renovations, Refurbishments etc. project of Residential (Units, apartments, flats, townhouses, villas) project at Community of Nturiya, Alice Springs, NT 0870. Upgrade of 14 Remote Community Housing assets in the Community of Nturiya Click for more details...

KATHERINE SOUTH PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) Addition project at 108 Riverbank Dr, Katherine South, NT 0850. This type is School - Addns with State ownership. Replacement of chilled water air handling units to Blocks 8, 5 & 2 & learning units B & C & transportable. Click for more details...

BUNTINE HIGHWAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Buntine Hwy & Edith Falls Rd, Katherine, NT 0850. This type is Roadworks - Reseals with State ownership. Resealing of Buntine Highway at various existing primerseal sections with an S10E polymer modified binder using 7mm aggregate.Resealing of a section along Edith Falls Road between chainage 0.1 ? 0.45km. The works comprise of a two coat reseal with an S10E polymer modified binder using 14mm & 7mm aggregate. Click for more details...

WURLI WURLINJANG HEALTH SERVICES
21 Third St (Lot 3442), Katherine, NT 0850 Has Wurli Wurlinjang Health Services currently at Construction stage. Extension of an existing medical centre for an additional 2 consulting/interview rooms, offices, chemist store room & general store room. Aluminium doors & windows, wall cladding. Car parking for 8 vehicles. Associated landscaping. Click for more details...

ALAWA PRIMARY SCHOOL
Public Utilities (Water distribution systems, Drainage) project at 27 Pett St, Alawa, NT 0810 for New. Upgrade potable & irrigation water mains. Associated works Click for more details...