State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Insulation Projects in TAS®ion=⊂=2418 in region


TOTALISATOR AGENCY BOARD
Retail (Shops, shopping centres & arcades, supermarkets) project In The Penguin Council Area of Private ownership. Internal refurbishment of existing TAB. Click for more details...

WREST POINT HOTEL CASINO - BOARDWALK PROMENADE
Casino Foreshore Redevelopment New project In The Hobart Council Area. New gaming area, restaurant & boulevard boardwalk cafe. Reinforced concrete & glass construction, steel roof. Click for more details...

NORTH WEST RESIDENTIAL CARE UNIT
Residential Care Unit New project In The Devonport Council Area. 18 bedrooms & 2 flats. Block internal & brick external walls, colorbond roof, concrete slab floors, aluminium windows. Click for more details...

BASS HIGHWAY JUNCTION IMPROVEMENTS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Bass Hwy & River Rd, Burnie, TAS 7320 for New. Junction improvements & signalisation. Click for more details...

POMONA BED & BREAKFAST
Additional Holiday Cabin New project In The West Tamar Council Area. 2 Bedroom, possible timber construction, iron roof. Click for more details...

ZEEHAN SLAG DUMP BASE METALS RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at Near, Zeehan, TAS 7469. This type is Resource - Base Metals with Private ownership. The Zeehan slag dump contains residue material from lead smelting over 100 years ago. It includes 450,000 tonnes of material grading 13.4% zinc, 1.7% lead, 54g/t silver and 50g/t iridium. It is located approx 90 km southwest of the Hellyer metals project by road. Click for more details...

TSO CONCERT HALL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at 1 Davey St, Hobart, TAS 7000. This type is Concert Hall - Early Works with Private ownership. Foundation works associated with the construction of the TSO Concert Hall Click for more details...

UNIVERSITY OF TASMANIA-ANNE O'BYRNE BUILDING
Education (Tertiary - colleges, institutes, universities) project at Cnr Howick & Charles Street, Launceston, TAS 7250 of Lecture Rooms/Offices/Lab's-Refurbishment type of Renovations, Refurbishments etc. development. Internal refurbishment of existing building to provide lecture rooms, common room, research room, offices and Education Development Laboratories. Click for more details...

SISTERS HILLS ROAD REDEVELOPMENT
Sisters Hills Road Redevelopment is currently at the Construction stage, valued at about $ 2900000 it is Road upgrade from Rulla Road Junction to summit including extension of overtaking lane, widening of pavement, realignment and junction improvements. Click for more details...

TANDARRA LODGE
Residential (Units, apartments, flats, townhouses, villas) project In The Kentish Council Area of Independent Living Units (2) type. Construction of two 2 bedroom units. Brick veneer, metal roof, concrete floors and aluminium windows. Click for more details...

ROSNY WASTE WATER TREATMENT PLANT UPGRADE
New project of Public Utilities (Treatment plants, Sewerage reticulation) project at 90 Esplanade, Rosny, TAS 7018. Design, supply and installation of a filter for helminth removal at the Rosny Waste Water Treatment Plant. Click for more details...

KINGSTON CENTRAL AREA (KCA) ROADWORKS
Currently at the Construction stage In Kingborough is a project estimated to be $ 2200000. This project Construction of approximately 500 metres of roadworks, central median, lighting and associated siteworks on Channel Highway from John Street to Summerleas Road and Freeman Street from Denison Street to Channel Highway, includes construction of a concrete roundabout and associated works at Channel Highway and Freeman Street intersection. Click for more details...

NORTH TERRACE RESTUARANTS
Private ownership Hospitality (Restaurants, Canteens) project In The Burnie Council Area for Addition development. Extensions and alterations to existing community building and for the purpose of two restaurants with boundary line variation and relaxation to car parking. Click for more details...

MURRAY STREET OFFICE
Currently at the Planning stage In Devonport is a project estimated to be $ 50000. This project Alterations to existing building to provide new office. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - BUILDING CONTRACTORS COMPOUND
Private ownership Mining - Support Facilities (Bath houses, Amenities, Dressing rooms) project In The King Island Council Area for New development. For the provision of accommodation buildings, bath houses & crib rooms etc for Building Contractors Compound. Click for more details...

CO-OP MOTORS
Co-Op Motors is currently at the Construction stage, valued at about $ 700000 it is Construction of showroom, wash bay and car preparation area. Steel frame over existing concrete slab and concrete tilt panels. Click for more details...

ST JOHN'S AVENUE OFFICE/STORAGE
Renovations, Refurbishments etc. project of Industrial (Warehouses, cargo sheds, distribution centres) project at 13 St Johns Avenue, New Town, TAS 7008. Works comprise of the fitout of two existing internal spaces to form new office accommodation and the construction of a new Storage Facility. New partitions plastering, ceilings, joinery, plumbing, doors and hardware, floor coverings, painting, glazing and tiling. the works also include new electrical, mechanical, communications and security services. Timber frame, metal cladding walls and roof. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Reservoir project at Forthside, Forth, TAS 7310 In The Council Area Of Devonport of State. Construction of a new concrete, aluminium roofed reservoir, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of an access road to the reservoir site, clearing, grubbing and excavation works, importation of structural fill, construction of a 1ML (approx) reinforced concrete water storage reservoir, construction of an aluminium clad roof, inlet, outlet, overflow and scour and drainage pipelines, platforms and ladders, hardstand/access track and open drain around the reservoir, installation of a stock proof fence, miscellaneous civil works and provision of shop and as-executed drawings. Click for more details...

COOEE PRIMARY SCHOOL - BER PROJECT
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Burnie Council Area for New development. Construction of a multi purpose hall. Click for more details...

MUNGALA CRESCENT UNITS
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construction of five units with setback variations. Brick veneer, timber floor and metal roof. Click for more details...

BURNIE WASTE MANAGEMENT CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Burnie Council Area of Local Govt ownership. Design, construction and operation of a waste transfer and resource recovery facility. Scope of works includes obtaining all necessary approvals, design and construction of the facility and its operation for a 10 year period. Click for more details...

HUON VALLEY COUNCIL ANNUAL TENDERS
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Huon Council Area for New development. Tenders are invited for the following annual standing tenders. Infrastructure works including periodic supply and placement of asphalt surfacing, periodic supply and delivery of re-sheeting material, aggregate, concrete and kerb and channel, periodic supply and delivery of bitumen seal and reseal and periodic supply of plant hire and civil construction works. Building works including periodic supply of labour for building maintenance and construction works. Click for more details...

BREAK O'DAY COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Various Locations with the Municipality of Break O'Day, St Helens, TAS 7216. This type is Civil Construction Works with Local Govt ownership. Civil construction works for Break O'Day Council up to the value of $100,000 (excluding GST) per project for a three year period, between 31 January 2012 and 31 December 2014. Tenderers may submit prices for any of the work categories and may tender for more than one category provided that the company has the experience and capacity to carry out the works. Works under this tender would involves the following *Asphalt works *Road and footpaths *Kerb and Channel *Traffic islands *Drainage works *Landscaping *Pipe Cracking *Pipe Relining *Line Marking *Day Works *Communication conduit. Click for more details...

BLUNDSTONE ARENA BELLERIVE REDEVELOPMENT
15 Derwent St, Bellerive, TAS 7018 Has Blundstone Arena Bellerive Redevelopment currently at Construction stage. Redevelopment of Blundstone Arena. The proposal consists of: the demolition of several structures/features including the old players/members pavilion, the Clarence District Cricket Club and the small Western Stand. Relocation of Cricket Tasmania administration to the refurbished indoor centre practice building. Relocating indoor practice into the new Western Grandstand. Modifications to the Clarence Football Club area. A new Western Stand to accommodate a total of 5,000 additional seats, with a roof reflecting (sail boats on the Derwent). Upgraded players and spectator areas to ICC standards in time for the World Cup in 2015. New pedestrian entrance and a bus interchange facility in Derwent Street. Click for more details...

QUEENSTOWN DWELLINGS
Dwellings (2) project at ., Queenstown, TAS 7467 In The Council Area Of West Coast of Private. Construction of two residential dwellings. Click for more details...

NRAS UTAS STUDENT ACCOMMODATION
Apartments (430)/Retail Precinct project at 49 Melville St, 46 & 64 Brisbane St and 145, 147, 163, 165, & 171-175 Elizabeth St, Hobart, TAS 7000 In The Council Area Of Hobart of State. Construction of 430 studio apartments, central common areas, laundry facilities, catering services, academic support services and 24 hour on-site residential support, landscaping and a retail hub is proposed for the sites Elizabeth Street frontage. Click for more details...

DODDER RIVULET BRIDGE NO 3292
Bridge project at Over Dodder Rivulet, Old Paradise Rd, Sheffield, TAS 7306 in the Civil Engineering (Bridges, Aqueducts, Viaducts). Design and construction of a replacement bridge No 3292 over Dodder Rivulet. Click for more details...

NUBEENA FORESHORE PATH DEVELOPMENT (STAGE 1)
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Tasman Council Area for New development. Civil construction works for the Nubeena Foreshore Path Development (Stage 1) Works include intersection reconstruction at Clarke Street, Nubeena and Slip Road construction at Judd Park, Nubeena. Click for more details...

NORTHERN MIDLANDS COUNCIL BIANNUAL TENDERS
Kerb/Gutter And Crossovers project at Various locations within the Municipality of Northern Midlands, Longford, TAS 7301 In The Council Area Of Northern Midlands of Local Govt. Construction of concrete kerb/gutter and crossovers at various locations within the municipality of Northern Midlands for a two year period. Click for more details...

ST JOHNS CATHOLIC SCHOOL
A project in the TAS Within Clarence. Extensions to 3 classrooms, alterations to administration building & alterations to 3 classrooms. Click for more details...

GENEVA CHRISTIAN COLLEGE
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 197 Moriarty Rd, Latrobe, TAS 7307. Construction of new two storey classrooms, concrete blockwork on ground level, lightweight construction on upper level, metal roof. Includes demolition of an old double storey building. Click for more details...

RESERVOIR ACCESS UPGRADES PACKAGE 3
New project of Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Various Locations Tasmania Wide, Hobart, TAS 7000. Design, supply and installation works associated with the OH&S reservoir access upgrades. Works include ladders, ramps and platforms. Click for more details...

UNITED PETROLEUM SERVICE STATION
40 Gordon St, Sorell, TAS 7172 Has United Petroleum Service Station currently at Construction stage. Demolition of the existing service station and construction of a new building and canopy with replacement of fuel pumps and forecourt paving. A Take-away food premise and convenience store will also be constructed. Click for more details...

TOLOSA WATER SUPPLY UPGRADE - TANK CONSTRUCTION
Tolosa Water Supply Upgrade - Tank Construction is currently at the Construction stage, valued at about $ 10000000 it is Construction of 2 x 20 ML tanks & ancillary works for the Tolosa Water Supply Upgrade. Each of these tanks will be 54 metres in diameter & 11 to 12 metres high at their centre point. Click for more details...

BLUE LAGOON CHRISTIAN YOUTH CAMP
Local Govt ownership Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Sorell Council Area for New development. Construction of a new recreation hall at the Blue Lagoon Christian Youth Camp. Extensions to the existing Assembly Hall, construction of a new storage shed for camp equipment, and extensions & works to existing sports oval. Recreation hall consisting of floorboard basketball court and associated male and female amenities/changerooms. Foyer and sports equipment strorage room. Associated construction of 4 new water storage tanks. Mixed materials including colourbond cladding. Assembally hall extensions and sports oval extension including roof structure for archery targets. Click for more details...

BELLAMY ROAD BRIDGE REPLACEMENT
Currently at the Construction stage In Devonport is a project estimated to be $ 100000. This project Tenders are invited for the Design & Replacement Bellamy Road. Click for more details...

REECE PLUMBING RETAIL WAREHOUSE REDEVELOPMENT
Reece Plumbing Retail Warehouse Redevelopment is currently at the Construction stage, valued at about $ 3000000 it is Redevelopment of the existing Reece Plumbing retail warehouse. Works will be carried out in 2 stages. To include demolition & redevelopment of existing show room facilities, storage areas, offices, amenities & associated signage. Click for more details...

ROAD SPECIFIC MAINTENANCE PAVEMENT MARKING 2015/16 - NORTH
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various locations throughout North Tasmania, Launceston, TAS 7250 for New. This Contract involves delivering the Department's annual pavement marking maintenance program for State, National and local Government road networks in the north region of Tasmania. Click for more details...

HOTEL FEDERAL WYNYARD 911 BOTTLE SHOP
Currently at the Construction stage In Waratah-Wynyard is a project estimated to be $ 1200000. This project Construction of a drive-through bottle shop at the rear of the hotel. Comprising a general retail area, cool room for storage purposes & an office area. Two lane paved drive-through area. Also refurbished gaming room & bar as well as a new gourmet hamburger café. Click for more details...

LES WALKDEN TRANSPORT
Industrial (Warehouses, cargo sheds, distribution centres) project at 325-327 Hobart Rd, Youngtown, TAS 7249 for Addition. Extensions to the Les Walkden Transport Warehouse facility to include new administration offices. Click for more details...

EXETER HIGH SCHOOL REDEVELOPMENT
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The West Tamar Council Area for Addition development. Redevelopment of an existing science laboratory and preparation room. Click for more details...

ESK MAIN ROAD STABILISATION WORKS 2016
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Esk Main Road slip & batter stabilisation & associated works throughout St Marys Pass. Click for more details...

PARKWOOD GARDENS RESIDENTIAL SUBDIVISION STAGE 2
Civil Engineering (Residential Subdivision) project at 221A Lenah Valley Rd & 2-16 Creek Rd, Lenah Valley, TAS 7008 for New. Construction of stage 2 of a 17 lot residential subdivision. To include associated civil works. Click for more details...

WINDSOR PARK RIVERSIDE STGE 3
Currently at the Construction stage In West Tamar is a project estimated to be $ 300000. This project Carpark Construction at Windsor Park, Riverside (Stage 3). Scope of works includes Construction of approximately 1600 sqm of Car-park. 300m of Concrete Kerb `type KC & BK'. 415 sqm of Concrete Footpath. Two Coat Spray Seal (Approx 1620m2). Supply & installation of 17m of DN300 `Profiled Wall Polyethylene' Stormwater pipe, two (2) Side Entry Pits & one (1) DN1050 benched Manhole. Click for more details...

ELIZABETH STREET OFFICE REFURBISHMENT
Currently at the Construction stage In Hobart is a project estimated to be $ 1093000. This project Refurbishment to the internal offices, levels 4 & 5, 22 Elizabeth Street, Hobart. Click for more details...

MAIN ROAD SHOPS
Shops (2) New project In The Northern Midlands Council Area. Construction of 2 shops to include hairdressing salon & general retail shop. Installation of signage. Roof cladding, wall cladding, powdercoated aluminium window frames, concrete block veneer & semi transparent window signage. Car parking for 4 vehicles & 2 bicycle bays. Associated landscaping. Click for more details...

TARLEON STREET & STONY RISE MAIN ROAD UNDERPASSES
Bridgeworks New project In The Devonport Council Area. Bridge Strengthening Program 2016/17, Tarleton Street Underpass (B5238) & Stony Rise Main Road Underpass (B5607). This project involves carbon fibre strengthening of the two existing bridges using Near Surface Mounted (NSM) & Carbon Fibre Reinforced Polymer (CFRP) systems. Click for more details...

JOHN CLENNETTS MITRE 10 CAFE
A project in the TAS Within Kingborough. Construction of cafe with kitchenette & dining area. Timber battens, deck & pergola, plywood cladding with clear finish & awning over with timber decking below. Associated car parking & landscaping. Click for more details...

ESPERANCE COAST ROAD REALIGNMENT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Esperance Coast Rd, Surges Bay, TAS 7116. This type is Roadworks - Realignment with Local Govt ownership. Construction of Esperance Coast Road Realignment project. Click for more details...

GENERAL PRACTICE PLUS SANDY BAY
Medical Clinic - Altns & Addns project at 18 Gregory St, Sandy Bay, TAS 7005 in the Medical (Surgeries, Medical centres). Partial demolition & extent of internal alteration works to existing building. Main entry with new ramp & stair access & bin storage. Removal of internal framed walls, hot water unit for relocation, sink & sanitary fixtures from existing bathroom, sink from existing consulting room, door & glazing, existing awning structure & existing translucent roof cladding. New paint to external walls of newer part of building & new planter boxes within entry wall. New automatic sliding door & clear glazing, painted brick entry wall, new roof with polycarbonate roof sheeting, ceiling to follow rake of roof & new columns & translucent roofing to awning over. New signage. Associated landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect