State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities Projects in TAS®ion=⊂=770 in region


BITUMEN SURFACING CONTRACT
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various Locations, Municipality of, Waratah, TAS 7321. The contract comprises three separable portions, including spray seals, asphalt (including supply only of asphalt) and bituminous slurry seals. The contract also includes modified bitumen, and works associated with surface preparation. Click for more details...

BITUMEN SURFACING CONTRACT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Burnie Council Area of Local Govt ownership. Surfacing works may include spray sealing, slurry surfacing and asphalt surfacing. Click for more details...

EXETER SAW MILL
108 Frankford Main Road, Exeter, TAS 7275 Has Exeter Saw Mill currently at Construction stage. Timber poles, steel trusses, colorbond cladding walls and roof, asphalt flooring. Click for more details...


is currently at the Construction stage, valued at about $ 826000 it is 2 bedroom, single storey, brick veneer, colorbond roof, aluminium windows, concrete floor slab, driveways & landscaping. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Currently at the Construction stage In West Tamar is a project estimated to be $ 356000. This project Supply & installation of an irrigation system. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

LEIGHLANDS SECONDARY ROAD JUNCTION
Leighlands Secondary Road Junction is currently at the Construction stage, valued at about $ 185000 it is Construction of a left turn deceleration lane along with a G turn lane. Click for more details...

MAY SHAW NURSING CENTRE REDEVELOPMENT STAGE 2A
Aged Care & Retired Developments (Nursing homes) project In The Glamorgan-Spring Bay Council Area of New Nursing Wing type. Additional nursing wing. Click for more details...

TI TREE WWTP - SLUDGE HANDLING UPGRADE
Sludge Thickening Equipment - Supply And Install project at Ti Tree Bend, Launceston, TAS 7250 In The Council Area Of Launceston of Local Govt. Supply and installation of sludge thickening equipment. Click for more details...

HAGLEY FARM PRIMARY SCHOOL REDEVELOPMENT
Hagley Farm Primary School Redevelopment is currently at the Construction stage, valued at about $ 1100000 it is Demolition of existing buildings and construction of four new double classrooms and library. Click for more details...

ROKEBY TRANMERE SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project, Rokeby, TAS 7019. This type is Chemical Dosing Systems For Rokeby Waste Water Treatment Plant with Local Govt ownership. Supply of all materials, installation & commissioning of Chemical Dosing Systems for alum, sodium hydroxide & sodium hypochlorite. Click for more details...

ANGLESEA BARRACKS REGIONAL TRAINING CENTRE
Military (Military installations & facilities) project at Pontville Rifle Range, Pontville, TAS 7030 for New. Site infrastructure works Click for more details...

HUON TOURIST DEVELOPMENT
Car Park & Roadworks project at Tahune Forest south of, Geeveston, TAS 7116 In The Council Area Of Esperance of State. Civil works for visitors centre & construction of road. Click for more details...

AURORA OPERATIONAL FACILITY
Commercial Premises (Offices) project for New development. Construction of works depot,offices and storage requiring a variation to height. Precast concrete walls, metal roof and concrete floors. Click for more details...

TANDARRA LODGE
Residential (Units, apartments, flats, townhouses, villas) project In The Kentish Council Area of Independent Living Units (2) type. Construction of two 2 bedroom units. Brick veneer, metal roof, concrete floors and aluminium windows. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Underground - including longwall). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

GLENORCHY ACCOMMODATION OPTIONS FOR DISABILITY SERVICES
Group Home New project In The Glenorchy Council Area. Construction of a four bedroom group home. Brick veneer, metal roof, concrete floor & aluminium windows. Click for more details...

QUEECHY SEWAGE PUMPING STATION
Currently at the Construction stage In Launceston is a project estimated to be $ 3400000. This project The scope of works under this contract includes the supply, delivery and installation of all materials and equipment for the construction of a new sewage pumping station and covered storage that will pump flow (via a new rising main) to Hoblers Bridge Wastewater Treatment Plant. The pumping station and covered storage will include a below ground circular concrete structure divided into multiple chambers, installation of inlet and outlet pipework, three 22kw (approximate) variable speed pumps, pumping equipment, control systems, flushing systems, mechanical ventilation and an architecturally designed above ground control building. Two DN 375 Ductile iron cement lined, rubber ring, jointed PN 35 pipelines installed below ground and two 450 OD, PE 100, PN 10 butt fusion welded pipelines installed below ground surface that connect to a new PE rising main (installed under separate contract) to the existing Norwood Rising Main. A flowmeter and valve pit complete with two electromagnetic flow meters, actuated valves and control systems. Upgrading power supply and water supply to the site. A new access road to the pumping station. Significant earthworks and rock retaining walls. Landscaping of the site. Decommissioning of the existing pumping station and associated infrastructure and the existing open storage basin. Click for more details...

TASMANIAN HOCKEY CENTRE REDEVELOPMENT
Hockey Centre Redevelopment - Miscellaneous Works - Stage 1 New project In The Hobart Council Area. Construction of two astro turf synthetic surface hockey fields, car parking modifications, new lighting, sound systems and associated works. Click for more details...

FLINDERS/BARREN ISLAND HEAVY MINERAL SANDS PROJECT - RESOURCE
A project in the TAS Within Flinders. Previous minor exploration has identified good zircon and gold potential in the extensive strandline systems. The areas cover a 70km strike length of fossil shore strandlines overlying mineralised rocks. Click for more details...

RIOLO ON THE TAMAR STAGE ONE
Beach Side Dwellings - Stage One project at Lot 283 Low Head Road, Low Head, TAS 7253 in the Residential (Units, apartments, flats, townhouses, villas). Construction of four double story beach side dwellings. Plywood and batten cladding walls, concrete and timber floors, aluminium windows, lock up garages, elevated with boardwalks for beach access and associated works. Click for more details...

BRIGHTON BYPASS SOUTHERN SECTION
Roadworks New project In The Brighton Council Area. The Brighton Bypass project involves construction of a new bypass between the East Derwent Highway and Pontville consisting of high standard dual carriageway highway and seamless road connections. The project is divided into two separate contracts, each covering a section of the new bypass, with the Southern Section also including construction of civil works for the Brighton Transport Hub. Click for more details...

BOWEN ROAD PRIMARY SCHOOL - BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at 35 Bowen Road, Moonah, TAS 7009 of Library, Hall And Classrooms type of New development. Construction of a new library, extension to multi purpose hall and modifications to existing classrooms. Click for more details...

MONTROSE BAY HIGH SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a performing arts centre and administration building. Extensive renovations to existing Rosetta High School buildings. Click for more details...

DEVONPORT MARITIME MUSEUM
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at 46 Victoria Pde, Devonport, TAS 7310 for Addition. Extension to the existing Maritime Museum. Click for more details...

GLENESK ROAD BRIDGE NO 3001
Glenesk Road Bridge No 3001 is currently at the Construction stage, valued at about $ 500000 it is Design, documentation and construction of a replacement deck for the bridge across the South Esk River on Glenesk Road, 8.3 kms east of the Midlands Highway at Cleveland. Click for more details...

AURORA ENERGY PROPERTIES
A project in the TAS Within Various. Provision of general architectural services on an as-required basis for Aurora?s owned and leased properties around Tasmania. Click for more details...

LEWIS STREET UNITS STAGE 2
Residential (Units, apartments, flats, townhouses, villas) project at 24 Lewis St, Longford, TAS 7301 for New. Construction of one single storey two bedroom unit plus study, being unit no 8 of staged development. Brick veneer and cement sheet weatherboards, metal roof, concrete floors and double glazed aluminium windows. Click for more details...

CASH N CARRY PROSPECT STAGE 1
Retail Warehouse project at 61 Oakden Rd, Prospect, TAS 7250 in the Retail (Shops, shopping centres & arcades, supermarkets). Internal alterations to existing building and associated works. Click for more details...

GORDON BOAT RAMP AND BREAKWATER
Currently at the Construction stage In Kingborough is a project estimated to be $ 230000. This project Construction of a rock breakwater. Click for more details...

GROOM STREET STROMWATER LINE
A project in the TAS Within Break O'Day. Upgrading of existing stormwater line. Click for more details...

ROAD AND BRIDGE WORKS - CONTRACT SUPERVISION SERVICES
A project in the TAS Within Various. The Department of Infrastructure, Energy and Resources wishes to establish a register of road and bridge works contract supervisors that would potentially be available to provide services to the department during 2013?14. Click for more details...

ICON UNITS
A project in the TAS Within Burnie. Construction of 34 two and three bedroom villa units. Brick veneer concrete floor, metal roof and aluminium windows. Click for more details...

LAUNCESTON RECEPTION PRISON SAFETY AND SECURITY PROJECT
Launceston Reception Prison Safety And Security Project is currently at the Construction stage, valued at about $ 500000 it is A range of safety and security building upgrades to the Launceston Reception Prison including all relevant trades. Click for more details...

LEWIS STREET UNITS STAGE 2
Residential (Units, apartments, flats, townhouses, villas) New project at 24 Lewis St, Longford, TAS 7301. This type is Units (8 Overall) - Final Stages Units 4/5 & 7 with Private ownership. Construction of eight single storey, two bedroom plus study. Brick veneer and cement sheet weatherboards, metal roof, aluminium windows. Click for more details...

ROAD SPECIFIC MAINTENANCE - PAVEMENT RESURFACING 2015/16 NORTH
Roadworks - Pavement Resurfacing New project In The Launceston Council Area. This Contract involves Sprayed Bituminous and Asphalt Surfacings with associated Pavement Marking; delivery of Spring and Autumn Resurfacing Preparation work at nominated sites in the Northern Region of the State Road and National Highway networks. The proposed contract period is 10 months. Click for more details...

QUADRANT MALL REDEVELOPMENT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Launceston Council Area of Mall Expansion/Play Areas type. Quadrant Mall Redevelopment Project through modern landscape, street furniture, lighting, drainage & associated works. The works include installation of underground services, lighting & electrical, new planters including performance stages, street furniture, landscaping & earthworks associated with the base preparation. Click for more details...

BITUMEN RESEALING SERVICES 2015/16
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Resealing in various locations in the Municipality of Kentish. Click for more details...

LUCAS STREET DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 15 Lucas St, Howrah, TAS 7018 for New. Construction of 4 single storey dwellings. 3 bedrooms. Shared paved driveway with double car space garages for dwellings 1-3, dwelling 4 with single car space garage. 2 visitor parking spaces. Pitch tiled roofing, brick veneer walls. Landscaping. Click for more details...

BARRETTA WASTE MANAGEMENT FACILITY OFFICE RENOVATION
Office - Renovation Renovations, Refurbishments etc. project In The Kingborough Council Area. Refurbishment of recently relocated demountable buildings at Barretta Waste Management Facility, Barretta, Tasmania 7054. Works include the internal and external refurbishment of the demountable buildings, relocation of an existing office and modifications to existing service connections. Click for more details...

LAUNCESTON WASTE CENTRE
Launceston Waste Centre is currently at the Construction stage, valued at about $ 500000 it is Preparative works for the landfill extension Launceston Waste Centre. Works Include: - Removal of Vegetation - Undertake earthworks to achieve specified sub-grade & sub-soil drain - Supply & install drainage layer - Supply & Construct composite leachate barrier - Supply & install leachate subsoil drains including manholes and inspection shafts and tubes - Supply & installation of a steel shed - Compliance testing & reporting Click for more details...

ELIZABETH COLLEGE
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Hobart Council Area for New development. Provision of new, & refurbishment of existing storage facilities for the college performing arts centre. Click for more details...

GOLDEN FLEECE RIVULET & ARGONAUT ROAD BRIDGE NO 1941
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Break O'Day Council Area of Bridgeworks - Replacement type. Replacement of bridge No. 1941 to a new 34m long two-lane concrete bridge to include re-alignment on the downstream side of the existing 43m long single-lane timber bridge. Precast wingwall, precast concrete wind wall, precast pier panels & precast sheathing panel. Click for more details...

KINGSTON WETLANDS CARPARK UPGRADE
Carpark Upgrade project at Channel Highway, Kingston, TAS 7050 In The Council Area Of Kingborough of Local Govt. Sealing of existing carpark in front of Kingston Wetlands Click for more details...

SACRED HEART PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project In The Launceston Council Area of School - Altns & Addns type. Works to include the redevelopment of existing buildings, construction of new covered ways, construction of reconfigure of existing stairs at the Sacred Heart Primary School. Click for more details...

LAUNCESTON SUPREME COURT
Currently at the Construction stage In Launceston is a project estimated to be $ 150000. This project Alterations to the front entry security of Launceston Supreme Court. New tiled concrete ramp with tactiles. Stud wall, frameless glass auto door, double glazed toughened glass roof, glass panel & powdercoated aluminium cover. Click for more details...

TASMAN COUNCIL GRAVEL ROAD CONVERSION OVERLAY & CIVIL WORKS
Roadworks/Civil Works project at Various locations within the municipality of, Nubeena, TAS 7184 In The Council Area Of Tasman of Local Govt. Gravel Road Conversion Overlay & Civil Works. Construction of a 100mm "Base A" overlay, drainage, improvements & associated works at various locations in the Tasman municipality. Click for more details...

NEW RIVER ROAD FARM SHED
Industrial (Warehouses, cargo sheds, distribution centres) project In The Dorset Council Area of Private ownership. Construction of farm shed. Steel wall. Click for more details...

FAHAN MIDDLE SCHOOL BARN RELOCATION
Barn project at 1 Fisher Ln, Sandy Bay, TAS 7005 in the Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)). Relocation of an existing barn & new deck. Brick pier on mass concrete footing, timber deck & handrail, face brick, hanger to wall, treated pine deck & sliding barn doors with glazing behind. Click for more details...

GEORGE TOWN COUNCIL ROAD RESEALING
George Town Council Road Resealing is currently at the Construction stage, valued at about $ 800000 it is Construction of road resealing on various roads within George Town Council area. Click for more details...

PIPERS BROOK & BRIDPORT ROADS WINERY & OFFICE
Currently at the Construction stage In George Town is a project estimated to be $ 800000. This project Demolition of existing buildings. Construction of new buildings to include 600sq m barrel stores/winery & 129sq m office & amenities. Associated car parking & landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect