State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Landscaping, revegetation Projects in QLD®ion=⊂=2822 in region


COOMERA WATERS COMMUNITY CLUBHOUSE
A project in the QLD Within Gold Coast City. Construction of a single storey building for clubhouse. To include showers, amenities, canteen, community rooms. Tennis court, barbecue area. Parking for 12 cars. Click for more details...

BRIGHTON ON BROADWATER MIXED DEVELOPMENT STAGE 1A - CORAL
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project In The Gold Coast City Council Area of Private ownership. Construction of a 57 level tower with a 4 storey podium to include small supermarket (1,273sq m), speciality retail & restaurants (1,195) & tavern (544sqm) & office & back of house area for serviced apartments (419 sq m). 53 levels of apartments. 249 residential apartments & 239 serviced tourist apartments (including 10 dual key). Two lift cores containing multiple lifts. Basement parking. Total parking for 694 cars. Landscaping. Click for more details...

GATEWAY UPGRADE PROJECT
Currently at the Construction stage In Brisbane City is a project estimated to be $ 1800000000. This project Work to include: upgrade (approx 20 km) existing carriageways mostly on the existing Gateway Motorway alignment between Mt Gravatt-Capalaba Rd & the Gateway Bridge; duplication of the Gateway Bridge & duplication through realignment of the Gateway Motorway from the Gateway Bridge north to the Nudgee Road interchange. The deviation will be through old & new airport land & upgrade works include a grade separated interchange for direct access to the Brisbane Airport. Click for more details...

CARLYLE GARDENS (PRIMELIFE)
Aged Care & Retired Developments (Retirement villages) project at Lot 500 SP 120762 Woongarra Scenic Dr, Bargara, QLD 4670 of Independent Living Units (11) - Stages 1 & 2 type of New development. Stage 1- 6 units. stage 2 - 5 units. Associated carparking & landscaping. Click for more details...

STANHILL DRIVE UNITS
Residential (Units, apartments, flats, townhouses, villas) project In The Gold Coast City Council Area of Units (6) - 4 Storey type. Construction of one residential building containing 6 units. Ground floor area 226.6 sqm, level 1 - 226.6 sqm, level 2 - 193.3 sqm & level 3 - 128.8 sqm. Parking for 12 cars. Associated landscaping. Click for more details...


Industrial (Warehouses, cargo sheds, distribution centres) project In The Brisbane City Council Area of Private ownership. Single storey building. Concrete slab, concrete block & metal roof. Covered parking for 4 cars & open parking bays for 10 cars approx. Area of land 827 sq m. 12-16 week construction period. Click for more details...

HEIDELBERG STREET UNITS
Currently at the Construction stage In Brisbane City is a project estimated to be $ 950000. This project Construction of two buildings of 11 x 2 bedroom units each with ensuite & large balcony. Concrete slab, concrete block, rendered & paint finish, timber truss, metal roof. Total parking for 22 cars. Click for more details...

KENSINGTON PLACE
Civil Engineering (Residential Subdivision) New project at Sparkes Rd, Bray Park, QLD 4500. This type is Subdivision - Residential - Stage 2a with State ownership. Roadworks, stormwater drainage, water & sewerage reticulation for 33 lots. Click for more details...

PARADISE GARDENS
New project of Civil Engineering (Residential Subdivision) project at Discovery Dve Moore Rd & Captain Cook Hwy, Kewarra Beach, QLD 4879. Roadworks, stormwater drainage, water & sewerage reticulation for 54 lots. Total area of land 15.3 ha approx. Click for more details...


Violet St (Lot 6 Mph 24430), Gympie, QLD 4570 currently at Construction stage. Concrete slab, steel frame, metal clad walls & roof. Click for more details...

CLONCURRY COPPER SULPHIDE PROJECT - PADDOCK/ORPHAN SHEAR
Resource - Base Metals New project In The Cloncurry Shire Council Area. Inferred resource at Paddock is 220,000 t at 2.5% copper. Inferred resource at Orphan Shear is 50,000 t at 1.5% copper. Click for more details...

YAMANTO TAVERN
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project In The Ipswich City Council Area of Private ownership. Conversion of existing retail space to tavern. Work to include new airconditioning, kitchen, bars, refrigeration, lighting, carpets, tiles, painting and furniture and fittings. Click for more details...

WARWICK FUNERALS
Social (Religious Buildings, civil chapels) project at 48 Willi St (Lot 10 RP 868355), Warwick, QLD 4370 of Funeral Home - Refurbishment type of Renovations, Refurbishments etc. development. Refurbishment & extension of existing funeral home. Click for more details...

CAIRNS & DISTRICT REGIONAL HOUSING CORPORATION
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Cassowary Coast Regional Council Area for Renovations, Refurbishments etc. development. Internal & external refurbishment of 3 houses in the Innisfail Area. Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

DOMAIN CENTRAL DUCKWORTH STREET BUILDING C
103-141 Duckworth St, Garbutt, QLD 4814 Has Domain Central Duckworth Street Building C currently at Construction stage. Construction of showroom. Details not disclosed. Parking and associated landscaping. Click for more details...

AIRPORT LINK TUNNEL & NORTHERN BUSWAY (WINDSOR TO KEDRON)
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Brisbane City Council Area for New development. Airport Link is a mainly underground toll road proposed to connect Brisbane's northern arterials of Gympie Road and Stafford Road at Kedron, and Sandgate Road and the East-West Arterial at Clayfield to the Inner City Bypass and North-South Bypass Tunnel at Bowen Hills. Airport Link to include 6.7 km dual tunnels, Northern Busway to include 3km 2 lane busway including 1.5 km between Windsor & Kedron, busway stations at Lutwyche & Kedron & Airport Dr flyover include 750 m flyover to link East-West Arterial Rd to Airport Dr, replacemrnt of roundabout with signalised intersection & upgrade of the East-West Arterial to 3 lanes each way. Click for more details...

DICKSON ROAD WAREHOUSE UNITS
New project of Industrial (Warehouses, cargo sheds, distribution centres) project at 30-36 Dickson Rd (Lots 6 & 7 RP 148118), Morayfield, QLD 4506. Construction of 2 x single storey industrial building with total of 12 warehouse units. Reinforced concrete floor, pre-cast concrete panels with textured paint finish, powdercoated aluminium framed glass shopfronts, metal roller doors, steel framed metal roof. Total parking for 63 cars. Associated landscaping. Click for more details...

PALM BEACH UNITS
Residential (Units, apartments, flats, townhouses, villas) project at 1491-1493 Gold Coast Hwy, Palm Beach, QLD 4221 for New. Construction of 7 storey residential building with 7 x 4 bedroom units. Concrete slab, slab edges & walls, metal wall cladding, aluminium/timber battens, privacy feature screen, aluminium feature screen, sunhoods, powdercoated aluminium framed glazing, glass balustrades & solid balustrades & panel lift garage doors. Basement & ground level car parking for 16 cars. Lift. Roof terrace with barbecue areas. 3 swimming pools. Associated landscaping. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Non-Construction Items (Supply/fabrication) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

FELTON COAL PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Toowoomba Regional is a project estimated to be $ 2000000. This project In the area of the Walloon Coal Measures of Middle Jurassic Age, in a series of gently folded northeast trending synclines and anticlines with gentle dips. Six lenticular banded coal seams are present. The total resource estimate is 1.1 billion tonnes of steaming coal includes 240,000 tonnes inferred, 280,000 indicated & 580,000 tonnes of measured coal resources. Click for more details...

BAYSIDE @ SOUTH BAY ESTATE SUBDIVISION STAGE 4
Currently at the Construction stage In Gold Coast City is a project estimated to be $ 810000. This project Civil works for 27 townhouse sites. Click for more details...

PETRIE STREET APARTMENTS
Apartments (3) project at 6-8 Petrie St, Dunwich, QLD 4183 In The Council Area Of Redland Shire of State. 3 x 2 bedroom apartments. Parking & associated landscaping. Click for more details...

DRAGON STREET UNITS
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 1094000. This project Proposed construction of 6 x 2 bedroom units. Parking & associated landscaping. Click for more details...

ST FRANCIS COLLEGE SCIENCE & LANGUAGE CENTRE BER PROJECT
A project in the QLD Within Logan City. Construction of science & language centre. To include 3 x 248sq m pods & associated covered areas. Steel portal frame, metal cladding, fibre cement cladding, brick veneer, metal roof. Associated landscaping. Click for more details...

WAYLAND STREET UNITS
Units (6) - 2 Storey New project In The Brisbane City Council Area. Construction of 6 x 2 bedroom units. Painted concrete, lightweight cladding, fibre cement sheeting, metal roof. Associated parking & landscaping. Click for more details...

MOSAIC MIXED USE DEVELOPMENT STAGE 1
Units (212)/Offices/Shops/Hotel - 18 Storey - Stage 1 New project In The Brisbane City Council Area. Construction of 18 storey mixed use building with retail space on lower ground & ground level, 3 levels of office space, 41 hotel rooms & 212 units above. To include revitalization of historical bomb shelter providing public seating & partial screening, creation of garden square to tower forecourt, providing outdoor dining for retail outlets with green wall to screen existing Locksmith Building. Pre-cast concrete, insitu concrete, curtain glass wall panels, aluminium panels. 3 levels of basement parking. Extensive landscaping. Click for more details...

RED BERET HOTEL ALTERATIONS & ADDITIONS
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) New project at 401-411 Kamerunga Rd, Redlynch, QLD 4870. This type is Tavern - Altns & Addns with Private ownership. Alterations & additions to existing 1567sq m extension to provide 1726sq m including new gaming room (159sq m) extension to bistro area, & open deck & new children's' playground. Click for more details...

KENYA TO CHINCHILLA WEIR WATER PIPELINE (QCLNG WATER TREATMENT PROJECT)
Civil Engineering (Pipelines) project for New development. 20 km underground pipeline. Click for more details...

THE VALE ESTATE SUBDIVISON STAGES 13 - 19
Residential Subdivision (185) Lots - Stages 13 - 19 project at 43-67 & 125 Gardiner Rd & 284,288,290,292,298,308 & 316 Tallangandra Rd, Holmview, QLD 4207 in the Civil Engineering (Residential Subdivision). Reconfiguration of 185 lots. Average size lots from 500sq m - 650sq m. Stage 13 - 26 lots. Stage 14 - 22 lots (1.126ha). Stage 15 - 27 lots. Stage 16 - 31 lots. Stage 17 - 26 lots (0.9182ha). Stage 18 - 23 lots. Stage 19 - 30 lots. (0.5081ha). Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

SCRUB ROAD HARDWARE STORE
A project in the QLD Within Gympie Regional. Construction of a hardware store. Parking & associated landscaping. Click for more details...

SEABRIGHT RESIDENTIAL SUBDIVISION STAGES 1-4
Residential Subdivision (107) Lots - Stage 1-4 project at 1090 Pimpama Jacobs Well Rd (Lot 9 RP813822), Jacobs Well, QLD 4208 in the Civil Engineering (Residential Subdivision). Reconfiguration into 107 lots in 4 stages. Drainage. Construction of new roads. Click for more details...

QUEENSLAND TRANSPORT & MAIN ROADS BITUMEN SEAL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Bitumen sealing. Click for more details...

BANNOCKBURN ROAD SUBDIVISION STAGE 4
Currently at the Construction stage In Logan City is a project estimated to be $ 1200000. This project Reconfiguration into 29 lots. Construction of 480m new road. 3523sq m parkland. Click for more details...

FIRE STATIONS FOR AIRSERVICES AUSTRALIA
Public Buildings & Facilities (Fire Stations, SES) project at Gladstone Airport, Gladstone, QLD 4680 of Fire Station - For Aviation type of New development. Package I - Design & construction of Aviation Rescue & Fire Fighting Fire Station at Gladstone Airport Qld & Newman Airport WA. Package II - Assess the level of interest that might exist in relation to potential work at Hamilton Island, Rockhampton, Coffs Harbour & Ballina. Click for more details...

DAGUILAR HIGHWAY (CABOOLTURE - KILCOY) ASPHALT RESURFACING JOB 250/40A/701
Daguilar Highway (Caboolture - Kilcoy) Asphalt Resurfacing Job 250/40a/701 is currently at the Construction stage, valued at about $ 395000 it is Funding approved for asphalt resurfacing on the D'Aguilar Highway 17.17-17.57km. Click for more details...

KING STREET UNITS
A project in the QLD Within Brisbane City. Construction of 4 x 4 bedroom 2 bathroom units in 2 separate buildings on a vacant site. Rendered brick veneer, metal roof. Parking for 8 cars. Associated landscaping. Click for more details...

DOGGETT STREET UNITS
A project in the QLD Within Brisbane City. Demolition of existing dwelling & warehouses. Construction of 10 storey residential building with 10 x studio, 21 x 1 bedroom, 65 x 2 bedroom & 20 x 3 bedroom units. Rendered & painted concrete, vertical metal cladding, glass balustrades, select feature tiles, feature timber cladding. 4 levels basement & ground level parking for 131 cars. 2 lifts. Swimming pool, sauna & barbecue facilities. Associated landscaping. Click for more details...

PADUA COLLEGE TENNIS CENTRE REDEVELOPMENT
Padua College Tennis Centre Redevelopment is currently at the Construction stage, valued at about $ 350000 it is Construction of curved roof over existing Greccio Tennis centre & construction of covered tiered seating area. To include construction of 59sq m equipment storage shed beside the school oval. Click for more details...

COTTON TREE MIXED USE DEVELOPMENT
A project in the QLD Within Sunshine Coast Regional. Removal of existing retail, commercial & residential buildings. Construction of mixed use development with ground floor restaurants, retail & office tenancies & 143 units in 2 separate towers. Northern tower to include 1145sq m restaurant & retail tenancies, 14 x 1 bedroom, 30 x 2 bedroom & 29 x 3 bedroom units. Southern tower to include 400sq m office tenancies, 28 x 1 bedroom & 42 x 2 bedroom units. Painted precast concrete walls, painted blockwork, painted vertical cladding, stone wall, painted precast concrete balustrades & sunhoods, shopfront glazing, powdercoated aluminium framed glazing & powdercoated awnings. 2 basement levels & ground level car parking for 289 vehicles. To include 202 residents, 37 visitors, 40 shops & 10 offices car parks. 4 lifts. Communal facilities on level 1 Northern building to include swimming pool, spa, barbecue area. Ground level Southern building to include recreation deck. Associated landscaping. Click for more details...

POLICE CREEK SEWER & WATER MAIN REALIGNMENT
Public Utilities (Treatment plants, Sewerage reticulation) project for Renovations, Refurbishments etc. development. Upgrade of sewer & water main at Police Creek, Kin Kora. Works to include bypass line to remove water & sewer mains from their supports. Installation of 2 concrete piles for the low flow portion of the creek & demolition of 3 existing headstocks. Remedial works to various headstocks. Supply & installation of sewer & water mains. Twin 70m runs with spanning element. Associated civil works. Click for more details...

ALDOGA TRUCK WASHDOWN FACILITY
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Gladstone Regional Council Area of Truckwash type. Construction of 2 bay truck washdown facility located on Aldoga Drive, Yarwun. To include hardstands, Aldoga Drive roadworks, washdown bays & spray screens. Sludge pit & treatment slab. Wash pump shed, pipework & water storage. Installation of treatment & recycling system. Associated civil, electrical & plumbing works. Associated concrete works. Associated carpentry, painting & roofing works. Click for more details...

BAC HANSON OFFICE & LABORATORY
A project in the QLD Within Brisbane City. Construction of 2 storey office building & separate 2 storey laboratory building. Lifts. Associated parking & landscaping. Click for more details...

PORT OF TOWNSVILLE WHARF 11 BERTHING DOLPHIN ACCESS BRIDGES
Currently at the Construction stage In Townsville City is a project estimated to be $ 600000. This project Fabrication & installation of 4 aluminium bridges. To include disposal of four steel bridges, fabrication of 8 bridge frames, fabrication of steel hangers & installation of hangers & frames to a concrete wharf structure. Click for more details...

KANDANGA CREEK ROAD BRIDGE REPLACEMENT
Local Govt ownership Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Gympie Regional Council Area for New development. Replacement of the existing timber bridge with a reinforced concrete bridge on Kandanga Creek Rd over Kandanga Creek. Construction of temporary side track & removal at completion of works. Demolition of existing timber bridge, stockpiling of good materials for Council collection & disposal of remainder (prior to practical completion). Minor earthworks. Construction of a new prestressed concrete bridge with cast-insitu concrete deck as the wearing surface (complete). Re-alignment, widening & sealing of the bitumen approaches. Installation of road signage, W-beam barrier energy absorbing bollards on concrete strip footings (cutoff wall CW1) & guide posts. Scour protection & soil stabilisation measures including riprap, subsoil drainage, planting, turfing & hydromulching. Removal & disposal of all waste material from the site & finishing the works to a high standard. Click for more details...

KFC RESTAURANT WILSONTON REFURBISHMENT
Hospitality (Restaurants, Canteens) project In The Toowoomba Regional Council Area of Private ownership. Internal refurbishment of KFC restaurant. To include new fixtures & fittings & upgarde to services. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...

MOBIL SERVICE STATION
A project in the QLD Within Cairns Regional. Construction of mobil service station with fast food outlets. 3 fuel bowsers. Car parking for 10 vehicles covered by a shade roof structure. 140sq m landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect