State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Law Courts Projects in NT®ion=⊂=522 in region


NT GOVERNMENT OCCUPIED BUILDINGS
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) Renovations, Refurbishments etc. project at Urban Regions of, Darwin, NT 0800. This type is Fire Detection Equipment - Package A - Maintenance with State ownership. Routine servicing & emergency repairs to fixed fire detection equipment - Package A Click for more details...

KATHERINE REGIONAL CULTURAL PRECINCT DOUBLE REPORT
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 13000000. This project Construct Arts & Cultural Centre. Incorporating external landscaping: exhibition space: internal multi-use space: external performing space: ancillary spaces including office, kitchen & workshop areas, studios & meeting rooms: art & craft retail outlet, cafe/restaurant. Capacity to incorporate new town library. Site area: 60,000 sq m approx. Click for more details...

STUART HIGHWAY ROADWORKS REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at Stuart Hwy (btwn 163.3 km - 166.53 km) Region of, Darwin, NT 0800. This type is Bituminous Resurfacing For Stuart Hwy with State ownership. Bituminous resurfacing between Ch: 163.3 km - 166.53 km. Click for more details...

PARKS AUSTRALIA NORTH - KAKADU NATIONAL PARK
Electrical Systems - Upgrade Renovations, Refurbishments etc. project In The Darwin City Council Area. Programmed maintenance & repairs to electrical systems. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
A project in the NT Within Unincorporated North. Programmed maintenance & repairs to water supply, sewerage & fuel infrastructure. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Internal Roadworks/Carparks/Hydraulics For University New project In The Darwin City Council Area. Project consists of roadworks, carparks, water reticulation, sewage reticulation, drainage works & lighting. Click for more details...


is currently at the Tenders & Building stage, valued at about $ 150000 it is 3 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

KAKADU NATIONAL PARK
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Kakadu National Park, NT 8000 of Power Generation Systems - Upgrading type of Renovations, Refurbishments etc. development. Programmed maintenance & repairs to Mechanical & Electrical systems. Click for more details...

NIGHTCLIFF OVAL
Oval - Upgrade project at Camphor St, Nightcliff, NT 0810 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Work to include installation turf wicket & general upgrade & irrigation works. Click for more details...

MITCHELL'S CHASE
New project of Civil Engineering (Residential Subdivision) project at Chung Wah Tce, Palmerston, NT 0830. 70 allotments. Roads, stormwater, sewer, telephone services. Click for more details...

ALICE SPRINGS RESORT
Resort - Upgrade - Final Stage project at 34 Stott St, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of Private. New bar to accommodate upto 40 patrons in contemporary setting of booths, tables & bar seating. Palms Restaurant refurbishment will get new decor, furniture & fittings, doors to pool deck. Revamped conference facilities in Gum Tree Lounge & upgrading accommodation. Click for more details...

TJUKARURU (DOCKER RIVER) ROAD REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area of Roadworks - Upgrade type. Resheet various sections Tjukaruru Rd (Ch: 24 km - 41 km). Click for more details...

GARRAK - JARRU/JABIRU/MITATJA REGION
Water Supply - Upgrade Renovations, Refurbishments etc. project In The Unincorporated North Council Area. Installation & repairs of solar powered bore pumps, construction of pipelines, & erection of tanks & stands. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) New project at Various locations Southern Region Central Australia Area of, Alice Springs, NT 0870. This type is Houses (6) with Federal ownership. Design & construction of 4 houses for Doctor's accommodation. Click for more details...

BERRIMAH CARAVAN PARK
Tourism (Caravan parks with assoc facilities, Camping grounds) project at Beaton Rd cnr Hidden Valley Rd (prtn 1679 Hund of Bagot), Berrimah, NT 0828 of Hostel/Caravan Park/Ancillaries type of New development. Subdivide to create 2 lots. Construction of 20 room hostel, caravan park & ancillaries. Sites for 70-80 caravans, 10 on site cabins, shop, reception. Swimming pool. Block-work and precast construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

WALER BARRACKS
Public Utilities (Water distribution systems, Drainage) project at Waler Barracks, Palmerston, NT 0830 for New. Extension of trunk roads & engineering services (water, power, storm water, communications & sewer). Click for more details...


Local Govt ownership Residential (Units, apartments, flats, townhouses, villas) project In The Unincorporated North Council Area for New development. 3 bedroom. Steel framed on stumps. Click for more details...

ROBERTSON BARRACKS
Military (Military installations & facilities) project at Robertson Barracks (Formerly Waler Barracks), Palmerston, NT 0830 of Logistic Facilities - Stage 2 - Apin - Stage 2 type of New development. DLB Q store, supply company main Q store & headquarters. Click for more details...

FAIRWAY WATERS
A project in the NT Within Palmerston Town. 1n excess of 100 ha. Approx 1,100 lots - 200 lots to be developed per year over 6 years as residential blocks & portion of land will be developed as 9 hole extension of golf course. Approx 40 per cent of developed lots will be purchased by Defence Housing, remainder to be sold on open market. Defence Housing proposes to construct 740 dwellings for Defence personnel & their families. The dwelling mix will be 20 per cent units, 20 per cent courtyard homes & the remaining 60 per cent traditional homes. Overall development likely to include 1600 dwellings. Block, brick, tile & some metal cladding. Golf course to include club rooms, community facilities including creche & preschool facilities. Click for more details...

LARRAKEYAH PRIMARY SCHOOL
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) Renovations, Refurbishments etc. project at Packard St, Larrakeyah, NT 0820. This type is Grounds Maintenance For School with State ownership. Grounds maintenance services. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Underground - including longwall) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

DESERT PEOPLES CENTRE (DESERT KNOWLEDGE PRECINCT)
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Desert Knowledge Precinct, Stuart Hwy, Alice Springs, NT 0870 of Consultants For Desert Knowledge Precinct type of New development. Engineering designs & documentation of site & trunk services. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

NORTH STUART HIGHWAY MOTOR VEHICLE REGISTRY VARIOUS WORKS
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Alice Springs Town Council Area for Renovations, Refurbishments etc. development. Repairs & maintenance of painting & civil works to motor vehicle registry. Click for more details...

PALMERSTON ARTERIAL ROADS - IRRIGATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Supply & Install project at Within region of, Palmerston, NT 0831. This type is Irrigation Telemetry - Supply/Delivery/Installation/Commissioning with State ownership. Supply, delivery, installation & commissioning of irrigation telemetry. Click for more details...

LYONS CIVIL WORKS PHASE 1 STAGE 1 (STAGES 1 - 5)
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Local Govt ownership. Civil works including roads, drains & other service infrastructure. Click for more details...

DARWIN/JABIRU NT GOVERNMENT ASSETS GROUP 7 - AIRCONDITIONING PLANT/EQUIPEMENT REPAIRS/MAINTENANCE
Airconditioning Plant/Equipement - Repairs/Maintenance Renovations, Refurbishments etc. project In The Darwin City Council Area. Repairs & maintenance to airconditioning plant & equipement for 12 month period contract for Group 7 NT Government Assets in Darwin & Jabiru areas. Click for more details...

NT GOVERNMENT ASSETS EAST ARNHEM REGION - MAINTENANCE SERVICES
East Arnhem Region within region of, Nhulunbuy, NT 0881 Has Nt Government Assets East Arnhem Region - Maintenance Services currently at Tenders & Building stage. Provision of maintenance services to government assets including building, plumbing & electrical works for 12 month period. Click for more details...

BURT PLAIN PROJECT - COPPER/GOLD/URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Alice Springs Town Council Area of Private ownership. High grade metamorphics of the Palaeoproterozoic Arunta Block crop out in the north-east part, and sporadically in the western part of the tenement. Aeoromagnetic and gravity information shows anomalies indicative of a huge iron oxide system. It is interpreted to be seven kilometres long by five kilometres wide, and is in places within 50 metres of the surface. This area has many attractive exploration attributes including the geophysical signature is comparable with that over the giant Olympic Dam deposit in South Australia. The prospect is trannsected by the Stuart Highway and Australasia Railway Line. Of particular interest is the U/Th ratio data, which shows a general correlation of elevated values with drainage patterns. Significantly the highest occur in the central eastern part of the tenement area, adjacent to inferred and mapped structures. This further expands the uranium exploration area to include roll-front deposits in palaeochannels incised in basement, and calcrete deposits. Click for more details...

THAMARRURR REGIONAL COUNCIL
A project in the NT Within Unincorporated North. Providing power and water services, and fencing of the town oval. The length of fencing encompasses an approximate area 165m X 150m. Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

DEFENCE HOUSING BELLAMACK
Military (Military housing & accommodation, Military colleges) project at 26 46 47 Flynn Cct 20 Taylor Cres 5 Magdalen St 13 Corry St 37 & 39 Clarke St (Lots 10842 10808 10777 10784 10788 10793 10816 10, Bellamack, NT 0832 for New. Construction of 4 x 4 bedroom & 4 x 5 bedroom houses with ensuite & family room. Double Garages. Associated landscaping. Click for more details...

TI TREE ROADHOUSE TRUCK STOP FACILITIES UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy (approx CH 1301.3km), Ti Tree, NT 0872 for New. Upgrade existing truck stop facilities at Ti Tree Roadhouse on Stuart Highway. To include drainage, underground stormwater drain, road signage, street lighting, landscaping & earthworks. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

ALICE SPRINGS HOSPITAL TEACHING & TRAINING FACILITY & FIRE RECTIFICATION
Teaching & Training Facility/Fire Rectification Works - For Hospital New project In The Alice Springs Town Council Area. Construction of 2 storey teaching & training facility. To include 100 seat theatre, 2 training & tutorial rooms, 2 clinical simulation rooms, 2 video-conference rooms, student computer hubs, student lounge & office areas. Design & construction of fire rectification works of Main Ward Block. To include fire sealing of existing unsealed service penetrations (mechanical, electrical, hydraulic, gases) through walls & floors. Fitout of existing Intensive Care Unit for temporary 24 bed Decant Ward while hospital undergoing fire rectification works. Services upgrades. Demolition works. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
New project of Retail (Shops, shopping centres & arcades, supermarkets) project at 5, 15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830. Supply of mall, food court & street furniture for the Gateway Shopping Centre. Click for more details...

NAUIYU/DALY RIVER HIGH PENETRATION ENERGY STORAGE SYSTEM
108 Wooliana Rd, Maranunga VIA NAUIYU, Daly River, NT 0822 Has Nauiyu/Daly River High Penetration Energy Storage System currently at Construction stage. Supply & installation of an energy storage system for the Nauiyu/Daly River high penetration solar/diesel hybrid power station as part of the Solar Energy Transformation Program (SETuP). To include battery system, power conversion system, isolation transformer & energy storage controller. Click for more details...

ARLPARRA SOLAR FACILITY
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 1000000. This project Construction of a Solar Facility capable of generating 450kw per year as pert of the Solar Energy Transformation Program (SETuP). To include solar arrays & mounting frames. Security fencing & gates. 6m wide access roads. Associated carparking & landscaping. Click for more details...

VICTORIA HIGHWAY HOUSING UPGRADES
Victoria Highway Housing Upgrades is currently at the Construction stage, valued at about $ 814000 it is Upgrade works to 14 dwellings at Katherine. To include removal of vinyl tiles & replacement with ceramic tiles. Replacement of roofing, kitchens & cisterns. Painting of all internal & external surfaces. Click for more details...

ALPURRURULAM PRESCHOOL
Education (Kindergartens, day nurseries, child care centres) project at Pitjara St, Alpurrurulam, NT 0862 of Preschool type of New development. Design & construction of a preschool at Alpurrurulam, located 600 km East of Tennant Creek. To include demolition & removal of existing concrete paths. Preschool to include playroom, quiet room, office, kitchen, childrens amenities, store room & outdoor activity area. Click for more details...

NAKARA PRIMARY SCHOOL ROOF REPAIRS
A project in the NT Within Darwin City. Replacement of roof, vapor barriers, flashing & gutters at Nakara Primary School. To include removal of existing roof sheeting, flashings, box gutters, insulation & downpipes. Construction of fully sealed vapour barrier. Supply & installation of 100mm x 100mm angle flashing & 0.9mm stainless steel box gutters. Supply & installation of series 450 stormwater pits at the base of downpipes. Supply & installation of sheet metal roofing. Provision of secure external scaffolding. Click for more details...

YARRALIN COMMUNITY ROADS UPGRADE
Yarralin Community Roads Upgrade is currently at the Construction stage, valued at about $ 500000 it is Upgrade works to internal roads in the Yarralin Community. To include supply & lay of gravel overlay & bitumen seal. Click for more details...

TAMINMIN COLLEGE AIR CONDITIONING UPGRADES
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 700000. This project Upgrades to the air conditioning system at Taminmin College. To include supply & installation of chiller. Click for more details...

TENNANT CREEK REGION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Barkly Shire Council Area of Seal/Culverts type. Widening of seal & culverts CH850.33-CH854.71 Click for more details...

TIO STADIUM
Tio Stadium is currently at the Construction stage, valued at about $ 3148000 it is Upgrade to lighting at TIO stadium Click for more details...

TENNANT CREEK URBAN PUBLIC HOUSING
Dwellings (2) project at Lots 144 & 151, Elliott, NT 0862 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 1 x 3 bedroom dwelling on Lot 144 & 1 x 3 bedroom dwelling on Lot 151, Elliott, Click for more details...

GALIWINKU POLICE STATION
Social (Amenities, Dressing rooms) New project at Elcho Island, Galiwinku, NT 0822. This type is Ablution Block with State ownership. Construction of a transportable ablutions block including connection to sewer at Galiwinku Police Station. Demolition 15lm of existing fencing and install 116m x 2100 high chain wire fencing including gates Click for more details...

KARLU KARLU (DEVILS MARBLES)
Car Park Viewing Area/Rehabilitation Works New project In The Barkly Shire Council Area. Car park North Viewing Area (new construction) - provide 2 wheel drive & caravan suitable entry & exit to new gravel carpark area with adequate sightlines and turn off lane if required; construction of new gravel carpark sub-base (compacted to 95% MMDD) and base (compacted to 100% MMDD) suitable for future sealing works; install REPLAS bollards to define extent of parking area (approximately 120 to be confirmed); existing fence to be removed where required and stabilised with end strainers. Car park Rehabilitation North - remove & dispose off-site existing pine bollards; scarify surface of informal parking area & supply only fencing materials. Car park Rehabilitation South - remove & dispose off-site existing pine bollards; scrape off bitumen and remove from site; scarify surface of informal parking area & supply only fencing material Click for more details...

CRAWFORD STREET SHOWROOM
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 42 Crawford St (Lot 2509), Katherine East, NT 0850 of Showroom type of New development. Construction of showroom sales to comprise covered awning area & sales & office area. Roof sheeting, wall cladding & powdercoated aluminium doors & windows. Car parking for 17 vehicles to include 16 car parks & 1 accessible car park. Associated landscaping. Click for more details...

ALICE SPRINGS BUS STOPS
Bus Stops New project In The Alice Springs Town Council Area. Construction of infrastructure upgrades to existing bus stops in the Alice Springs town area, including earthworks, concreting, supply and installation of shelters, seats, tactile ground surface indicators and other items. The locations are Memorial Ave, Araluen, Stuart Highway & Len Kittle Dr, Ilparpa Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect