State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Light Industry (Laundries, printing works, textiles, clothing) Projects in NT®ion=⊂=720 in region


KATHERINE HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Katherine Hospital Kitchen, Katherine, NT 0850 for Supply & Install. Supply & install airconditioning system with insulating ceiling panels to kitchen area of the Katherine Hospital. Click for more details...


Local Govt ownership Social (Amenities, Dressing rooms) project In The Alice Springs Town Council Area for New development. Construction of change room/ablution block (block). Grandstand/change rooms (steel). Sports administration building with kiosk (block). Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Region of Coomalie, NT 0845 for Renovations, Refurbishments etc.. Work involved includes repairs to sealed & unsealed roads, tree lopping, clean-up after storm damage & such like. Click for more details...


Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Unincorporated North Council Area for New development. Equipping of bore & construction of approx 7 km of rising, main, upgrade of water reticulation, storage & treatment systems. Click for more details...

MCARTHUR RIVER BASE METALS MINE
A project in the NT Within Katherine Town. 38 week contract envisaged to construct the Batten Creek bridge and approaches. Click for more details...

ULURU - BASE OF CLIMB
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Uluru via, Alice Springs, NT 0872 of Rising Main For Toilet Block type of New development. Solar powered sewerage pump station rising main, water mains & civil works for new toilet block at Uluru (base of climb). Click for more details...

LARRIMAH POWER & WATER SUPPLY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project In The Darwin City Council Area of Operation & Maintenance - Power & Water type. Day to day operations & maintenance of power, water systems & customer services at Larrimah for 12 month period. Click for more details...

STUART/VICTORIA HIGHWAY REHABILITATION
Stuart & Victoria Hwys Region of, Katherine, NT 0850 Has Stuart/Victoria Highway Rehabilitation currently at Tenders & Building stage. Slurry correction & overlay. Click for more details...

ANMATJERE COMMUNITY GOVERNMENT COUNCIL
Residential (Units, apartments, flats, townhouses, villas) Addition project at Aluen & Nturiya, NT 8999. This type is Houses (2) with Local Govt ownership. 4 bedroom. Steel frame & steel clad construction, timber floor, metal deck roof, aluminium framed windows. Click for more details...


Civil Engineering (Residential Subdivision) project for New development. 3 commercial & 32 housing lots. Roads, stormwater drainage, water supply, sewerage, power & street lighting. Click for more details...

ALICE SPRINGS CULTURAL PRECINCT - THE RESIDENCY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Addition project at Alice Springs Cultural Precinct - The Residency, Alice Springs, NT 0870. This type is Paving Levels - Altns/Stormwater - Install with State ownership. Alterations paving levels & installation storm water. Click for more details...

TANAMI GOLD OPERATIONS
Mining (Open Cut) project at 650 km northwest of, Alice Springs, NT 0870 of Mines - Open Cut/Infrastructure type of New development. Work to date includes resource definition, pit planning, metallurgical testwork & scoping studies (on several deposits). Area contains Jim's Find, Jim's South, Dogbolter & Redback deposits with a total estimated resource of 4.6mt grading 3.4gpt gold. Initial mining involving 7 small pits is envisaged with an average strip ratio of 9:1. Earlier drilling results included 8m grading 76.5gpt gold from Dogbolter's main zone. First deposits to be mined to also include the Harleys area. Mining reserves currently estimated at 2mt grading 3.8gpt gold with potential to prove up additional reserves. Haulage of ore to the plant site approximately 8 km distant & up to 25 km (Jim's Find deposit) is included in this tender. Original contract period is for 2 years with a 2 year option. These deposits to be mined to various depths up to 110m for this 1mtpa operation. Haulage roads to be constructed as mine site are developed. Click for more details...

FAIRWAY WATERS
A project in the NT Within Palmerston Town. 1n excess of 100 ha. Approx 1,100 lots - 200 lots to be developed per year over 6 years as residential blocks & portion of land will be developed as 9 hole extension of golf course. Approx 40 per cent of developed lots will be purchased by Defence Housing, remainder to be sold on open market. Defence Housing proposes to construct 740 dwellings for Defence personnel & their families. The dwelling mix will be 20 per cent units, 20 per cent courtyard homes & the remaining 60 per cent traditional homes. Overall development likely to include 1600 dwellings. Block, brick, tile & some metal cladding. Golf course to include club rooms, community facilities including creche & preschool facilities. Click for more details...

MINJILANG COMMUNITY
Currently at the Construction stage In West Arnhem Shire is a project estimated to be $ 450000. This project Construction of 2 x 3 bedroom steel framed houses & renovation/extension to an existing house. Click for more details...

COLLEGE ROAD DEVELOPMENT
Commercial Premises (Offices) project at 2 College Rd (Secn 4920 Hund of Bagot), Berrimah, NT 0828 for New. Construction of 8 warehouse units with ancillary offices & showroom in 5 buildings. Steel frame & steel clad, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

GATEWAY RESORT
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 1200000. This project Headworks for Tourist Development including roads, sewer, water, fire main & electrical services. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

COASTAL PLAINS HORTICULTURE RESEARCH FARM
Slashing/Weed Control project at Coastal Plains Horticlture Research Farm, Darwin, NT 0800 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Provision of slashing & wed control for 3 year period. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Underground - including longwall) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

CORPORATE COMMUNICATIONS OFFICE
A project in the NT Within Darwin City. Supply & install new proprietary modular partitioning system to office area of Corporate Communications office. Click for more details...

FROG'S HOLLOW ARTS CENTRE REPAIRS
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Frogs Hollow Arts Centre, Woods St, Darwin, NT 0800 for Renovations, Refurbishments etc.. Comprising painting, shelving & security screens. Click for more details...

DALY RIVER POLICE STATION AEROBIC BACTERIA TREATMENT SYSTEM
Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area of Aerobic Bacteria Treatment Systems For Police Station - Supply & Install type. Design, supply & install 2 x aerobic bacteria secondary treatment systems. There are two houses into one treatment system & one house & police complex into other system. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

ADELAIDE RIVER SCHOOL RESOURCE ROOM
Joinery/Associated Works For Resource Room Renovations, Refurbishments etc. project In The Coomalie Community Council Area. Remove & replace existing joinery with new, remove existing sink & capping plumbing services, preparations & painting existing painted surfaces, remove & replace existing vinyl floor tiles with new sheet vinyl. Click for more details...

CONCRETE ASSETS-CITY OF PALMERSTON
Concrete Maintenance Renovations, Refurbishments etc. project In The Palmerston Town Council Area. Construction & maintenance concrete assets. Click for more details...

BULLOCKY POINT MUSEUM/ART GALLERY CORNUCOPIA CAFE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) Renovations, Refurbishments etc. project at 19 (lot 05714) Conacher St Bullocky Point, Darwin, NT 0800. This type is Loading/Storage Area Modifications For Walk-In Freezer with State ownership. Modifications to existing loading & storage areas for provision new walk-in freezer. Click for more details...

ALICE SPRINGS HOSPITAL MENTAL HEALTH
Alice Springs Hospital Mental Health is currently at the Planning stage, valued at about $ 100000 it is Construct mental health residential facilities building. Click for more details...

NHULUNBUY TERRITORY HOUSING - GROUNDS MAINTENANCE/ARBOREAL SERVICES
A project in the NT Within East Arnhem Shire. Grounds maintenance & arboreal services to Territory Housing unit complexes for period of 12 months. Click for more details...

ROYAL DARWIN HOSPITAL PLUMBING SERVICES
Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr, Casuarina, NT 0810 of Plumbing Services type of Renovations, Refurbishments etc. development. Provision of plumbing services to hospital for period of 3 years. Click for more details...

NORTHERN TERRITORY STRATEGIC INDIGENOUS HOUSING & INFRASTRUCTURE
Houses project at Various communities within Northern Territory, ., NT 8999 in the Residential (Units, apartments, flats, townhouses, villas). Proposed design & construction of housing works packages to be delivered across 73 communities & targeted urban living areas - 16 communities to receive major capital works & 57 communities to receive housing refurbishments. The program will deliver: approx 750 new houses including new subdivision; more than 230 new houses to replace houses to be demolished; more than 2500 housing upgrades; essential infrastructure to support new houses; improvements to living conditions in town camps. Click for more details...

CASUARINA CAMPUS CHARLES DARWIN UNIVERSITY
New project of Residential (Student & group accommodation) project at 7 (Lot 9199) Ellengowan Dve, Brinkin, NT 0810. Construction of 6 x 2 storey ancillary hostel accommodation buildings to an existing establishment in two stages. Concrete slab, concrete blockwork & metal cladding. Click for more details...

TARAKAN COURT MIXED USE DEVELOPMENT
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 20000000. This project Construction of mixed use development with commercial space on lower levels & 224 units in 5 x 4 storey buildings. 75 x 3 bedroom, 119 x 2 bedroom & 30 x 1 bedroom units. Associated carparking & landscaping. Click for more details...

DAWSON STREET WAREHOUSE OFFICE COMPLEX
Commercial Premises (Offices) project for New development. Construction of warehouse (1399sq m) & office (229sqm) complex. Cement slab, rendered concrete blockwork, metal roof. Parking for 23 cars. Associated landscaping. Click for more details...

MILINGIMBI SCHOOL TRADE TRAINING CENTRE
Trade Training Centre project at Yurrwi Island via, Darwin, NT 0800 in the Education (Schools - primary, secondary (up to Yr 12)). Construction of trade training centre. Includes 2 bay shed with theory room & temporary trainers quarters. Click for more details...

BOULTER ROAD RESIDENTIAL DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project at 47 Boulter Rd (Lot 5695), Bagot, NT 0820 for New. Construction of 45 x 3 bedroom townhouses in 23 separate single storey buildings. Cement slab, metal cladding walls & metal roof. Parking for 90 cars. Associated landscaping. Click for more details...

POLGLASE CIRCUIT VILLAS
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 2700000. This project Construction of 11 x 3 bedroom villas in 6 single storey buildings. Concrete slab, rendered blockwork, powdercoated aluminium frames, colour-coated metal roof. Parking for 22 cars. Associated landscaping. Click for more details...

STUART HIGHWAY ALI CURUNG RAIL OVERPASS EMBANKMENT PROTECTION WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Embankment protection works to the Ali Curung rail overpass from Ch 1137.09 to Ch 1138.23 of the Stuart Highway, located 150 Km South of Tennant. To include supply & lay of 620 - 650gms geofabric material to embankment. Provision of traffic control. Click for more details...

SADADEEN ZONE SUBSTATION CIVIL WORKS
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 431000. This project Construction of civil & hydraulic works to enable the installation (by others) of a coupling transformer and 2 capacitor banks at Sadadeen Zone Substation. To include demolition/removal of existing infrastructure. Concrete foundations, slabs & plinths in the transformer Bay 5 & capacitor bank Bay 6. Extension of the height of block work blast walls in the transformer Bay 5. Fences, stairs, new cable trench, conduit trench, installation of PVC conduits, reinstatement of ground & slab, pit, sump drains & fire water main & valves. Click for more details...

ALYANGULA SCHOOL CANTEEN REFURBISHMENT
A project in the NT Within East Arnhem Shire. Refurbishment of the existing canteen at Alyangula School, located on the corner of Flinders Street & Ayawarra Crescent, Groot Eylandt in East Arnhem Land. To include the removal of vinyl flooring, internal door, roller shutter, joinery & splash back. Supply & installation of stainless steel bench tops, MDF bench tops, vinyl flooring, tiled splash back & stainless steel splash back. Click for more details...

ADELAIDE RIVER CEMENT WATER MAIN REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project at Stuart Hwy, Adelaide River, NT 0846 for New. Replacement of an asbestos cement water main on the Stuart Highway Service Road, Adelaide River. Click for more details...

WEST LANE CAR PARK CHILLED WATER PIPE REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of Chilled Water Pipe - Replacement type. Replacement of a chilled water pipe to an existing air conditioning system at the West Lane Car Park, Darwin. Click for more details...

LITCHFIELD NATIONAL PARK BULEY ROCKHOLES VISITOR AREA UPGRADES
Litchfield Park Rd, Litchfield Park, NT 0832 Has Litchfield National Park Buley Rockholes Visitor Area Upgrades currently at Construction stage. Upgrade works at the Buley Rockholes site at Litchfield National Park to convert the existing camping area to a day visitor area. To include conversion of existin car park to day use area with 2m wide concrete path. Construction of new picnic shelter with reinforced concrete slab, metal sheet roofing, metal tables & barbecues. Conversion of existing campground into asphalt day parking area with 52 car parks. Decommissioning of remaining campsites. Decommission & removal of existing ablutions block & septic system. Upgrades works to access road to create a 2 way sealed road with 2 x 3m lanes. Associated landscaping. Click for more details...

MILIKAPITI GOVERNMENT EMPLOYEE HOUSING UPGRADES
Residential (Units, apartments, flats, townhouses, villas) project In The Tiwi Islands Shire Council Area of Government Employee Houses (10) - Upgrade type. Refurbishment works to 10 Government Employee Houses located within Milikapiti, Melville Island. To include painting of internal & external surfaces. Removal of vinyl flooring & replacement with ceramic floor tiles. Supply & installation of kitchen fittings & fixtures. Supply & installation of bathroom vanity, cistern, fittings & fixtures. Supply & installation of security screen & air conditioning units. Extension of concrete pathway. Click for more details...

RAAF BASE TINDAL PUBLIC DOMAIN WORKS
Landscaping project at Houston Dr, Tindal Raaf, NT 0853 In The Council Area Of Katherine Town of Private. Design & construction of public domain landscaping works at the RAAF Base Tindal. Design to include retaining wall, playgrounds, shelters, bridges & concrete pathways. Click for more details...

LUDMILLA WASTEWATER TREATMENT PLANT
Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area of State ownership. Construction of a new chemical storage bund at Ludmilla Wastewater Treatment Plant at approximately about 4.5m x 9m with depth of 300mm. Associated works. Click for more details...

FRED PASS RESERVE
Electrical - Upgrade project at ., Freds Pass, NT 0822 in the Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)). Upgrade of electrical infrastructure at Freds Pass Reserve. Scope of work includes: replacement of existing main switchboard no 1 with a new main switchboard & additional supply authority metering facilities, demolition & removal from site of redundant sub-boards, submains, columns & streetlights, the installation of new below ground conduits & pits, the establishment of new service corridors in systematic locations to enable future works packages & future master planning to occur Click for more details...

CHAN BUILDING REDEVELOPMENT
State ownership Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area for Renovations, Refurbishments etc. development. Scope of works comprise: making good the building to ensure it is water tight with a controlled environment to prevent the reoccurrence of mould in the building. It is not proposed to use the currently vacant section of the ground floor, first and second floor for any habitable purpose, but each floor must be secure from entry by anyone other than authorised officers Click for more details...

ROOM TO BREATHE
Residential (Units, apartments, flats, townhouses, villas) project for Addition development. Room to Breathe early works program for Maningrida. Creation of new living spaces in existing homes Click for more details...

ROOM TO BREATHE
Renovations, Refurbishments etc. project of Residential (Units, apartments, flats, townhouses, villas) project at in Ampilatwatja, Tennant Creek, NT 0860. Room to Breathe early works program for Ampilatwatja. Creation of new living spaces in existing homes Click for more details...

GALIWINKU SOLAR FACILITY
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at ., Galiwinku, NT 0822 for New. Clearing, grubbing, & fencing for a solar facility in Galiwinku. Works include: clearing & grubbing of all vegetation; mulching of vegetation; site is to be left with an evenly graded surface that does not concentrate water run-off, & is clear of organic material & debris; removal of rubbish, & excess mulch (if required), from site & its appropriate disposal off site; establish a site access; fencing of the solar facility to the Power & Water standard. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect