State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Marinas Projects in NT®ion=⊂=1741 in region


DAMOE-RA-PARK - THE ESPLANADE
Damoe-Ra-Park - The Esplanade is currently at the Construction stage, valued at about $ 50000 it is Walkway reconstruction & Associated works. Click for more details...


Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at Fitzgerald St (Lots 8634 4546 & 8636 Town of Nightcliff) & 365 Bagot Rd, Millner, NT 0810 for New. Block-work construction, concrete floor, metal deck roof, aluminium framed shop front windows, airconditioning. Carparking. Click for more details...


Industrial (Depot, Garages, Workshops, Carwashes, Hangars) New project at Bulman, NT 8999. This type is Houses (2)/Office (1)/Community Hall (1)/Mechanical Workshop (1) with Local Govt ownership. 2 x 3 bedroom, steel framed houses on stumps, 1 x steel framed office on stumps, 1 x community hall & 1 x mechanical workshop. Click for more details...


A project in the NT Within Alice Springs Town. 3 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...


A project in the NT Within Alice Springs Town. 2 bedroom. Lightweight panel concrete system, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
1st Aviation Regiment Robertson Barracks is currently at the Construction stage, valued at about $ 6500000 it is Construction of live-in accommodation for Other Ranks. Click for more details...

ULURU - BASE OF CLIMB
Public Utilities (Treatment plants, Sewerage reticulation) project at Uluru via, Alice Springs, NT 0872 of Rising Main For Toilet Block type of New development. Solar powered sewerage pump station rising main, water mains & civil works for new toilet block at Uluru (base of climb). Click for more details...

BRADSHAW FIELD TRAINING AREA
Bradshaw Field Training Area is currently at the Construction stage, valued at about $ 20000000 it is Scope of works to comprise, but not limited to: Range Control facilities including workshop & sleeping quarters, 2 Caretaker's residences, Training Force maintenance area, 3 x 250 person scale A camps, 3 x 250 person Satellite camps. Click for more details...


Civil Engineering (Residential Subdivision) project for New development. 3 commercial & 32 housing lots. Roads, stormwater drainage, water supply, sewerage, power & street lighting. Click for more details...

ROBERTSON BARRACKS
State ownership Military (Military installations & facilities) project In The Litchfield Shire Council Area for New development. Civil works for 1 BASB - Transport & Maintenance Companies. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) Renovations, Refurbishments etc. project, Ramingining, NT 5999. This type is School Building & Residences - Upgrading with State ownership. Painting & repairs. Click for more details...

ROBERTSON BARRACKS
Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 Has Robertson Barracks currently at Construction stage. Second stage to provide facilities for 5/7 Royal Australian Regiment (206 beds). Click for more details...

DARWIN PORT CORPORATION
Renovations, Refurbishments etc. project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Fisherman's Wharf, Darwin, NT 0800. Proposed corrosion protection to steel piles & repairs to landings. Click for more details...

URAPUNGA & EVA VALLEY AIRSTRIPS
Fence - Supply & Install project at Urapunga (Rittarangu) Airstrip & Eva Valley (Manyallaluk) Airstrip Region of, Katherine, NT 0850 in the Civil Engineering (Retaining walls, Seawalls). Supply & install 7 km fence around Airport boundaries. Click for more details...

CLUB ALICE
Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area of Sporting Complex/Residential Subdivision For Golf Club - Redevelopment type. Plans are to expand with an extra 18 holes, plus new 18 hole short course under lights. Likely to include bowling greens, squash & tennis courts. Urban development would include: child care centre, swimming pool, barbecue areas, convenience store, function & gaming rooms, bars, gyms & offices as well as houses. Golf club rooms would be relocated & extra 18 holes & housing development would be built on north side of Stephens Road between Lasseters Hotel Casino & existing housing in new suburb in Mt John Valley. Click for more details...

ALICE SPRINGS HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) Subcontract project at Gap Rd, Alice Springs, NT 0870. This type is Trade Package For Joinery - Hospital - Redevelopment with State ownership. Joinery for hospital redevelopment. Click for more details...

KAKADU NATIONAL PARK
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Maguk Barramundi Creek Kakadu National Park Area of, Darwin, NT 0800. This type is Walkway For Maguk Barramundi Creek - Stage 1 with State ownership. Construction of new galvanised steel sub framed, aluminium decked walkway across & up short distance of Barramundi Creek. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DORAT ROAD REHABILITATION
Currently at the Planning stage In Darwin City is a project estimated to be $ 300000. This project Proposed Dorat Road bitumen reseal Ch: 0km - 11km. Click for more details...

MIRAMBEENA TOURIST RESORT
Hospitality (Hotels, Serviced Apartments) project In The Darwin City Council Area of Private ownership. Room extensions & refurbishment to 54 rooms. Click for more details...

DARWIN INTERNATIONAL AIRPORT APRON BAYS 11 & 12
A project in the NT Within Darwin City. Construct new Apron Bay 11 & 12. Works includes earthworks including disposal of soil on or off site, heavy grandular pavements with concrete in-fills & AC surfacing plus match to existing airfield pavements, relocated airside roadworks including service re-location, underground services covering drainage lines & interceptor structures, civil works for construction of high pressure fuel lines & communication infrastructure (latter two possibly by nominated subcontract), ordinary related works - linemarking, water supply, fencing, onduits, landscape etc & hardstand lighting. Click for more details...

BROWNS OXIDE PROJECT - NEW TAILINGS FACILITY
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - New Tailings Facility currently at Construction stage. The Tailings Storage Facility associated with the approved BOP has been found to overly a zone of potentially economic mineralisation. To avoid sterilisation of this zone of mineralisation th Company intends to construct a new TSF to contain the tailing from ore processed from the Browns oxide deposit in a location immediately adjacent to the approved TSF location. The new TSF has been designed on the basis that it will store both tailing and potentially acid forming (PAF) waste rock from the deposit. Prepatory activities associated with the construction of the new TSF are: vegetation clearing and grubbing, topsoil stripping and stockpiling, levelling of the site and compaction of existing clayey soils. The construction of the TSF will involve: an internal lining of compacted clayey soil, comprising a number of layers of low permeability material. Material for this zone will be preferentially sourced from a borrow pit located within the storage area, a rockfill zone for the external empbankment, constructed using NAF pit waste material, an internal ramp to access the decant system, and a PAF bund. The PAF bund will provide a physical barrier between tailings and the PAF waste, and is required because the tailings level will be higher than PAF waste level in the early stages of construction. A protective rockfill layer place (loose) over the face of the Zone 1 layer to provide protection from erosion and evaporative drying. Click for more details...

GOVERNMENT HOUSE
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project for Renovations, Refurbishments etc. development. Replace retaining wall North east corner. Click for more details...

KATHERINE REGION ROADWORKS/REPAIRS/MAINTENANCE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Roads within region of, Katherine, NT 0852. This type is Drainage/Structures/Bridges/Grids - Repairs/Maintenance with State ownership. Repairs & maintenance of drainage, structures, bridges & grids for 12 month period. Click for more details...

DARWIN/JABIRU NT GOVERNMENT ASSETS GROUP 7 - AIRCONDITIONING PLANT/EQUIPEMENT REPAIRS/MAINTENANCE
Airconditioning Plant/Equipement - Repairs/Maintenance Renovations, Refurbishments etc. project In The Darwin City Council Area. Repairs & maintenance to airconditioning plant & equipement for 12 month period contract for Group 7 NT Government Assets in Darwin & Jabiru areas. Click for more details...

DEPARTMENT OF DEFENCE SHOAL BAY RECEIVING STATION
New project of Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project at Shoal Bay Receiving Station, Rapid Creek Rd, Alawa, NT 0810. Upgrade & modifications of existing air conditioning systems. Provision of new air conditioning system to accommodate additional loads of approx 360 kW. Upgrade & modifications of the existing electrical reticulation systems & associated infrastructure to cater for additional equipment load. Upgrade & modifications of existing Uninterruptible Power Supply. Provision of a fully automatic fire suppression & control system in accordance with Defence Manual of Fire Protection Engineering & relevant Australian Standards. Refurbishment of existing workspaces to open-plan design. Click for more details...

WEST MACDONNELL NATIONAL PARK LARAPINTA TRAIL SHELTERS(T07-1294)
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Alice Springs Town Council Area of Shelters type. Construct shelters along Larapinta trail within West MacDonnell National Park. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - ROAD HAULAGE
Road Haulage New project In The Coomalie Community Council Area. For the provision of road haulage. Click for more details...

YIRRKALA HOMELANDS CENTRES CLASSROOMS BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at Yirrkala Homelands Boruwuy (Wandawuy) Dhalinbuy Garrthalana & Gangan, Yirrkala, NT 0880 of Classrooms type of New development. Construction of Classrooms at each site. Click for more details...

WEST ARNHEM COLLEGE TRADE TRAINING CENTRE (JABIRU AREA SCHOOL)
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 40 Waterhouse Rd (Lot 00895), Jabiru, NT 0866. Construction of engineering facility. To include: 3 bay workshop, covered open bay, amenities, classroom & self contained visiting officers quarters. Portal frame, masonry blockwork. Associated landscaping. Click for more details...

DEFENCE HOUSING AUSTRALIA - NATIONAL PROPERTIES
various locations in the Northern Territory, ., NT 8999 Has Defence Housing Australia - National Properties currently at Planning stage. Defence Housing Australia (DHA) undertakes property provisioning around Australia through upgrading of existing stock, new construction, acquisition & development projects. Scope of Works will require suitably qualified companies to undertake some of the following works - Concept feasibility studies of probable costs, including revisions; Preparation of costing?s to be included in feasibility studies for DHA Board & Public Works Committee; Design Stage ? Validating Preliminary & final Sketch Plan costs; Documentation Stage ? Pre-EOI estimates; EOI Review ? EOI assessments & reports; Contract cost variation assessment & validation report & other adhoc services Click for more details...

KINTORE STREET SCHOOL ADMINISTRATION & CLASSROOM BUILDING
11 Kintore St, Katherine, NT 0851 Has Kintore Street School Administration & Classroom Building currently at Construction stage. Design & construction of administration & classroom building. To include demolition/removal of existing administration building. Reception area (47.4sq m) with electronic access security, 3 offices (52.86sq m), resource room (24.68sq m), 2 classrooms with teacher offices (15.31sq m), staff area/kitchen (33.40sq m), amenities (17.34sq m), cleaner's room (4.50sq m), first aid room (5.88sq m) & store room (8.64sq m). Refurbishment of existing ablutions facilities to Banyon Classroom. Installation of solar power. Extension to concrete driveway. Full length awning for bus & carpark. Steel, corrugated metal roof, cladding & concrete. Car parking for 9 cars. Associated landscaping. Click for more details...

WADEYE POLICE STATION
Public Buildings & Facilities (Police Stations) project at Perdjert St (Lots 447 - 450, 527, 575), Wadeye, NT 0822 for New. Proposed construction of the Wadeye Police Complex to include police station, visiting officers quarters & housing. To include demolition & decommissioning of existing Power Water Corporation facility & existing dwellings. Construction of Police Station in a single storey building with reception, office areas, interview rooms, cells, communications, interview facilities, sally port & ancillary administration areas. 10 x 4 bedroom detached 2 storey dwellings with double car ports & balconies. Construction of 2 x 3 bedroom duplexes with carports & balconies. 8 x single bedroom units for visiting officers in a 2 storey building. Boat shed & dog storage area with 3 roller doors & internal workshop. Painted steel balustrades, concrete blockwork walls, ceramic floor tiles, vinyl flooring, sheet metal roofing & cladding. 2.1m high chainmesh fence around site boundary & 1.8m high chainmesh fence around dwellings. Asphalt driveways & total car parking for 18 cars. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
New project of Retail (Shops, shopping centres & arcades, supermarkets) project at 5, 15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830. Supply of mall, food court & street furniture for the Gateway Shopping Centre. Click for more details...

GOOD SHEPHERD LUTHERN COLLEGE ACCESS ROAD
Education (Schools - primary, secondary (up to Yr 12)) project In The Litchfield Shire Council Area of Private ownership. Construction of an access road to connect Stow Road to the Good Shepherd Lutheran College, Howard Springs. To include vegetation clearing, removal of earth berm & re-alignment of open unlined drain. Widening of existing bus interchange area. Table drains & reinforced concrete box culverts. To include 2.5m wide drop off zone & 2.5m wide footpath. Parking for 17 cars. Associated landscaping. Click for more details...

KATHERINE REGION PARKS REPAIRS & MAINTENANCE
Currently at the Construction stage In Katherine Town is a project estimated to be $ 259000. This project Building repairs & maintenance to various parks located within the Katherine Region. Locations to include Limmen National Park, Elsey National Park, Cutta Cutta National Park, Giwiniry/Flora River Nature Reserve, Nitmiluk National Park, Caranbirini Conservation Reserve, Barrangi National Park, Bullwaddy Conservation Reserve & Kintore Caves National Park. To include repairs & general maintenance to walking tracks, fence lines, erosion control structures, asbestos removal & tree removal. Supply & installation of barriers, bollards, barbecues, bridges, board walks, furniture, rubbish bins, shelters & amenities. Click for more details...

ROBINSON RIVER WATER STORAGE UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The Roper Gulf Shire Council Area of Water Tank - Upgrade type. Design, supply & installation of a 277KL potable water storage tank with roofing at Robinson River. To include excavation & benching, sub base preparation including filling, compaction & back fill. Construction of concrete tank foundation. Supply & installation of tank pipework, fittings & valves. Tank pipework to include overflow pipe outlet, scour box & outlet pipe to transfer pumps. Click for more details...

SATELLITE CITY BMX TRACK ROOFING
Private ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Palmerston Town Council Area for New development. Design & construction of roofing to cover the Satellite City BMX track, start hills & spectator areas. To include guttering & down pipes. Construction of start hills with decking, guard & hand rails. Supply & installation of lighting with 2-3 electrical circuits. Supply & installation of sound system. Click for more details...

NORTHERN GAS PIPELINE VEHICLE HIRE
Vehicle Hire - For Gas Pipeline project at Warrego (NT) - Mount Isa (QLD), ., NT 8999 In The Council Area Of Various of State. Provision of 4WD diesel vehicles for field work, site investigations & stakeholder engagement for the Northern Gas Pipeline. Click for more details...

AMPILATWATJA PRESCHOOL
New project of Education (Kindergartens, day nurseries, child care centres) project at Ampilatwatja, Alice Springs, NT 0870. Design & construction of a preschool at Ampilatwatja, located 325km North East of Alice Springs. To include removal of existing basketball court. Preschool to include play room, childrens amenities, outdoor acitivity area & enclosed verandah. Design & construction of concrete paths & fencing. Click for more details...

ALICE SPRINGS POLICE STATION EXTERNAL WORKS STAGES 1 & 2
Public Buildings & Facilities (Police Stations) project In The Alice Springs Town Council Area of Police Station - Upgrade - Stages 1 & 2 type. External upgrade works to the Alice Springs Police Station to be completed over 2 stages. Stage 1 to include supply & laying of 3m x 3m concrete slab to 100mm thickness & relocation of existing training shed to concrete slab. Upgrade & extension to existing push bike shelter. Supply & instillation of motorbike shed. Supply & installation of new 2.4m high sheet metal fencing to Southern & Eastern boundaries. Stage 2 to include construction of new car ports with concrete footings, steel columns & sheet metal roofing. Supply & installation of lighting & CCTV cameras. Supply & instillation of 2.4m high sheet metal fencing to Eastern boundary. Click for more details...

IMANPA DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project In The Macdonnell Shire Council Area of State ownership. Demolition of five dwellings on Lots 5, 6/ 1 & 2 (a duplex), 51 & 54. Construction of 2 x 2 & 2 x 3 bedroom dwellings on Lots 5, 6/ 1 & 2 (a duplex) & 54 in the community of Imanpa in the Northern Territory Click for more details...

ARCHER TO PALMERSTON TRANSMISSION LINE
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project at Archer to, Palmerston, NT 0830 of Transmission Line type of New development. Construction and commissioning of a new 66kV underground transmission line from the underground/overhead termination pole installed by others at the western boundary of the Heights, the underground route shall continue east through the Heights sub division to the Roystonea Avenue road reserve where it will run parallel with the western property boundary at a proposed offset of 5m through to University Avenue. Click for more details...

BISHOP STREET LEISURE & RECREATION FACILITY & OFFICE
Renovations, Refurbishments etc. project of Commercial Premises (Offices) project at Unit 1, 27 Bishop St (Lot 1837), Woolner, NT 0820. Conversion of 2 storey warehouse, showroom sales & office into leisure & recreation facility (279.8sq m), office (97.7sq m) & warehouse (50.7sq m). Ground floor - Demolition of reception area, office walls, bathroom & stairs to create additional space for sewing workshops. Existing kitchen to be expanded & relocation of bathroom. New access ramp, internal stairs & awning. First floor - Retention of balcony, demolition of kitchenette & meeting room wall, extension of floor to accommodate dance hall, toilet facilities & office/store room. Concrete floor slab & spring timber floor. Car parking for 8 vehicles. Associated landscaping. Click for more details...

NGUKURR REMOTE COMMUNITY HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Roper Gulf Shire Council Area for Renovations, Refurbishments etc. development. Upgrade to 14 Remote Community Housing (RCH) assets in the Community of Ngukurr. The lot numbers are 286, 287, 304, 306, 309, 311, 312, 320, 325, 326, 328, 364, 366 and 389 Click for more details...

BUNTINE HIGHWAY
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Buntine Hwy & Edith Falls Rd, Katherine, NT 0850. This type is Roadworks - Reseals with State ownership. Resealing of Buntine Highway at various existing primerseal sections with an S10E polymer modified binder using 7mm aggregate.Resealing of a section along Edith Falls Road between chainage 0.1 ? 0.45km. The works comprise of a two coat reseal with an S10E polymer modified binder using 14mm & 7mm aggregate. Click for more details...

ANZAC PARADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Litchfield Shire Council Area of Local Govt ownership. Pavement strengthening and widening between chainage 1.35km & chainage 2.175km on Anzac Parade. Click for more details...

WURLI WURLINJANG HEALTH SERVICES
21 Third St (Lot 3442), Katherine, NT 0850 Has Wurli Wurlinjang Health Services currently at Construction stage. Extension of an existing medical centre for an additional 2 consulting/interview rooms, offices, chemist store room & general store room. Aluminium doors & windows, wall cladding. Car parking for 8 vehicles. Associated landscaping. Click for more details...

BARKLY HIGHWAY
A project in the NT Within Barkly Shire. Shoulder rehabilitation works on the Barkly Highway to improve road safety by topping shoulders with imported gravel, mixing, compacting & trimming existing scoured shoulders. The site of the works is chainage 164.50 to chainage 173.50 on the Barkly Highway. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect