EXETER SAW MILL
108 Frankford Main Road, Exeter, TAS 7275 Has Exeter Saw Mill currently at Construction stage. Timber poles, steel trusses, colorbond cladding walls and roof, asphalt flooring. Click for more details...


Shops/Offices (15) project at 6 Bayfield St, Rosny Park, TAS 7018 In The Council Area Of Clarence of Private. Shops ranging in size from 100 sq m - 250 sq m. Offices ranging in size from 100 sq m - 160 sq m. Basement carparking for vehicles, concrete blockwork walls, concrete frame & floors, colorbond roof. Includes a lift. Click for more details...

BUILDING 101
Commercial Premises (Offices) project In The Glenorchy Council Area of Private ownership. Complete external refurbishment, replacement of windows, portion of internal works, carpet. Click for more details...

ROBERTS WOOL STORE
Wool Store project at Midland Hwy, Bridgewater, TAS 7030 in the Industrial (Warehouses, cargo sheds, distribution centres). Pre-cast concrete panel walls, concrete floor, trimdeck roofing, aluminium windows. Click for more details...

MOUNT CARMEL COLLEGE
361 Sandy Bay Road, Sandy Bay, TAS 7005 Has Mount Carmel College currently at Construction stage. Demolition, alterations and new construction works to an existing two storey building. Cement sheet cladding, metal roof, concrete floor and aluminium windows. Click for more details...

TI TREE WWTP - SLUDGE HANDLING UPGRADE
Sludge Thickening Equipment - Supply And Install project at Ti Tree Bend, Launceston, TAS 7250 In The Council Area Of Launceston of Local Govt. Supply and installation of sludge thickening equipment. Click for more details...

UNITED MILK TASMANIA LTD
Currently at the Construction stage In Devonport is a project estimated to be $ 500000. This project Roadway, water & fencing. Click for more details...

CENTRAL COAST COUNCIL OFFICES UPGRADE
Addition project of Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project at 19 King Edward Street, Ulverstone, TAS 7315. Internal refurbishment to include new partitions, carpet, painting, lift & internal stairs, a minor extension of brick, steel, concrete floor & aluminium windows. Click for more details...

WEST DELORAINE SEWER PUMP STATION AND RISING MAIN
Sewer Pump Station And Rising Main New project In The Meander Valley Council Area. Construction of a sewer pump station and rising main. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - MINING CONTRACTORS COMPOUND
New project of Mining - Support Facilities (Accommodation - units, housing, group accom.) project at Near, Grassy, TAS 7256. For the provision of mining contractors compound. Click for more details...

ULVERSTONE BYPASS DUPLICATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Central Coast Council Area of Roadworks/Bridgeworks type. This contract involves road and bridge works on the Bass Hwy from East Ulverstone to west of the Leven River. Click for more details...

PROFESSOR ZINC PROJECT - RESOURCE
Near, Zeehan, TAS 7469 Has Professor Zinc Project - Resource currently at Early Planning stage. Inferred resource estimate of 350,000 tonnes @ 4% Zn. Scoping study will look at establishing a flow sheet to economically recover zinc from the surface zinc sulphide deposit at Grieves. Other work will be drilling to upgrade the resource, examining options for the treatment of underlying zinc oxide mineralisation and optimising the mining rate initially planned to be 200,000 tonnes per annum of ore @ 4% Zn for 6000 tonnes of contained zinc per annum. Click for more details...

GAGEBROOK COMMUNITY CENTRE
State ownership Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Brighton Council Area for New development. Construction of a community centre on a Greenfield site. Block veneer, cement sheet cladding, metal roof, concrete floor, aluminium powder coat windows and asphalt car parking for 20 vehicles. Click for more details...

ULVERSTONE HIGH SCHOOL
State ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Central Coast Council Area for Renovations, Refurbishments etc. development. Upgrading of existing toilet facility. Click for more details...

RISDON VALE/GEILSTON BAY RETIREMENT VILLAGE
Aged Care & Retired Developments (Aged care facilities) New project at 170 Sugarloaf Road, Risdon Vale, TAS 7016. This type is Retirement Village with Private ownership. Construction of retirement village to include 176 living units plus aged care facility and community centre and water pipeline. Click for more details...

BOWEN ROAD PRIMARY SCHOOL - BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project at 35 Bowen Road, Moonah, TAS 7009 of Library, Hall And Classrooms type of New development. Construction of a new library, extension to multi purpose hall and modifications to existing classrooms. Click for more details...

LENAH VALLEY PRIMARY SCHOOL - BER PROJECT
Library And Learning Areas project at 11 Creek Road, Lenah Valley, TAS 7008 in the Education (Schools - primary, secondary (up to Yr 12)). Construction of a library and upgrading of learning areas. Click for more details...

UPPER AND LOWER JORDAN WATER SCHEME
Currently at the Planning stage In Brighton is a project estimated to be $ 7000000. This project The new water scheme will deliver to the communities of Jericho, Melton Mowbray, Kempton, Pontville, Brighton and Broadmarsh with an irrigable area of 6,500 ha. Click for more details...

UTAS INSTITUTE FOR MARINE AND ANTARCTIC STUDIES BUILDING
Imas Building New project In The Hobart Council Area. Construction of an education and research facility. Concrete structure, metal roof and concrete floors. Click for more details...

ROWALLAN PARK
Aged Care & Retired Developments (Retirement villages) New project at Jindabyne Rd, Kingston, TAS 7050. This type is Architects For Master Planning Services with Private ownership. The site consists of 1.4 hectares at Jindabyne Road in Kingston, known as Rowallan Park. It is on a gently sloping hillside overlooking the Derwent Estuary. The site is surrounded by established urban residential development. It has two road entries - off Jindabyne Road to the north and Tingira Road to the south. Apart from a prefabricated church and associated facilities, the site is currently largely vacant bushland. The Uniting Church wishes to use the site to establish an ?intentional community? to be known as Rowallan Park. This community will become an extension to the existing life and mission of the Kingston Uniting Church. The design requires housing options that cater for a broad range of people who are currently excluded from the market, and those whose housing needs are not being adequately met by the current system, including those with disabilities. Communal spaces where people can interact with one another and share aspects of their lives together. A multi-use building (Rowallan House) to provide facilities and services for the use by the residents, the wider community and also a space for the Kingston Uniting Church for its life as a congregation and a community that can be socially, environmentally and economically sustainable. Click for more details...

WOODBRIDGE COMMUNITY SPORTS FACILITY
A project in the TAS Within Kingborough. Construction of new clubrooms and changerooms. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Aged Care & Retired Developments (Nursing homes) New project at 55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018. This type is Independent Living Units (23) - Stage 4 with Private ownership. Construction of twenty three, two and three bedroom independent living units. Brick veneer, concrete floors, metal roof and aluminium framed windows. Click for more details...

KENNEDY DRIVE WAREHOUSE DEVELOPMENT
Commercial Premises (Offices) project In The Clarence Council Area of Private ownership. Construction of three warehouses and associated offices, concrete tilt panel walls, metal roof and concrete floors. Click for more details...

RED WATER CREEK STEAM MUSEUM AMENITIES BLOCK
Tourism (Caravan parks with assoc facilities, Camping grounds) New project at Corner Main and Spring Sts, Sheffield, TAS 7306. This type is Amenities Block with Private ownership. Construction of an amenities block and caravan park. Click for more details...

BURNIE STORMWATER INFRASTRUCTURE DEVELOPMENT PROJECT
Within Burnie Urban Area, Burnie, TAS 7320 Has Burnie Stormwater Infrastructure Development Project currently at Construction stage. Survey, design and project delivery services for the Stormwater Infrastructure Development Project. To cover 7 areas throughout Burnie urban area. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Support Facilities (Administration facilities) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

ICON UNITS
A project in the TAS Within Burnie. Construction of 34 two and three bedroom villa units. Brick veneer concrete floor, metal roof and aluminium windows. Click for more details...

BROOKS HIGH SCHOOL REDEVELOPMENT
School - Redevelopment project at George Town Rd, Rocherlea, TAS 7248 in the Education (Schools - primary, secondary (up to Yr 12)). Redevelopment of school to include extension of two existing buildings to become Learning Plazas that will house social and informal learning areas, outdoor learning areas, project rooms, senior staff rooms and student amenities. Other buildings will be completely refurbished including the administration block, to add a student lounge, principals office and conference room and demolition of some out dated facilities. Click for more details...

PENNY ROYAL GUNPOWDER MILL
Paterson St, Launceston, TAS 7250 Has Penny Royal Gunpowder Mill currently at Construction stage. Extension of the restaurant at the Watermill Tavern and creation of a food, wine and adverture precinct at the old Penny Royal site. To include an indoor/outdoor space, revamping the apartments and modernising and restoring the attractions area. Click for more details...

TASNETWORKS ADMIN 2 ALTERATIONS
Commercial Premises (Offices) Renovations, Refurbishments etc. project at Maria St (off Creek Rd), Lenah Valley, TAS 7008. This type is Office - Alterations with State ownership. Alterations to ground floor admin 2 building, works to include plasterboard walls and ceilings, computer flooring, painting, floor coverings and associated services. Click for more details...

DION CRESCENT TOWNHOUSES
Dion Crescent Townhouses is currently at the Construction stage, valued at about $ 480000 it is Construction of 2 double storey townhouses. Click for more details...

ST PAULS RIVER BRIDGE REPLACEMENT
St Pauls River, Avoca, TAS 7213 Has St Pauls River Bridge Replacement currently at Construction stage. Bridge replacement of the St Pauls River Bridge, Avoca & associated civil works. Click for more details...

PROVISION OF ROAD RESERVE AND HORSE TRAIL MAINTENANCE
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Clarence Council Area of Local Govt ownership. Provision of Road Reserve and Horse Trail Maintenance. Click for more details...

SORELL COUNCIL FOOTPATH, KERB & CHANNEL & STORMWATER WORKS
Public Utilities (Water distribution systems, Drainage) project In The Sorell Council Area of Footpath/Kerb/Channel/Stormwater Works type. Footpath, Kerb & Channel & Stormwater Works - Midway Point, Dodges Ferry & Sorell. Click for more details...

GLEN DHU PRIMARY SCHOOL
Primary School - Altns & Addns New project In The Launceston Council Area. Construction of 2 conjoined general learning areas and alterations to school buildings at Glen Dhu Primary School, South Launceston. Undertake remedial roof stiffening and structural repairs to the heritage listed buildings. Click for more details...

ENCHANTED WALK PEDESTRIAN BRIDGE
Enchanted Walk Pedestrian Bridge is currently at the Construction stage, valued at about $ 63000 it is Parks and Wildlife Service is seeking quotation submissions from suitably qualified and experienced contractors to remove and replace the Enchanted Walk Pedestrian Bridge at Cradle Mountain. Click for more details...

TASMANIAN EEL EXPORTERS
Eel Conditioning Shed project at 4 Lyndon Rd, Bagdad, TAS 7030 in the Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)). Construction of a new 660 sqm eel conditioning facility for Tasmanian Eel Exporters. Click for more details...

OATLANDS DISTRICT HIGH SCHOOL
High School Renovations, Refurbishments etc. project In The Southern Midlands Council Area. Upgrade to the administration area, toilets and general learning areas. Click for more details...

DEAD HORSE HILL ROAD BRIDGE REPLACEMENT
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Dorset Council Area of Local Govt ownership. Design & construction of a replacement for the Dorset River, Dead Horse Hill Road, Ringarooma. A single lane timber & concrete bridge. Click for more details...

LAUNCESTON AMBULANCE STATION REMEDIAL WORK
Public Buildings & Facilities (Ambulance Stations) project at 450 Wellington St, Launceston, TAS 7250 for Renovations, Refurbishments etc.. Demolition, removal and replacement of the existing retaining wall and asphalt driveway, and replace and upgrade all in ground infrastructure supporting the Launceston Ambulance Station including sewer and stormwater separation works. Click for more details...

BASS HIGHWAY CAFE
A project in the TAS Within Waratah-Wynyard. Construction of a cafe, upgrade of existing roadside flower stall & vegetable stall. Materials to be used include wall cladding & selected stained glass window. Click for more details...

FRESHWATER POINT ROAD DWELLINGS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 108 Freshwater Point Rd, Legana, TAS 7277. Construction of 4 x 1 storey dwellings x 2 bedrooms. Materials to include tile roof, selected face brickwork, steel panel & powdercoated aluminium glazed entrance door. Car parking for 8 vehicles. Associated landscaping. Click for more details...

SOMERSET CBD UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Waratah-Wynyard Council Area of Roadworks/Landscaping type. Supply of all plant, labour & materials for the construction of the Somerset CBD Upgrade . The Contract works comprise reconstruction of kerbs, footpaths, road pavement & associated infrastructure including landscaping & street furniture. Click for more details...

ELIZABETH STREET OFFICE REFURBISHMENT
Currently at the Construction stage In Hobart is a project estimated to be $ 1093000. This project Refurbishment to the internal offices, levels 4 & 5, 22 Elizabeth Street, Hobart. Click for more details...

A MACDONALD RESERVE
48 Nelson St, Smithton, TAS 7330 Has A Macdonald Reserve currently at Construction stage. Refurbishment & extension of its existing administration building at Circular Head Christian School. Click for more details...

TECHNOPARK GROUND FLOOR TECH 2
New project of Commercial Premises (Offices) project at 33-38 Innovation Dr, Dowsing Point, TAS 7010. Supply, installation, testing & commissioning of a new HVAC system, including decommissioning of redundant existing equipment & installations. Click for more details...

DEVIL ENCLOSURE FIVE MILE BEACH
Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project In The Hobart Council Area of Tasmanian Devil Enclosure type. Construction & erection of an approximately 20 hectare enclosure with a common fence dividing the enclosed space into two 10 hectare enclosures to contain Tasmanian Devils from the insurance population prior to release of these animals into the wild. Click for more details...

REGATTA POINT FORESHORE
Local Govt ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The West Coast Council Area for New development. Construction of remedial works to the Crown land foreshore at Regatta Point in Strahan. Click for more details...

ILLAWARRA ROAD STORMWATER & PAVEMENT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kingborough Council Area of Stormwater Pipes/Pavement - Upgrade type. Upgrade of Illawara Road stormwater pipes & local pavements. Click for more details...