State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Military housing & accommodation, Military colleges Projects in NT®ion=⊂=1810 in region


JABIRU AREA SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of External Lighting Replacement For School type. Replace existing light fittings & switches. Click for more details...

FLYNN DRIVE COMMUNITY HEALTH CENTRE
Medical (Surgeries, Medical centres) project at 10 (lot 04440) Flynn Dr, Alice Springs, NT 0870 of Minor Building Works For Health Centre type of Renovations, Refurbishments etc. development. Various building works including painting, tiling & minor carpentry work. Click for more details...

ROBERTSON BARRACKS
Other Ranks Accommodation (North) - 2 Storey - Apin - Stage 1 project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 In The Council Area Of Litchfield Shire of Federal. 20 buildings, accommodating 8 personnel each. Block-work & concrete frame, metal clad frame, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire detectors & extinguishers. Associated carparking & landscaping. Click for more details...

LAKE BENNETT RESORT
Cabins/Sports Facilities project at 80 kms south of, Darwin, NT 0800 In The Council Area Of Darwin City of Private. 60-100 self contained 1 - 2 bedroom bungalows. Further expansion of commercial area will include tennis courts, chip & putt green, driving range & BMX track etc. Click for more details...


House (1)/Buildings (4) - Upgrading project at Willowra Area of, Alice Springs, NT 0870 in the Residential (Student & group accommodation). Construction of 1 x 4 bedroom house. Concrete block & steel construction, concrete floor, metal deck roof, aluminium framed windows. Additions to existing blocks including airconditioning & tiling. Click for more details...

LE CORNU FURNITURE
Showroom project at Snell St cnr 47 Bishop St (Lot 5507 Town of Darwin), Stuart Park, NT 0820 in the Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods). 10,000 sq m site. Steel frame & steel construction, concrete floor, metal deck roof, airconditioning, fire services. Carparking. Click for more details...

KAKADU NATIONAL PARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 100000. This project Upgrading of campground ablution block at Gunlom. Proposed works include upgrade shower & toilet cubicles, replace existing internal walls, provide new internal wall linings to shower & toilet cubicles, plumbing works, electrical works including solar electrics, various carpentry work, painting, tiling. Click for more details...

EDNA BERYL GOLD PROJECT
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Includes sinking a shaft up to 150 m and associated drivage. Also includes moving 7,000 to 10,000 tonnes of ore. Click for more details...

MILIKAPITI-SNAKE BAY-MELVILLE ISLAND HOUSING
Lot 359 Milikapiti (Snake Bay) Melville Island, ., NT 8999 Has Milikapiti-Snake Bay-Melville Island Housing currently at Construction stage. Construct 1 x 2 bedroom house including carport, shed, fencing, driveway & all associated services. Click for more details...

AIRCONDITIONING REHABILITATION
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Various Council Area of Airconditioning - Upgrading type. Maintenance to RAC's, airconditioning units up to 7.5kw, water coolers & refrigerators. Click for more details...

PRODUCTION BORES - WALLACE ROCKHOLE
Public Utilities (Water distribution systems, Drainage) project In The Alice Springs Town Council Area of State ownership. Construct new production bores. Click for more details...

TRAEGER PARK
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) project In The Alice Springs Town Council Area of State ownership. Proposed design & construct lighting upgrade for Main Oval. Click for more details...

FORREST PARADE APARTMENTS
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 1200000. This project 8 x 2 bedroom approx 90 sq m approx. 8 x 3 bedroom 110 sq m approx. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Carports. Click for more details...

JOINT DEFENCE FACILITY - PINE GAP
New project of Military (Military installations & facilities) project at Pine Gap Region of, Alice Springs, NT 0872. Installation & testing of new digital control system & new 2000 kW diesel generator set to work in synchronization with twelve existing diesel generator sets operating in two buildings. Existing power system supports critical 24 hour operation that shall remain on line during new construction. Tasks will include: Demolition of existing control system from existing building, designated "Utilities Building". Installation of new central control system in existing building, designated "Powerhouse". Digital control system will interface with 2400 volt switchgear & auxiliary systems. Installation of new inter-connecting ductbanks between two buildings. Click for more details...

BATHURST ISLAND DEFENCE RADAR SITE
Bathurst Island Defence Radar Site is currently at the Construction stage, valued at about $ 2500000 it is Building works & services includes workshop & accommodation. Click for more details...

DARWIN INTERNATIONAL AIRPORT APRON BAYS 11 & 12
A project in the NT Within Darwin City. Construct new Apron Bay 11 & 12. Works includes earthworks including disposal of soil on or off site, heavy grandular pavements with concrete in-fills & AC surfacing plus match to existing airfield pavements, relocated airside roadworks including service re-location, underground services covering drainage lines & interceptor structures, civil works for construction of high pressure fuel lines & communication infrastructure (latter two possibly by nominated subcontract), ordinary related works - linemarking, water supply, fencing, onduits, landscape etc & hardstand lighting. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Civil Services (Power stations, Power generation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

STUART HIGHWAY PARAP ROAD - RIGHT TURN LANE
Stuart Highway Parap Road - Right Turn Lane is currently at the Tenders & Building stage, valued at about $ 90000 it is Upgrade Parap Rd right turn lane. Click for more details...

DARWIN BEN HAMMOND COMPLEX - DEMOUNTABLE BUILDINGS
Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area of State ownership. Supply, installation & lease of demountable buildings for temporary accommodation for 12 month period. Click for more details...

ALICE SPRINGS REGION - TANAMI HIGHWAY BORES
Tanami Hwy, Alice Springs, NT 0870 Has Alice Springs Region - Tanami Highway Bores currently at Planning stage. Construct 3 bores for road maintenance. Click for more details...

ALICE SPRINGS REGION - TERRITORY HOUSING MAINTENANCE
Housing - Maintenance/Repairs project at Various sites within region of, Alice Springs, NT 0870 in the Residential (Units, apartments, flats, townhouses, villas). Provision of repairs & maintenance services for Territory housing. Click for more details...

MCARTHUR RIVER BASE METALS MINE - CONCENTRATOR UPGRADE
Currently at the Construction stage In Katherine Town is a project estimated to be $ 50000000. This project Zinc Concentrator upgrade from 1.8 million tpa to 2.5 million tpa. The expansion of capacity will allow production capacity to increase from 320,000 tonnes to 430,000 tonnes of zinc-lead concentrate. Click for more details...

PETER MCAULAY CENTRE CARPORT BAYS
Public Buildings & Facilities (Police Stations) project for New development. To include 2 x 5 bay, 4 x 6 bay & 2 x 8 bay carports. Columns & footings, roof framing, roof sheeting, bracing. Click for more details...

HAMAURA ROAD INDUSTRIAL BUILDING
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area of Workshop type. Construction of a industrial building to include an office. Parking for 18 cars. Associated landscaping. Click for more details...

JACANA HOUSE WOOD STREET OFFICE BUILDING & SHOPS
New project of Commercial Premises (Offices) project at 39-41 (Lots 2387 & 2388) Wood St, Darwin, NT 0800. Construction of a 10 storey office building with 371sq m retail on ground floor. Basement parking for 128 cars. Associated landscaping. Click for more details...

DARWIN AIRPORT CENTRAL
Showrooms/Offices/Recreation Centre project at McMillans Rd (cnr Osgood Dr, Bagot Rd), Marrara, NT 0812 in the Retail (Shops, shopping centres & arcades, supermarkets). Construction of showrooms, offices & recreation facilities. Associated car parking & landscaping. Click for more details...

DARWIN INTERNATIONAL AIRPORT EXPANSION
Addition project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Fenton Ct, Marrara, NT 0812. Expansion of airport to include additional new 2 storey terminal to the east & west ends of the current terminal duplicating existing structural form with retail precinct; dedicated goods delivery precinct, aircraft parking bays for planes. Click for more details...

JOHNSTON RIDGE SUBDIVISION STAGE 2 REMAINING STAGES
Civil Engineering (Residential Subdivision) project at Off Roystonea Ave & Stuart Hwy, Palmerston, NT 0830 for New. The Johnston Stage 2 development incorporates overall 296 lots for release in 6 stages comprising 251 single dwelling residential (SD) lots, 34 multiple dwelling residential lots (MD) which includes one site for an NT Government seniors village and one medium density residential (MR). The balance of the development consists of lots identified for community purpose, commercial, public open space and conservation. Click for more details...

QUEST APARTMENTS
Quest Apartments is currently at the Construction stage, valued at about $ 6000000 it is Construction of 34 room motel development facing Gap Road, to the rear of existing Quest Apartments on South Terrace. Colour-coated steel roofing with reflective vapour barrier, insulation, window shading, large sliding doors to balconies, landscaping & wide roof overhangs. Two wheelchair accessible suites. Click for more details...

CHARLES DARWIN UNIVERSITY SPORTS FACILITY & MEDICAL CLINIC-DOUBLE REPORT SEE ID911302
Charles Darwin University Sports Facility & Medical Clinic-Double Report See Id911302 is currently at the Tenders & Building stage, valued at about $ 2000000 it is Construction of sports facility & medical clinic. Click for more details...

NORTHERN IMMIGRATION DETENTION CENTRE RECREATION AREAS UPGRADE
Recreation Building New project In The Darwin City Council Area. Construction of outdoor recreation buildings, work to include new recreation building in North 1 compound with associated electrical, mechanical & civil works including connections to existing services. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

OLD TIMERS VILLAGE AGED CARE ADMINISTRATION FACILITY PROJECT 1
New project of Aged Care & Retired Developments (Aged care facilities) project at 245 (Lot 446) Stuart Hwy Connellan, Alice Springs, NT 0872. Construction of new administration building (320 sqm). Comprising individual offices as well as flexible open office area. Tea room, amenities & storage facilities. Associated carparking. Click for more details...

ROYAL DARWIN HOSPITAL OPERATING THEATRE LIGHTS
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Darwin City Council Area of Operating Theatre Lights - Installation - For Hospital type. Supply & installation of lights to 9 operating theatres at Royal Darwin Hospital. To include removal of existing lights & all associated electrical works. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - LUBE OIL FLUSHING
Lube Oil Flushing project at Blaydin Point, via, Darwin, NT 0800 in the Non-Construction Items (Supply/fabrication). For the provision of pop testing. Click for more details...

POLGLASE CIRCUIT RESIDENTIAL DEVELOPMENT
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Palmerston Town Council Area for New development. Construction of 17 x 3 bedroom villas in eight single storey buildings. Cement slab, metal cladding walls & metal roof. Parking for 34 cars. Associated landscaping. Click for more details...

SHEPHERD STREET RESIDENTIAL & COMMERCIAL DEVELOPMENT
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project for New development. Construction of 8 x 3 bedroom & 20 x 2 bedroom units in 9 storey buildings. To include ground level office (200sq m). Concrete slab, rendered concrete blockwalls, glass balustrade with powdercoated aluminium frames, metal roof. Swimming pool & barbeque facilities. Parking for 62 cars. Associated landscaping. Click for more details...

WADEYE POLICE STATION
Residential (Student & group accommodation) project at Perdjert St (Lots 447 - 450, 527, 575), Wadeye, NT 0822 for New. Proposed construction of the Wadeye Police Complex to include police station, visiting officers quarters & housing. To include demolition & decommissioning of existing Power Water Corporation facility & existing dwellings. Construction of Police Station in a single storey building with reception, office areas, interview rooms, cells, communications, interview facilities, sally port & ancillary administration areas. 10 x 4 bedroom detached 2 storey dwellings with double car ports & balconies. Construction of 2 x 3 bedroom duplexes with carports & balconies. 8 x single bedroom units for visiting officers in a 2 storey building. Boat shed & dog storage area with 3 roller doors & internal workshop. Painted steel balustrades, concrete blockwork walls, ceramic floor tiles, vinyl flooring, sheet metal roofing & cladding. 2.1m high chainmesh fence around site boundary & 1.8m high chainmesh fence around dwellings. Asphalt driveways & total car parking for 18 cars. Associated landscaping. Click for more details...

LUDMILLA CREEK CATCHMENT DEFENCE FLOOD MITIGATION
State ownership Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area for New development. Flood mitigation upgrade works to the Ludmilla Creek Catchment. To include construction of Dywer Park holding basin & drain structure at Sadgroves Park. Extension of the Ludmilla Creek Trunk Drain to the Dick Ward Drive Culverts. Associated earthworks & landscaping. Click for more details...

PALMERSTON REGIONAL HOSPITAL - REINFORCEMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Stuart Hwy (Section 4231 Hundred of Bag S901068), Palmerston, NT 0830. This type is Reinforcement - For Hospital with State ownership. Fixing of reinforcements at the Palmerston Regional Hospital. Supply of sundry items to include tie wire. Click for more details...

CASUARINA SENIOR COLLEGE EMERGENCY MANAGEMENT UPGRADE
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 61 Parer Dr, Moil, NT 0810. Emergency management upgrade works at the Casuarina Senior College in Block A. To include the removal of existing shed & generator. Construction of 125mm thick reinforced concrete slab & footings. Fabrication & installation of sheet metal shed with louvers & metal flashing to house emergency generator. Supply & installation of 3 air conditioning units to room A1. Conduiting, cable ducts & cabling. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - PILE CONSTRUCTION
Civil Engineering (Bridges, Aqueducts, Viaducts) project for New development. Construction of 28 x 1016mm cased cast-in-place reinforced concrete piles with 900mm diameter rock sockets at the Roper River High Level Crossing on the Roper Highway. Click for more details...

WINDOWS ON THE WETLANDS GROUNDS MAINTENANCE
A project in the NT Within Litchfield Shire. Maintenance works at the Windows on the Wetlands park at Humpy Doo. To include mowing, mulching & weeding. Erosion control works to walking tracks. Click for more details...

CLYDE FENTON PRIMARY SCHOOL WATER MAINS UPGRADE
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 10 Tilston Ave, Katherine, NT 0850. Design & construction of upgrates to water mains for potable water, fire services & irrigation uses at the Clyde Fenton Primary School. Design team to include Architect, Quantity Surveyor, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer & Stormwater Engineer. Click for more details...

STUART HIGHWAY IRRIGATION SYSTEM
Stuart Hwy, Woolner, NT 0820 Has Stuart Highway Irrigation System currently at Construction stage. Construction of a telemetry controlled irrigation system for the Stuart Highway between Snell Street & Woolner Road. To include removal of existing redundant irrigation system. Supply & installation of irrigation system to include flow meters, master valves & backflow prevention devices. Connection to 3 x existing water mains. Provision of traffic control. Click for more details...

ALICE SPRINGS MORGUES UPGRADE & MAINTENANCE
Medical (Hospitals & associated buildings, mortuaries) project at Various Locations, Alice Springs, NT 0870 of Morgues - Upgrades & Maintenance type of Renovations, Refurbishments etc. development. Maintenance & upgrade works to Morgues at various locations in the Alice Springs region. Locations to include Nyirripi, Yuendumu, Papunya, Ali Curang, Alpurrurulam, Areyonga, Atitjere, Corella Creek, Finke, Haasts Bluff, Impanpa, Kalkukatjara, Larama, Mount Liebig, Orrtipa Thurra, Tara, Ti Tree, Wallace Rockhole, Watarrka, Willowra, Wolora, Wutungurra & Yuelamu. Upgrade works to include supply & installation of new ceilings, lighting & security mesh. Maintenance works to include gap sealing & repairs to damaged walls. Provision of electrical works, plumbing, hydraulic works & mechanical works. Click for more details...

HIDDEN VALLEY MOTOR SPORTS COMPLEX
171 Hidden Valley Rd, Berrimah, NT 0828 Has Hidden Valley Motor Sports Complex currently at Construction stage. Package 1 - hydraulic infrastructure upgrade servicing the Hidden Valley Motor Sports Complex. Scope of work includes: new meter assembly & new external water main, 280 diameter (ND) HDPE Click for more details...

HUMPTY DOO PRIMARY SCHOOL - BLOCK A
Toilet Block - Replacement Renovations, Refurbishments etc. project In The Litchfield Shire Council Area. Replacement of ablution block A Click for more details...

YIRRKALA SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project at Yirrkala School, Yirrkala, NT 0880 of Ablution Block - Upgrade type of Renovations, Refurbishments etc. development. Upgrade to student ablution block. Scope of work includes: removal & disposal of existing asbestos wall & ceiling linings to male & female change rooms. Upgrades to male & female change rooms including associated building, electrical & hydraulic works Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect