State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Mining equipment maintenance Projects in NT®ion=⊂=2310 in region


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DEPARTMENT INFRASTRUCTURE, PLANNING & ENVIRONMENT
Department Infrastructure, Planning & Environment is currently at the Planning stage, valued at about $ 200000 it is Period panel contract for 12 months to allow establishment of approved panel of contractors to undertake enginering services for the NT Government, Department of Infrastructure, Planning & Environment - Information Services. Click for more details...

WOODS INLET ECO RESORT & COMMERCIAL DEVELOPMENT
Retail (Shops, shopping centres & arcades, supermarkets) project at Woods Inlet Cox Peninsula, Darwin, NT 0800 for New. Proposed construction of an Eco Resort. To include 160 bungalows, general store, cafe, restaurant, wharf, marine museum, lagoons, backpackers dormitories, jetty, 18 hole golf course with clubhouse, town centre with retail precinct & 300 room international hotel, offices, swimming pool, indoor recreation facilities, a machinery workshop, water storage tanks, stables & interpretive centre. 60 tonne reverse osmosis desalination unit Click for more details...

PARKS AUSTRALIA NORTH - ULURU-KATA TJUTA NATIONAL PARK
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) Renovations, Refurbishments etc. project at Uluru-Kata Tjuta National Park Region of, Alice Springs, NT 0870. This type is Airconditioning Systems - Upgrade with Federal ownership. Programmed maintenance & repairs to airconditioning systems. Click for more details...

ROBERTSON BARRACKS
Other Ranks Accommodation (North) - 2 Storey - Apin - Stage 1 project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 In The Council Area Of Litchfield Shire of Federal. 20 buildings, accommodating 8 personnel each. Block-work & concrete frame, metal clad frame, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire detectors & extinguishers. Associated carparking & landscaping. Click for more details...

AYERS ROCK RESORT - SAILS IN THE DESERT HOTEL
Tourism (Tourist villages, Resort complexes) project for Renovations, Refurbishments etc. development. Complete refurbishment. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Internal Roadworks/Carparks/Hydraulics For University New project In The Darwin City Council Area. Project consists of roadworks, carparks, water reticulation, sewage reticulation, drainage works & lighting. Click for more details...

DARWIN TRANSIT CENTRE
Building - Conversion - 2 Storey project at 69 Mitchell St (Lot 5345 Town of Darwin), Darwin, NT 0800 in the Retail (Shops, shopping centres & arcades, supermarkets). Upgrading of existing passenger terminal building for Youth Hostel accommodation, retail & convenience foods. Click for more details...


Currently at the Construction stage In Darwin City is a project estimated to be $ 59000. This project Shoulder rehabilitation & edge seal from Chainage 200kms to 205kms. Click for more details...

FAIRWAY WATERS
Civil Engineering (Residential Subdivision) project at Pt Lot 4635 University Ave (Town of Palmerston) Durack, NT 0830 for New. To create 45 lots approx. Roads, water, sewerage & telephone services. Click for more details...

DARWIN TRANSMISSION LINES
66 Kv Transmission Lines New project In The Darwin City Council Area. Consultants to investigate maximum operating temperature of 66 Kv transmission lines. Click for more details...

WILDMAN RIVER ROAD REHABILITATION
Floodways - Repairs & Upgrade - Stage 2 project at Ch: 3.50 km, 7.28 km & 7.60 kms from Point Stuart Rd, Darwin, NT 0800 In The Council Area Of Darwin City of State. Repairs & upgrade floodways. Click for more details...

ROYAL DARWIN HOSPITAL
Rocklands Dve, Casuarina, NT 0810 Has Royal Darwin Hospital currently at Construction stage. Repairs, operation & maintenance of broilers & auxiliary equipment at Royal Darwin Hospital, Building 10. Click for more details...

BERRIMAH ROAD WEIGHBRIDGE COMPLEX
State ownership Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Darwin City Council Area for New development. Construct weighbridge complex inclusive of civil works, weighbridge building & base. Click for more details...

FAIRWAY WATERS
Fairway Waters is currently at the Construction stage, valued at about $ 400000 it is For 40 lots approx. Click for more details...

GURUNGU COUNCIL ABORIGINAL CORPORATION HOUSING PROGRAM
A project in the NT Within Barkly Shire. Construction of 1 x 3 bedroom elevated house. Steel frame & steel clad, timber floor, metal deck roof, aluminium framed windows. 2 x 4 bedroom houses. Blockwork, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

1ST AVIATION REGIMENT ROBERTSON BARRACKS
Commercial Premises (Offices) New project at Robertson Barracks, Darwin, NT 0800. This type is Administration Building For Command Precinct - Major Works - Package 3 with State ownership. Construct Administration building for Command Precinct. Click for more details...

NT GOVERNMENT BUILDINGS
Currently at the Planning stage In Darwin City is a project estimated to be $ 30000. This project Proposed NT Government Buildings - repair & replace locks for 12 month period. Click for more details...

ALPURRURULAM COMMUNITY GOVERNMENT COUNCIL DWELLINGS
Alpurrurulam 240 km approx west of Mt Isa situated on Lake Nash Station & 550 km approx east/south east, Tennant Creek, NT 0860 Has Alpurrurulam Community Government Council Dwellings currently at Construction stage. Qualified electricians to tender for renovation work of eleven (11) community houses. Click for more details...

POWER & WATER CORPORATION DISSOLVED AIR FLOTATION PLANT - BUILDINGS/EARTHWORKS
State ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area for New development. Disolved air flotation plant building works, earthworks & ancillary services (power, water & telecommunications) for 6 mL/day water facility. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

STUART HIGHWAY PASSING LANE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy Ch: 175 km Hayes Creek in region of, Darwin, NT 0800 of Passing Lane - Extn type of New development. Extension of passing lane at Ch: 175 km Stuart Hwy Hayes Ck. Click for more details...

DARWIN, CASUARINA & PALMERSON REGIONS TERRITORY HOUSING MAINTENANCE
Residential (Units, apartments, flats, townhouses, villas) project In The Various Council Area of State ownership. Provision of repairs & maintenance services to various Territory Housing properties over 12 month period. Click for more details...

DARWIN/JABIRU - NT GOVERNMENT BUILDINGS - AIRCONDITIONING - GROUP 7
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area of Airconditioning Equipment - Repairs/Maintenance type. Repairs & maintenance to airconditioning plant & equipment for 12 month period. Click for more details...

STEPHENS ROAD CYLCLE/FOOTPATH - PHASE 3
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stephens Rd btwn Barrett Dr & The Links, Alice Springs, NT 0870 for New. Construction of cycle/foot path for Stephens Rd between Barrett Dr & The Links, Phase 3. Click for more details...

POWER & WATER VARIOUS LOCATIONS - ELECTRICAL WORKS
Power & Water Various Locations - Electrical Works is currently at the Tenders & Building stage, valued at about $ 800000 it is Panel contract for electrical works on electricity distribution systems for 36 month period at various locations within Northern Territory. Click for more details...

BURT PLAIN WEST JOINT VENTURE PROJECT - URANIUM RESOURCE
Mining (Exploration - airborne surveys etc.) project at Approximately 100km North Northwest of, Alice Springs, NT 0870 for New. The tenement shows evidence of palaeo-drainage systems adjacent to known uraniferous source rocks and conceptually analogous to the Mt Painter relationship to the Beverley and Beverley Four Mile deposits. Click for more details...

ARNHEM HIGHWAY CYCLE PATH
Cycle Path - Resurface project at Arnhem Hwy ( Spencely Rd to Humpty Doo Servo), Darwin, NT 0800 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Rehabilitating the existing 3.6km bitumen cycle path. Install road furniture to match with Australian Standards for Cycle Paths. Click for more details...

PALMERSTON HOSPITAL WATER & SEWER HEADWORKS SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 8408 Cook St, Farrar, Palmerston, NT 0830 of Water/Sewer Mains - Upgrade type of New development. Upgrade & extension of water & sewer mains services to the proposed site for future Palmerston Hospital. Click for more details...

MOIL CRESCENT DEMOLITION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darwin City Council Area of Demolition type. Demolition of existing dwellings containing asbestos, concrete driveways, paths & associated services & infrastructure. Includes site levelling & earthworks. Click for more details...

MITCHELL STREET SEWER RETICULATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area of Truck Sewer Main/Stormwater Drainage type. Construction of approximately 87m of trunk sewer main with associated stormwater drain reconstruction along Mitchell Street. To include construction of approximately 35m of sewer reticulation & reconnection to all property sanitary drains to new sewer system. Click for more details...

YUENDUMU SCHOOL TRADE TRAINING CENTRE REFURBISMENT
Education (Schools - primary, secondary (up to Yr 12)) project In The Central Desert Shire Council Area of Trade Training Centre - Refurbishment type. Refurbishment of trade training centre. Includes 2 bay shed with theory room & temporary trainers quarters. Click for more details...

DARWIN LNG PLANT - MAINTENANCE CONTRACT
Private ownership Maintenance Contracts (Processing & materials handling equipment maintenance incl. shutdowns) project In The Litchfield Shire Council Area for New development. Two year extension of an existing contract for onshore maintenance works including shutdowns. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

STURT TERRACE TOWNHOUSES
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 2144000. This project Demolition of existing single storey house. Construction of 7 x 3 bedroom townhouses in 2 storey building. Concrete slab, sheet metal cladding, metal roof. Car parking for 14 vehicles. Associated landscaping. Click for more details...

DARWIN HIGH SCHOOL COOLING TOWERS & PUMPS
Atkins Dr (Bullocky Point), The Gardens, NT 0820 Has Darwin High School Cooling Towers & Pumps currently at Construction stage. Decommission & removal of existing 3 cooling towers & 3 existing associated condenser water pumps. Installation & commissioning of 2 cooling towers & 3 variable speed condenser water pumps. To include modification to existing condenser water reticulation system, reconnection of control signals & installation of power supply. Click for more details...

ALICE SPRINGS TOWN COUNCIL CONCRETE FOOTPATHS PROGRAM 2014/2015
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Alice Springs Town Council Area for New development. Construction of concrete footpaths at various locations in Alice Springs. To include all associated earthworks, compaction & trimming beneath the footpath. Concrete to be 25MPA glass cullet mix with reinforcing (where possible), footpaths across driveways, wheelchair/pram ramp crossings. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Retail (Shops, shopping centres & arcades, supermarkets) project for New development. Design & construct electrical sub-contract for Gateway Shopping Centre Stage 1. To include Woolworths & Big W fit-out, mall lighting, external lighting, shops & cinema. Click for more details...

NYIRRIPI SOLAR FACILITY
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Lot 1739, Chilla Well, Nyirripi, NT 0872 of Solar Facility type of New development. Proposed construction of a Solar Facility capable of generating 200kw per year for the remote community of Kaltukatjara as part of the Solar Energy Transformation Program (SETuP). To include solar arrays & mounting frames. Security fencing & gates. Underground power cabling & concrete footings. 6m wide access roads. Associated carparking & landscaping. Click for more details...

KATHERINE REGION PARKS REPAIRS & MAINTENANCE
Currently at the Construction stage In Katherine Town is a project estimated to be $ 259000. This project Building repairs & maintenance to various parks located within the Katherine Region. Locations to include Limmen National Park, Elsey National Park, Cutta Cutta National Park, Giwiniry/Flora River Nature Reserve, Nitmiluk National Park, Caranbirini Conservation Reserve, Barrangi National Park, Bullwaddy Conservation Reserve & Kintore Caves National Park. To include repairs & general maintenance to walking tracks, fence lines, erosion control structures, asbestos removal & tree removal. Supply & installation of barriers, bollards, barbecues, bridges, board walks, furniture, rubbish bins, shelters & amenities. Click for more details...

SAMUEL STREET DUPLEX
2 Samuel St (Lot 11969), Muirhead, NT 0810 Has Samuel Street Duplex currently at Construction stage. Construction of 2 x 4 bedroom dwellings in single storey building. To include garages, verandas & porches. Reinforced concrete slab, sheet metal roofing, roller doors & solar hot water systems. Rendered concrete blockwork walls, plasterboard ceiling, ceramic floor tiles & carpet floors. Aluminium framed louvres, sliding doors & sliding windows. 1.8m high slat fencing between dwellings & 1.8m high chainmesh fence around the perimeter. Exposed aggregate driveway & total car parking for 4 vehicles. Associated landscaping. Click for more details...

ALAWA PRIMARY SCHOOL PLAYGROUND
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Design & construction of a playground for upper primary students at Alawa Primary School. To include supply & installation play equipment, shade sails, rubber & sand soft fall. Concrete kerbing & drainage. Relocation of existing tables. Click for more details...

MILIKAPITI SEWER EXTENSION & LOT SERVICES
Public Utilities (Water distribution systems, Drainage) Addition project at Milikapiti, Tiwi Island, NT 0810. This type is Sewer - Extn with Private ownership. Sewer extension (80m) & lot services to 5 lots in Milikapiti, Northern Territory. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining - Civil Services (Power stations, Power generation) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...

MUSEUM AND ART GALLERY OF THE NORTHERN TERRITORY
Museum - Thermal Plant New project In The Darwin City Council Area. Construction of a new thermal plant system at the Museum and Art Gallery of he Northern Territory. Scope of work includes: decommissioning, removal & relocation of the existing thermal plant systems serving the facility. Provision of new chilled water pumps, new condenser water pumps, new cooling towers, new feed & expansion system, new chilled water, condenser water reticulation systems, and new DDC controls for complete & operating systems. Installation of a new chiller provided by others Click for more details...

TAMINMIN COLLEGE
70 Challoner Cct (Lot 1849), Humpty Doo, NT 0836 Has Taminmin College currently at Construction stage. STEM Centre - early works. Construction of a new engineering fill platform to include: demolition of concrete pavements, footing & related services. Preparation of ground. New redirected fire main. Engineered fill platform Click for more details...

PINE CREEK POLICE STATION
., Pine Creek, NT 0847 Has Pine Creek Police Station currently at Construction stage. Scope of work includes: sealing the driveway & car park at front & rear with dense grade asphalt 40mm depth. Dismantling & removal of existing concrete footpath. Reconstruct the concrete footpath with reinforcement. Remove a tree at front driveway including stump & roots Click for more details...

ROYAL FLYING DOCTOR SERVICE - DARWIN INTERNATIONAL AIRPORT
Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project at 1 Henry Wrigley Dr, Darwin Dc, NT 0820 for New. Proposed development of a new purpose-built Royal Flying Doctor Service aeromedical base at Darwin International Airport for up to 4 planes. The facility will create a streamlined patient transfer process and better option for the repatriation of low acuity patients from Royal Darwin Hospital to hospitals such as Katherine and Gove. Click for more details...

GRICE CRESCENT DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project In The Litchfield Shire Council Area of Private ownership. Construction of 2 x 3 bedroom x 1 storey dwellings. Powdercoated aluminium louvre windows & sliding doors, tiled features & reinforced concrete block walls. Car parking for 2 vehicles. Associated landscaping. Click for more details...

KALKARINDJI MORGUE
Morgue project at Lot 659, Kalkarindji, Katherine, NT 0850 In The Council Area Of Katherine Town of State. Construction of a new morgue building Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect