State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Mining equipment maintenance Projects in TAS®ion=⊂=2310 in region


HOBART CITY CHURCH OF CHRIST
Church project at 203 Liverpool St, Hobart, TAS 7000 in the Social (Religious Buildings, civil chapels). Internal alterations to existing building & roof. Click for more details...

TASMANIA FIRE SERVICES
Sprinkler Services For Administration Building - Stage 1 New project In The Hobart Council Area. Sprinkler services associated with the construction of administration block & new statewide control room. Click for more details...

LAUDERDALE QUAY
Mixed Use Waterfront Housing And Marina Development New project In The Clarence Council Area. Proposed waterfront housing and marina development. Click for more details...

TASMANIAN ABORIGINAL CENTRE
Medical (Surgeries, Medical centres) project at 56 Patrick St, Hobart, TAS 7000 of Health Centre Redevelopment type of Addition development. Alterations and additions to existing premises. Click for more details...

TASMANIAN ABORIGINAL CHILDRENS CENTRE
Currently at the Planning stage In Glenorchy is a project estimated to be $ 500000. This project Extension to existing centre. Click for more details...

STATEWIDE GUARD FENCE CONTRACT
Various Locations, ., TAS 7999 Has Statewide Guard Fence Contract currently at Construction stage. Post and steel construction guard fence. Click for more details...

ROKEBY TRANMERE SEWERAGE SCHEME
Public Utilities (Treatment plants, Sewerage reticulation) New project, Rokeby, TAS 7019. This type is Chemical Dosing Systems For Rokeby Waste Water Treatment Plant with Local Govt ownership. Supply of all materials, installation & commissioning of Chemical Dosing Systems for alum, sodium hydroxide & sodium hypochlorite. Click for more details...

PRINCESS CREEK TAILINGS DAM - MOUNT LYELL
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Lyell Council Area for New development. The dam is a zoned earth/rock fill embankment, with current height of 42 metres. The planned lift is 5 metres, requiring excavation, movement and placement of approximately 230,000 cubic metres of clay and rock. Other components include excavation of a spillway, embankment and spillway foundation works, construction of roads, installation of decant structure and rehabilitation of exhausted borrow pits. Click for more details...

MT PLEASANT ANIMAL HEALTH LABORATORY WING
Medical (Veterinary Clinics) Renovations, Refurbishments etc. project at 145 Westbury Rd, Prospect, TAS 7250. This type is Laboratory - Altns with State ownership. Alterations to existing laboratories in the animal health wing. Works include new partitions, painting, benches, floor coverings and plumbing. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of Local Govt ownership. Supply and delivery of precast concrete levee retaining walls. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - MINING CONTRACTORS COMPOUND
New project of Mining - Support Facilities (Administration facilities) project at Near, Grassy, TAS 7256. For the provision of mining contractors compound. Click for more details...

MCCOMBE HOUSE REDEVELOPMENT
New project of Residential (Student & group accommodation) project at Creek Road, New Town, TAS 7008. Construction of accommodation shelter, offices and childrens activities area. Brick veneer, metal roof, aluminium windows and concrete floors. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINE DEVELOPMENT & ORE PRODUCTION WORK
Currently at the Construction stage In Lyell is a project estimated to be $ 10000000. This project Mine development to include decline & level of development at variable grades. This includes drill, blast, ground support, load, haul and dump of ore/waste. Ore production including drill, blast, load, haul and dump of stope ore. Crushing and conveying of the ore from the primary crusher to the skip loading station. The Developer intends to produce 2.85Mt of ore pre annum (+/- 10%) and 250 metres of development per month (+/-10%) for three years in underground development. Click for more details...

THE SWANSEA BARREL
A project in the TAS Within Glamorgan-Spring Bay. Construction of additional level for offices and function centre. Click for more details...

BRIGHTON BYPASS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Brighton Council Area of State ownership. Roadworks and associated earthworks required for the construction of the Brighton bypass in infrastructure, industry and rural zones. Click for more details...

MAYDENA PRIMARY SCHOOL - BER PROJECT
A project in the TAS Within Derwent Valley. Construction of a new multi purpose hall. Click for more details...

MOWBRAY HEIGHTS PRIMARY SCHOOL - BER PROJECT
Multi Purpose Hall project at Cadorna Street, Mowbray, TAS 7248 In The Council Area Of Launceston of State. Construction of a multi purpose hall. Click for more details...

UPPER AND LOWER JORDAN WATER SCHEME
Currently at the Planning stage In Brighton is a project estimated to be $ 7000000. This project The new water scheme will deliver to the communities of Jericho, Melton Mowbray, Kempton, Pontville, Brighton and Broadmarsh with an irrigable area of 6,500 ha. Click for more details...

GOODWOOD PRIMARY SCHOOL - BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) New project at Elmsleigh Road, Moonah, TAS 7009. This type is Library Resource Centre with State ownership. Development of the Goodwood Primary School site including construction of the Big Picture School, utilising demountable classrooms and a new music/library/resource centre. Refurbishment of the general purpose hall and extensive decking. Click for more details...

CHANNEL COURT RETAIL DEVELOPMENT - STAGE 3
Retail Tenancies And Associated Works New project In The Kingborough Council Area. Channel Court stage 3 development incorporating demolition works, supermarket, approximately 20 retail tenancies and additional car parking. Concrete construction and glazing. Click for more details...

AURORA ENERGY PROPERTIES
A project in the TAS Within Various. Provision of general architectural services on an as-required basis for Aurora?s owned and leased properties around Tasmania. Click for more details...

BLACKMANS BAY CHILDRENS SERVICES OCEAN VIEW
Education (Kindergartens, day nurseries, child care centres) project for Addition development. Extension to existing child care centre, post tensioned concrete slab, steel columns, metal roof, cement sheet walls and double glazed windows. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Aged Care & Retired Developments (Nursing homes) New project at 55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018. This type is Independent Living Units - Stage 2a with Private ownership. Construction of twenty-nine two bedroom independent living units. Brick veneer, metal roof, double glazed aluminium windows and concrete floors. Click for more details...

ELIZABETH STREET COMMERCIAL/RESIDENTIAL DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project at 285 Elizabeth St, Hobart, TAS 7000 of Retail/Restaurant And Residential Development type of New development. Demolition and redevelopment for supermarket restaurant/take away food shop/shop, 6 flats, parking spaces and bike racks. Click for more details...

DELORAINE WASTEWATER TREATMENT PLANT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at ., Deloraine, TAS 7304. This type is Bulk Earthworks - Stage 1 with State ownership. This contract comprises the first stage of major upgrading work at the Deloraine Wastewater Treatment Plant. The contract includes the supply, placement, compaction and trimming of over 18,000 cubic metres of bulk fill material, the construction of open drains and site landscaping. Click for more details...

SOUTH ARM JETTY REPLACEMENT
A project in the TAS Within Clarence. Demolition and replacement of the South Arm Jetty Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018 Has Fairway Rise Lifestyle Village currently at Construction stage. Construction of a multi purpose centre. Brick veneer, metal roof, concrete floors. Click for more details...

PRISON INFRASTRUCTURE REDEVELOPMENT PROGRAM STAGE D
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for New development. Construction of a staff gymnasium at Risdon Prison. Metal walls and roof, steel frame. Click for more details...

PENGUIN REGIONAL ATHLETICS CENTRE REDEVELOPMENT
Local Govt ownership Sports (Athletic Tracks) project In The Central Coast Council Area for New development. Resurfacing of the existing athletics track. Click for more details...

RACECOURSE ROAD UNITS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at 40 Racecourse Rd, Brighton, TAS 7030. This type is Units (5) with Private ownership. Construction of five two bedroom units, brick walls, metal roof and concrete floor. Includes demolition of existing buildings. Click for more details...

EXETER PRIMARY SCHOOL
Kindergarten Redevelopment project at 31 Glen Ard Mohr Rd, Exeter, TAS 7275 in the Education (Kindergartens, day nurseries, child care centres). Minor alterations and refurbishment to existing kindergarten buildings. Click for more details...

CENTACARE GUNN STREET UNIT DEVELOPMENT
Currently at the Construction stage In Brighton is a project estimated to be $ 3200000. This project Construction of 16 single storey units. Two bedroom, brick veneer, metal roof, concrete floors, and aluminium windows. Click for more details...

CLAREMONT AGED CARE UNITS
Private ownership Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Glenorchy Council Area for New development. Demolition of former Abbotsfield Primary School. Construction of 55 elderly units and communal facilities. Click for more details...

SOUTHERN HIGHLANDS IRRIGATION SCHEME
Civil Engineering (Pipelines) project at Various locations within the municipality of the Southern Highlands, Hamilton, TAS 7140 for New. The Southern Highlands Irrigation Scheme (SHIS) is one of five schemes which comprises Tasmanian Irrigation?s (TI) second suite of schemes known as ?Tranche Two?. The SHIS will deliver 7,215 ML of high reliability irrigation water from a holding dam approximately 17km north-west of Bothwell to scheme participants via a 58km underground pipeline distribution network. Stripping of the embankment footprint & excavation of the keyway of Southernfield Dam. Construction of Shannon River Pump Station to be located to the south of Waddamana Road on the banks of the Shannon River. Construction of 1MW pump station & construction of the access road. Construction of 58km-long scheme distribution pipeline to run from Waddamana Road, south to Bothwell and on to Hollow Tree. The pipe diameter will range from DN180mm up to DN710mm. Pipeline spurs will provide water to farms along Nant Lane and to the east of Bothwell along Highland Lakes Road. Two small booster pump stations are required in the scheme. One located on the eastern edge of Bothwell and the other along Hollow Tree Road at Montacute. Click for more details...

PENGUIN ROAD DWELLINGS
Penguin Road Dwellings is currently at the Construction stage, valued at about $ 402000 it is Construction of 3 single storey dwellings. Click for more details...

WESTELLA DRIVE RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) New project at 240 Westella Dr, Turners Beach, TAS 7315. This type is Residential Subdivision (18) Lots with Private ownership. Residential subdivision of 18 lots and associated civil works. Click for more details...

HOTEL FEDERAL WYNYARD 911 BOTTLE SHOP
Currently at the Construction stage In Waratah-Wynyard is a project estimated to be $ 1200000. This project Construction of a drive-through bottle shop at the rear of the hotel. Comprising a general retail area, cool room for storage purposes & an office area. Two lane paved drive-through area. Also refurbished gaming room & bar as well as a new gourmet hamburger café. Click for more details...

DEVONPORT ASSISTED ACCOMMODATION FACILITY
Residential (Student & group accommodation) project at Valley Rd, Devonport, TAS 7310 for Renovations, Refurbishments etc.. Works to include renovation of an assisted & independent living facility adjacent to TasTAFE in Devonport. The existing building was formerly student accommodation & will be converted into 25 one-bedroom assisted living apartments for young people aged from 15-25 who are likely to become homeless. Also a 20 lot subdivision will be made available by developing vacant land next to the site. The subdivided lots will be available to the public, excluding 1 lot which will be retained by Housing Tasmania for the construction of a 5-bedroom shared living accommodation facility for people with disabilities requiring care & support. Click for more details...

WINDSOR PRECINCT OLYMPIC SOCCER FIELD
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) project at Windsor Dr, Riverside, TAS 7250 of Soccer Field Drainage - Design/Construct type of New development. Windsor Precinct - Design & Construct Drainage for Olympic 1 & 2 Soccer Field. Click for more details...

NEW NORFOLK PRIMARY SCHOOL
Renovations, Refurbishments etc. project of Education (Schools - primary, secondary (up to Yr 12)) project at 8 Pioneer Av, New Norfolk, TAS 7140. Refurbishment of the New Norfolk Primary School to accommodate a one-room Kindergarten on the main campus. Click for more details...

KENNEDY DRIVE WAREHOUSE & SHOWROOM
Kennedy Drive Warehouse & Showroom is currently at the Construction stage, valued at about $ 450000 it is Construction of a warehouse & showroom. Click for more details...

LORDES RISE UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Huon Council Area for New development. Construction of 4 units. Associated car parking & landscaping. Click for more details...

OLSENS EGG SORTING SHED
A project in the TAS Within Launceston. Works to include the replacement of an existing egg sorter by a larger machine in a purpose built shed. Materials to be used include roof cladding & a shed structure. Click for more details...

ALEXANDRA ROAD DWELLINGS
Dwellings (3) project at 47 Alexandra Rd, Ulverstone, TAS 7315 In The Council Area Of Central Coast of Private. Construction of 3 dwellings comprising of 3 bedrooms with a single car garage. 3 visitor car bays. Materials include steel roofing, aluminium windows, brick veneer. Click for more details...

KILLIECRANKIE TOILET BLOCK
A project in the TAS Within Flinders. Construction of a 8 metre unisex toilet block and a 10,000 litre water tank as well as the demolition of a 'long drop' toilet. Materials include, stainless steel, a plastic cistern, disabled compliant rails, colourcoated steel, wonderglass sheeting, pine timber posts/frames/rafters, hardwood timber battens, anti vandal bolts, plas coated steel, post supports and concrete footing. Click for more details...

ELIZABETH STREET OFFICE REFURBISHMENT
Currently at the Construction stage In Hobart is a project estimated to be $ 1093000. This project Refurbishment to the internal offices, levels 4 & 5, 22 Elizabeth Street, Hobart. Click for more details...

ULVERSTONE HIGH SCHOOL
A project in the TAS Within Central Coast. Refurbishment of existing classrooms at Ulverstone High School. Click for more details...

PENNA ROAD ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Penna Rd from Reynolds Rd, Midway Point, TAS 7171 of Roadworks - Reconstruction type of New development. Reconstruction of Penna Road, Midway Point approximately 360m from Reynolds Road to the Kindergarten Bus Stop. Associated civil & drainage works. Click for more details...

GOODWINS ROAD DWELLINGS
Residential (Units, apartments, flats, townhouses, villas) project at 102 Goodwins Rd, Rokeby, TAS 7019 for New. Construction of 3 x 3 bedroom x 1 bathroom x 1 storey dwellings. Colour coated metal roof sheeting, selected timber deck & balustrade, face brickwork, privacy screen & aluminium windows & doors. Car parking for 7 vehicles. Associated landscaping. Click for more details...

ILLAWARRA ROAD STORMWATER & PAVEMENT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Kingborough Council Area of Stormwater Pipes/Pavement - Upgrade type. Upgrade of Illawara Road stormwater pipes & local pavements. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect