State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Motor Registries Projects in NT®ion=⊂=233 in region


DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Plumbing Works/Gas Infrastructure - Upgrade Renovations, Refurbishments etc. project In The Unincorporated North Council Area. Programmed maintenance & repairs to plumbing works & gas infrastructure. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Education (Kindergartens, day nurseries, child care centres) Renovations, Refurbishments etc. project at Urban Regions of, Darwin, NT 0800. This type is Fire Detection Equipment - Package A - Maintenance with State ownership. Routine servicing & emergency repairs to fixed fire detection equipment - Package A Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

FLYNN DRIVE COMMUNITY HEALTH CENTRE
Medical (Surgeries, Medical centres) project at 10 (lot 04440) Flynn Dr, Alice Springs, NT 0870 of Minor Building Works For Health Centre type of Renovations, Refurbishments etc. development. Various building works including painting, tiling & minor carpentry work. Click for more details...

DRIVER PRIMARY SCHOOL
Currently at the Tenders & Building stage In Palmerston Town is a project estimated to be $ 30000. This project Replace fire indicator panel & associated works. Click for more details...


Local Govt ownership Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area. 3 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...


Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Yeperenye Link & rear of Post Office, Alice Springs, NT 0870 for New. Landscaping, paving & irrigation. Click for more details...


Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Unincorporated North Council Area for New development. Equipping of bore & construction of approx 7 km of rising, main, upgrade of water reticulation, storage & treatment systems. Click for more details...

NT GRAIN DEPOT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) Renovations, Refurbishments etc. project at NT Grain Depot Crawford St, Katherine, NT 0850. This type is Gateway - Upgrade with State ownership. Modify main gateway. Existing concrete & section of kerbing to be removed. New concrete to start road level & finish ground level. NT Grain Depot sign to be relocated. Fence & gates. Click for more details...

RAAF BASE DARWIN
Airfield Lighting Equipment Rooms New project In The Darwin City Council Area. Works include: Two masonry airfield lighting equipment rooms including airconditioning, high voltage & low voltage electrical equipment & access roads. Replacement of high intensity (HI) & low intensity (LI) light fittings on runway 11,29 with combined HI/LI fittings. Connections to air traffic control tower. Click for more details...

RUSTLERS ROOST GOLD MINE
Addition project of Mining (Underground - including longwall) project at 100 km southeast of, Alice Springs, NT 0870. Likely to include widening and deepening of the existing pit. Click for more details...


is currently at the Construction stage, valued at about $ 153000 it is Construct new access road & boat ramp. Click for more details...

FAIRWAY WATERS
Civil Engineering (Residential Subdivision) New project at Pt Lot 4635 University Ave (Town of Palmerston) Durack, NT 0830. This type is Subdivision - Residential - Stage 8 with J/V - Private & Govt ownership. To create 154 lots approx. Roads, water, sewerage & telephone services. Click for more details...

ALICE SPRINGS HOSPITAL
Trade Package For Cone/Reo/Forms - Hospital - Redevelopment Subcontract project In The Alice Springs Town Council Area. Cone/reo/forms for hospital redevelopment. Click for more details...

ALICE SPRINGS HOSPITAL
Subcontract project of Medical (Hospitals & associated buildings, mortuaries) project at Gap Rd, Alice Springs, NT 0870. Mechanical services for hospital redevelopment. Click for more details...

RAPHAEL ROAD DEVELOPMENT
Industrial (Warehouses, cargo sheds, distribution centres) project at 14 Raphael Rd (Secn 4845 Hund of Bagot), Winnellie, NT 0820 for New. Construction of two (2) warehouses. Steel frame & steel clad, concrete floor, metal deck roof. Earthworks & drainage. Click for more details...

ROADSIDE FURNITURE MAINTENANCE REGION OF DARWIN
A project in the NT Within Darwin City. Maintenance of Roadside furniture. Click for more details...

BATCHELOR SUBSTATION PROJECT - ELECTRICAL PACKAGE
New project of Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Batchelor Road, Batchelor, NT 0845. Electrical works for the Batchelor 132/22 KV Substation. Click for more details...

ALICE SPRINGS AQUATIC CENTRE REDEVELOPMENT STAGE 1
Swimming Pool Redevelopment project at Speed St, Alice Springs, NT 0870 in the Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria). Stage 1 involves the redevelopment and expansion of the existing Alice Springs Swimming Centre. Works include the provision of a replacement learn to swim pool, a replacement toddler's pool (with an adjoining splash pad), new dedicated plant room, associated building services and landscaping. Click for more details...

PEKO MAGNETITE PROJECT - TAILINGS POND
Currently at the Early Planning stage In Barkly Shire is a project estimated to be $ 1000000. This project For the provision of a temporary tailings pond. Click for more details...

BULLOCK CREEK UPGRADE
Local Govt ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Katherine Town Council Area for New development. Supply of gravel and all earth works associated with the construction of road pavements including bitumen sealing and line marking. Click for more details...

KATHERINE CENTRAL CHILDRENS SPORTSGROUND/PLAYGROUND
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) New project at Adjacent skatepark, Katherine, NT 0850. This type is Sportsground/Playground with Local Govt ownership. Supply & construction of coloured concrete footpath (180 m x 1.4 m). Supply & installation of 210 m x 1.8 m high chain mesh security fencing including minimum 300 mm extension for the placement of two barbed wire strands over the top of the chain mesh. Click for more details...

DARWIN REGION BER SCHOOLS
A project in the NT Within Litchfield Shire. Construction of multi purpose facility/cyclone shelter. Concrete slab, concrete block, steel, clerestory aluminium louvre windows, solid core doors, cyclone enclosure for generator, colour-coated metal roof with cyclone fixtures. Click for more details...

LARAPINTA PRIMARY SCHOOL BER PROJECT INCORPORATETD INTO ID 1155089
Education (Schools - primary, secondary (up to Yr 12)) project at 22 Albrecht Dr, Larapinta, NT 0870 of Multipurpose Classroom type of New development. Construction of multipurpose room/classroom. Click for more details...

MENZIES SCHOOL OF HEALTH & RESEARCH & TRAINING & PALLIATIVE CARE UPGRADE
Currently at the Construction stage In Darwin City is a project estimated to be $ 27000000. This project Construction of a new research & training facility & refurbishment of existing offices within the John Matthews Building. An extension to the Palliative care building, car parking & miscellaneous works at the Royal Darwin Hospital. Click for more details...

JOHNSTON ESTATE TOWNHOUSES
Townhouses (3) New project In The Palmerston Town Council Area. Construction of 1 x 3 bedroom & 2 x 2 bedroom multiple dwellings in 2 single storey buildings. Concrete slab, rendered & painted concrete block walls & metal deck roofing. Click for more details...

SYMES STREET RESIDENTIAL DEVELOPMENT
1 Symes St (Lot 05066), cnr Rowling St, Nakara, NT 0810 Has Symes Street Residential Development currently at Early Planning stage. Rezoning from single dwelling (SD) to multiple dwelling (MD). Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS CRUSHER CIRCUIT CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Roper Gulf Shire Council Area for New development. One year extension of the contract to operate the crusher circuit including feeding from the run-of-mine (ROM) stockpile. Covers the primary, secondary & tertiary crushing plants & mobile equipment. Click for more details...

LAJAMANU SCHOOL TRADE TRAINING CENTRE
Education (Schools - primary, secondary (up to Yr 12)) project In The Katherine Town Council Area of State ownership. Construction of trade training centre. Includes 2 bay shed with theory room & temporary trainers quarters. Click for more details...

CASUARINA DRIVE UNITS - ALLURE RESIDENCES
Units (24) - 5 Storey project at 286 Casuarina Dr (Lot 33), Rapid Creek, NT 0810 In The Council Area Of Darwin City of Private. Construction of 24 x 2 bedroom units in a 5 storey building. Concrete blockwork, glass & steel. 1 lift. Gymnasium. Swimming pool. Parking for 48 vehicles. Associated landscaping. Click for more details...

CARPENTARIA HIGHWAY STRENGTHENING & WIDENING BORROLOOLA JUMP UP SECTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Carpentaria Hwy Ch230.230km to Ch233.438km, Borroloola, NT 0854 of Roadworks - Strengthening/Widening type of New development. Pavement strengthening & widening on Carpentaria Highway Ch230.230km to Ch233.438km including realignment of Borroloola jump up section. Click for more details...

OGDEN STREET TOWNHOUSES
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area for New development. Construction of 2 x 4 bedroom townhouses in 2 storey building. Concrete slab, rendered blockwork, tile cladding, glass balustrade, colour-coated metal roof. Parking for 4 cars. Associated landscaping. Click for more details...

COMMUNICATIONS CABLING UPGRADE - ADIN PROJECT
Cabling - Upgrade project at ., ., NT 8999 In The Council Area Of Various of Federal. Aeronautical Data Interchange Network (ADIN) Upgrade Communications Cabling Upgrade. Supply, installation & testing of the structured cabling at various sites across the country. The Aeronautical Data Interchange Network Upgrade Project will see the upgrade of all equipment, interfaces & associated software at the following sites: all ADIN site's; TNS operational sites (tower & VHF/ADS-B sites to be selected in the Execution Phase). 2 x enroute centres (interface changes from enroute to 2 remote sites only). 1 x control tower. 1 x VHF/ADS-B site. All TNS Control & Monitoring (C&M) sites. Infrastructure to include new hardware & software, potential replacement of recently installed network equipment, replacement of all end-of-life network equipment, wireless networking equipment & UPS for network devices. Air conditioning for network devices, equipment racks. Decommissioning & removal of old assets. New test & training platform including end user equipment & replacement of building cabling. Replacement of inter building cabling. Power over Ethernet (PoE). New Network Monitoring System (NMS) software including Manager of Managers software integration Network Access Controls. Interface changes to include Software changes. IT Policy & Security. Bring-Your-Own-Device (BYOD) integration & management. Wireless implementation & management. External telecommunications (WAN) to include Satellite bearers, radio link bearers & telecommunications carrier services. Click for more details...

YARRAWONGA ROAD WOOLWORTHS SERVICE STATION
Industrial (Service stations) project In The Palmerston Town Council Area of Private ownership. Construction of a Woolworths Service Station. To include 120sq m of floor space & refueling forecourt, 409sq m canopy, 3 x 55kL underground fuel storage tanks & 25.2kL underground SPEL full separator. Steel framed canopy, flat metal deck roof, signage panels, fascias, profiled metal soffit lining & hardstand pavement for forecourt. Car parking for 5 cars. Associated landscaping. Click for more details...

BRAITLING PRESCHOOL
State ownership Education (Kindergartens, day nurseries, child care centres) project In The Alice Springs Town Council Area for New development. Construction of free standing preschool building, shade structures & concrete carparks at Braitling Primary School, Alice Springs. To include demolition of existing basketball courts, cricket nets, concrete slab & steel shed. Construction of pre school building with foyer, class rooms, staff amenities, student amenities, kitchen, store room & veranda. Concrete footings & 100mm slab with SL81 mesh. Louvers, ceiling fans, aluminium framed windows & air conditioning. Metal cladding, sheet metal roofing & steel plate sunshades. Construction of multipurpose area with steel frame, sand pit, concrete paving & sheet metal roof. Landscaped play area & play equipment. Perforate sheet metal fencing with sliding vehicle gate. Click for more details...

JABIRU AREA SCHOOL DISABLED TOILET
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of Disabled Toilet - For School type. Construction of a new disability block with wall mounted gantry at Jabiru Area School opposite G-Block, with the ability to be easily converted to a disabled toilet on request. Supply & installation of new hot water system. Concrete slab, steel studded wall framing, steel framed roof, metal roof sheeting & water proof membrane. Click for more details...

JUNGAWA ROAD UPGRADE & SEAL
Roadworks - Reseals New project In The Darwin City Council Area. Upgrade & seal to the Jungawa Road between Ch6.5 & Ch9.326 in the Douglas-Daly region. Works to include earthworks, pavements & shoulders, drainage works & protection works. Construction of road formation by cut & fill earthworks, preparation & maintenance of subgrade, construction of gravel pavements & construction of culverts with protection works. Spray seal of single seal throughout length. Provision of traffic control. Click for more details...

BYERS ROAD & MANTON VALLEY ROAD RECONSTRUCTION & SEALING
Byers Road & Manton Valley Road Reconstruction & Sealing is currently at the Construction stage, valued at about $ 500000 it is Reconstruction of pavement & sealing works to Byers Road & Manton Valley Road, Acacia Hills. Works to include reconstruction of pavement to create specific grade line. Supply & laying of 100% MMDDD base course to 200mm. Prime & seal with 20/14 aggregate. Upgrade existing access to adjoining properties. Installation of road furniture. Provision of line marking & traffic control. Click for more details...

JOHNSTON & STUART PARK DUPLEXES
Residential (Units, apartments, flats, townhouses, villas) project at Angel Rd, Redwood St & Graham St, Johnston, NT 0832 of Duplexes (5) type of New development. Design, documentation, certification & construction of 5 x 2 bedroom duplexes at Johnston & Stuart Park. Locations of work to include 14, 53 & 59 Angel Road, Johnston; 14 Redwood Street, Johnston & 22 Graham Street, Stuart Park. Reinforced concrete slab, concrete block, aluminium framed glazing, metal roof. Associated car parking & landscaping. Click for more details...

ALICE SPRINGS FOOTPATH PROGRAM 2015/2016
Currently at the Construction stage In Alice Springs Town is a project estimated to be $ 286000. This project Construction of concrete footpaths at various locations within Alice Springs. To include the removal of existing bitumen footpaths. Supply & lay 100mm thick cast in situ concrete footpaths 1m x 1.2m wide with RF62 welded reinforcing. Supply & lay 125mm thick cast in situ concrete 1.5m wide with RF62 welded reinforcing where footpath crosses driveway. Click for more details...

MACKILLOP CATHOLIC COLLEGE STAGE 4
Mackillop Catholic College Stage 4 is currently at the Construction stage, valued at about $ 750000 it is Completion of works for Stage 4 of the Mackillop Catholic College at Johnston. To include the conversion of a portion of Block A into a commercial kitchen & dining area. Aluminium roller shutters, aluminium framed windows, vinyl flooring & walls. Conversion of external breezway between Block C & Block D into laboratory. Miscellaneous works through Block B first floor existing laboratories & administration building. Chainmesh fencing with gate surrounding the construction compound. Click for more details...

SMITH STREET INTERSECTION UPGRADES
Roadworks - Intersection Upgrads New project In The Darwin City Council Area. Upgrade works at the intersection of Smith Street & The Esplanade in Darwin. To include the construction of raised decorative pavement, provision of line marking & furniture. Stormwater, landscaping & street lighting upgrades. Click for more details...

CITY OF PALMERSTON CIVIC PLAZA ROOF REPLACEMENT STAGE 1
Chung Wah Tce & University Ave, Palmerston, NT 0830 Has City Of Palmerston Civic Plaza Roof Replacement Stage 1 currently at Construction stage. Stage 1 of the roof replacement at the City of Palmerston City Council. Click for more details...

PALMERSTON REGIONAL HOSPITAL FENCING
Medical (Hospitals & associated buildings, mortuaries) project In The Litchfield Shire Council Area of Fencing - For Hospital type. Supply & installation of fencing & motorised gates for the Palmerston Regional Hospital. Click for more details...

PHILPOTT STREET TOWNHOUSES
Townhouses (2) - 2 Storey New project In The Darwin City Council Area. Proposed construction of 2 x 2 storey x 3 bedroom townhouses. Aluminium framed glass louvre windows, wall cladding & custom orb roof. Car parking for 4 vehicles. Associated landscaping. Click for more details...

WOLLOGORANG ROAD
Wollogorang Rd, Tennant Creek, NT 0860 Has Wollogorang Road currently at Construction stage. Regravel Wollogorang Rd from Ch252.25km to 262.01km Click for more details...

MUSEUM AND ART GALLERY OF THE NORTHERN TERRITORY
Museum - Thermal Plant New project In The Darwin City Council Area. Construction of a new thermal plant system at the Museum and Art Gallery of he Northern Territory. Scope of work includes: decommissioning, removal & relocation of the existing thermal plant systems serving the facility. Provision of new chilled water pumps, new condenser water pumps, new cooling towers, new feed & expansion system, new chilled water, condenser water reticulation systems, and new DDC controls for complete & operating systems. Installation of a new chiller provided by others Click for more details...

STUART HIGHWAY BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Stuart Hwy, Tennant Creek, NT 0860 of Bridges (3) type of New development. Supply & install steel beam guardrails complete on the Stuart Highway at the following 3 locations: Chainage.696.99 North Newcastle Creek Bridge, Chainage.697.47 Middle Newcastle Creek Bridge & Chainage.697.95 South Newcastle Creek Bridge. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect