State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Nursing homes Projects in NSW®ion=⊂=1643 in region


BELGRAVE ESP MIXED USE DEVELOPMENT
New project of Residential (Units, apartments, flats, townhouses, villas) project at 284 (Lot 565) Belgrave Esp (DP528968), Sylvania Waters, NSW 2224. Demolition of existing and construction of a 2 storey mixed use development comprising 6 residential units and approximately 1,000 sq m retail/commercial space. Associated landscaping & carparking. Click for more details...

ENTERPRISE CL FACTORY UNITS
Currently at the Construction stage In Gosford is a project estimated to be $ 200000. This project Construction of 4 new factory units & small offices component. Concrete slab, tilt up panels, metal roof, associated carparking & landscaping. Click for more details...

WOOLWORTHS DISTRIBUTION CENTRE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Wyong Council Area of Warehouse/Office type. Construction of a multi million dollar food distribution centre & 800 sq m office for Woolworths Supermarkets with associated carparking & landscaping. Click for more details...

HUNTER ST TOWNHOUSES & VILLA
Townhouses (6)/Villa - 2 Storey project at 1 & 3 (Lots 5 & 6 ) Hunter St (DP27557), Kirrawee, NSW 2232 in the Residential (Units, apartments, flats, townhouses, villas). Construction of a medium density development comprising 6 x 2 storey townhouses & 1 single storey villa. Associated carparking & landscaping. Click for more details...

ORIENT POINT/ST GEORGES BASIN & BERRARA SEWER
Sewer - Rehabilitation project at various within Shoalhaven Council areas, ., NSW 2999 in the Public Utilities (Treatment plants, Sewerage reticulation). Sewer rehabilitation work comprises: cleaning & removing all foreign matters & roots from sewer mains & provide visual inspection of the internal condition of sewer mains using CCTV prior to commencement of works. Excavate sewer dead ends to receive liner. Install, connect & cure suitable liners to 150 & 225mm dia existing sewer mains as designated. Remote, cutting of existing services, re-establish all manholes affected by installation procedure & seal around outside of liner at all manholes & junctions. Supply of CCTV inspection of completed sewer mains & record of junction location & rectification of all above ground areas. Click for more details...

HARRIS ST MIXED DEVELOPMENT - SITE M SOUTH
New project of Residential (Units, apartments, flats, townhouses, villas) project at 54 Harris St, Pyrmont, NSW 2009. Construction of mixed development comprising 81 units ranging from 1 to 3 bedrooms and 2000 sq m of commercial space Click for more details...

MITRE 10 HARDWARE STORE
Showroom/Carpark/Yard - Extns project at 275 West St, Umina Beach, NSW 2257 In The Council Area Of Gosford of Private. Proposed extension to showroom, carpark & timber storage racks, new acoustic boundary fencing, new timber storage building, plant nursery, landscaping & carparking for 32 vehicles. Click for more details...

MULGRAVE RD MUSHROOM COMPOSTING FACILITY
Private ownership Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project In The Hawkesbury Council Area for New development. Constructions of alterations & additions to existing mushroom compost facility, concrete slab & walls. Click for more details...

DENT ST UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Penrith Council Area for New development. Construction of 6 x 2 & 2 x 3 bedroom units. Associated carparking & landscaping. Click for more details...

CAMBRIDGE ST WAREHOUSE
11 Cambridge St, Enmore, NSW 2042 Has Cambridge St Warehouse currently at Planning stage. Demolish part of the premises and carry out alterations & additions to warehouse. Click for more details...


A project in the NSW Within Hornsby. 4 Buildings comprising 8 semi-detached dwellings & 2 single dwellings containing 10 x 3 bedrooms. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project In The North Sydney Council Area of Townhouses (4) - 2 Storey type. Demolish existing 2 storey dwelling & in ground swimming pool & erect 4 x 3 bedrooms attached dwellings, basement parking for 8 cars, landscaping. Brick walls, concrete floor, terracotta roof tiles. Click for more details...

BETHEL NURSING HOME
Subcontract project of Aged Care & Retired Developments (Nursing homes) project at 90-98 Holden 27-31 Clissold Sts, Ashfield, NSW 2131. Demolition of existing Nursing Home & construction of a 76 bed Nursing Home Click for more details...

BLACKTOWN/MT DRUITT HOSPITALS REDEVELOPMENT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for Subcontract development. Palliative Care Building to be constructed at Mt Druitt, Oncology Building at Blacktown. Concrete raft slabs with 2 way deep beams, brick veneer with light weight cladding, aluminium framed windows, metal roof. Internal masonry walls with light weight partitions with range of wall finishes, including cement render, plasterboard, plywood & fibre cement sheeting. Fixed plasterboard ceilings with drop in mineral fibre tiles on aluminium suspended grid. Interior fitout, including fixed joinery, installation of workstations, floor coverings, wall & window finishes. Services include: power; lighting; communications; security; fire control; nurse & emergency call; mechanical air conditioning; medical gases; sanitary/medical fixtures; floor coverings; wall & window finishes. Floor area, 945 sqm for Palliative Care, 405 sqm for Oncology. Click for more details...

HYDRO MAJESTIC HOTEL
Renovations, Refurbishments etc. project of Tourism (Tourist villages, Resort complexes) project at The Great Western Highway, Medlow Bath, NSW 2780. Restore the ornate casino room & to turn disused pool rooms into a health club. Renovations would also include an arts & craft gallery, upgraded tennis courts, conversion of the hotel's boiler house into new accommodation & reuse old abandoned buildings on the site. Click for more details...

SYDNEY CHURCH OF ENGLAND GIRLS GRAMMAR SCHOOL
School - Refurbishment project at Forbes St, Darlinghurst, NSW 2010 in the Education (Schools - primary, secondary (up to Yr 12)). Refurbishment of Wilkinson House boarding house for a student education centre. Click for more details...

THE WATERFRONT - PAROS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Auburn Council Area for New development. Construction of 130 units a mix of 1, 2 & 3 bedrooms, concrete slab, brick, associated carparking & landscaping. Click for more details...

MINES RESCUE BUILDING
3 Proto Ave, Lithgow, NSW 2790 Has Mines Rescue Building currently at Construction stage. Alterations & additions to the existing Mines Rescue Building. Click for more details...

UNIVERSITY OF WESTERN SYDNEY NEPEAN
A project in the NSW Within Penrith. Construction of new building (Building A)to contain workshops, laboratories, office areas. Concrete slab, steel frame, precast concrete panels, metal cladding & roof.. Click for more details...

SILVERWATER RD WAREHOUSE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 17 (Lot 4) Silverwater Rd (DP978080), Auburn, NSW 2144 for New. Construction of a 544sq m warehouse/workshop with associated office space of 50sq m. Associated carparking and landscaping Click for more details...

BAY RD WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Sutherland Council Area of Warehouse/Office - 2 Storey type. Construction of a warehouse with associated office space. Associated carparking for 30 cars and landscaping Click for more details...

CUMBERLAND RD APARTMENTS
Cumberland Rd Apartments is currently at the Planning stage, valued at about $ 10000000 it is Construction of a 6 storey x 87 residential apartment building with a common room, gymnasium, pool and basement carparking for 135 cars. Associated landscaping. Click for more details...

WAVERLEY DR WAREHOUSE DEVELOPMENT
Industrial (Warehouses, cargo sheds, distribution centres) project at 9 (Lot 15) Waverley Dr (DP749648), Unanderra, NSW 2526 for New. Demolition of existing. Construction of 3 warehouses with associated office space and undercover parking Click for more details...

MCDONALDS RESTAURANT
Mcdonalds Restaurant is currently at the Construction stage, valued at about $ 500000 it is Refurbishment of McDonalds Forestway Click for more details...

COALCLIFF TELECOMMUNICATION TOWER
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project at Pt Lot 58 & Pt Lot 102 Lawrence Hargrave Dr (DP 752054), Coalcliff, NSW 2508 for New. Construction of a Telecommunication Tower & associated facilities. Click for more details...

WOY WOY HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at 7 (Lot 101) Kathleen St (DP747829), Woy Woy, NSW 2256 of Aged Care Health Care Facility - 2 Storey type of New development. Construction of new transitional aged care unit under the Pathways Home Program at Woy Woy hospital. The unit will include a residential care section for 20 persons with 18 single & 2 twin share bedrooms with ensuites, common areas including office, service rooms, storage, resident living/dining area, therapy space, assisted bathroom and support facilities. There will be a new service access road associated with the building and an additional 8 carparking spaces. Click for more details...

ISLAND POINT ROAD 14 LOT SUBDIVISION
Civil Engineering (Residential Subdivision) project In The Shoalhaven Council Area of Private ownership. Proposed 14 lot medium density residential subdivision with lot sizes ranging from 2090 sqm to 5640 sqm, 1 open space lot of 8750 sq m. Click for more details...

VICTORIA PARK MIXED DEVELOPMENT - SITE 1 - VICTORIA PARK CENTRAL - EAST VILLAGE
Victoria Park Mixed Development - Site 1 - Victoria Park Central - East Village is currently at the Construction stage, valued at about $ 151851000 it is Construction of a new mixed use development. incorporating a 4 storey podium of residential, retail, commercial & carparking uses with residential units accommodated within 4 buildings located above, total GFA 41,647.7sq m + 680sq m for Section 96 additional retail/commercial floorspace. The proposal has a maximum height of 7 to 8 storeys. The proposal accommodates a total of 206 residential apartments, 1 x studio, 78 x 1, 68 x 2 bedroom standard, 49 x 2 bedroom large & 10 x 3 bedroom, 11,417sq m of commercial floor space, including a car service centre, gymnasium & 17 serviced apartments; 10,804.7sq m of retail floor space on the ground floor level, including a supermarket of approximately 3,500sq m. Stage 1 will comprise early works - site preparation works, including perimeter shoring & excavation. Stage 2 will comprise retail & commercial -construction of the basement levels, including carparking & plant; construction of the podium building up to level 4, including retail areas, residential entrance lobbies, service vehicle areas & loading dock; & all streetscape and public domain works. Stage 3 will comprise residential - construction of all levels above podium, being residential units on levels 5 to 8 (Buildings A, B, C and D); completion & fitout of residential & serviced apartments on level 3; & associated landscaping, communal open space & recreation facilities. The project will target a 5 Star Green Star rating. Precast concrete walls, green wall, shadow box glazed wall, high performance generally clear single & double glazing with powdercoated aluminium frames, timber blades, metal, bluestone & timber cladding, timber fins, glazed & solid awning with steel trim, aluminium framed balustrades with translucent glass infill, aluminium louvres, metal cladding. Basement carparking over 2 levels, total of 1185 carparking spaces & 63 motorcycle spaces. Landscaping & public domain works, including the provision of a landscaped podium skypark of approx 6,000sq m & a public plaza at the intersection of Gadigal/Defries Av. Click for more details...

PEISLEY ST WAREHOUSES
A project in the NSW Within Orange. Construction of 5 new warehouse buildings. Click for more details...

SEAFRONT CIRCUIT TOWNHOUSES
Residential (Units, apartments, flats, townhouses, villas) project In The Port Macquarie-Hastings Council Area of Townhouses (7) - 2 Storey type. Construction of 7 x 2 storey x 4 bedroom beach houses. Carparking for 16 vehicles. Associated landscaping. Click for more details...

PRINCES HWY INDUSTRIAL SHEDS
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Shoalhaven Council Area of Sheds type. Construction of 2 industrial sheds, metal framed and clad on concrete floor slabs. Associated carparking and manoeuvring in 2 stages and to facilitate expansion of uses ancillary to current sawmill operation and the centralisation of operation relocated from the corner of Ilett St and Princes Hwy. Click for more details...

INTEGRATED OIL SEED PROCESSING & BIODIESEL FACILITY
Seed Crushing Facility/Biodiesel Plant New project In The Wagga Wagga Council Area. Proposed construction of an oil seed crushing facility & biodiesel plant. The plant will utilise approx 165,000 tonnes of oil seed per annum & produce 25,000 tonnes of edible oil, 100,000 tonnes of meal & 75 million litres of biodiesel. Construction of an integrated oilseed processing & biodiesel facility. The plant would use canola and safflower seed as raw material to produce vegetable oil, from which bio-diesel is manufactured through a process known as trans-esterification. It is envisaged that the integrated plant would produce up to 75 ML of bio-diesel per annum using 165 000 tonnes of oilseed. The development includes the following proposed facilities: Oilseed Crushing Plant. The oilseed crushing equipment would be housed in a steel building with a concrete floor. The footprint of the building would be approximately 48m x 20m. The plant would have the capacity to process some 500 tonnes per day (TPD) of oil seed and produce around 100 TPD of expelled oil and about 400 TPD of oil cake. Solvent Extraction Plant. The solvent extraction equipment would be housed in a steel building without walls. It would have a concrete floor and a footprint of approximately 30m x 12m. The use of hexane in the building would make it a hazardous area. The facility would have the capacity to process about 400 TPD of oil cake, some 100 TPD of solvent extracted oil and around 300 TPD of de-oiled cake. Meal Blending Shed. This would be an enclosed steel building with a footprint of approximately 12m x 8m. De-oiled meal from the solvent extraction building would be conditioned by mixing it with produced gum and adjusting the moisture content of the meal. Vegetable Oil Refinery. The oil refining equipment would be housed in an enclosed building with a concrete floor and a footprint of approximately 20 m x 18m. The refinery would have the capacity to process some 200 TPD of expelled oil or solvent extracted oil. Biodiesel Plant. The bio-diesel plant would comprise an open building with a footprint of approximately 25m x 15m. The area would be treated as hazardous due to the use of methanol as a solvent. The plant would have the capacity to produce some 6.25 ML of bio-diesel per month. Weighbridge. A weighbridge would be installed near the main access point of the plant to weigh all raw material, chemicals, products and by-products. It would be fully automated to handle semitrailer and B-double vehicles up to 90 T. Storage. Oilseed would be stored in six steel silos, each with the capacity to store around 3 300 T. The silos would be gas tight to allow for fumigation and would have an aeration system. Each silo would also have temperature and level monitoring equipment installed. From the silos, the oilseed would be conveyed to two day bins from which the crushing plant is supplied. This would occur at a controlled rate of around 20 ? 40 tonnes per hour (TPH). De-oiled meal would initially be stored in day bins and then conveyed to the meal storage shed or loaded directly onto trucks. The meal storage shed would have the capacity to store some 3000 T of meal. Meal from the shed would be loaded onto trucks by a front end loader. Vegetable Oil Storage. Six vertical cylindrical tanks with flat floors and conical roofs would be installed to store the refined canola and safflower separately. Each tank would have a nominal capacity of 500 KL and have steam heating coils installed to maintain the temperature at approximately 50°C. Two tanks of some 240 KL capacity would be constructed to store procured palm oil. Biodiesel Storage. Biodiesel would be stored in four day tanks of nominal 110 KL capacity and three bulk storage tanks of nominal 1 370 KL capacity. These storage tanks would have nitrogen blanketing. Biodiesel would be pumped to road tankers from these tanks for dispatch by road. Click for more details...

CHARD HOUSE
Chard House is currently at the Construction stage, valued at about $ 290000 it is General upgrading & maintenance of the building externally and at the roof terrace and parapet level, with a refurbishment of the former foyer entrance way. Works to the exterior comprise recladding of ground floor street awning, painting of exterior moulding & ground floor entry doors & surrounding columns & mouldings, lighting to facade features. Refurbishment of ground floor entry foyer & fire stair. Remedial works for repair of damaged structure. Click for more details...

OAKDALE CENTRAL - DHL LOGISTIC HUB BUILDING 1
Industrial (Warehouses, cargo sheds, distribution centres) project In The Fairfield Council Area of Private ownership. Construction of building 1 containing a 20,000sq m warehouse including 600sq m office. Associated carparking & landscaping Click for more details...

HAMMOND AVE COMMERCIAL OFFICE/SHED
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Wagga Wagga Council Area of Private ownership. Construction of a new commercial shed/offices. Carparking & landscaping. Click for more details...

OAKEY CREEK RD WINERY
Winery New project In The Cessnock Council Area. Demolition & reconstruction of Winery building. Click for more details...

BUNINYONG PUBLIC SCHOOL
Buninyong Public School is currently at the Construction stage, valued at about $ 230000 it is Manufacture & install transportable building (Community Centre Facilities) at Buninyong Public school including the connection of services. Click for more details...

NIRRANDA ST & QUANDONG PL SENIORS LIVING DEVELOPMENT - NBESP
Nirranda St & Quandong Pl Seniors Living Development - Nbesp is currently at the Construction stage, valued at about $ 2982000 it is Construction of a new development for seniors people & people with a diosability. Development will comprise 10 x 1 & 2 x 2 bedroom infill self care dwelling within 2 x 2 storey buildings. A central communal garden & clothes line for residents. Associated carparking for 8 cars & landscaping. Click for more details...

GLENMORE PARK PRECINCT B STAGE 2
Civil Engineering (Residential Subdivision) project for New development. Proposed 47 lot residential subdivision. Lots range from: Terrace 200-250sqm. Villa 250-300sq m. Executive 300-375sq m. Traditionsal 450-550sq m, traditional premium 550-650sq m & large premium 650-750sq m. Lifestyle & superlots 750-1,000sq m. Associated roads & services. Click for more details...

CHAPEL RD INDUSTRIAL DEVELOPMENT
Private ownership Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Bankstown Council Area for New development. Demolition of existing garages. Construction of a mechanical workshop & car spare parts showroom & storage area. Awning & front fence. Click for more details...

ROSEMEADOW SUBDIVISION - CHURCHFIELD
Civil Engineering (Residential Subdivision) New project at Los 2 & 21 Demetrius & Anthony Dr DP706701 & DP733505, Rosemeadow, NSW 2560. This type is Residential Subdivision (72) Lots - Stage 1 with Private ownership. Proposed residential subdivision of 70 lots with 2 residual lots. Lot sizes range from 502sq m to 690 sq m. Associated roads & infrastructure Click for more details...

TELECOMMUNICATIONS FACILITY
Telecommunications Facility New project In The Shoalhaven Council Area. Proposed construction of a Telecommunications facility comprising 35m Tower & equipment shed Click for more details...

GANNONS RD TOWNHOUSES - ECLIPSE
121 (Lots 27 & 28) Gannons Rd (DP5179), Caringbah, NSW 2229 Has Gannons Rd Townhouses - Eclipse currently at Construction stage. Demolition of existing dwellings. Construction of 8 detached townhouses, 6 x 3 & 2 x 4 bedroom. Dwellings 2, 3, 5, 6, 7 & 8 will have a plunge pool. Dwellings 1 & 4 will be adaptable with lift access to first floor. Brick veneer walls, cement render finish, feature cladding, aluminium framed windows & doors. Carparking within double garages & 2 visitor spaces. Landscaping. Click for more details...

PRINCES HIGHWAY - TERMEIL CREEK
Roadworks New project In The Shoalhaven Council Area. Upgrade of the Princes Highway at Termeil Creek. Construction of a new two lane, three span bridge at Termeil Creek to the west of the existing bridge; the new bridge would be 13 metres wide and 45 metres long; the existing bridge would be demolished. Realignment of the Princes Highway from the new bridge to about 1.1 kilometres north of the bridge; the realignment would tie in with the existing Princes Highway at Blackbutt Road. Widening of the Princes Highway by about three metres, from the new bridge to about 0.5 kilometres south. Four major cuts and two fill embankments in the section of realigned highway. The height of cuts would range from about 1.8 metres to 20 metres and fill embankments from 2.5 metres to 17 metres. Provision of 3 road junctions A new junction to the redundant section of the Princes Highway to provide property access; upgrade to the existing junction to Blackbutt Road, consisting of minor widening and sealing; a new junction for safe access to property on the west of the realigned section of the Princes Highway. The proposal includes provision of a new gravel driveway for property access. A southbound right turn bay near the southern extent of the proposal to provide safe access to an existing access road to a residential subdivision; this would include pavement work and new line marking. Installation of 2 new piped culverts to extend the existing culverts at the ephemeral drainage lines. Click for more details...

PETER BROCK DR WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Blacktown Council Area of Private ownership. Construction of a new warehouse/factory on proposed lot 1 of approx 3200sq m. Associated carprking. Landscaping Click for more details...

MASTERS MARSDEN PARK
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 17-43 (Lots 18 & 19) Hollinsworth Rd (DP262886), Marsden Park, NSW 2765. Construction of a Masters Home Improvement Store. Access works. Carparking. Landscaping. Click for more details...

MURRAY STREET INDUSTRIAL BUILDING
Currently at the Construction stage In Tamworth is a project estimated to be $ 180000. This project Demolition of existing industrial buildings Click for more details...

BEST RD MIXED USE DEVELOPMENT
140-148 Best Rd, Seven Hills, NSW 2147 Has Best Rd Mixed Use Development currently at Construction stage. Construction of a mixed use development comprising 3 retail/commercial tenancies of 560sq m on the ground floor with 68 residential units above with 8 x 1, 36 x 2 & 24 x 3 bedrooms. Associated carparking for 146 vehicles. Landscaping Click for more details...

MAGIC GLASS ALEXANDRIA
Magic Glass Alexandria is currently at the Construction stage, valued at about $ 4152000 it is Proposed alterations & additions to, with demolition of part of, the existing industrial building & use of the premises for industrial use with ancillary office accommodation & retail showroom, a business known as Magic Glass will occupy the building. A 5 storey addition is proposed to the north & west of the existing factory. The additions accommodate a reception area, small showroom, staff offices & facilities. Specifically the development includes the following: 790sq m factory area to the rear of the building. Ground floor (level 1) reception area; 188.65sq m retail showroom on the ground floor (level 1) & level 2 to allow for customers to view samples of the products offered by the company; office floor space and meeting rooms over levels 3-5. The proposed office space is ancillary to the industrial use of the premises. Staff facilities including a lockers area, shower & change room & toilets on the ground floor & staff amenities area on level 2 accessed from the factory. A new feature glass facade along the majority of the length of the site?s frontage to Burrows Rd. 2 glass panel lift doors on the western side of the factory to provide secure vehicular access to the site. Brick walls, copper/chrome/arsenate treated timber, compressed fibre cement sheeting, glass louvres, in situ concrete, ceramic tiles, corrugated colorbond roofing. Onsite parking for 10 cars & 10 bicycles. Click for more details...

BOUNDARY RD SUBDIVISION
Civil Engineering (Residential Subdivision) project at 136 (Lot 1) Boundary Rd (DP236422), Schofields, NSW 2762 for New. Proposed residential subdivision in 2 stages comprising 32 lots. Construction of 2 new roads including Kensington Park Road Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect