State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Nursing homes Projects in NT®ion=⊂=1643 in region


DEPARTMENT INFRASTRUCTURE, PLANNING & ENVIRONMENT
Department Infrastructure, Planning & Environment is currently at the Planning stage, valued at about $ 200000 it is Period panel contract for 12 months to allow establishment of approved panel of contractors to undertake enginering services for the NT Government, Department of Infrastructure, Planning & Environment - Information Services. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
A project in the NT Within Unincorporated North. Programmed maintenance & repairs to water supply, sewerage & fuel infrastructure. Click for more details...

BATHURST ISLAND HOUSING ASSOCIATION
Residential (Units, apartments, flats, townhouses, villas) New project at Bathurst Island, NT 5999. This type is Houses (6) with Local Govt ownership. 3 bedroom. Steel frame & steel construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...


Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) New project at Bulman, NT 8999. This type is Houses (2)/Office (1)/Community Hall (1)/Mechanical Workshop (1) with Local Govt ownership. 2 x 3 bedroom, steel framed houses on stumps, 1 x steel framed office on stumps, 1 x community hall & 1 x mechanical workshop. Click for more details...

NORTHERN TERRITORY UNIVERSITY - CASUARINA CAMPUS
Internal Roadworks/Carparks/Hydraulics For University New project In The Darwin City Council Area. Project consists of roadworks, carparks, water reticulation, sewage reticulation, drainage works & lighting. Click for more details...


Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project for Renovations, Refurbishments etc. development. Painting of various Council Properties as required. Click for more details...

REPAIRS & MAINTENANCE on Tenanted properties
Repairs & Maintenance On Tenanted Properties is currently at the Tenders & Building stage, valued at about $ 60000 it is Repairs & Maintenance on Tenanted properties involving plumbers & electricians. Click for more details...

GENERAL DRAFTING SERVICES-POWER & WATER
General Drafting Services - Consultants New project In The Various Council Area. General drafting services for Northern Region for 3 year period. Click for more details...


Mitchell's Chase project at SUBDIVISION - Residential - stage 4 1 Chung Wahg Tce, Palmerston, NT 0830 in the Civil Engineering (Residential Subdivision). To create 45 lots. Roads, drainage, water, sewerage & electrical services. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

AYERS ROCK RESORT - DESERT ROSE RESTAURANT
Renovations, Refurbishments etc. project of Tourism (Tourist villages, Resort complexes) project, Yulara, NT 0872. Refurbishing of existing restaurant. Click for more details...

PETER MCAULEY CENTRE
Peter Mcauley Centre is currently at the Construction stage, valued at about $ 315000 it is Construction of new firearm facility. Click for more details...

ALICE SPRINGS RESORT
Tourism (Tourist villages, Resort complexes) project In The Alice Springs Town Council Area of Hotel Units (40) type. Construct additional forty X 1 bedroom units. Block-work construction, concrete floor, custom orb colourbond roofing, aluminium framed windows, refrigerated airconditioning. Click for more details...

FRANCES BAY DRIVE CLUSTER DWELLINGS
New project of Residential (Units, apartments, flats, townhouses, villas) project at 76 (pt lot 5725 & proposed lot 5) Frances Bay Dr (Town of Darwin), Darwin, NT 0800. 3 bedroom. Click for more details...

CHARIOT GOLD PROJECT
Mining Contract - Open Cut New project In The Barkly Shire Council Area. For the greater part, Chariot will be an underground mine. An open pit will be excavated to a depth of 45 m from which a portal for a decline will be established to access the orebody. Click for more details...

BASE BACKPACKER HOSTEL
Residential (Student & group accommodation) project at 86 (lot 111) Todd St, Alice Springs, NT 0870 of Backpacker Hostel - 3 Storey type of New development. Construct 3 storey Backpacker Hostel with maximum capacity of 312 beds comprising ground floor reception, art gallery first floor restaurant/bar, terrace, pool, residential accommodation & second floor residential accommodation. Carparking & associated landscaping. Total floor area of hostel (excluding gallery space) 2,629 sq m, Total room area including ensuites: 1,238 sq m, Total room area excluding ensuites: 1,004 sq m. Click for more details...

NEBO ROAD WORKSHOP
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Construct steel fabrication & welding workshop. Click for more details...

PEKO TAILINGS DAM PROJECT - EARTHMOVING CONTRACT
Peko Tailings Dam Project - Earthmoving Contract is currently at the Construction stage, valued at about $ 1000000 it is Earthmoving contract is for moving 4 million tonnes of magnetite stockpile to plant. Click for more details...

HALE RIVER URANIUM PROJECT - RESOURCE
Mining (Exploration - Drilling) New project at 90 km north east of, Alice Springs, NT 0872. This type is Resource - Uranium with Private ownership. A 10km strike length of identified redox boundaries, producing advanced targets for roll-front or sandstone-type uranium deposits have been identified at Hale River. Click for more details...

OATSIH HEALTH CAPITAL WORKS PROGRAM
Medical (Hospitals & associated buildings, mortuaries) project at Various sites within Northern Territory, ., NT 8999 of Project Manager For Capital Works Program type of New development. Suitably qualified organisations to act as project managers responsible for carriage of individual projects in respective communities. Project managers will be responsible for delivery of projects, including consultation, development of scoping study, planning, design, documentation, tendering, administration & superintendence of construction & hand over phases. Some projects will not require completion of scoping study. High level of community consultation, coordination, liaison & formal reporting is required. Click for more details...

DARWIN REGION REVIEW ROAD MAINTENANCE PRACTICES - CONSULTANCY
Within the region of, Darwin, NT 0801 Has Darwin Region Review Road Maintenance Practices - Consultancy currently at Planning stage. Consultancy for review of current road maintenance practices for Darwin region. Click for more details...

DARWIN/JABIRU - NT GOVERNMENT BUILDINGS - AIRCONDITIONING - GROUP 7
Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Darwin City Council Area of Airconditioning Equipment - Repairs/Maintenance type. Repairs & maintenance to airconditioning plant & equipment for 12 month period. Click for more details...

BATCHELOR SUBSTATION PROJECT - INDOOR SWITCHING ROOM
Currently at the Construction stage In Darwin City is a project estimated to be $ 719000. This project Design, construction, testing and commissioning of a 22 KV Transportable Indoor Switching Room. Click for more details...

STUART HIGHWAY INBOUND LANE ASPHALT REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Stuart Hwy btwn Bagot Rd & Ross Smith Av, Darwin, NT 0800 of Asphalt - Rehabilitation type of New development. Asphalt rehabilitation to inbound lanes on Stuart Hwy between Bagot Rd & Ross Smith Av. Click for more details...

YIRARA COLLEGE LIBRARY BER PROJECT
Library project at South Stuart Hwy, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of Private. Construction of Library. Click for more details...

MUIRHEAD RESIDENTIAL DEVELOPMENT STAGES 5-7
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Residential Subdivision (445) Lots - Stages 5-7 type. Reconfiguration into 445 lots for residential estate at Muirhead, adjacent to new suburb of Lyons in the northern suburbs of Darwin. Stage 5 - 189 lots. Stage 6 - 143 lots. Stage 7 - 113 lots. Click for more details...

KILGARIFF 33 LOT SUBDIVISION STAGE 1A
Residential Subdivision (33) Lots - Stage 1a project at Stuart Hway (Portion 7234) Connellan via, Alice Springs, NT 0870 in the Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways). Reconfiguration into 33 lots to include 3 multiple dwelling lots (4.48ha). Lot sizes 688sq m - 966sq m. New road. Click for more details...

VEREKER STREET SHOWROOM
Industrial (Warehouses, cargo sheds, distribution centres) project at 2 (Lot 2562) Vereker St, Humpty Doo, NT 0836 for New. Construction of showroom/sales shed. Steel framed & metal cladding. Parking for 16 cars. Click for more details...

PALMERSTON HOTEL
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 50000000. This project Construction of 200 unit hotel in a 8 storey building. To include ancillary shops & offices. Concrete blockwork, glass & steel. 4 lifts. 2 loading bays. Parking for 240 cars. Associated landscaping. Click for more details...

CASUARINA DRIVE UNITS - ALLURE RESIDENCES
Units (24) - 5 Storey project at 286 Casuarina Dr (Lot 33), Rapid Creek, NT 0810 In The Council Area Of Darwin City of Private. Construction of 24 x 2 bedroom units in a 5 storey building. Concrete blockwork, glass & steel. 1 lift. Gymnasium. Swimming pool. Parking for 48 vehicles. Associated landscaping. Click for more details...

PIENING STREET WAREHOUSE
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Litchfield Shire Council Area for New development. Construction of a industrial warehouse building. To include warehouse & mezzanine level (610sq m) with ancillary office (13sq m). Cement slab, metal cladding walls & metal roof. Parking for 7 cars. 1 loading bay. Associated landscaping. Click for more details...

SHEPHERD STREET RESIDENTIAL & COMMERCIAL DEVELOPMENT
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project for New development. Construction of 8 x 3 bedroom & 20 x 2 bedroom units in 9 storey buildings. To include ground level office (200sq m). Concrete slab, rendered concrete blockwalls, glass balustrade with powdercoated aluminium frames, metal roof. Swimming pool & barbeque facilities. Parking for 62 cars. Associated landscaping. Click for more details...

ROPER HIGHWAY PAVEMENT WIDENING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Roper Hwy, Wilton, NT 0852. This type is Roadworks - Pavement Widening with State ownership. This project is part of the Australian Government's Heavy Vehicle Safety & Productivity Programme. Proposed works to include pavement & seal widening of approximately 9.3km, in 6 separate locations of the Roper Highway from a narrow single lane to 8.0m wide sealed dual lanes. Click for more details...

STUART HIGHWAY STUARTS WELL & HUGH RIVER STOCK ROUTE
Stuart Highway Stuarts Well & Hugh River Stock Route is currently at the Construction stage, valued at about $ 968000 it is Upgrade of intersection at Stuart Highway corner of Stuart's Well & Hugh River Stock Route. Works to include turning lanes, earthworks, drainage & pavement works. Click for more details...

LEMKE STREET DUPLEX
Residential (Units, apartments, flats, townhouses, villas) project for New development. Proposed construction of 2 x 3 bedroom multiple dwellings in a single storey building. To include verandas, shared driveway & 2 x double garage. Stepped block work retaining wall, black plastic coated chain wire fence, metal roof sheeting & rotary roof ventilation systems. Roller doors, solar hot water units, painted plasterboard ceilings & reinforced slab & footings. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
A project in the NT Within Palmerston Town. Floor Coverings to Woolworths & Big W. To include 8000sq m of vinyl floor & 2000sq m of carpet. Click for more details...

TABLELANDS HIGHWAY OVERTAKING LANE
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 996000. This project Construction of a 3.7Km widening of the existing sealed pavement from 4.0 metres to 7.0 metres on the Tablelands Highway between CH 40.50 to CH 44.20 to provide an overtaking opportunity. Base course material & aggregate. Click for more details...

CHARLES DARWIN UNIVERSITY BUILDING YELLOW 1 REFURBISHMENT
Education (Tertiary - colleges, institutes, universities) Renovations, Refurbishments etc. project at University Dr North, Ellengowan Dr, Brinkin, NT 0810. This type is University Building - Refurbishment with Private ownership. Renovation works to Building Yellow 1, Level 3, West Wing at the Casuarina campus of Charles Darwin University over 3 stages. Stage 1 to include Rooms 3.01 - 3.06, 3.10 - 3.15 & Corridor 3.C01. To include demolition of existing stud framed walls to offices, removal of carpet & installation of new carpet tiles. Patching & painting of walls. Ceiling reconfiguration. Stage 2 to include Rooms 3.18 - 3.26, Corridor 3.C02 & 3.C04 & Lobby Area 3.C03. Works to include those of Stage 1 & installation of new flushset ceilings. Stage 3 to include Rooms 3.27 - 3.29, 3.31 - 3.34 & Corridor 3.C05. Works to include those of previous 2 stages & removal of ceramic tiles. Installation of new sheet vinyl flooring. Click for more details...

MILES ROAD WAREHOUSES & SHOWROOM
Industrial (Warehouses, cargo sheds, distribution centres) project at 35 miles Rd (Lot 6416), Berrimah, NT 0828 of Warehouses/Showroom type of New development. Construction of warehouses, showroom & offices in 2 separate buildings. Building A to include 178sq m warehouse with loading bay & 304sq m of offices with amenities & mezzanine over. Building B to include 357sq m showroom with amenities & 450sq m warehouse with loading bay. Rendered concrete blockwork walls, steel stud walls, sheet metal roofing & powder coated aluminium awnings. Roller doors, timber cladding, feature wall tiles & aluminium framed windows & doors. Stormwater pipes & pits. Sealed concrete driveway on stabilised rubble. Car parking for 33 vehicles. Associated landscaping. Click for more details...

LEANYER PRIMARY SCHOOL MODULE 3 REFURBISHMENT
Education (Schools - primary, secondary (up to Yr 12)) project for Renovations, Refurbishments etc. development. Refurbishment works to Module 3 at Leanyer Primary School. To include demolition of existing walls, doors & windows. Removal of asbestos wall lining. Supply & installation of 50mm & 75mm stud walls with plasterboard lining. Supply & installation of aluminium framed sliding windows & doors. Supply & installation of bulkhead over sliding doors. Supply & installation of modular carpet tiles, sheet vinyl flooring, acoustic ceiling tiles, joinery, light fittings & fixtures. Painting of new & existing walls, doors & windows. Click for more details...

NHULUNBUY HIGH SCHOOL MARINE TRADE TRAINING SHED
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 51 Matthew Flinders Wy, Nhulunbuy, NT 0880. Construction of a steel framed marine trade training centre at Nhulunbuy High School. To include boat parking area, chart room , simulation room, teacher office, workshop, equipment store, tool store & amenities. Steel stud wall frame with sheet metal cladding. Sheet metal roofing & roller doors. Acoustic walls tiles, ceramic floor tiles, concrete flooring with non slip finish, vinyl flooring & skirting. Aluminium framed sliding windows & louvres. Click for more details...

PALMERSTON DENTAL CLINIC RENOVATIONS
Medical (Surgeries, Medical centres) project In The Palmerston Town Council Area of State ownership. Renovation works to the Palmerston Dental Clinic laboratory & reception areas. To include demolition & removal of existing vinyl flooring, walls, doors, windows & fixtures. Construction of 100mm thick concrete entrance ramp with waterproof membrane. Supply & installation of vinyl flooring, plasterboard walls, joinery, aluminium framed windows & doors. Hydraulic works to include PVC plaster trap, drainage diversion & relocation of hand basin. Mechanical works to include relocation of air diffusers & provision of exhaust canopy & LP gas system. Painting of all internal surfaces. Click for more details...

WISHART ROAD & BERRIMAH ROAD RESURFACING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Resurfacing of asphalt on Wishart Road & Berrimah Road. supply & lay type 4 & 5 A15E Binder to 50mm thickness & 40mm thickness. Construction of drainage structures. Supply & installation of geofabric. Provision of traffic control. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - CONTRACTOR CAMP
Contractor Camp - Communications/Data project at Roper Hwy, Katherine, NT 0850 in the Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons). Supply, installation & commissioning of communications & data at the Contractor Camp for the Roper & Wilton Rivers high level crossings & road upgrades project. Click for more details...

DRIPSTONE MIDDLE SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) New project at Lot 7422, Tiwi, NT 0810. This type is Drainage/Oval - Upgrade with Local Govt ownership. Drainage swale & oval upgrade Click for more details...

KATHERINE TRAINING CENTRE - BLOCK A
Training Centre - Refurbishment project at Second St, Katherine, NT 0850 In The Council Area Of Katherine Town of Local Govt. Refurbishment of Block A Click for more details...

BELYUEN REMOTE COMMUNITY HOUSING
Units/Dwellings/Duplex (6) New project In The Belyuen Shire Council Area. Demolition of 3 lots on 249, 262 & 244. Construction of 3 x 2 bedroom units on lot 249 with extension to sewer main, 1 x 2 bedroom duplex on lot 262 & 1 x 3 bedroom dwelling on lot 244 in the township of Belyuen Click for more details...

BERRIMAH FARM COMMERCIAL & RESIDENTIAL REDEVELOPMENT - NORTHCREST
Civil Engineering (Commercial Subdivision) project at Sec 7349, 100 of Baget, Berrimah, NT 0828 of Residential/Commercial Subdivision (144) Lots - Stage 1 type of New development. Redevelopment of Berrimah Farm for commercial & residential purposes. To include 24ha for Department of Primary Industries & Fisheries research & education facilities. Stage 1: subdivision works 144 lots. Click for more details...

HOWARD SPRINGS TO COOLALINGA BICYCLE PATH
Currently at the Construction stage In Litchfield Shire is a project estimated to be $ 148000. This project Removal & safely dispose of approximately 2000 cubic metres of illegally dumped materials & including asbestos. The site of works are located at approximately chainange: 565m along the new proposed alignment of the Howard springs to Coolalinga cycle path. The works include soil sampling, analysis & reporting before & after the removal of dumped materials. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect