State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Oil refineries, Chemical Plants Projects in NT®ion=⊂=732 in region


ARALUEN THEATRE BOOM LIGHTS
Boom Lights - Replacement Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Replacement of theatre boom lights. Click for more details...

ALICE SPRINGS POLICE STATION
Public Buildings & Facilities (Police Stations) project In The Alice Springs Town Council Area of State ownership. Airconditioning modifications & duct cleaning. Click for more details...

RAAF BASE TINDAL
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) New project at Raaf Base Tindal & Delamere Air Weapongs Range, NT 0853. This type is Sheds (3)/Extn (1) with Federal ownership. Design/supply & construct 3 sheds & extension to 1 shed. Internally concrete floor placed over footings or footings placed in existing surfaces. All framing to be galvanized steel with truss style roof frames. Roof line to have bull nosed edges & no guttering or facia required. Cladding to be colour bond custom orb. Earthworks will be required on some sites. Click for more details...

PORT OF DARWIN - EAST ARM PORT REDEVELOPMENT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Hard Standing Area For Wharf Oil Handling & Storage Facilities type. Construction of electrical, water, sewerage & other hydraulic services, pavement works & minor building works. Click for more details...

ULURU - BASE OF CLIMB
Public Utilities (Water distribution systems, Drainage) project at Uluru via, Alice Springs, NT 0872 of Rising Main For Toilet Block type of New development. Solar powered sewerage pump station rising main, water mains & civil works for new toilet block at Uluru (base of climb). Click for more details...

LITCHFIELD SHIRE COUNCIL
A project in the NT Within Darwin City. Period contract for street furniture maintenance. Click for more details...

GARRAK - JARRU/JABIRU/MITATJA REGION
Water Supply - Upgrade Renovations, Refurbishments etc. project In The Unincorporated North Council Area. Installation & repairs of solar powered bore pumps, construction of pipelines, & erection of tanks & stands. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project. Upgrade & additions to existing residence. Click for more details...

ROBERTSON BARRACKS
State ownership Military (Military installations & facilities) project In The Litchfield Shire Council Area for New development. Civil works for 1 BASB - Transport & Maintenance Companies. Click for more details...

DEPARTMENT OF ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
A project in the NT Within Unincorporated North. Programmed maintenance & repairs to airconditioning systems. Click for more details...

BATHURST ISLAND DEFENCE RADAR SITE
Bathurst Island Defence Radar Site is currently at the Construction stage, valued at about $ 2300000 it is Comprising all earthworks, roads, boat ramp, bore & water supply & fencing. Click for more details...

TANGENTYERE COUNCIL WATER SUPPLY RETICULATION
Public Utilities (Water distribution systems, Drainage) project at Charles Creek Camp Region of, Alice Springs, NT 0870 of Water Supply Reticulation type of New development. Construction of water supply reticulation at Charles Creek Camp. Click for more details...

TERRITORY HOUSING REHABILITATION
Housing - Upgrading project at Various locations Area of, Palmerston, NT 0830 In The Council Area Of Palmerston Town of State. Repairs to vacated dwellings for Territory Housing. Work to include carpentry, glazing, electrical services & plumbing. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

BASE BACKPACKER HOSTEL
Residential (Student & group accommodation) project at 86 (lot 111) Todd St, Alice Springs, NT 0870 of Backpacker Hostel - 3 Storey type of New development. Construct 3 storey Backpacker Hostel with maximum capacity of 312 beds comprising ground floor reception, art gallery first floor restaurant/bar, terrace, pool, residential accommodation & second floor residential accommodation. Carparking & associated landscaping. Total floor area of hostel (excluding gallery space) 2,629 sq m, Total room area including ensuites: 1,238 sq m, Total room area excluding ensuites: 1,004 sq m. Click for more details...

CHALLONER CIRCUIT SERVICES
Services For Dwelling project at Secn 4568a Challoner Crct (Hund Strangways), Humpty Doo, NT 0836 In The Council Area Of Litchfield Shire of State. Provision services for dwelling incorporating sewer, water service, concrete driveway. Click for more details...

DARWIN INTERNATIONAL AIRPORT APRON BAYS 11 & 12
A project in the NT Within Darwin City. Construct new Apron Bay 11 & 12. Works includes earthworks including disposal of soil on or off site, heavy grandular pavements with concrete in-fills & AC surfacing plus match to existing airfield pavements, relocated airside roadworks including service re-location, underground services covering drainage lines & interceptor structures, civil works for construction of high pressure fuel lines & communication infrastructure (latter two possibly by nominated subcontract), ordinary related works - linemarking, water supply, fencing, onduits, landscape etc & hardstand lighting. Click for more details...

TERRITORY HOUSING - HOUSE ROOFING
Residential (Units, apartments, flats, townhouses, villas) project In The Katherine Town Council Area of House Roof - Replacement type. Replace complete roof for 35 Acacia Dr Katherine. Click for more details...

CENTRAL ARNHEM ROAD - PIPES/CULVERTS
Public Utilities (Water distribution systems, Drainage) project In The East Arnhem Shire Council Area of Steelpipes/Rcbc Culverts - Remove/Install type. Removal of Heliloc steel pipes & install RCB culverts on Central Arnhem Rd. Click for more details...

PETER MCAULEY CENTRE GROUND MAINTENANCE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Darwin City Council Area of Ground Maintenance type. Three year peiod contract for provision of ground maintenance for Peter McAuley Centre. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

DARWIN REGION VARIOUS HIGHWAYS RESEALS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Various reseals to Arnhem, Kakadu & Stuart hwys. Click for more details...

BORROLOOLA REGION TERRITORY HOUSING MAINTENANCE
Residential (Units, apartments, flats, townhouses, villas) project at Within region of, Borroloola, NT 0854 for New. Provision of repairs & maintenance services for 12 month period for Territory Housing Maintenance within Borroloola region, Tennant Creek. Click for more details...

VICTORIA HIGHWAY ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Victoria Hwy btwn CH: 129 km & CH: 132 km within region of, Katherine, NT 0850. This type is Road - Rehabilitation with State ownership. Road rehabilitation of Victoria Hwy between CH: 129 km & CH: 132 km. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPELINE PLACEMENT
Currently at the Construction stage In Coomalie Community is a project estimated to be $ 2000000. This project For the provision of pipeline placement services for a 275 km pipeline. Click for more details...

MUIRHEAD RESIDENTIAL DEVELOPMENT STAGES 5-7
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Residential Subdivision (445) Lots - Stages 5-7 type. Reconfiguration into 445 lots for residential estate at Muirhead, adjacent to new suburb of Lyons in the northern suburbs of Darwin. Stage 5 - 189 lots. Stage 6 - 143 lots. Stage 7 - 113 lots. Click for more details...

ROBERTSON BARRACKS REDEVELOPMENT WORKS PART 2 HIGH VOLTAGE ELECTRICAL RETICULATION SYSTEM UPGRADE & BUILDING WORKS
Military (Military installations & facilities) project In The Darwin City Council Area of High Voltage Electrical Reticulation System/Building Works type. Work to include construction of new emergency power station, upgrade to substations & modification to two other buildings. Click for more details...

MITCHELL STREET SEWER RETICULATION
Public Utilities (Treatment plants, Sewerage reticulation) project In The Darwin City Council Area of Truck Sewer Main/Stormwater Drainage type. Construction of approximately 87m of trunk sewer main with associated stormwater drain reconstruction along Mitchell Street. To include construction of approximately 35m of sewer reticulation & reconnection to all property sanitary drains to new sewer system. Click for more details...

FLYNN CIRCUIT MIXED USE DEVELOPMENT
Units (30)/Serviced Apartments (36)/Childcare Centre/Commercial - 4 Storey project at 127 Flynn Cct (Lot 10281), Bellamack, NT 0832 In The Council Area Of Palmerston Town of Private. Construction of mixed use commercial & residential development in 1 x 1 & 2 x 4 storey buildings with ground floor & undercroft parking. To include childcare centre (3000sq m), ground floor commercial (1333sq m) & 3 floors of residential above. 6 x 1 bedroom, 18 x 2 bedroom & 6 x 3 bedroom units. 6 x 1 bedroom, 24 x 2 bedroom & 6 x 3 bedroom serviced apartments. Swimming pool. 2 lifts. Concrete blockwork, glass & steel. Parking for 276 cars. Associated landscaping. Click for more details...

MCCOURT ROAD WAREHOUSE & OFFICE
27 McCourt Rd (Lot 8543), Yarrawonga, NT 0830 Has Mccourt Road Warehouse & Office currently at Construction stage. Construction of a 927.45sq m warehouse & 147.8sq m office space. To include 139.89sq m mezzanine area & 167.2 sqm external storage area. Reception, display area, 3 x offices, meeting room, photocopy room, kitchen & amenities. Sealed gravel hardstand, reinforced concrete, concrete kerb & gutter, concrete retaining wall, metal battens, steel framed awnings & wall cladding. Car parking for 19 cars. Associated landscaping. Click for more details...

DARWIN RSL SERVICES & SOCIAL CLUB ALTERATIONS & ADDITIONS STAGES 1-3
Hospitality (Clubs (licensed), licensed premises, casinos, taverns) project In The Darwin City Council Area of Private ownership. Alterations & additions to the Darwin RSL Services & Social Club over 3 stages. Stage 1- 55sq m building extension & new deck area, conversion of existing deck into additional internal gaming areas & refurbishment of existing amenities on first floor. Reconfiguration of car park from 29 to 27 car spaces & new fascia. Stage 2- 83sq m building extension to provide additional storage & loading area, new cold room, reconfiguration to ground floor lobby & refurbishment to bar, TAB, office area & sports lounge. Stage 3- 91sq m building extension & new dining area, new fascia treatment, new service access & signage. Metal deck roof, powdercoated aluminium sunshade louvers, concrete floor & upstand, concrete column, metal sunshade, aluminium framed windows & weatherboard cladding. Associated landscaping. Click for more details...

BOOTU CREEK MANGANESE PROJECT - POWER STATION CONTRACT EXTENSION
Mining - Civil Services (Power stations, Power generation) project for New development. Extension of 4MW power station generation supply contract for further 2 years. Click for more details...

ANULA REGIONAL PLAYGROUND
Playground - Refurbishment project at Yanyula Dr, Anula, NT 0812 In The Council Area Of Darwin City of Local Govt. Design, supply & installation of playground equipment, soft fall & shade structure at the Anula Regional Playground. Demolition & removal of kerbing, concrete footing & existing playground equipment. Supply & installation of playground equipment, concrete kerbing, soft fall & LED lighting. Click for more details...

ARLPARRA SOLAR FACILITY
Currently at the Construction stage In Barkly Shire is a project estimated to be $ 1000000. This project Construction of a Solar Facility capable of generating 450kw per year as pert of the Solar Energy Transformation Program (SETuP). To include solar arrays & mounting frames. Security fencing & gates. 6m wide access roads. Associated carparking & landscaping. Click for more details...

CASUARINA COASTAL RESERVE - LEE POINT, DRIPSTONE PARK & FREE BEACH UPGRADES
Parks - Upgrades project at Daribah Rd & Lee Point Rd, Tiwi, NT 0810 in the Entertainment (Parks, Leisure grounds, Playgrounds). Upgrade works to the Lee Point, Dripstone Park & Free Beach parks at the Casuarina Coastal Reserve. To include construction of new ablutions block at Dripstone Park with solar hot water system, cement walls & metal wall sheeting. Construction of 3 shade shelters at Dripstone Beach with timber purlins, metal roof sheeting, concrete slab & footings. Upgrade works to barbecues & picnic tables Dripstone Park & Lee Point. Installation of drinking fountains, bike racks, recycling bins & log barrier bollards. Installation & upgrades to fencing at Dripstone Beach & Free Beach. Landscaping of traffic islands. Click for more details...

ROPER & WILTON RIVERS HIGH LEVEL CROSSINGS & ROAD UPGRADES - BRIDGE CONSTRUCTION
Currently at the Construction stage In Katherine Town is a project estimated to be $ 10000000. This project Construction of a 5 span rendered concrete bridge over the Wilton River on the Roper Highway. To include headstocks, beam, deck slab, kerbs, approaches & railings. Click for more details...

RAMINGINING ROADS RESEALING PROGRAM 2016
Ramingining Roads Resealing Program 2016 is currently at the Construction stage, valued at about $ 2878000 it is Resealing of roads within the Ramingining as part of the Galiwinku Roads Resealing Program 2016. Click for more details...

CASUARINA COASTAL RESERVE DRIPSTONE CLIFFS & RAPID CREEK SITE UPGRADES
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Darwin City Council Area of Parks - Upgrades type. Upgrade works to the Dripstone Cliffs Site & Rapid Creek Site at the Casuarina Coastal Reserve. Dripstone Cliffs works to include demolition of existing car parking facilities & landscaping of existing car parking loop. Construction of new carp parking area, shelters, picnic tables & barbecues. Rapid Creek works to include construction of sealed access road & car park, landscaping & construction of new picnic area with shelters & toilet block. Construction of concrete beach ramp. Click for more details...

SANDOVER HIGHWAY RESHEETING
State ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Central Desert Shire Council Area for New development. Resheeting of the Sandover Highway between Ch203.75 & Ch216.23, located 310km North East of Alice Springs. To include clearing & grubbing of road formation & windrows of sand & vegetation. Reformation & lifting of sand clay to 150mm subgrade with 150mm gravel surface. Reinstatement of trapezoidal drains, offlets & blocks. Provision of traffic control. Click for more details...

GUNN POINT ROAD
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area for New development. Roadworks includes: resheeting of various sections from CH 14.16 to 36.96km Click for more details...

WOOLWORTHS SERVICE STATION BAGOT
Retail (Shops, shopping centres & arcades, supermarkets) project In The Darwin City Council Area of Service Station type. Construction of service station to comprise canopy (415sq m), 8 pumps, underground fuel storage tanks, hardstand pavement for forecourt & building surrounds & Cellarbrations Superstore (300sq m) with trading area, storage, toilet & ancillary facilities. Rendered & paint finish to blockwork walls, feature timber panels, powder coated aluminium window & door frames & powder coated aluminium awning. Car parking for 22 vehicles to include 20 car parks, 2 accessible car parks & 6 caravan parks. Associated landscaping. Click for more details...

NGANMARRIYANGA (PALUMPA) SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project at Palumpa, Nganmarriyanga, NT 0822 for Renovations, Refurbishments etc.. Extend & upgrade preschool & toilet block. Scope of work includes: demolition of existing classroom end wall (concrete block) & prepare for concrete block extension. Construction of concrete slab, provide all required services including hydraulic, drainage, electrical and mechanical plant enclosure. Classroom extension to match existing round iron joint finish block work. Click for more details...

KARLU KARLU (DEVILS MARBLES)
Car Park Viewing Area/Rehabilitation Works New project In The Barkly Shire Council Area. Car park North Viewing Area (new construction) - provide 2 wheel drive & caravan suitable entry & exit to new gravel carpark area with adequate sightlines and turn off lane if required; construction of new gravel carpark sub-base (compacted to 95% MMDD) and base (compacted to 100% MMDD) suitable for future sealing works; install REPLAS bollards to define extent of parking area (approximately 120 to be confirmed); existing fence to be removed where required and stabilised with end strainers. Car park Rehabilitation North - remove & dispose off-site existing pine bollards; scarify surface of informal parking area & supply only fencing materials. Car park Rehabilitation South - remove & dispose off-site existing pine bollards; scrape off bitumen and remove from site; scarify surface of informal parking area & supply only fencing material Click for more details...

TIMBER CREEK MEDICAL CENTRE
State ownership Medical (Surgeries, Medical centres) project In The Katherine Town Council Area for Addition development. Removal of existing Ambulance Bay carport & construction of new secure carport, Construction of unisex ablutions building Click for more details...

ROOM TO BREATHE
Room To Breathe is currently at the Construction stage, valued at about $ 371000 it is Room to Breathe early works program for Lajamanu. Creation of new living spaces in existing homes Click for more details...

NAKARA PRIMARY SCHOOL
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of School - Civil Works type. Replace, fire, potable & irrigation mains. Associated works Click for more details...

DARWIN REGION BUS STOP SHELTERS
State ownership Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Darwin City Council Area for New development. Fabricate & install Type 15 Bus Stop Shelters at various locations in Darwin Click for more details...

ROOM TO BREATHE
., Kintore, NT 0872 Has Room To Breathe currently at Construction stage. Room to Breathe early works program for Kintore. Creation of new living spaces in existing homes Click for more details...

DARWIN REGION ROADWORKS
Darwin Region Roadworks is currently at the Construction stage, valued at about $ 2356000 it is Urban asphalt replacement on various roads & highways in the Darwin region Click for more details...

LARRAKEYAH PRIMARY SCHOOL
Currently at the Construction stage In Darwin City is a project estimated to be $ 391000. This project Upgrade potable & irrigation mains at Larrakeyah Primary School. Associated works Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect