State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Onshore processing facilities Projects in NT®ion=⊂=2540 in region


CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...

ARCHITECTURAL/ENGINEERING & MISCELLANEOUS CONSULTANT SERVICES PANEL CONTRACT
State ownership Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Various Council Area for New development. Consultants for Architectural, engineering & Miscellaneous Services Panel Contract - 1st Review. Click for more details...

STUART HIGHWAY ROADWORKS REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at Stuart Hwy (btwn 163.3 km - 166.53 km) Region of, Darwin, NT 0800. This type is Bituminous Resurfacing For Stuart Hwy with State ownership. Bituminous resurfacing between Ch: 163.3 km - 166.53 km. Click for more details...

DRIVER PRIMARY SCHOOL
Currently at the Tenders & Building stage In Palmerston Town is a project estimated to be $ 30000. This project Replace fire indicator panel & associated works. Click for more details...


Shops (6) project at Proposed Lot 4556 (Town of Palmerston) Essington Ave, Gray, NT 0830 in the Retail (Shops, shopping centres & arcades, supermarkets). 2 large & 4 small shops. Steel frame & block-work construction, concrete floor, metal deck roof, aluminium framed windows, partial airconditioning, fire services. Carparking & landscaping. Click for more details...

"THE PINNACLE" (PACIFIC INTERNATIONAL APARTMENTS)
A project in the NT Within Darwin City. Construction of 4 x 4 bedroom penthouses in two storey structure. 48 x 3 bedroom flats, gymnasium, pool & 2 levels of basement carparking in fifteen storey structure. Click for more details...

ANMATJERE COMMUNITY GOVERNMENT HOUSING PROGRAM
Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area of Local Govt ownership. Construction of 1 x 2 bedroom duplex. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

ENVIRONMENT AUSTRALIA
Federal ownership Commercial Premises (Offices) project In The Darwin City Council Area for New development. Facility will house Office of Supervising Scientist (OSS), Parks Australia North (PAN) & Environmental Research Institute of Supervising Scientist (ERISS). Facility of approximately 2,000 sq m including 600 sq m laboratory space is to provide accommodation for about 50 personnel. It is to include research laboratories, administration facilities, office accommodation & storage space for samples & equipment. Laboratories are to facilitate special & varied activities & must be planned to meet specific functional interrelationships. They are mixture of wet & dry, indoor & outdoor facilities. Click for more details...

LUDMILLA WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project for New development. Excavation & construction of large underground chambers & elevated concrete structure. 140 m reinforced concrete pipeline. Extension to existing building. Block-work & masonry construction, concrete floor, metal deck roof, electrical & associated works. Click for more details...

THORAK ROAD NURSERY
Thorak Road Nursery is currently at the Construction stage, valued at about $ 300000 it is Construction of plant nursery. Steel frame & shade cloth with PVC piping for irrigation of plants. Machinery shed. Steel frame & steel clad, concrete floor, metal deck roof. Click for more details...

COLLEGE ROAD DEVELOPMENT
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 2 College Rd (Secn 4920 Hund of Bagot), Berrimah, NT 0828 for New. Construction of 8 warehouse units with ancillary offices & showroom in 5 buildings. Steel frame & steel clad, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

HUDSON CREEK - BERRIMAH TRANSMISSION LINE
Currently at the Construction stage In Darwin City is a project estimated to be $ 1490000. This project Comprising 66kV overhead transmission line from Hudson Creek to Berrimah on outskirts of Darwin. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Underground - including longwall) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

PAPUNYA & NYIRRIPI BORES
Aboriginal Communities of Nyirripi &, Papunya, NT 0872 Has Papunya & Nyirripi Bores currently at Construction stage. Drilling bores at Aboriginal communities Papunya & Nyirripi. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Exploration - Drilling) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

TENNANT CREEK POWER STATION
Hv Terminations/Cable Routing/Clamping/Ct Mounting For Power Station Renovations, Refurbishments etc. project In The Barkly Shire Council Area. Supply & completion 24 HV terminations, cable routing, clamping & CT mounting for Tennant Creek Power Station. Click for more details...

WARREGO TAILINGS PROJECT - SAMPLING DRILLING
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Barkly Shire Council Area for New development. Project to process existing tailings. Sample drilling & assaying program underway mid-2010. Click for more details...

DEFENCE HOUSING RESIDENTIAL MAINTENANCE
Residential Maintenance For Defence Houses - (540) Renovations, Refurbishments etc. project In The Katherine Town Council Area. Provision residential maintenance services for homes in Tindal area managed by DHA. Maintenance services for; appliance repair, carpentry, ceramic tiling, clotheslines, concreting, electrical services, fencing, glazing, locksmith, painting, security screen, tv antenna repairs. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Subcontracts (Electrical installation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

STUART HIGHWAY - VARIOUS STUCTURAL & CIVIL WORKS
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Alice Springs Town Council Area of Visitor Facilities/Sealed Accesses/Shelter/Various Items type. Upgrade visitor facilities, construct sealed accesses, shelter & various items from Teamster Memorial to Mount Polhill on Stuart Hwy within Alice Springs Region. Click for more details...

WEST MACDONNELL NATIONAL PARK FACILITIES EXPANSION PART 1
Facilities Expansion - Part 1 Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Upgrade & expand park facilities including walking tracks & car parks within park. Click for more details...

POWER & WATER CORPORATION - NORTHERN REGION WATER SUPPLY/SEWERAGE SYSTEMS INSTRUMENTATION/EQUIPMENT
Public Utilities (Water distribution systems, Drainage) Renovations, Refurbishments etc. project at Various sites within northern region of, Darwin, NT 0801. This type is Water Supply/Sewerage Systems Instument/Equipment - Install/Repairs/Service/Main with State ownership. Installation, repairs, service & maintenance to general instrumentation & control equipment for water supply & sewerage systems for 36 month period contract in northern region. Click for more details...

PEKO MAGNETITE PROJECT - TAILINGS POND
Currently at the Early Planning stage In Barkly Shire is a project estimated to be $ 1000000. This project For the provision of a temporary tailings pond. Click for more details...

MOULDEN PARK SCHOOL GENERAL LEARNING AREA BLOCKS BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project In The Palmerston Town Council Area of General Learning Area Blocks type. General learning area blocks. Click for more details...

WANGURI PRIMARY SCHOOL MULTI PURPOSE LEARNING AREAS BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) New project at 46 Gsell St, Wanguri, NT 0810. This type is Multi Purpose Learning Areas with State ownership. Construction of Multipurpose Learning Area Click for more details...

ALICE SPRINGS SUPREME COURT & OFFICE BUILDING
Commercial Premises (Offices) project In The Alice Springs Town Council Area of Private ownership. Construction of supreme court & offices in 5 storey building. To include 2 oval shaped court rooms, legal office space, prisoner holding cells, interview, jury & meeting rooms & cafe (37sq m) on 2 levels. With 2 levels commercial office space (1728sq m) above. 2 levels of basement car parking. Open rooftop public use area. Associated landscaping. Click for more details...

PALMERSTON HOSPITAL WATER & SEWER HEADWORKS SERVICES
Public Utilities (Treatment plants, Sewerage reticulation) project at Lot 8408 Cook St, Farrar, Palmerston, NT 0830 of Water/Sewer Mains - Upgrade type of New development. Upgrade & extension of water & sewer mains services to the proposed site for future Palmerston Hospital. Click for more details...

ICHTHYS LNG PROJECT - OFFSHORE PRODUCTION - URF - HELICOPTER REFUELLING SYSTEM
Non-Construction Items (Supply/fabrication) project In The Darwin City Council Area of Helicopter Refuelling System type. For the provision of a helicopter refuelling system required for the refuelling of helicopters on board the Deepwater Construction Vessel Aegir. This refuelling system shall be designed to service the Sikorsky S-92 helicopter, being the largest helicopter intended to serve the vessel. The refuelling system must be capable of providing closed circuit pressure refuelling for the contracted helicopter type. Both purchase & rental of this system are being considered. The refuelling system shall comply with the requirements as stated in the latest edition of UK CAP437 ? Offshore Helicopter Landing Areas for offshore fuelling installation system components, recommended maintenance schedules & operating procedures. Click for more details...

KLEENHEAT GAS DEPOT OPEN WORKSHOP & STORAGE
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project for New development. Construction of 38.5m x 14m open roofed structure for industrial purposes. To include 8m x 13.64m & 2.6m x 4.8m enclosed areas for site storage & compressor/switchboard. 2 roller doors & emergency fire escape door. 2 truck trailer bays. Concrete slab, pre-fabricated concrete wall. Associated landscaping. Click for more details...

FOELSCHE STREET CARPARK
Currently at the Construction stage In Darwin City is a project estimated to be $ 150000. This project Construction of 22 bay ground level open car park. To include bitumen spray seal with 7mm aggregate on compacted base to 95% MMDD. Associated concrete infrastructure & drainage. Click for more details...

STUART HIGHWAY ALI CURUNG RAIL OVERPASS
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Stuart Hwy 150 Km South Tennant Creek, Tennant Creek, NT 0860. Repairs to the Tennant Creek Region - Stuart Highway - Ali Curung Rail Overpass. Earthwork repairs to soured earth batters on the overpass, rehabilitate embankment, utilising sand-clay from pits on site. Overpass is 150km south of Tennant Creek township. Click for more details...

ZUCCOLI RESIDENTIAL SUBDIVISION STAGES 5A & 5B
Residential Subdivision (91) Lots - Stages 5a-5b project at Zuccoli Pde & Roystonea Ave (Lot 4251), Zuccoli, NT 0832 in the Civil Engineering (Residential Subdivision). Reconfiguration of 91 lots. Stage 5A - 21 lots. Lot sizes ranging from 300sq - 800sq m. Stage 5B - 69 lots. Lot sizes ranging from 300sq m - 800sq m. 3700sq m of open space. Click for more details...

NGUIU CRESCENT DUPLEX
Nguiu Crescent Duplex is currently at the Construction stage, valued at about $ 300000 it is Construction of 2 x 2 bedroom multiple dwelling. To include car parking for 4 vehicles. Click for more details...

NIGHTCLIFF MIDDLE SCHOOL LIFT & ASSOCIATED WORKS
Proprietry Lift - For School project at 90 Aralia St, Rapid Creek, NT 0810 in the Education (Schools - primary, secondary (up to Yr 12)). Installation of a lift & associated works at Nightcliff Middle School, Rapid Creek. To include the removal of existing carpet, glass doors, floor slab, hand rails, debris screens & windows. Supply, installation & commissioning of propriety lift system to include electrical reticulation & reinforced concrete lift pad. Supply & installation of flood vinyl, glass wall, steel stud wall, cement cladding, support columns, metal roof cladding & cyclone rated debris screens. Click for more details...

FAIRWAY WATERS & BAKEWELL SEWER PUMP STATION CONTROL CENTRE UPGRADES
Public Utilities (Treatment plants, Sewerage reticulation) project at Located Within, Bakewell, NT 0832 for New. Upgrade works to the motor control centre at the Fairway Waters & Bakewell Sewer Pump Station. Click for more details...

KYBROOK FARM SFNT HOUSING UPGRADES
Houses (13) - Upgrades project at Kybrook Farm, Katherine, NT 0850 in the Residential (Units, apartments, flats, townhouses, villas). Upgrade works to 13 dwelling at Kybrook Farm under the National Partnership Agreement for Stronger Futures in the NT (SFNT). To include removal & replacement of windows, louvers, solid core doors & vinyl flooring. Supply & installation of ceramic floor & skirting tiles, shelving & cupboards. Patch & make good existing block work wall. Painting of ceilings, external walls, internal walls, pergola steel & wood work. Supply & installation of solar panels at Lots 26 & 25. Supply & installation of solar hot water unit at lots 25, 35 & 15. Click for more details...

NICHOLS PLACE COURTS CHILLED WATER SYSTEM UPGRADE STAGE 2
Public Buildings & Facilities (Law Courts) project at Nichols Pl, Darwin, NT 0800 for New. Stage 2 of upgrade works to the Nichols Place Courts chilled water system. Click for more details...

ALICE SPRINGS CORRECTIONAL CENTRE EMERGENCY LIGHT DEFECT RECTIFICATION
Public Buildings & Facilities (Prisons) project at Stuart Hwy, Alice Springs, NT 0870 of Emergency Lighting - Rectification type of New development. Rectification of exit & emergency lighting at the Alice Springs Correctional Centre. Click for more details...

ALICE SPRINGS SEWER MANHOLE RELINING
Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area of State ownership. Relining of manholes in the Alice Springs sewer. Click for more details...

BATCHELOR SCHOOL & OUTDOOR EDUCATION CENTRE WATER MAINS
Water Mains - For School project at 10 Tilston Ave, Palmerston, NT 0830 In The Council Area Of Palmerston Town of State. Design & construction of water mains for potable water, fire services & irrigation uses at the Batchelor Area School & Batchelor Outdoor Education Centre. Design team to include Architect Quantity Surveyor, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer & Stormwater Engineer. Click for more details...

EDITH FARMS ROAD UPGRADE
Roadworks project at Edith Farms Rd, Edith, Katherine, NT 0852 In The Council Area Of Katherine Town of State. Edith Farms Road upgrade at Granite Creek Crossing. To include erosion control, concrete slab (apron) & dumped rock with concrete bonding & 2 coats sealing on the existing pavement. Associated civil works. Click for more details...

DALY RIVER SOLAR ARRAY
Earthworks project at Off Daly River Rd, Daly River, NT 0822 In The Council Area Of Darwin City of Local Govt. Clearing, grubbing & construction of an earthworks pad, drainage & site access for a solar array Click for more details...

CHANNEL ISLAND TO HUDSON CREEK
Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Palmerston Town Council Area of State ownership. Design, supply & re-construct existing Channel Island to Hudson Creek 132kV overhead transmission line to incorporate Archer to Palmerston 66kV overhead transmission line Click for more details...

WADEYE COMMUNITY MORGUE
Wadeye Community Morgue is currently at the Construction stage, valued at about $ 166000 it is Refurbishment of the Wadeye Morgue Building. Scope of work includes: supply & installation of new mortuary unit & associated plant. Supply & installation of a temperature alarm. Supply & installation of new split air-conditioning unit. Upgrade of the electrical board & supply & installation of new generator back up power unit. Supply & installation of new 9mm CFC ceilings. Supply & install of new hand basin & hot water service. Painting & vinyl flooring. Click for more details...

ROYAL FLYING DOCTOR SERVICE - DARWIN INTERNATIONAL AIRPORT
Public Buildings & Facilities (Passenger terminals (aiport, bus, rail & sea), Air control towers) project at 1 Henry Wrigley Dr, Darwin Dc, NT 0820 for New. Proposed development of a new purpose-built Royal Flying Doctor Service aeromedical base at Darwin International Airport for up to 4 planes. The facility will create a streamlined patient transfer process and better option for the repatriation of low acuity patients from Royal Darwin Hospital to hospitals such as Katherine and Gove. Click for more details...

DALY RIVER FLOOD RESPONSE
A project in the NT Within Katherine Town. Scope of work: clear fallen vegetation from off the existing roadway. Roadways:rip the existing pavement, wet mix to 150mm, layout, shape & trim to a achieve 3% cross fall and compacted to 95% MMDD to form a 6.00 meter sub grade layer. Win, load & cart gravel to achieve a 6.00 metres wide x 150 mm deep base course layer, compacted to 95% MMDD. Construct new table, off let drain & blocks to adequately shed the water from the road surface. Car park area: re-sheet the parking areas at the boat ramp Click for more details...

SOUTH STUART HIGHWAY
A project in the NT Within Alice Springs Town. South Stuart Highway pavement rehabilitation from chainage 1727.60 to chainage 1783.80 Click for more details...

KATHERINE POLICE STATION
Public Buildings & Facilities (Police Stations) project at Stuart Hwy, Katherine, NT 0850 of Police Station - Repaint type of Renovations, Refurbishments etc. development. Repainting of various surfaces in the Watch House holding cells & repainting all previously painted surfaces to the exterior of the main building Click for more details...

ARAFURA STADIUM
Currently at the Construction stage In Darwin City is a project estimated to be $ 113000. This project Construction of a shade structure at Arafura Stadium Click for more details...

LATZ CRESCENT & GREVILLEA DRIVE RESIDENTIAL HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The Alice Springs Town Council Area of State ownership. Refurbishment of 2 residential dwellings, both properties comprise 4 bedrooms, 2 bathrooms located within the Alice Springs town centre Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect