State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Open Cut Projects in TAS®ion=⊂=2011 in region


WREST POINT HOTEL CASINO - BOARDWALK PROMENADE
Casino Foreshore Redevelopment New project In The Hobart Council Area. New gaming area, restaurant & boulevard boardwalk cafe. Reinforced concrete & glass construction, steel roof. Click for more details...

EAST STRAHAN WASTEWATER TREATMENT PLANT
Not known, Strahan, TAS 7468 Has East Strahan Wastewater Treatment Plant currently at Construction stage. Supply, installation & commissioning of aeration equipment. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Clarence Council Area of Concrete - Supply & Delivery type. Annual tenders for the supply of goods and/or services for the period from 1 July 1996 to 30 June 1997. Click for more details...

NORTH WEST REGIONAL HOSPITAL
Brickport Rd, Burnie, TAS 7320 Has North West Regional Hospital currently at Construction stage. Redevelopment of theatre number 4, expansion of theatre support areas, refurbishment of recovery and day surgery and development of an acute oral health unit within the North West Regional Hospital. Click for more details...

BUCKLAND MILITARY TRAINING AREA STAGE 2
Military (Military installations & facilities) project at Not known, Buckland, TAS 7190 for New. Construction of target storage & toilet facility. Click for more details...

MEANDER VALLEY WWTP UPGRADE
Local Govt ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Westbury Council Area for New development. Electrical services associated with the upgrading of Prospect Vale Waste Water Treatment Plant. Click for more details...

BURNIE POLICE HEADQUARTERS
Air Conditioning Upgrade project at 88-98 Wilson St, Burnie, TAS 7320 in the Public Buildings & Facilities (Police Stations). Upgrade of the existing air conditioning systems including the replacement of the existing air cooled chiller with an air/water heat pump, replacement of the existing controls system and all associated electrical and building works. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Works will include the construction of a twin box culvert and associated downstream gabion erosion protection, supply and installation of gates, access structure and walkways. Click for more details...

QUEECHY SEWAGE PUMPING STATION
Currently at the Construction stage In Launceston is a project estimated to be $ 3400000. This project The scope of works under this contract includes the supply, delivery and installation of all materials and equipment for the construction of a new sewage pumping station and covered storage that will pump flow (via a new rising main) to Hoblers Bridge Wastewater Treatment Plant. The pumping station and covered storage will include a below ground circular concrete structure divided into multiple chambers, installation of inlet and outlet pipework, three 22kw (approximate) variable speed pumps, pumping equipment, control systems, flushing systems, mechanical ventilation and an architecturally designed above ground control building. Two DN 375 Ductile iron cement lined, rubber ring, jointed PN 35 pipelines installed below ground and two 450 OD, PE 100, PN 10 butt fusion welded pipelines installed below ground surface that connect to a new PE rising main (installed under separate contract) to the existing Norwood Rising Main. A flowmeter and valve pit complete with two electromagnetic flow meters, actuated valves and control systems. Upgrading power supply and water supply to the site. A new access road to the pumping station. Significant earthworks and rock retaining walls. Landscaping of the site. Decommissioning of the existing pumping station and associated infrastructure and the existing open storage basin. Click for more details...

CAMBRIDGE STREET UNITS
Cambridge Street Units is currently at the Construction stage, valued at about $ 400000 it is Construction of three units, brick veneer, metal roof and concrete floors. Click for more details...

OCEANA DRIVE RESIDENTIAL SUBDIVISION
Residential Subdivision - 13 Lots - Stage 4 project at Ocean Drive, Howrah, TAS 7018 in the Civil Engineering (Residential Subdivision). Stage 4, construction of a thirteen lot fully serviced residential subdivision. (Approximately 900 sqm each) Click for more details...

WILLIAM STREET UNITS
Residential (Units, apartments, flats, townhouses, villas) project at 134 William Street,, Devonport, TAS 7310 of Units (4) - Stage 1 type of New development. Construction of four, two bedroom, single storey units. Rendered brick construction, concrete floors, metal roof, aluminium windows, lock up garages and associated site works. Click for more details...

EAST DERWENT PRIMARY SCHOOL - BER PROJECT
Education (Schools - primary, secondary (up to Yr 12)) project In The Brighton Council Area of Multi Purpose Hall - Extension type. Extension of a multi purpose hall. Click for more details...

FINGAL PRIMARY SCHOOL - BER PROJECT
Education (Kindergartens, day nurseries, child care centres) project In The Break O'Day Council Area of Early Childhood Education Facilities type. Provide new early childhood education and birth to four year facilities. Click for more details...

WINNALEAH IRRIGATION SCHEME
Winnaleah Irrigation Scheme is currently at the Planning stage, valued at about $ 12500000 it is The new irrigation scheme will deliver 6,200 ML p.a. to the communities of Derby and Weldborough with an irrigable area of 5,000 ha. Click for more details...

ROYAL HOBART HOSPITAL - FIRE SAFETY UPGRADE PROGRAM
Medical (Hospitals & associated buildings, mortuaries) project In The Hobart Council Area of Fire Suppression Systems type. Fire safety upgrade program - fire suppression systems. Click for more details...

AURORA STADIUM - NEW NORTHERN STAND
Concrete Piles - Stage 1 project at 6A Invermay Road, Inveresk, TAS 7248 In The Council Area Of Launceston of Local Govt. Supply and delivery of approximately 93 reinforced concrete piles, 20.5 metres long each, to the Aurora Stadium adjacent to the New Northern Stand site in Launceston. Click for more details...

ROSNY COLLEGE STORAGE AND RESEARCH CENTRE
4 Rosny Hill Rd, Rosny Park, TAS 7018 Has Rosny College Storage And Research Centre currently at Tenders & Building stage. Installation of new DDC controls and commissioning of a building management system (BMS) and its associated electrical services, field sensors and control devices. Installation and commissioning of air conditioning units and their associated electrical ducting and piping. Upgrade of the mechanical switchboard and replacement of humidifiers. Modification of zone ducting, installation of new ducted heater banks in some zones and installation of smart meters. Click for more details...

FAIRWAY RISE LIFESTYLE VILLAGE
Independent Living Units - Stage 3 project at 55 and 75 Gordons Hill Rd, Rosny Park, TAS 7018 In The Council Area Of Clarence of Private. Construction of twenty nine two bedroom independent living units. Brick veneer, concrete floors, metal roof and aluminium frame windows. Click for more details...

KENNEDY DRIVE WAREHOUSE
Warehouse project at 18 Kennedy Dr, Cambridge, TAS 7170 in the Industrial (Warehouses, cargo sheds, distribution centres). Construction of a warehouse with variation to setbacks. Click for more details...

SNUG PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project at Channel Hwy, Snug, TAS 7054 for New. Construction of two new classrooms and new toilets to match existing buildings. Click for more details...

GLENORCHY COUNCIL
Currently at the Tenders & Building stage In Glenorchy is a project estimated to be $ 200000. This project Concrete cutting works. Click for more details...

JENKINS STREET ROAD RECONSTRUCTION
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Jenkins St, Taroona, TAS 7053. Design and construction of road pavement and associated works. Click for more details...

WATERWORKS RESERVE
Waterworks Reserve is currently at the Construction stage, valued at about $ 200000 it is Construction of a disability access pathway including retaining walls and car park. Click for more details...

FINGAL SPORTS COMPLEX AMENITIES BUILDING
Social (Amenities, Dressing rooms) New project at Brown St, Fingal, TAS 7214. This type is Amenities Building with Local Govt ownership. Construction of new amenities building, includes demolition of existing amenities building. Click for more details...

WILLIAM STREET PAVEMENT RECONSTRUCTION
William Street Pavement Reconstruction is currently at the Construction stage, valued at about $ 359000 it is Reconstruction of William St between tasman St and Charles St. Work includes new road pavement and kerb and channel. Click for more details...

PENNY ROYAL GUNPOWDER MILL REDEVELOPMENT- STAGE 2
Penny Royal Gunpowder Mill Redevelopment- Stage 2 is currently at the Construction stage, valued at about $ 6000000 it is The redevelopment of the Penny Royal Gunpowder Mill to include the construction of 3 cafes/restaurants totalling 287sqm, a 160 sqm function room, a 115 sqm wine bar and 100 sqm distillery which will include retail, distillery and storage. Construction will also include an upgrade of the complex entry and pathways and alteration of the carpark. Click for more details...

DALEY'S CREEK BRIDGE REPLACEMENT
Daley's Creek Bridge Replacement is currently at the Planning stage, valued at about $ 100000 it is Design and construction of a replacement bridge. Click for more details...

TASMANIAN PICKLED ONION PROCESSING PLANT
A project in the TAS Within Central Coast. Staged construction firstly of a warehouse/factory storage facility for processing/ bottling plant. Secondly administration, amenities and farm door tasting area. Concrete panel walls, metal roof and concrete floor. Click for more details...

TOLOSA WATER SUPPLY UPGRADE - TANK CONSTRUCTION
Tolosa Water Supply Upgrade - Tank Construction is currently at the Construction stage, valued at about $ 10000000 it is Construction of 2 x 20 ML tanks & ancillary works for the Tolosa Water Supply Upgrade. Each of these tanks will be 54 metres in diameter & 11 to 12 metres high at their centre point. Click for more details...

ST LUKE'S HOSPITAL
A project in the TAS Within Launceston. Extension to a wing of the existing hospital to add four private rooms to the mental health unit & increase the size of the nursing station. Click for more details...

PERIODIC STANDING CONTRACTS
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Various Locations, Launceston, TAS 7250. Works involve; asphalt works, road and footpaths, kerb and channel, traffic islands, drainage works, landscaping, pipe cracking, directional drilling, communication conduit, line marking, day works, service investigation works. Click for more details...

BITUMEN SURFACING SERVICES 2015/16
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Circular Head Council Area of Private ownership. Circular Head Council invite suitably qualified contractors to tender for the provision of Bitumen Surfacing Services for 2015/16. Click for more details...

TIMSBURY ROAD SCHOOL CAR PARK
Education (Schools - primary, secondary (up to Yr 12)) project In The Glenorchy Council Area of School Car Park/Road Works type. Civil works to provide a new road entrance and car parking off Timsbury Road Glenorchy. Click for more details...

ALEXANDRA ROAD UNITS
Currently at the Construction stage In Central Coast is a project estimated to be $ 450000. This project Construction of 3 single storey units with 3 bedrooms. Individual driveways with double car space garages. Brick face work, timber cladding & pitched tiled roofing. Landscaping. Click for more details...

CLARENCE CITY COUNCIL ANNUAL RESEAL AND MICRO SURFACING PROGRAM 2015/16
Clarence City Council Annual Reseal And Micro Surfacing Program 2015/16 is currently at the Construction stage, valued at about $ 550000 it is Construction of Council?s Annual Reseal and Micro Surfacing Program for the financial year of 2015/16. Click for more details...

SALAMANCA SUSHI TRAIN RESTAURANT
Salamanca Sushi Train Restaurant is currently at the Construction stage, valued at about $ 350000 it is Construction of a Sushi Train Restaurant, Salamanca Wharf. 3 storeys. Kitchen, bar, storage facilities & associated amenities. Ground floor comprising of the Sushi Train, 11 dining tables & a function room. First floor consisting of existing amenities, & third floor consisting of cold storage. Click for more details...

SANDOWN VILLAGE AGED CARE FACILITY
A project in the TAS Within Hobart. Extensions, alterations & additions to the existing Southern Cross Residential Aged Care. Works include; demolition & construction of new recreation areas, extensions to car park & alterations & additions to existing residential areas. Click for more details...

CRESSY DISTRICT HIGH SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project for New development. Construction of a new administration area and redevelopment of existing learning areas to provide two flexible general learning areas for Year 11 & 12, with associated amenities and storage. Click for more details...

WILLIAM STREET STORMWATER UPGRADE STAGE 5
Stormwater - Upgrade project at William St, Devonport, TAS 7310 in the Public Utilities (Water distribution systems, Drainage). Stormwater upgrade on William Street, between Eugene Street & North Street. Click for more details...

TRIKALA PLACE TOWNHOUSES
New project of Residential (Units, apartments, flats, townhouses, villas) project at 7-9 Trikala Pl, Tranmere, TAS 7018. Construction of 3 double storey townhouses with garages. Materials include colorbond roof, fibre cement sheet, paint finish, concrete block, rendered finish, glazed doors, fixed glass. Associated landscaping. Boundary adjustment. Click for more details...

TREVOR STREET UNITS
Units (3) project at 66 Trevor St, Ulverstone, TAS 7315 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 3 x 2 bedroom single storey units with single garages. Materials to be used include colorbond gutter, fascias & flashing, scyon stria cladding, colorbond custom orb roofing, face clay brick & aluminium windows. Associated landscaping. Click for more details...

ALL SAINTS CHURCH
Currently at the Construction stage In Glamorgan-Spring Bay is a project estimated to be $ 175000. This project Renovation and restoration of the Anglican church in Swansea. Works include removal of asbestos and roof replacement. Click for more details...

TASMAN COUNCIL GRAVEL ROAD CONVERSION OVERLAY & CIVIL WORKS
Roadworks/Civil Works project at Various locations within the municipality of, Nubeena, TAS 7184 In The Council Area Of Tasman of Local Govt. Gravel Road Conversion Overlay & Civil Works. Construction of a 100mm "Base A" overlay, drainage, improvements & associated works at various locations in the Tasman municipality. Click for more details...

BLUFF ROAD FITNESS EQUIPMENT
Fitness Equipment Installation project at Foreshore along Bluff Rd, Devonport, TAS 7310 In The Council Area Of Devonport of Local Govt. Expression of Interest for Bluff Road Fitness Equipment & associated infrastructure installed at the foreshore along Bluff Road in Devonport. Click for more details...

ATKINSONS ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Construction of the Atkinsons Street Stormwater upgrade. The work includes the following, Supply & installation of 269 m DN 300 Ribbed Polyethylene Pipe. Supply & installation of a 1050 manhole & heavy duty surround. Supply & installation of 245 m sub soil drain type FD. Supply & installation of 6 x Type "GP" pit. Construction of 175 m of concrete lined trapezoidal drain. Construction of 55 m concrete strip drain with heavy duty grate. Construction of 5 asphalt driveways. General reinstatement. Click for more details...

TOOSEY AGED CARE FACILITY STAGE 6
Aged Care & Retired Developments (Aged care facilities) project at 10 Archer St, Longford, TAS 7301 for New. Partial demolition of the existing structure. Construction of 6 additional bedrooms & new administration area in stage 6 to the existing aged care facility to include 2 offices, meeting room, reception area & waiting area. Fibre cement sheet cladding, aluminium framed glazed entry door, external brickwork, roof sheeting, aluminium sun shade panel, aluminium framed window & precast concrete lift shaft. Click for more details...

WEST TAMAR COUNCIL ROAD RESEALING PROGRAM 2016/2017
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The West Tamar Council Area of Roadworks type. Road asphalting & spray seal contractors able to carry out this program. Specifications & quantities are set out in the tender documents attached &include, 48046 sq m of 10 mm spray seal. 5900 sq m of 25 mm AC7 asphalt seal. 1500 m Machine profiling for 25 mm Asphalt seals. 40 t Asphalt for correction of surface shape (provisional quantity). Click for more details...

WELLS PARADE & SUNCOAST AVENUE INTERSECTION IMPROVEMENTS
Wells Parade & Suncoast Avenue Intersection Improvements is currently at the Construction stage, valued at about $ 250000 it is Construct approximately 130sq m of new concrete footpath & 8 pedestrian ramps at the intersection of Wells Parade & Suncoast Avenue, together with the construction of new concrete perimeter kerbing around the roundabout at this location. Click for more details...

TARLEON STREET & STONY RISE MAIN ROAD UNDERPASSES
Bridgeworks New project In The Devonport Council Area. Bridge Strengthening Program 2016/17, Tarleton Street Underpass (B5238) & Stony Rise Main Road Underpass (B5607). This project involves carbon fibre strengthening of the two existing bridges using Near Surface Mounted (NSM) & Carbon Fibre Reinforced Polymer (CFRP) systems. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect