State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Parks, Leisure grounds, Playgrounds Projects in NT®ion=⊂=1231 in region


ARUNTA PROJECT
Mining (Underground - including longwall) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

DEPARTMENT OF HEALTH & COMMUNITY SERVICES
Region of, Alice Springs, NT 0870 Has Department Of Health & Community Services currently at Tenders & Building stage. Provide external security of Health & Community Services occupied buildings for 5 year period. Click for more details...

BURNSIDE JV GOLD OPERATIONS - BROCKS CREEK PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Approximately 40 km southeast of, Adelaide River, NT 0846 of Processing Plant type of New development. A 1.5 mtpa facility and asscoiated infrastructure. Click for more details...

NHULUNBUY HIGH SCHOOL BLOCK 26
Compressor Shed Fo Rschool project at Nhulunbuy High School, Block 26, Technical Studies Bldg, Nhulunbuy, NT 0880 In The Council Area Of East Arnhem Shire of State. Construct compressor shed. Click for more details...

TIWI ISLANDS HOUSING
A project in the NT Within Offshore. Construction of 7 x 3 bedroom houses of 180 sq m each for 2003/2004Two (2) block houses at Milikapiti (Melville Island), One (1) block house at Takaprimili, One (1) steel framed house at Yimpinari (Condor Point). Click for more details...

RAAF BASE TINDAL
Military (Military installations & facilities) New project at Raaf Base Tindal & Delamere Air Weapongs Range, NT 0853. This type is Sheds (3)/Extn (1) with Federal ownership. Design/supply & construct 3 sheds & extension to 1 shed. Internally concrete floor placed over footings or footings placed in existing surfaces. All framing to be galvanized steel with truss style roof frames. Roof line to have bull nosed edges & no guttering or facia required. Cladding to be colour bond custom orb. Earthworks will be required on some sites. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project for New development. 2 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Carports, carparking & landscaping. Click for more details...

FAIRWAY WATERS
Civil Engineering (Residential Subdivision) project at Pt Lot 4635 University Ave (Town of Palmerston) Durack, NT 0830 for New. To create 45 lots approx. Roads, water, sewerage & telephone services. Click for more details...

ELANG
Oil & Gas (Pipelines & associated contracts) project In The Darwin City Council Area of Resource - Oil/Gas - Field Development - Offshore & Floating Production Facility type. Field development plan involves subsea completions of the existing vertical Elang 1 & 2 wellbores; connection of wells via subsea flowlines to leased FPSO moored over the field using a disconnectable single point riser turret moring; production & export of crude oil using shuttle tankers. Click for more details...

YUENDUMU COMMUNITY
Private ownership Public Utilities (Treatment plants, Sewerage reticulation) project In The Alice Springs Town Council Area for New development. Full gravity sewerage system. Click for more details...

NT GOVERNMENT OCCUPIED BUILDINGS
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) Renovations, Refurbishments etc. project at Palmerston, Darwin rual area incl Batchelor, Nhulunbuy, Groote Eylandt &, Darwin, NT 0800. This type is Fire Detection Equipment - Package B - Maintenance with State ownership. Routine servicing & emergency repair to fixed fire detection - Package B. Click for more details...

TIMBER CREEK
Ch: 1.560 Wilson St & adj Lot 47 Victoria Hwy, Timber Creek, NT 0852 Has Timber Creek currently at Tenders & Building stage. Construct drainage structures & associated roadworks. Click for more details...

GROOTE EYLANDT-ALYANGULA HOUSING REHABILITATION
Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area of State ownership. Internal & external repaint to various duplex units. Click for more details...

ELECTRICAL DRAFTING SERVICES-POWER & WATER
Currently at the Planning stage In Various is a project estimated to be $ 300000. This project Electrical drafting services for Northern Region for 3 year period. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Approx 200 km east of, Daly Waters, NT 0852 for Subcontract. Work on tailings dam expected to be completed within 10 - 11 weeks of commencement. Click for more details...

NIGHTCLIFF SHOPPING CENTRE
Shopping Centre - Addn project at 159 (lot 9679 Town of Nightcliff) Dick Ward Dr, Coconut Grove, NT 0810 In The Council Area Of Darwin City of Private. Construction of new store of 780 sq m for Crazy Clarks. Click for more details...

MITCHELL STREET DEVELOPMENT
Mitchell Street Development is currently at the Construction stage, valued at about $ 200000 it is Alterations to existing foodstalls arcade comprising fitout of 4 tenancies. Click for more details...

LEARN TO SWIM HYDROTHERAPY POOL
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project for New development. Project consists of following: Building of approx 180 sq m. Construction is concrete slab onground with block walls & steel roof. Ablution facilities containing changeroom, toilets, showers, male, female & unisex disabled facility to existing verandah area. Carparking & driveway. Click for more details...

MITCHELL CENTRE
Currently at the Construction stage In Darwin City is a project estimated to be $ 60000000. This project Construction of multi storey development to include retail on ground floor, carparking structure, 10 floors of office space & police station comprising of watch-house, cells & 24 hour shop-front. Tenancies to include Coles supermarket, 40 specialty shops, restaurant precinct & parking for 650 vehicles. Click for more details...

LYONS SUBDIVISION DEVELOPMENT
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project at Located west of Lee Point Rd (next to Royal Darwin Hospital & bordered to north by RAAF radar site) Lyons, Region of, Darwin, NT 0800 for New. New suburb will be built in Darwin's Northern area on 68 ha Defence Department land. To include 700 lots, 400 approx houses, parks, & associated community facilities. Click for more details...

DESERT PEOPLES CENTRE (DESERT KNOWLEDGE AUSTRALIA)
A project in the NT Within Alice Springs Town. Site civil works. Click for more details...

BROWNS OXIDE PROJECT - PROCESSING PLANT/ LEACHING FACILITIES
Processing Plant/Leaching Facilities project at South East of, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Tankage, Silos). The plant will treat 1.3 million tonnes per year. All major items of equipment for the plant have been acquired including grinding and classification circuit, Cawse solvent extraction, electrowinning plant, thickners and tanks have also been acquired. Other equipment is being custom designed and fabricated offsite. Detailed engineering design works of the plant are in progress. Finalisation of processing plant flowsheet and confirmatory metallurgical testwork are also in progress. Testwork has already shown that the valuable copper, cobalt and nickel minerals are dissolved in acid. Once the metals are in the solution, the liquor is separated from the leached solids which are then washed and sent to the tailings storage facility. Testwork is confirming solvent extraction design criteria for concentrating metals in solution ahead of copper electrowinning of high purity cathode product. The facility will comprise a solvent extraction plant, electrowiring plant, tankage and product filtering equipment. Click for more details...

DARWIN REGION ROADWORKS - SHOULDER & DRAINAGE REHABILITATION
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of State ownership. Shoulder & drainage rehabilitation & upgrading various secns between Ch: 79.0 km to Ch: 127.5 km & Ch: 174.6 km to Ch: 191.8. km. Click for more details...

STUART HIGHWAY - VARIOUS STUCTURAL & CIVIL WORKS
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project In The Alice Springs Town Council Area of Visitor Facilities/Sealed Accesses/Shelter/Various Items type. Upgrade visitor facilities, construct sealed accesses, shelter & various items from Teamster Memorial to Mount Polhill on Stuart Hwy within Alice Springs Region. Click for more details...

PETER MCAULEY CENTRE GROUND MAINTENANCE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Darwin City Council Area of Ground Maintenance type. Three year peiod contract for provision of ground maintenance for Peter McAuley Centre. Click for more details...

POWER & WATER CORPORATION OLD CHLORINE DOSING ROOM
Old Chlorine Dosing Room - Renovation Renovations, Refurbishments etc. project In The Katherine Town Council Area. Renovations to old Chlorine Dosing Room within water treatment plant. Click for more details...

DARWIN CBD WATERFRONT CONVENTION & EXHIBITION CENTRE BUILDING
New project of Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at 25 The Esplanade, Darwin, NT 0801. Convention & Exhibition Centre building, seats 15,000 with 4,000 sq m of exhibition space & 500 sq m of function rooms. Click for more details...

NTCSA PALMERSTON CHRISTIAN SCHOOL FIRE BOARD/SENSORS CONSULTANT
A project in the NT Within Palmerston Town. Design & installation of fire board & sensors at school including: supply/install fire panel & communications equipment, supply/install smoke detectors, supply/install thermal detectors, supply/install roof space indicators, install inter-building conduits & wiring, testing & commissioning, as constructed block plan & certification. Click for more details...

VICTORIA RIVER JOINT VENTURE PROJECT - URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Victoria Daly Shire Council Area of Resource - Uranium type. The eight tenements all contain radiometric anomalies and are variously prospective for a range of uranium mineralisations styles, including primary and secondary. Click for more details...

BERRIMAH ROAD WAREHOUSE
Mining - Support Facilities (Industrial buildings) project In The Darwin City Council Area of Private ownership. Construction of a warehouse to include railway track running into warehouse. Parking for 6 cars. Associated landscaping. Click for more details...

BERRIMAH ROAD TRANSPORT TERMINAL DOUBLE ENTRY REFER ID 1121446
Industrial (Warehouses, cargo sheds, distribution centres) project for New development. Construction of transport terminal with ancillary office. Click for more details...

MURAMATS ROAD WAREHOUSE WORKSHOP & OFFICE
Private ownership Industrial (Warehouses, cargo sheds, distribution centres) project In The Unincorporated North Council Area for New development. Warehouse/workshop (2350 sqm) & offices (465 sqm). Materials to include concrete slab, colour-coated metal cladding, rendered concrete block, roller shutters, colour-coated metal roof. Associated parking & landscaping. Click for more details...

FORREST PARADE SUBDIVISION/HOUSES
Civil Engineering (Residential Subdivision) project In The Palmerston Town Council Area of Residential Subdivision (11) Lots/Detached Houses/Group Houses (23) type. Land to be subdivided & developed as a residential estate. The development will subdivide into 7 lots ranging in size from 771 sqm to 1078 sqm for single dwellings & 4 lots ranging in size from 949 sqm to 1500 sqm for multiple dwellings. To include construction of an access road which will be configured as a cul-de-sac with a reserve width of 18 m. Two single dwelling lots (Proposed Lots 1 & 2) will be accessed from Amans Place. Proposoed Lot 3 will have a boundary to Amans Place & also the proposed road. Proposed Lots 4, 5, 10 & 11 are in Zone MD. They have been configured to provide small multiple dwelling complexes of 3, 4 & 5 dwellings. Click for more details...

VEREKER STREET SHOWROOM & WAREHOUSE
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 6 (Lot 2561) Vereker St, Humpty Doo, NT 0836. Construction of showroom & warehouse. Steel framed & metal cladding. Parking for 16 cars & additional handicap carpark. Associated landscaping. Click for more details...

OLD PIRATE GOLD PROJECT - TRIAL MINING
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Central Desert Shire Council Area for New development. A project based on a Resource Estimate of 1.88 million tonnes at 11.96 g/t gold for 723 800 ounces gold. Trial mining will include the extraction of 10 000 tonnes of gold bearing material, installation of a pilot plant & tailings facility, associated site works & ground water extraction. Pilot plant will include 15tph gravity gold plant including crushers, coarse gold jig, ball mill Knelson gravity concentrator & tabling/gold room. Click for more details...

ALICE SPRINGS SECURE CARE FACILITY INTERNAL ALTERATIONS
Medical (Rehabilitation Centres, Youth Care Accommodation) Renovations, Refurbishments etc. project at South Stuart Hwy (adjacent to prison), Alice Springs, NT 0870. This type is Secure Care Facility - Altns with State ownership. Installation of windows, doors & alterations to blockwork wall. Conversion of laundry to bathroom. Associated demolition works. Click for more details...

MAGNUM APARTMENTS
Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria) project at 44 Woods St (Lot 1423), Darwin, NT 0800 for New. Construction of 9 storey mixed use building with 194sq m commercial tenancy on ground floor & 40 units above. 24 x 1 bedroom & 16 x 2 bedroom units. Concrete blockwork, glass & steel. 1 lifts. Swimming pool. 3 levels of basement carparking. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-2) - POST WELD TREATMENT SERVICES
Currently at the Construction stage In Darwin City is a project estimated to be $ 2500000. This project For the provision of post weld heat treatment services. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Retail (Shops, shopping centres & arcades, supermarkets) project at 5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 of Fall Arrest Roof Systems type of New development. Installation of Fall Arrest system to Gateway Shopping Centre roof. Click for more details...

ROBINSON RIVER WATER STORAGE UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The Roper Gulf Shire Council Area of Water Tank - Upgrade type. Design, supply & installation of a 277KL potable water storage tank with roofing at Robinson River. To include excavation & benching, sub base preparation including filling, compaction & back fill. Construction of concrete tank foundation. Supply & installation of tank pipework, fittings & valves. Tank pipework to include overflow pipe outlet, scour box & outlet pipe to transfer pumps. Click for more details...

MOUNT DENISON & NAMATJIRA KINTORE LINK ROADS FLOOD DAMAGE REPAIRS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Mount Denison Rd & Namatjira Kintor Link Rd, Papunya, NT 0872. This type is Roadworks - Flood Damage Repairs with State ownership. Repair works to flood damage on the Mount Denison Road at various locations between Ch116 - Ch1414 & at the Namatjira Kintore Link Road at various locations from Ch16 - Ch20, located North West of Alice Springs. To include clearing of sand from drains, lifting & compacting fill to construct subgrades. Supply & lay 150mm gravel base course layer. Box out floodways & sheet with 300mm gravel. Provision of traffic control. Click for more details...

MANINGRIDA & RAMINGINING SOLAR FACILITIES FENCING
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Central Arnhem Rd, Ramingining &, Maningrida, NT 0822. Construction of chainmesh fencing surrounding the Proposed Maningride & Ramingining solar facilities as part of the Solar Energy Transformation Program (SETuP). To include 4m wide vehicle access gates. Click for more details...

ELRUNDIE AVENUE & KIRKLAND DRIVE INTERSECTION UPGRADE
Roadworks - Intersection - Upgrade project at Elrundie Ave & Kirkland Dr, Darwin, NT 0800 In The Council Area Of Darwin City of State. Upgrade works to drainage structures at the intersection of Kirkland Drive & Elrundie Avenue. To include supply & installation of automatic irrigation system. To include connection to water mains & control system. Construction of concrete invert drain, kerbs & footpaths. Associated landscaping. Provision of traffic control. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Oil & Gas (Pipelines & associated contracts) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

GUNN POINT ROAD
Local Govt ownership Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area for New development. Roadworks includes: resheeting of various sections from CH 14.16 to 36.96km Click for more details...

HUMPTY DOO PRIMARY SCHOOL - BLOCK A
Toilet Block - Replacement Renovations, Refurbishments etc. project In The Litchfield Shire Council Area. Replacement of ablution block A Click for more details...

OWEN SPRINGS POWER STATION
Public Utilities (Water distribution systems, Drainage) project at 205 Brewer Rd, Alice Springs, NT 0870 of Water Line - Upgrade type of New development. Supply, installation, testing & commissioning of reticulated domestic water system within the Owen Springs Power Station. Installation will require appropriate trenching, pipe encasement within clean sand fill & final compaction Click for more details...

ROOM TO BREATHE
Residential (Units, apartments, flats, townhouses, villas) Renovations, Refurbishments etc. project at ., Hermannsburg, NT 0872. This type is Early Works Program with State ownership. Room to Breathe early works program for Hermannsburg. Creation of new living spaces in existing homes Click for more details...

TENNANT CREEK HOSPITAL
Tennant Creek Hospital is currently at the Construction stage, valued at about $ 484000 it is Refurbishment of the bedroom, kitchen & bathroom in the Nurses quarters Click for more details...

GOVE DISTRICT HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project at Matthew Flinders Way, Nhulunbuy, NT 0880 of Hospital - Refurbishment type of New development. Replacement of existing asbestos suspended ceiling system, asbestos wall tiles & sheet vinyl floor coverings in Service?s Building Corridors B3, B4 & kitchen. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect