JABIRU AREA SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project In The Darwin City Council Area of External Lighting Replacement For School type. Replace existing light fittings & switches. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Minerals Processing) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

NT GOVERNMENT ASSETS-EAST ARNHEM REGION
Fixed Fire Detection Services - Package B - Maintenance project at Groote Eylandt &, Nhulunbuy, NT 0880 in the Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls). Replacement existing fire indicator panels, specified thermal/smoke detectors & other specified works - Package B. Click for more details...

URBAN TRAJECTORY
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Darwin City Council Area for New development. Construct 9 x 3 bedroom detached dwelling & 8 x 3 bedroom cluster dwelling in 13 x 2 storey building concrete slab, steel frame, light weight clad. Private garden with water tank, includes park with aviation & bowls theme. Associated carparking & landscaping. Floor area: 120 sq m - 150 sq m approx. Click for more details...

PARKS AUSTRALIA NORTH - KAKADU NATIONAL PARK
Electrical Systems - Upgrade Renovations, Refurbishments etc. project In The Darwin City Council Area. Programmed maintenance & repairs to electrical systems. Click for more details...

STUART HIGHWAY REHABILITATION
Resurfacing - Upgrade project at Various areas btwn Hook Rd & Shiers St (Ch: 4.44 km - 7.38 km), Darwin, NT 0800 In The Council Area Of Darwin City of State. Asphalt resurfacing. Click for more details...


Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at Region of, Katherine, NT 0850 for Subcontract. Period contract for general repairs & maintenance of plumbing services on PAWA installations. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

ULURU - BASE OF CLIMB
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Uluru via, Alice Springs, NT 0872 of Rising Main For Toilet Block type of New development. Solar powered sewerage pump station rising main, water mains & civil works for new toilet block at Uluru (base of climb). Click for more details...

WAGAMAN PRIMARY SCHOOL
Social (Amenities, Dressing rooms) project for Addition development. Construct blockwork & metal clad roofed ablution block. Click for more details...

ANGURUGU SCHOOL-GROOTE EYLANDT
Education (Schools - primary, secondary (up to Yr 12)) project In The East Arnhem Shire Council Area of Airconditioning (14) Supply & Install For School type. Remove old RAC airconditioners & make walls good. Supply & install fourteen new wall mount, inverter drive 7.1 kw 240 volt split system airconditioners & associated fresh air systems. Click for more details...


is currently at the Construction stage, valued at about $ 30000 it is Construction of multi use safari camp centre. Click for more details...

KALANO COMMUNITY
Administration Building/Training Room/Farm House/Residences (2) - Upgrading project at Kalano & Prior Crt Kalano Community, NT 0850 In The Council Area Of Katherine Town of Local Govt. Remedial works required to administration building, training room & farm house at Kalano, 2 residences at Prior Court. Click for more details...

SMITH/MCLACHLAN STREETS DEVELOPMENT
Currently at the Planning stage In Darwin City is a project estimated to be $ 20000000. This project Construction of 18 storey 58 m high hotel. Proposed 4.1/2 star, 172 rooms, basement carparking, swimming pool, health club, business centre & penthouse suites. Click for more details...

GHAN ESTATE
Civil Engineering (Industrial Subdivision) project at Ghan Rd, Alice Springs, NT 0870 of Subdivision - Industrial - Upgrading type of New development. Upgrading of existing services & roads for subdivision. Click for more details...

ULURU-KATA TJUTA NATIONAL PARK
Retail (Shops, shopping centres & arcades, supermarkets) project In The Darwin City Council Area of State ownership. Supply, install, test & commission entire electrical works to provide tariff meters on each facility in 'Rangerville', Maruku & Mutitjulu Community, Uluru-Kata Tjuta National Park. Click for more details...

BULLOCKY POINT MUSEUM/ART GALLERY CORNUCOPIA CAFE
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) Renovations, Refurbishments etc. project at 19 (lot 05714) Conacher St Bullocky Point, Darwin, NT 0800. This type is Loading/Storage Area Modifications For Walk-In Freezer with State ownership. Modifications to existing loading & storage areas for provision new walk-in freezer. Click for more details...

ROYAL DARWIN HOSPITAL BUILDING 9 NORTH - MODIFICATIONS
A project in the NT Within Darwin City. Modifications to reception & dosing areas, Building 9 North. Click for more details...

DARWIN REGION VARIOUS HIGHWAYS RESEALS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of State ownership. Various reseals to Arnhem, Kakadu & Stuart hwys. Click for more details...

BATCHELOR SUBSTATION PROJECT
Batchelor Rd, Batchelor, NT 0845 Has Batchelor Substation Project currently at Construction stage. The project comprises the construction of a new power distribution infrastructure in the Batchelor region to the proposed Compass Resources Brown Oxide mine. Development includes a new 132 kV transmission line of 3.7 km along Batchelor road, two new substations and a new 22 kV underground XLPE cable feeder of 10.6 km from Batchelor road to the mine site. Construction work will involve the design certification and installation of control room, disconnection uplift transport handling temporary storage and placement of all items from the Edith River substation that are to be relocated and reinstalled at Batchelor substation, erection of all electrical equipment, connection of the earth wire conductors to electrical equipment and testing of the completed earthing system, attachment of conductors and insulators to the landing structure, 132 kv transmission line erection and commissioning, electrical installation work not otherwise specified, installation of communications and 240 V power between the crib room and the control room. Click for more details...

BURNSIDE GOLD OPERATIONS - FOUNTAIN HEAD - RESOURCE
Private ownership Mining (Open Cut) project In The Katherine Town Council Area. Indicated resource is 1,985,000 tonnes @ 1.7 g/t for 106,100 ounces of Au and an inferred resource of 661,000 tonnes @ 1.6 g/t for 34,000 ounces of Au. Click for more details...

ALICE SPRINGS REGION - TERRITORY HOUSING MAINTENANCE
Housing - Maintenance/Repairs project at Various sites within region of, Alice Springs, NT 0870 in the Residential (Units, apartments, flats, townhouses, villas). Provision of repairs & maintenance services for Territory housing. Click for more details...

BORROLOOLA & BARKLY AREAS - AIR CONDITIONING SYSTEMS
State ownership Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls) project In The Barkly Shire Council Area for Renovations, Refurbishments etc. development. Provision of air conditioning systems within Borroloola & Barkly areas for 12 month period. Click for more details...

POWER & WATER CORPORATION - ALL CENTRES CONSULTANCY
Groundwater Monitoring/Hydrogeological Services Consultancy project at Various sites within Northern Territory, ., NT 8999 In The Council Area Of Various of State. Provide consultancy for groundwater monitoring & hydrogeological services for period of 36 months. Click for more details...

COSMO DEEPS UNDERGROUND GOLD PROJECT - PIT DEWATERING
40 km south east of, Adelaide River, NT 0846 Has Cosmo Deeps Underground Gold Project - Pit Dewatering currently at Construction stage. Detailed design is scheduled for completion late March 2008. The Company will need to hire pumps for the pit dewatering. Click for more details...

EAST ARM WHARF PORT FACILITIES CONSULTANCY
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at ., Darwin, NT 0800 for New. Works comprise: Filling of a bulk minerals stockpile area to the North East of the existing East Arm Wharf quay line. Filling & Armouring of an offshore supply base area. Filling a hardstand area for use by Defence. New rail spur providing access to the new stockpile area. New blocks (to be filled by the developer)for LDC extension of Muramats Road. Extension of the East Arm Wharf Northwest (two new berths). Dredging associated with all the above = dredged spoil to be piped or barged to onshore disposal ponds or disposed offshore at a nominated spoil site. Construction of an area to the North East of the existing wharf quay line for temporary stockpiling of fill material (behind a sand bund). Click for more details...

LITCHFIELD NATIONAL PARK WANGI FALLS CAMPGROUND STAGE 1
Campground/Day Use Area - Upgrade Stage 1 project at Litchfield National Park Via, Yarrawonga, NT 0830 in the Social (Amenities, Dressing rooms). The works comprise of campground rationalisation and upgrade works to day use area including' but not limited to; extension to car park, landscaping and irrigation works, and construction of a new ablution block in camp ground. Click for more details...

MILLNER VILLAGE PLAZA STAGES 1 & 2
New project of Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project at 348 Bagot Rd (Lot 9240), Millner, NT 0810. Construction of a village plaza providing mixed use commercial tenancies (1600sq m) in 1, 2 & 3 storeys with 54 apartments located behind the commercial areas. 48 x 2 bedroom & 6 x 3 bedroom apartments in 1 x 2 , 1 x 1 & 3 x 3 storey buildings. 2 x 2 storey showrooms & warehouses, shops, gymnasium & offices in 2 stages. Cement slab, rendered concrete blockwork & metal roof. Parking for 208 cars. Associated landscaping. Click for more details...

NT REMOTE REGIONS SCHOOLS COVERED OUTDOOR LEARNING AREAS BER PROJECT
Covered Outdoor Learning Areas project at Various 15 schools via, Alice Springs, NT 0870 in the Education (Schools - primary, secondary (up to Yr 12)). Construction of covered outdoor learning area for 15 regional primary schools. The anticipated construction system (alternatives will be considered on merit) will comprise reinforced concrete slabs on engineered fill platforms, reinforced single skin external block work walls with steel framed roof system. Provide metal cladding & insulation over blockwork walls generally to east & west facing walls & to other walls. COLA 18 m wide x 18 m long x 7 m high for the following schools: Areyonga, Finke, Haasts Bluff, Imanpa, M'Bunghara, Waitiyawnu (Mt Liebig), Tara (Neutral Junction), Rockhampton Downs, Stirling, Titjikala, Wallace Rockhole. COLA 18 m wide x 18 m long x 7 m high for Amoonguna School. COLA 18 m wide x 32 m long x 7 m high for Laramba School. COLA 18 m wide x 18 m long x 7 m high for Murray Downs School. COLA 15 m wide x 32 m long x 5 m high for Newcastle Waters School. Click for more details...

KATHERINE REGIONAL CULTURAL PRECINCT STAGE 1B
Social (Community centres, Clubs (unlicensed), Youth centres, Day respite) project at 108 (Lot 3002) Chambers Dr & Lot 3238 Stuart Hwy, Katherine, NT 0850 for Addition. Stage 1B to include: stage, backstage areas, offices, meeting rooms, storage & amenities. Click for more details...

DEFENCE HOUSING AUSTRALIA - NATIONAL PROPERTIES
various locations in the Northern Territory, ., NT 8999 Has Defence Housing Australia - National Properties currently at Planning stage. Defence Housing Australia (DHA) undertakes property provisioning around Australia through upgrading of existing stock, new construction, acquisition & development projects. Scope of Works will require suitably qualified companies to undertake some of the following works - Concept feasibility studies of probable costs, including revisions; Preparation of costing?s to be included in feasibility studies for DHA Board & Public Works Committee; Design Stage ? Validating Preliminary & final Sketch Plan costs; Documentation Stage ? Pre-EOI estimates; EOI Review ? EOI assessments & reports; Contract cost variation assessment & validation report & other adhoc services Click for more details...

FORREST PARADE MIXED USE DEVELOPMENT
Apartments(12)/Retail/Medical Centre/Service Station - 1, 2 & 3 Storey New project In The Palmerston Town Council Area. Construction of 1, 2 & 3 storey mixed use development in three buildings. To include retail tenancies (1167sq m) on ground level of both buildings with medical consulting rooms (840sq m) & 12 apartments above. Apartments comprise 12 x 2 bedroom apartments. To include a separate service station (217sq m). Cement slab, rendered concrete blockwork & metal roof. Basement car parking for 150 cars. 1 loading bay. Associated landscaping. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel). Click for more details...

ELCHO ISLAND GALIWINKU HEALTH CLINIC
Currently at the Construction stage In East Arnhem Shire is a project estimated to be $ 6295000. This project Construction of single storey health centre at Elcho Island. To include 5 general consultation rooms, 2 interview rooms, 2 children's consultation rooms & waiting areas. Ambulance area, emergency room, x-ray room, multi-purpose room, managers office, laundry, staff amenities & storage. Concrete slab, sheet metal roofing, sheet metal cladding, perforated metal screen & panels. Rendered concrete blockwork walls, plasterboard ceiling, vinyl flooring, acoustic insulation, metal roller doors, aluminium framed windows & doors. Solar hot water systems & water tanks. Associated car parking & landscaping. Click for more details...

MELVILLE ISLAND PICKERTARAMOOR ROAD SEALING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Tiwi Islands Shire Council Area of Roadworks - Reseal type. Sealing of 6.7Km of Pickertaramoor Road, Nguiu Road & Milirapti Road, Melville Island. S10E polymer modified binder & aggregate. Click for more details...

KATHERINE RESEARCH STATION VEHICLE WASH DOWN FACILITY & ASSOCIATED WORKS
Wash Down Facility project at Stuart Hwy (Lot 4391), Katherine, NT 0850 In The Council Area Of Katherine Town of State. Construction of vehicle wash down facility at the Katherine Research Station located 4km East of Katherine. To include supply & installation of a light truck wheel & underbody washdown system with surrounding concrete apron. Supply & installation of sump pump with decontainment materials tank mounted on a concrete slab. Water storage header tank & disinfectant tank. Weather proof control board mounted on steel frame unit. Low voltage fuse bases & fuses to existing power pole. Weather proof switchboard mounted on existing power pole. Connection to overhead & underground power supplies. Supply & installation of a 30,000l poly rainwater tank with self supporting roof & metal guttering mounted on a concrete slab. Weatherproof LED security lighting. To include construction of 97m x 6m sealed access road to the wash down facility with 2 coat seal of 20mm/10mm aggregate. Click for more details...

VICTORIA HIGHWAY SHOULDER REFORMATION
Roadworks - Shoulder Reformation New project In The Katherine Town Council Area. Reformation of shoulders on the Victoria Highway between Ch42.55 & Ch48.38. Cut existing shoulder to 1.5m width x 150mm depth, rip & compact sub base to 95% MMDD. Supply & lay gravel to create 1.5m wide x 150mmdeep shoulder compacted to 95% MMDD. Reshape table drains, off let drains & block drains. Provision of traffic control. Click for more details...

KINTORE ROAD & LIEBIG AIRSTRIP RESHEETING & DRAINAGE REPAIRS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Kintore Rd, Alice Springs, NT 0870 of Roadworks - Resheet & Drainage type of New development. Upgrades works to Kintore Road & the Mount Liebig Airstrip located 400km North West of Alice Springs. To include the re-sheeting of various sections of Kintore Road & re-instatement of drainage systems between Ch 257 & Ch273. Removal of sand & silt from roadway & drains & construction of 150mm sand clay base course layer. Drainage works to include table drains, table drain offlets & table drain blocks. Rip & re-compaction of the Mount Liebig Airstrip located at Ch174. Removal of existing airstrip furniture & replacement upon completion of works. Construction of 150mm gravel base course layer compacted to 150mm. Provision of traffic control. Click for more details...

ALICE PLAZA DEPARTMENT OF CORPORATE & INFORMATION SERVICES FITOUT
Commercial Premises (Offices) project for Renovations, Refurbishments etc. development. Fitout of the Department of Corporate Services training room & relocation of the RTM office located on the first floor of Alice Plaza. To include the demolition & removal of exisiting walls, doors, joinery & partitions. Supply & installation of new walls, solid core doors, windows & joinery. Extension of existing power & communications systems to new work stations. Supply & installation of air conditioning units. Painting of walls, ceilings & doors. Click for more details...

KARAMA PRIMARY SCHOOL FRONT OFFICE REFURBISHMENT
Education (Schools - primary, secondary (up to Yr 12)) project for Renovations, Refurbishments etc. development. Design & construction of refurbishment works to the front office at Karama Primary School. To include demolition of existing partitions, walls & doors. Construction of Principals Office, Assistant Principals Office, sick room, reception, meeting room, conference room, staff room, kitchen & teacher preparation areas. Refurbishment of existing amenities & dental room. Click for more details...

TIGER BRENNAN DRIVE, BENNETT STREET & CHUNG WAH TERRACE PATCHING & RESEALING
Roadworks - Reseal & Patching project at Tiger Brennan Dr, Bennett St & Chung Wah Tce, Palmerston, NT 0830 In The Council Area Of Palmerston Town of State. Resealing works to Tiger Brennan Drive, Bennett Street & Chung Wah Terrace. To include supply & lay A15E asphalt to 14mm. Provision of line marking & traffic control. Click for more details...

NORTHERN GAS PIPELINE GEOTECHNICAL TEST PITS
Oil & Gas (Pipelines & associated contracts) project In The Various Council Area of Geotechnical Test Pits - For Gas Pipeline type. Construction of geotechnical test pits for the Northern Gas Pipeline. To include backfilling test pits with excavated material. Click for more details...

BERRY SPRINGS RESERVE CARETAKERS RESIDENCE
Residential (Units, apartments, flats, townhouses, villas) project In The Litchfield Shire Council Area of Local Govt ownership. Design & construction of a caretakers residence at Berry Springs Reserve. To include demolition of existing structure. Construction of 1 bedroom residence with lock up garage & office. Supply & installation of air conditioning systems. Supply & installation of 2500l septic tank, 500l concrete pump well & hot water system. Click for more details...

NORTHERN GAS PIPELINE - HP & LP FLARE PACKAGE
Hp/Lp Flare Package New project In The Various Council Area. For the provision of a flare system for each of the blowdown systems for the Phillip Creek, NT Compressor Station. Click for more details...

TOP END TACKLE WORLD
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) Addition project at 425 Stuart Hwy (Lot 1401), Coolalinga, NT 0835. This type is Showroom - Addns with Private ownership. Addition of showroom to an existing activity centre. Car parking for 23 vehicles. Associated landscaping. Click for more details...

FREDS PASS RESERVE
Social (Amenities, Dressing rooms) project for New development. Construct a new ablution block at Freds Pass Reserve Click for more details...

NTARIA SCHOOL - BLOCK A
Education (Schools - primary, secondary (up to Yr 12)) project for Renovations, Refurbishments etc. development. Removal of existing roof on Block A. Lay & fix new colourbond roof cladding & associated roof plumbing works (including 4 X Whirly Bird roof ventilators). Scope of work includes: installation of roof sarking & R 3.0 insulation, replacement of water damaged ceiling tiles, replacement of damaged bird boards x 12. Installation of security grilles at vandal entry points. Installation of rain water storage tanks & the connection of the tanks to the roof plumbing accessories. Click for more details...

BISHOP STREET LEISURE & RECREATION FACILITY & OFFICE
Renovations, Refurbishments etc. project of Commercial Premises (Offices) project at Unit 1, 27 Bishop St (Lot 1837), Woolner, NT 0820. Conversion of 2 storey warehouse, showroom sales & office into leisure & recreation facility (279.8sq m), office (97.7sq m) & warehouse (50.7sq m). Ground floor - Demolition of reception area, office walls, bathroom & stairs to create additional space for sewing workshops. Existing kitchen to be expanded & relocation of bathroom. New access ramp, internal stairs & awning. First floor - Retention of balcony, demolition of kitchenette & meeting room wall, extension of floor to accommodate dance hall, toilet facilities & office/store room. Concrete floor slab & spring timber floor. Car parking for 8 vehicles. Associated landscaping. Click for more details...

NAKARA PRIMARY SCHOOL
Public Utilities (Water distribution systems, Drainage) project In The Darwin City Council Area of School - Civil Works type. Replace, fire, potable & irrigation mains. Associated works Click for more details...

SANDOVER HIGHWAY
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Sandover Hwy, Sandover, NT 0872. Construction of a 50m x 8m reinforced concrete floodway at chainage 273.20 Sandover Highway approximately 348Km South East of Tennant Creek. Click for more details...