NEW SOUTH WALES/VICTORIA/SOUTH AUSTRALIA ROADWORKS
various within New South Wales Victoria & South Australia, ., NSW 2999 Has New South Wales/Victoria/South Australia Roadworks currently at Tenders & Building stage. Supply of road maintenance services such crack sealing & patching, cold planing, resealing, line marking & other associated products & services for a period commencing November 2003 & ending October 2006. Click for more details...

BAULKHAM HILLS COLLEGE OF TAFE
Education (Tertiary - colleges, institutes, universities) project for Addition development. Construction of a gymnasium & associated site works & services. Click for more details...

WOLLONGONG RD WAREHOUSE REDEVELOPMENT
Industrial (Warehouses, cargo sheds, distribution centres) project for New development. Demolition of existing fire damaged industrial/commercial building down to foundations and reconstruction. Click for more details...

SINGLETON DRAINAGE
Singleton Drainage is currently at the Construction stage, valued at about $ 2000000 it is Catchment stormwater drainage improvements plus stormwater outfall., Click for more details...


Units (21) - 2/3 Storey project at 23 Bourke Street, Woolloomooloo, NSW 2011 in the Residential (Units, apartments, flats, townhouses, villas). Erection of two and three storey residential building containing 21 units, parking and landscaping. Click for more details...

ST FRANCIS OF ASSISI PRIMARY SCHOOL
Private ownership Education (Schools - primary, secondary (up to Yr 12)) project In The Blacktown Council Area for Addition development. Construction of several new demountable classrooms, carparking & basketball court. Click for more details...

BATHURST CITY COUNCIL AREA ROADWORKS
various within Bathurst Council areas, ., NSW 2999 Has Bathurst City Council Area Roadworks currently at Tenders & Building stage. Supply & laying of asphalt, preparation of pavement, placing of asphalt & control of traffic as well as supply only of asphaltic concrete for the period of 28 April 2003 to 31 December 2004. Click for more details...

CAMBRIDGE ST WAREHOUSE
11 Cambridge St, Enmore, NSW 2042 Has Cambridge St Warehouse currently at Planning stage. Demolish part of the premises and carry out alterations & additions to warehouse. Click for more details...

SYDNEY ELECTRICITY
Substation/Offices - 4 Levels New project In The Sydney Council Area. New substation incorporating 33,000 volt switch room, 132,000 volt Subtransmission Substation, transformer. 19 car spaces, staff amenities, lunch room, ancillary offices/showroom and small shop. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project at 70-72 Howard Ave, Dee Why, NSW 2099 for Subcontract. 9 x 1 & 6 x 2 bedrooms basement parking for 28 vehicles & landscaping. Click for more details...


Industrial (Warehouses, cargo sheds, distribution centres) project at 67 Epson Rd, Rosebery, NSW 2018 for Addition. Demolish front of existing building & erection of office frontage for industrial complex in 2 stages. Click for more details...


State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Penrith Council Area for New development. 8 x 1 bedroom units, 10 parking spaces & landscaping. SITE AREA 1826 sq m. Concrete slab, face brick, aluminium framed windows, concrete tiled roof. Click for more details...

TALLAWARRA POWER STATION
Civil Works - Stage 1 project at Pacific Hwy, Yallah, NSW 2530 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). The works generally include construction of an access road, carpark, contractors office, amenities lay down area, installation of security gates & access system, upgrading & modification to the existing water supply & sewage system, construction of stormwater, water reuse & reject water systems & wetland areas. Click for more details...

OLYMPIC WHITE WATER STADIUM
Slalom Canoe Course New project In The Penrith Council Area. Construction of the canoe slalom course for the Sydney Olympics comprising a U shaped concrete channel 300 metres long by 1 metre deep, moving ramp for rafts & canoes, pumping station, administration offices, kiosk, storage & amenities building, parking areas, access roads, seating for 10,000 spectators & standing for 5,000 plus event management, media & transport facilities. Click for more details...

RAYMOND ST MIXED DEVELOPMENT
Raymond St Mixed Development is currently at the Construction stage, valued at about $ 7000000 it is Construction of a mixed use retail/residential development with 1 level of basement parking, retail at ground floor consisting of 4 shops & 7 levels of residential with 56 x 2 bedroom units. The residential tower is a U shaped block orientated to the north to be located over the podium. The ground floor is designed to provide shop front glass facade along Raymond St. The site has a total area of 2721 sq m. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project at 2 Eveleigh St & Cleveland St, Redfern, NSW 2016 of Units (37) - 2/4 Storey type of New development. Construction of 33 x 2 & 4 x 3 bedroom units, 2 basement levels carpark for 44 car spaces & landscaping. Click for more details...

HANNELL ST COMPLEX
Residential (12)/Commercial - 4 Storey New project In The Newcastle Council Area. Proposal is for the construction of a 4 storey building containing 12 x 2 bedroom units, ground floor commercial tenancy. There will be two garages in the basement, one will house 9 residents spaces and the other will house 3 secure spaces for the commercial aspect. A lobby and lift well will separate the two garages, associated landscaping. Click for more details...

CARTIGNY PTY LTD
Currently at the Construction stage In Blacktown is a project estimated to be $ 460000. This project Alterations & additions to existing factory. Click for more details...

MELBOURNE ROAD OFFICE
Commercial Premises (Offices) project for Renovations, Refurbishments etc. development. Office redevelopment, stripping out, fixed partitioning & staircase. Click for more details...

KINGS PARK INDUSTRIAL ESTATE
A project in the NSW Within Blacktown. Construction of a factory/warehouse with an office (500 sq m) & associated carparking. Concrete slab, steel frame, precast concrete walls & metal roof. Click for more details...

ARNOTT RD TOWNHOUSES
Townhouses (7) - 2 Storey project at 21-23 (Lots 46 & 47) Arnott Rd (DP 566809), Marayong, NSW 2148 in the Residential (Units, apartments, flats, townhouses, villas). Construction of 7 x 2 storey townhouses consisting 4 x 3 ,2 x 2 & 1 x 4 bedrooms. Associated carparking & landscaping. Click for more details...

WALLGROVE RD CIVIL WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at Wallgrove Rd, Eastern Creek, NSW 2766. This type is Civil Works with Private ownership. Bulk earthworks Click for more details...

SYDNEY HARBOUR FEDERATION TRUST
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at various sites around Sydney Harbour, Sydney, NSW 2000 for New. Tenderers may submit tender for 1 site, a number of sites. Regular services required include turf management, including mowing, edging, fertilising & weed control. stormwater drain clearance, pathway maintenance, litter removal, garden bed maintenance including weed control, mulching, fertilizing, pruning & disposal of green waste & litter. Click for more details...

OLD HUME HWY BULKY GOODS - HIGHLANDS HOMEMAKER CENTRE
Currently at the Construction stage In Wingecarribee is a project estimated to be $ 6000000. This project Construction of a bulky goods retailing development comprising 17 tenancies totalling 10,703sq m. The tenancies will comprise 16 ground floor tenancies including a cafe/sandwich shop of 125sq m with a level 1 tenancy proposed fitness gym of 1,500sq m accessible by stairs or lift. Carparking for 277 vehicles and associated landscaping. Click for more details...

ETTAMOGAH INTERMODAL HUB
Transport Hub - Stage 1 New project In The Albury Council Area. Stage 1, valued at $9million will include earthworks, siding upgrades, terminal & office facilities. Warehouse facilities will be developed based on demand & as an integral part of Stage 1. Click for more details...

CASTLE HILL TAFE
Education (Tertiary - colleges, institutes, universities) project at Skills Centre, 2 Green Rd, Castle Hill, NSW 2154 for New. Demolition of a redundant office building. Construction of new facilities & refurbishment of existing buildings. Scope of work includes: General purpose rooms accommodating 9 lecture rooms, 1 lecture room; special support services including multi-function meeting room, 2 clinical nursing rooms, computer room & a home and community care room; reconfiguration of existing 80 parking spaces as well as additional parking resulting in an additional 101 spaces; student support services including teachers, education managers & administrative offices, student resource area & common area; general purpose accommodation including a lecture room, 2 seminar rooms & a call off room & provision of improved access through the construction of a separate exit driveway onto Green Rd Click for more details...

ST GEORGE PRIVATE HOSPITAL
Carpark project at 6A-14 Hogben St, Kogarah, NSW 2217 In The Council Area Of Kogarah of Private. Construction of a temporary carpark for 62 cars for St George Private Hospital Click for more details...

TERRIGAL DR CHILD CARE CENTRE
Child Care Centre project at 203 (Lot 1) Terrigal Dr (DP430128), Erina, NSW 2250 in the Education (Kindergartens, day nurseries, child care centres). Construction of a child care centre. Building comprises of 3 split level structures ajoined by play area with verandahs and sun shading. The structure will be timber framed with steel roof, wall cladding and selected fibrous cement, sub floor masonry walls with floors of reinforced concrete slabs. Associated parking and landscaping. Click for more details...

OLD NORTH RD TOURIST ACCOMMODATION
447 (Lot 25) Old North Rd (DP755255), Rothbury, NSW 2320 Has Old North Rd Tourist Accommodation currently at Planning stage. Construction of 11x 1 & 1 x 2 bedroom tourist accommodation. The dwellings range from 1 to 2 stories with roof top terraces. The buildings are staggered & organically arranged amongst the existing trees. A centrally located bell tower forms the highest element in the proposal. Carparking & landscaping. Click for more details...

GLOBAL SWITCH
Commercial Premises (Offices) project at 400 (Lots 1 & 3) Harris St (DP632525), Ultimo, NSW 2007 of Office Building - Altns & Addns - 8 Level type of Addition development. Addition of internal fire rated walls , expansion of plant room on level 8, & an external platform to house new cooling system on the roof top. Click for more details...

FAGAN PARK
Entertainment (Parks, Leisure grounds, Playgrounds) project at 50X Arcadia Rd, Galston, NSW 2159 for New. Regional park development. Scope of work includes: demolition & removal of the existing park gateway structure, paving, fixture & furniture; relocation of the existing park opening plinth & plaque; earthworks involving topsoil stockpiling & excavation; construction of stormwater, wastewater, electrical & water supply services to the building & playground areas & construction of the park entry building comprising accessible unisex toilets, baby change facilities, storage room, park information display & a covered outdoor area where a commercial mobile coffee cart adjacent to the main carpark can operate, enclosed toddler playground works & associated pathway & planting works Click for more details...

EAST ST WATER BOTTLING PLANT
Industrial (Factories & Factory Units) project at 215 East St, Albury, NSW 2640 for Addition. Conversion of existing warehouse to create a water bottling plant, refurbishment of the existing office & exterior facade works. Click for more details...

EASTERN FLAIR
Eastern Flair is currently at the Construction stage, valued at about $ 760000 it is Demolition of part of premises. Alterations & additions to the premises including second floor addition & reinstate verandah at first floor level & use of premises for retailing of artefacts, furniture & manchester. Construction of a 2 bedroom dwelling on second floor. Click for more details...

GOSFORD MAIL CENTRE
A project in the NSW Within Gosford. Alterations & additions to the existing mail centre to be completed in 2 stages. Stage 1 will comprise of the construction of a new steel framed awning, female internal toilets & external accessible ramp & door to the existing building. Car parking for 28 vehicles to the south of the existing building & 6 delivery vehicle spaces to the north. Click for more details...

NOWRA FIELD SUPPORT CENTRE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) New project at 23 Depot Rd, Nowra, NSW 2541. This type is Field Support Centre with Private ownership. Upgrade of the existing Nowra Field Support centre comprising the staged demolition of existing facility buildings & the stage construction s of a new split level facility comprising new vehicles workshops, vehicle wash bay, offices & amenities section, garaging & storage facilities with associated civil & drainage works. The works are to be staged and comprise of Stage 1 - part demolish existing workshop building (Building E) & garage (Building F) including concrete slabs & footings; demolish areas of external pavements; site remediation; construct part new Workshop building & new paved areas & drainage; relocate existing workshop equipment into new operations workshops including car hoist & install gantry crane; provide temporary sheet metal watertight cladding to south wall of remainder of Building E. Stage 2 - Demolish remainder of Buildings E & D including concrete slabs & footings; demolish areas of external pavements, kerb & gutter & landscaping; construct remainder of new Workshop building including second stage of gantry crane, paved areas, landscaping & drainage; re-build staff carpark including new kerb & gutter, bitumen paving, line-marking & drainage; demolish external pavement & drains & construction remainder of new paved areas & drainage. Click for more details...

HALL ST MIXED DEVELOPMENT
Units (3)/Shop (1) - 3 Storey project at 50 (Lot B) Hall St (DP442732), Bondi Beach, NSW 2026 in the Residential (Units, apartments, flats, townhouses, villas). Demolition of the existing structure. Construction of 3 storey mixed development comprising 3 units & ground floor retail area. The ground floor comprises a new full width retail area with cool room, office, storeroom, kitchenette, staff facilities, & bin area, with a private courtyard at the rear of the premises. The first floor has a stairwell off Hall St leading to an internal courtyard & common stair area. The front of the first floor contains a 1 x bedroom unit while the back area contains the first storey of a 2 storey x 2 bedroom apartment. The second storey comprises an internal courtyard & common stair area, a 1 x bedroom unit at the front of the building & the second storey of the 2 x bedroom apartment. The roof will have a small BBQ area & the air conditioning plant in an acoustic enclosure. Associated landscaping. Click for more details...

LARKIN ST UNITS
Currently at the Construction stage In Sydney is a project estimated to be $ 4200000. This project Demolition of existing buildings. Construction of a 4/5 storey residential flat building containing 16 residential units, 8 x 1 & 8 x 2 bedroom, & a communal roof terrace. Concrete walls, painted & rendered, single clear glazed powdercoated aluminium framed windows, operable or retractable aluminium louvres, powdercoated aluminium framed clear glass balustrade, concrete floor, concrete & waterproof membrane roof. Basement carparking for 14 vehicles. Landscaping Click for more details...

THE PONDS - STAGE 81
Private ownership Civil Engineering (Residential Subdivision) project In The Blacktown Council Area for New development. Staged residential subdivision of 62 lots. Construction of new roads & infrastructure Click for more details...

PIERCE ST VILLAS
Residential (Units, apartments, flats, townhouses, villas) project for New development. Construction of 10 x 1 bedroom & 4 x 2 bedroom villas. Concrete floors, brick/concrete plan walls & metal roof. Carparking & landscaping. Click for more details...

ROYAL HOTEL PADDINGTON
Royal Hotel Paddington is currently at the Construction stage, valued at about $ 650000 it is Alterations & additions to heritage hotel. The work comprises reconfiguration of the layout of the rear section of the existing ground floor level; alterations & addition to the first floor including the bar & amenities & changes to the first floor layout & the construction of a new uncovered roof terrace with the installation of an operable roof with retractable awnings & including the removal of the existing roof sheeting; changes to the second floor including the kitchen, bar & amenities & alterations to the floor layout; installation of a lift to all floor & new steel fire stairs at the rear of the hotel & a new masonry wall along part of the north eastern boundary. Replacement of the existing canvas awing over the bottle shop off Broughton St with a new metal awning; installation of 2 external timber windows to at the Broughton St facade & installation of 2 timber service exits & kitchen door openings. Click for more details...

AUSTRALIAN CATHOLIC UNIVERSITY HEALTH AND SCIENCES BUILDING
Education (Tertiary - colleges, institutes, universities) New project at 8-10 (Lots 8 & 9) Berry St (DP237104), North Sydney, NSW 2059. This type is University - 6 Storey - Altns & Addns with Private ownership. Alterations and additions to the existing educational establishment & construction of 3 additional storeys, comprising 420.6sq m level 4; 474.1sq m level 5; & 459.6sq m level 6. Refurbishment of the existing building to incorporate new facilities. Alterations to vehicular access through the car park of 12-16 Berry St. New accessible pedestrian access off Berry St. New double brick wall with structural steel stiffeners, new face brickwork to match existing, pre-weathered zinc cladding, FC panel cladding, acoustic louvres to plant, fixed glazing with internal blinds, steel surround frame, glazed entry door, glass & steel roof, high performance double glazing with anodised aluminium framing & interstitial blinds, pre-weathered zinc cladding, suspended acoustic ceiling, green roof. Decrease of 14 car spaces in the basement level, leaving a total of 4 spaces. Click for more details...

WATTLE ST BOARDING HOUSE
Residential (Student & group accommodation) project at 470 (Lot 1) Wattle St (DP209558), Ultimo, NSW 2007 for New. Construction of a 6 storey boarding house, comprising 57 single occupancy boarding rooms & a manager?s unit above, with an entrance off Wattle Ln. 2 x retail/commercial tenancies 160.2sq m are proposed on the Wattle St ground level. Communal living room of 73.9 sq m on ground floor. Pre-fabricated brick panel walls, exposed structural steel frame, timber slats, metal framed windows, glass balustrade. Carparking for 2 vehicles, 12 motorcycle & 12 bicycle spaces. Landscaping. Click for more details...

LAPSTONE PRESCHOOL
Private ownership Education (Kindergartens, day nurseries, child care centres) project In The Blue Mountains Council Area for Addition development. Alterations & additions to create new meeting rooms & deck located at the rear of the existing child care facility. Metal roof, timber floor & timber frame. Click for more details...

MAGNOLIA CLUB
Magnolia Club is currently at the Construction stage, valued at about $ 1200000 it is Alterations and additions to existing community building, concrete swimming pool and tennis court. Click for more details...

GRADY CRES INDUSTRIAL DEVELOPMENT
Commercial Premises (Offices) project for New development. Construction of a 9300sq m warehouse style building & 320sq m office. The warehouse will accommodate high bay storage racking, the building will be 12.2 metres high at the proposed ridgeline.The main office is over 2 levels & will include a general office fitout, meeting room, lunch room, worksatations & amenities & construction of an awning. The building will be supported by a steel structure & constructed with a concrete dado wall with metal cladding above, zincalume metal cladding. Basement carparking for 75 vehicles. Landscaping Click for more details...

AUSTRALIAN INSTITUTE OF MUSIC SURRY HILLS
Retail (Shops, shopping centres & arcades, supermarkets) project for New development. Demolition of existing building. Construction of 4 storey in-fill building associated with the Australian Institute of Music. The proposed building comprises ground floor loading bay from Sophia St, rear mezzanine level, 1 x ground floor retail tenancy 68.75sq m, 2 lecture spaces, 11 classrooms & 6 offices with internal access on every floor to the existing buildings on either side (1-15 and 17-51 Foveaux St). Basement carparking for 11 new carparking spaces within a new basement floor at 1-15 Foveaux St & 66 bicycle parking spaces, male & female shower/changing facilities, ach with 3 shower cubicles. Click for more details...

EAGLE VALE DRIVE
Currently at the Construction stage In Campbelltown is a project estimated to be $ 17500000. This project Upgrade of Eagle Vale Drive including road construction, road reconstruction, cycleway, drainage & landscaping Click for more details...

LAHC - NOWRA
Residential (Student & group accommodation) project for New development. Construction of a 5 bedroom villa style group home (2 x 2 & 1 x 1) with one carport. Associated site, stormwater & landscape works Click for more details...

BLACKSMITHS SURF CLUB
Currently at the Construction stage In Lake Macquarie is a project estimated to be $ 191000. This project Upgrade storage shed & first aid room located in surf club. Scope of work includes demolition of existing structure & construction of new reinforced concrete block wall building & adjoining pavement. Click for more details...

OBANVALE WATER TREATMENT PLANT
Water Treatment Plant - Repairs New project In The Singleton Council Area. Filter repairs & media replacement at Obanvale Water Treatment Plant. Scope of works includes: removal of all filter media & gravel from the 6 filters. Removal of filter floor pipework laterals & air scour laterals from the 6 filters. Disposal of removed materials off site to a suitable location. Repairs and coating to the concrete walls and floors of each filter. Replacement of the filter floor pipework laterals and air scour laterals. Minor repairs to some filter backwash launders. Supply of & refilling the filters with new media Click for more details...