State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Processing & materials handling equipment maintenance incl. shutdowns Projects in ACT®ion=⊂=2340 in region


GREENWAY COMMERCIAL ACCOMMODATION - CENTRELINK NATIONAL HEADQUARTERS
Office Buildings (2) - 5 Level project at Blk 4 Secn 13 cnr Souward Wy & Athllon Dve, Tuggeranong, ACT 2901 in the Public Buildings & Facilities (Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls). Construction of 2 commercial buildings with a total floor area of 40,000 sq m for Centrelink's new National Headquarters. The 2 environmentally friendly buildings will be nearly 200m in length with each floor being 9800 sq m. The upper levels will be connected by bridges. The buildings will have rainwater tanks, solar panels and wind generators on the roof. Click for more details...

HORSE PARK DRIVE EXTENSION
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Act Council Area of Roadworks type. Horse Park drive extension from Burramarra Av to Mirrabei Dr. Construction of the final section of Horse Park Drive. These works will improve traffic flow in the north western sector of the Gungahlin area & facilitate the future development of the Moncrieff &Taylor suburbs. Scope of work involves: Construction of approximately 1,800 metres of single, two way carriageway. Construction of 2 three way intersections, one of which is signalized. Construction of 1,600 metres of 300mm diameter water main & other hydraulic services. Construction of approximately 16 metres long by 19 metres wide bridge over flood way. Construction of approximately 2,000 metres of trunk cycleway. Construction of shared services trench & installation of street lighting. Landscape works. Click for more details...

MANUKA OVAL
State ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Act Council Area for Renovations, Refurbishments etc. development. Proposed upgrade of existing oval including extending the roofline of the Hawke & Menzies stands to cover an extra 2,500 seats, improve outer ground catering facilities, replacement of fences & new entrances. Click for more details...

LEICHARDT ST OFFICE
71 Leichardt St (Bl 4 Secn 14 former BBC Hardware store), Kingston, ACT 2604 Has Leichardt St Office currently at Construction stage. Refurbishment of 2 storey office building, which includes a business agency, community health centre & a gymnasium/indoor recreation facility,financial establishment, retail shop & public agency. Proposed additions also include increasing the area of the building to 669 sq m. Click for more details...

GUNGAHLIN TOWN CENTRE-CARNABY
Commercial Premises (Offices) project for New development. Construction of 2 x 4 storey residential buildings containing 137 x 1 & 2 bedroom units & construction of a new 2 storey commercial building with 16,000 sq m of retail space on the ground floor, a Big W retail outlet & other retail outlets on the ground floor, the second storey containing 4,000 sq m of commercial area. Click for more details...

BELCONNEN POOL & LEISURE CENTRE
Aquatic Centre project at cnr College St & Eastern Valley Way Aikman Rd (Secn 3 Blk 6), Bruce, ACT 2617 in the Sports (Swimming baths & assoc. facilities, Saunas, Spas, Solaria). Plans include a 50m 10-lane pool, a 25m warm-up pool, a pool with slide, spa & sauna, a gymnasium for adults & children, function rooms, sports halls, hydrotherapy facilities. Click for more details...

AUSTRALIAN FEDERAL POLICE - MAJURA TRAINING VILLAGE
Trade Package For Electrical Services Subcontract project In The Act Council Area. Electrical services. Click for more details...

ACT AREA FIRE DAMAGED VEGETATION REPLACEMENT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at various within ACT areas, Canberra, ACT 2601 of Fire Damaged Vegetation - Stage 2 type of Renovations, Refurbishments etc. development. Fire damaged vegetation replacement - design & construction superintendence - Stage 2. Click for more details...

THE CANBERRA HOSPITAL - ANU MEDICAL SCHOOL - ACT HEALTH LIBRARY
The Canberra Hospital - Anu Medical School - Act Health Library is currently at the Construction stage, valued at about $ 13310000 it is Construction of the ANU Medical School (ANUMS) at the Canberra Hospital (TCH). The building which has a GFA of approx 4000 sq m will house a large reference library, auditorium, staff offices & student learning facilities on 2 levels over a partial (utility) basement. The building will be designed to the latest standard of environmental sensitivity, energy efficiency & sustainability. The building will also have a roof slab for future extension if/as necessary. Click for more details...

EVATT MACGREGOR MELBA & SPENCE LINE MARKING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) Renovations, Refurbishments etc. project at various within Evatt MacGregor Melba &, Spence, ACT 2615. This type is Line Marking - Maintenance with State ownership. Maintenance line marking. Click for more details...

TIDBINBILLA OUTDOOR NATURE DISCOVERY CENTRE
Visitors Entry Building/Veterinary Surgery Building project at 99 (Part Blk 240) Tidbinbilla Nature Reserve Paddys River, Tidbinbilla, ACT 2620 In The Council Area Of Act of State. The proposed Outdoor Nature Discovery Centre project aims to showcase the Tidbinbilla Nature Reserve and will be centred on the redesign and development of the existing wetlands, to create a number of linked animal and habitat experiences. The redevelopment will involve the construction of: Pathway loop tracks containing interactive displays. 6 ecosystem habitat exhibits. A visitors centre of 100sq m to contain a variety of facilities including, reception and information areas, toilets, viewing platform and orientation displays. Veterinary centre of 150sq m with holding pens for pre release, quarantine & sick animals Click for more details...

HOPETOUN CCT APARTMENTS EMBASSY HOTEL SITE - AMBASSADOR
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Act Council Area for New development. Demolition of the Embassy Motel. Construction of a 4 residential flat buildings containing 114 apartments. Building 1 comprises 4 x 1, 8 x 2, 8 x 3 bedroom units & 3 penthouses; Building 2 comprises 10 x 1 & 14 x 2 bedroom units & 3 penthouses; Building 3 comprises 2 x 1 & 31 x 2 bedroom units & 3 penthouses & Building 4 comprises 5 x 1, 10 x 2 & 10 x 3 bedroom units & 3 penthouses. Associated landscaping and carparking for 205 cars. Click for more details...

YALLOURN ST WAREHOUSES
Industrial (Warehouses, cargo sheds, distribution centres) project In The Act Council Area of Private ownership. Demolition of existing buildings. Construction of 2 industrial warehouses with Building A approx 428sq m & Building B approx 335sq m. Carparking for 6 vehicles. Click for more details...

LYELL ST WORKSHOP
New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at 15 (Blk 3 Secn 21) Lyell St, Fyshwick, ACT 2609. Construction of a single storey workshop of 525sq ms. Carparking for 8 vehicles and associated landscaping. Click for more details...

CANBERRA INSTITUTE OF TECHNOLOGY - REID CAMPUS
Education (Tertiary - colleges, institutes, universities) New project at Reid Campus (Block H), Reid, ACT 2612. This type is Facade - Upgrade with State ownership. Extensively tile & paint existing precast facade Click for more details...

OWEN CR UNIT DEVELOPMENT
Residential (Units, apartments, flats, townhouses, villas) project at 25-27 (Blks 4 & 5 Secn 48) Owen Cr, Lyneham, ACT 2602 of Units (14) - 2 Storey type of New development. Consolidation of 2 blocks. Demolition of existing dwellings. Construction of a 2 storey building to comprise of 4 x 3 & 10 X 2 bedroom units. ACT housing energy rating of 5 stars. Basement carparking for 27 vehicles and associated landscaping. Click for more details...

ANU SECTION 68 - CO LAB OFFICES
Commercial/Cafe - 12 Storey New project In The Act Council Area. Construction of a 12 storey commercial building to comprise of offices, ground floor retail space & an arts laneway. Floor plates range from around 1400sq m to 2900sq m. Project to achieve 4.5 ABGR. Basement carparking for 600 vehicles & associated landscaping. Click for more details...

LANYON DRIVE DUPLICATION
Roadworks - Duplication - Overall project at Lanyon Dr, Hume, ACT 2620 In The Council Area Of Act of State. Duplication of Lanyon Dr from the Monaro Highway to Tompsitt Dr to a 4 lane, dual carriageway road, including the upgrading of the Monaro Hwy/Lanyon Dr intersection. Click for more details...

QUEEN ELIZABETH 11 SITE - CITY WEST OFFICES
Offices - 12 Storey project at Block 9 Section 31 Cnr Marcus Clarke, Rudd & Alinga Sts, Canberra City, ACT 2601 In The Council Area Of Act of Federal. Construction of a 44,000sq m 12 storey office building for 2000 staff with a cafe on the ground floor. Office accommodation is provided in rectangular office floor plates offering approximately 3,380sq m to 3,600sq m per floor. Office floors are modular & column free except for columns located at centre zone office partition locations. Basement carparking over 3 levels for 418 vehicles, 16 motorcycles & 175 bicycles. Associated landscaping. The building is to achieve a 5 Green star rating & a 4.5 Australian Building Greenhouse Rating (ABGR). Click for more details...

NATIONAL ARCHIVES PRESERVATION FACILITY (NAPF)
Storage Facility - 3 Storey project at 30 (Blk 7 Secn 21) Vicars St, Mitchell, ACT 2911 In The Council Area Of Act of Federal. The National Archives Preservation Facility (NAPF) will be a new, 3 storey purpose designed & built preservation facility of approximately 16,812sq m. The NAPF will be a passive, green facility that will minimise energy & resource use, greenhouse gas emissions & its environmental footprint. The NAPF will hold a significant proportion of the Archives paper records, 104 shelf km & 10 shelf km of audio-visual records in appropriate specialised storage. The building will include preservation laboratories, records handling areas & over 2,000sqm of office accommodation for approximately 150 staff. Metal roofing, colorbond gutters, flashings, parapet, capping, rainwater heads & downpipes, skylight, photovoltaic panels, aluminium composite panels, metal sunscreens, precast concrete, blockwork, metal feature blades, aluminium louvres, powdercoated aluminium window & door frames, roller doors, metal security fencing. Project aiming to achieve a 4.5star or higher NABERS rating. At grade carparking for 127 vehicles. Associated landscaping Click for more details...

FYSHWICK MARKETS REDEVELOPMENT
Commercial Premises (Offices) project at 12 (Blk 1 Secn 7) Dalby & Mildura Sts, Fyshwick, ACT 2609 for New. Demolition of the existing buildings. Staged construction of 3 new buildings comprising: Building 1: 763sq m offices, 1075sq m retail & 1076sq m storage. Building 2:1308sq m retail, 1307sq m storage & 84sq m amenities. Building 3: 608sq m retail & 608sq m storage. Extension to the existing building of 584sq m. Stage 1 of the development will contain a restaurant and function centre for up to 110 diners. Carparking for 583 vehicles & associated landscaping. Click for more details...

LIND CL UNITS
Private ownership Residential (Units, apartments, flats, townhouses, villas) project In The Act Council Area for New development. Demolition of the existing units. Construction of 5 single storey x 1 bedroom + study units with attached garages. The units to be constructed with painted external brickwork & concrete roof tiles. Associated landscaping. Click for more details...

OATLEY COURT COMMERCIAL BUILDING
Commercial Building - Altns & Addns project at 22-36 (Blk 3 Secn 4) Oatley Court, Belconnen, ACT 2616 in the Retail (Shops, shopping centres & arcades, supermarkets). Alterations & additions to the existing commercial building to comprise a 600sq m extension. Additional caparking for 22 vehicles. Click for more details...

MULLIGANS FLAT ROAD EXTENSION & BONNER WATER QUALITY CONTROL POND
Roadworks/Pond project at Mulligans Flat Rd, Forde, ACT 2914 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Construction of the extension of Mulligans Flat Road to the NSW border & Bonner Water Quality Control Pond No 2 which is to provide retardation & water quality improvement to stormwater runoff & floor protection to the suburbs of Forde & Bonner. Scope of work includes: Mulligans Flat Road extension to NSW/ACT border (Bonner side carriageway) from the roundabout intersection with Jessie Street. The roundabout is to be constructed by LDA as part Bonner 1A development by October 2008; associated intersections including design options report in the initial conceptual design recommending an option for construction (controlled, uncontrolled or roundabout) at Old Gundaroo Road; the entry into Bonner 2; & ; the entry into Bonner 1B. Note: This intersection is required to be a 4 way intersection that also services the undeveloped part of Forde (Forde 2); 2 underpasses (including associated floodway works & all cycle path connections within the development of Bonner) suitable for pedestrian and cycle path networks between Forde & Bonner to access schools, shops, community services and future Main Community routes. The locations of the underpasses are approximately 180m south of the entry intersection into Bonner 2; both underpasses will require headroom for cyclists; Noise impacts & any remediation measures required within the road reserve to reduce noise at the residential interface to acceptable levels; traffic lights at the Horse Park Drive & Mulligans Flat Road intersection. Note: Conduits already in place; associated hydraulic & utility services including any services required to service the adjacent areas of Bonner and Forde. (Note: there is a trunk water supply main within the road reserve or on the Forde side of the road reserve); A water quality control pond with retardation facility; associated inlet & outlet works, including provision of a gross pollutant trap, if necessary; the creek & floodway system & any associated improvements; landscape component & vehicular & any other access requirements to the area surrounding the pond including any gross pollutant trap. Click for more details...

GUNGAHLIN COLLEGE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Act Council Area of Local Govt ownership. Early Works package includes bulk earthworks & site services Click for more details...

THE PINES RESIDENTIAL AGED CARE FACILITY
Aged Care & Retired Developments (Aged care facilities) project at 11 (Blk 2 Secn 9) Beasley St & Drevermann St, Farrer, ACT 2607 for New. Construction of an aged care facility to comprise: Building RACF of 7,460sq m a 4 storey building with 106 beds comprising 20 high care, 40 low care, 46 extra service beds & basement carparking for 37 vehicles, 2 lifts & a hydrotherapy pool. Building A: Independent living units a 4 storey building with 26 x 2 bedroom units. Building C: ILU a 2 storey building with 16 x 2 bedroom units & managers office. Building D:11 x 2 storey units with a common room. Buildings F & G: ILU a single storey building 9 x 2 bedroom units & basement carparking for 9 vehicles. Associated landscaping. Click for more details...

CHENEY PL BULKY GOODS WAREHOUSE
Retail (Showrooms, Retail warehouses, Retail markets, Bulky goods) project In The Act Council Area of Showroom/Office - 2 Storey type. Alterations & additions to the existing bulky goods/warehouse to comprise: Construction of a 2 storey office & showroom of 676sq m. Construction materials comprise steel frame & clad with composite metal & cement render. Click for more details...

CITY WEST CARPARK
Blk 1 & 7 Secn 68 Marcus Clarke St, Canberra City, ACT 2601 Has City West Carpark currently at Construction stage. Construction of 3 new storeys to the existing 5 storey carpark for approx 400 vehicles. Construction of a caretakers residence on the 8th storey of 206sq m. Extension to the lift core. New facade treatment. New front entrance to Marcus Clarke Street. Click for more details...

THE CANBERRA HOSPITAL TEMPORARY OPERATING THEATRE COMPLEX
Various Trade Packages New project In The Act Council Area. Trade packages for formwork, metal roofing & cladding, external windows, glazing & louvers Click for more details...

HARRISON 4 RESIDENTIAL ESTATE
New project of Civil Engineering (Residential Subdivision) project at Wells Station Dr, 2.5km south east of Gungahlin Town Centre, Kenny, ACT 2911. Construction of a subdivision for 162 lots inlcuding 3 multi-unit sites. Click for more details...

CALWELL AGED CARE FACILITY
Aged Care Units/Aged Care Facility New project In The Act Council Area. Construction of a retirement complex to comprise 144 high & low level care, secure dementia beds, respite & day care & independent living units. The complex to be built over 4 separate wings. Wing A x 36 beds all with ensuites, 2 lounge areas, dining, staff rooms, store rooms, chapel. Wing B x 36 beds all with ensuites, 2 lounge areas, dining room, store rooms. Wing C x 36 beds all with ensuites, 2 lounge areas, dining room, staff rooms. Wing D x 36 beds all with ensuites, 2 lounge areas, dining room. Main reception. Recreation areas to comprise a hairdresser, chapel, doctors consulting rooms, activity rooms, mens shed, craft room, internet & library areas. Outdoor recreation areas including BBQ's. Carparking for 65 vehicles. Extensive landscaping. Click for more details...

GARTSIDE ST COMMERCIAL DEVELOPMENT
Commercial Premises (Offices) project at 33 (Blk 5 Secn 293) Gartside St, Wanniassa, ACT 2903 of Shops/Offices - 2 Storey type of New development. Demolition of the existing shop. Construction of a new commercial development comprising: Block A single storey building with 4 tenancies of 443.48sq m. Block B a single Storey building comprising 3 tenancies of 403.43sq m. Building C a 2 storey building comprising 4 office tenancies of 667.99sq m. Aluminium framed windows, alcubond awnings, colorbond roofing, timber panelling & glass awnings. Basement carparking for 23 vehicles, motorcycle & bicycle & on ground carparking for 32 vehicles. Associated landscaping. Click for more details...

WISE ST UNITS
Residential (Units, apartments, flats, townhouses, villas) project In The Act Council Area of Private ownership. Demolition of the exsisting dwellings. Construction of 20 x 1 bedroom x 2 storey units. Colorbond fence, suspended concrete slab, feature & masonry walls with applied finish, colorbond roof, fascia & pregola, aluminium windows & balustrades. Basement carparking for 25 vehicles. Associated landscaping. Click for more details...

GUNGAHLIN DRIVE DUPLICATION - NORTH
Gungahlin Drive Duplication - North is currently at the Construction stage, valued at about $ 13128000 it is Gungahlin Drive Extension Stage 2 - North. Stage 2 (North) comprises:Construction of the southbound bridge over the Barton Hwy. Construction of a new southbound 2-lane carriageway from Barton Hwy to Ginninderra Dr. Duplication of the super tee overpasses at Ellenborough St & Ginninderra Dr plus a pre-cast concrete arch fauna underpass at Lyneham Ridge. Additional lanes north & south bound carriageways between Ginninderra Dr & Belconnen Way. Duplication of Belconnen Way overpass. Duplication of the road works from Belconnen Way through to the Aranda flora underpass Click for more details...

ISABELLA PLAINS MEDICAL CENTRE
Currently at the Construction stage In Act is a project estimated to be $ 194000. This project Proposed addition to the existing medical centre to comprise an addition of a intern & medical student & nurses room, extension to the existing staff room to provide a more open environment, extending the treatment room. All to match existing, brick external walls, corrugated grey metal roof, aluminium windows, primrose colorbond fencing. Click for more details...

HARRISON SECONDARY SCHOOL
New project of Education (Schools - primary, secondary (up to Yr 12)) project at 22 (Part Blk 9 Secn 2) Wimmera St cnr Nullabor Ave, Harrison, ACT 2914. Trade packagea for Specialist flooring (12062.320) & Carpet & vinyl package (12062.325) Click for more details...

VIBE WAREHOUSE
Industrial (Warehouses, cargo sheds, distribution centres) project In The Act Council Area of Private ownership. Construction of a warehouse of 788sq m. Concrete tilt slab construction, side & front walls colorbond, colorbond roof, roller door, skylight panels. Carparking for 8 vehicles. Associated landscaping Click for more details...

FLEMINGTON RD MIXED USED DEVELOPMENT - AAMIRA
Commercial Premises (Offices) project In The Act Council Area of Units (105)/Commercial - 4 Storey type. Construction of a mixed use building 3 & part 4 storeys of 11998sq m. The complex comprises 5 commercial tenancies on the ground floor ranging from 214sq m to 373sq m with a gym & theatre for residents use. The units comprise 16 x 3, 27 x 2, 42 x 1 + study & 20 x 1 bedrooms. Colorbond roof, painted walls, aluminium framed windows, timber fascia, opaque glass balustrades with stainless steel handrail. Basement carparking for 204 vehicles. Associated landscaping Click for more details...

THE ENHANCED COMMUNITY HEALTH CENTRE - ECHC
The Enhanced Community Health Centre - Echc is currently at the Tenders & Building stage, valued at about $ 1200000 it is Various trade packages for the Belconnen Community Centre. Trade packages for Hydraulic services (14995.441); Precast concrete (14995.448); Communications (14953.447) & Security services (14995.439) Click for more details...

MOLONGLO INFRASTRUCTURE STAGE 1D/2A OVERLAP
Public Utilities (Water distribution systems, Drainage) project at Blocks 18,23,24 & 25, Molonglo Valley, Weston, ACT 2611 of Sewer/Stormwater type of New development. Proposed Molonglo trunk sewer to enable development in Molonglo Stage 2 & associated stormwater works for Molonglo 1 (North Wright). Scope of work involves: Molonglo Trunk Sewer (MTS) or Sewer 1 from MH31 to John Gorton Drive (JGD) in Molonglo Stage 2 a distance of approximately 1.3km & stormwater main (450mm to 1200mm diameter) to divert the following peak discharges to the Holden's Creek Pond. Click for more details...

CRACE MEDICAL CENTRE
Medical Centre project at Blk 1 Secn 46 Barratta St, Crace, ACT 2911 In The Council Area Of Act of Private. Staged construction of a single storey medical centre. Stage 1 to comprise construction of 8 consulting rooms 12-13.5sq m per room, 3 procedure rooms 16sq m per room, nurse station, reception areas, staff facilities, public amenities, server room, pathology rooms. Stage 2 to comprise allied health space of approx 440sq m, physiotherapy suite 210-280sq m, dental suite, psychologists. Painted expressed steel structure, steel roof, timber veneer composite panel cladding, aluminium faced composite panels, rendered masonry, profiled metal, solid timber pergola battens, natural stone. Carparking for 55 vehicles. Associated landscaping Click for more details...

INNER NORTH IRRIGATION TANKS PROJECT
New project of Public Utilities (Water distribution systems, Drainage) project at Lyneham, Hackett &, Downer, ACT 2602. Construction of tanks, pumps & associated infrastructure as required at Southwell Park in Lyneham, Hackett Neighbourhood Oval & Downer Neighbourhood Oval. The tanks are to be installed to connect to the Inner North Stormwater Reticulation Project. Click for more details...

FRANKLIN MEDIUM DENSITY UNITS
Residential (Units, apartments, flats, townhouses, villas) project at Blk 3 Secn 93 Flemington Rd, Franklin, ACT 2913 of Units (29) - 2/3 Storey type of New development. Construction of 29 x 2 & 3 bedroom units over 2 & 3 storey residential buildings. Facebrick masonry courtyard walls, feature cladding, colorbond roof, aluminium privacy screens, glass balustrades, render & paint. Basement carparking for 58 vehicles, 15 at grade & 6 visitor. Associated landscaping with communal spaces. Click for more details...

ACT CABIN & CAMPING DEVELOPMENT
Currently at the Construction stage In Act is a project estimated to be $ 16700000. This project Stage 1 to comprise: Construction of 46 serviced caravan & camping sites. Short stay cabin style accommodation in 3 buildings for 480 beds, buildings x small student accommodation 15 ensuite rooms x 4 beds with 6 teacher rooms, 15 ensuite rooms x 4 bed with 5 teachers rooms, large student accommodation 21 ensuite rooms x 4 beds with 8 teachers rooms. Single storey dining room for up to 320 students & 48 teachers & coach drivers - with offices, kitchens, cool rooms, freezer. Coach drivers accommodation building x 11 rooms with ensuites. Workshop. Covered assembly area. Covered walkways connecting the buildings. Colorbond roof sheeting, gutters, downpipes, powdercoated aluminium window frames, painted fibro cement cladding, coloured concrete blockwork base, colorbond roller shutters, magnesium oxide board, chainlink fence, open clerestory. Carparking for 47 vehicles & 12 coaches. Associated landscaping & internal street lighting. Click for more details...

ACT PUBLIC HOUSING COOMBS
Dwellings (72) project at Blks 1 & 2 Secns 37, 39 & 41, Coombs, ACT 2611 in the Residential (Units, apartments, flats, townhouses, villas). Design & construction of 24 dwellings on each of the following blocks. Block 1 Section 37. Block 1 Section 39. Block 2 Section 41. Associated carparking. Landscaping Click for more details...

HIGGINS PRIMARY SCHOOL SITE
Currently at the Construction stage In Act is a project estimated to be $ 1047000. This project Demolition of all existing buildings and structures of the former Higgins Primary School, including environmental site remediation. Click for more details...

FAIRHALL ST PUBLIC HOUSING
Currently at the Construction stage In Act is a project estimated to be $ 5924000. This project Construction of 25 x 2 bedroom x 2 storey units for public housing. Aluminium framed glazed window, hinged doors, sliding doors, aluminium slatted screen, facebrick, metal gutter, face block courtyard wall, chainwire fence, timber paling fence, metal cladding, precast concrete painted, metal roller door, metal roof sheet, sun shade. Carparking for 36 vehicles. Associated landscaping Click for more details...

DOWNER SEWER
Public Utilities (Water distribution systems, Drainage) project In The Act Council Area of Sewer Relocation type. Relocation & upgrade of the existing sewer main from within Downer to the verges of Bradfield & Melba Streets. Construction of an overflow diversion of the existing sewer main from Melba St to Swinden St. All works to be carried out with boring Click for more details...

BLACK SPOT PROJECT 2015/16 - PACKAGE 4
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Black Spot - package 4. Scope of work includes: streetlight installation works at Tuggeranong Parkway between Sulwood Dr & Hindmarsh Dr. Click for more details...

MAJURA LINK ROAD & BRIDGE CONSTRUCTION
Civil Engineering (Bridges, Aqueducts, Viaducts) project at from Majura Pky, Majura, ACT 2609 of Road/Bridge type of New development. Construction of a 1.3km Link Road from Majura Parkway to the IKEA access road (Meddhung Road), single span bridge over Woolshed Creek and a major drainage structure (3 x Bebo Arches). The new piece of infrastructure will consist of an off ramp from the southbound Majura Parkway carriageway, pavement over one single span bridge and one triple precast arch bridge, eventually joining to the recently constructed Meddhung road Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect