State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Rehabilitation Centres, Youth Care Accommodation Projects in NT®ion=⊂=1113 in region


STUART/CARPENTARIA HIGHWAYS REHABILITATION
Stuart/Carpentaria Highways Rehabilitation is currently at the Construction stage, valued at about $ 990000 it is Comprising resealing various areas & enrichment of various areas using emulsion, cutback or foam bitumen. Click for more details...

CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...


Dwellings - Unknown Number - Upgrading project at Wallace Rockhole via, Alice Springs, NT 0870 in the Residential (Units, apartments, flats, townhouses, villas). General maintenance. Click for more details...

NORTHERN TERRITORY UNIVERSITY
State ownership Education (Tertiary - colleges, institutes, universities) project In The Darwin City Council Area for New development. Mechanical services for new building. Masonry construction, concrete floor, colourbond roof, aluminium framed windows, reverse cycle refrigerated ducted airconditioning, fire hose reels & extinguishers. Refurbishment for general learning spaces. Click for more details...


House (1) project at Willowra via, Alice Springs, NT 0870 In The Council Area Of Alice Springs Town of Local Govt. 3 bedroom. Block-work construction, concrete floor, metal deck roof, aluminium framed windows. Click for more details...

FAIRWAY WATERS
Dwellings (18)/Sales Centre/Carpark New project In The Palmerston Town Council Area. 11 detached & 6 courtyard dwellings, 2 & 3 bedroom. Block-work & lightweight cladding construction, concrete floor, metal deck roof, aluminium framed windows, carports. Sales centre & carpark. Click for more details...

ROYAL DARWIN HOSPITAL
Medical (Hospitals & associated buildings, mortuaries) project In The Darwin City Council Area of State ownership. Comprising repairs & maintenance to various lifts in Buildings 1, 4 & 13 for 5 year period. Click for more details...


Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Roadworks type. Darwin - Hidden Valley Rd/Stuart Hwy intersection & entrance to Winnellie Wreckers Lot 4271 - provide "U" turn provision & second entrance to Winnellie Wreckers from service road. Click for more details...

UBIRR ROCK - KAKADU NATIONAL PARK
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Darwin City Council Area of Roadworks For Park type. Work comprises construction of 3 No concrete floodways on Ubirr Rock access road, reconstruction of Ubirr Rock carpark utilizing brick pavers laid on constructed FCR base & compacted subgrade. Construction of following items of work are also required: Site drainage, fencing, drainage culverts & sign posting. Click for more details...

WALER BARRACKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Waler Barracks, Palmerston, NT 0830 for New. Extension of trunk roads & engineering services (water, power, storm water, communications & sewer). Click for more details...

DEPARTMENT OF THE ENVIRONMENT & HERITAGE - PARKS AUSTRALIA NORTH
Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project In The Unincorporated North Council Area of Federal ownership. Repairs & maintenance of buildings. Click for more details...

WHITE RANGE GOLD OPERATIONS - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Alice Springs Town Council Area of Private ownership. Orex will construct a new leach pad to treat the residual stockpile of ore. The December Quarter 2006 saw the mine produce 346 ounces of gold. At present Orex is shifting over 7000 tonnes of ore @ 2 g/t au for leaching. Click for more details...

LUDMILLA WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project for New development. Excavation & construction of large underground chambers & elevated concrete structure. 140 m reinforced concrete pipeline. Extension to existing building. Block-work & masonry construction, concrete floor, metal deck roof, electrical & associated works. Click for more details...

BATHURST ISLAND HOUSING ASSOCIATION
Bathurst Island Community, Bathurst Island, NT 0822 Has Bathurst Island Housing Association currently at Construction stage. 2 x 3 & 2 x 4 bedroom houses. Steel frame & metal clad constructions on stumps, metal deck roof, aluminium framed louvred windows. Renovations to include fitout of an existing house, & additional room to another existing house. Click for more details...

THORAK ROAD NURSERY
Thorak Road Nursery is currently at the Construction stage, valued at about $ 300000 it is Construction of plant nursery. Steel frame & shade cloth with PVC piping for irrigation of plants. Machinery shed. Steel frame & steel clad, concrete floor, metal deck roof. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

SMITH STREET DEVELOPMENT
New project of Industrial (Depot, Garages, Workshops, Carwashes, Hangars) project at Pt Lot 9177 (Proposed Lot 9206) Smith St, Alice Springs, NT 0870. Construction of steel framed warehouses for light industry. Click for more details...

BATCHELOR INSTITUTE OF INDIGENOUS TERTIARY EDUCATION - ALICE SPRINGS
Bloomfield St, Alice Springs, NT 0870 Has Batchelor Institute Of Indigenous Tertiary Education - Alice Springs currently at Construction stage. Upgrading of student lounge. Click for more details...

MT BUNDEY TRAINING AREA
Mt Bundey Training Area 120 km South East of Darwin, ., NT 8999 Has Mt Bundey Training Area currently at Construction stage. Hardening of Transport Corridors. Construction of extensive gravel roadworks on floodplain. Work includes design & construction of approximately 12 km of road in Mt Bundy Training Area. Click for more details...

PATERSON STREET REHABILITATION
Paterson Street Rehabilitation is currently at the Construction stage, valued at about $ 56000 it is Ground maintenance of nominated NT Government Buildings for 12 month period. Click for more details...

STUART HIGHWAY REHABILITATION
Guard Rails/Piers - Upgrade Renovations, Refurbishments etc. project In The Darwin City Council Area. Protective treatment of guard rails & piers. Click for more details...

KATHERINE HIGH/MACFARLANE PRIMARY SCHOOLS GROUND MAINTENANCE
Ground Maintenance For Katherine High & Macfarlane Primary Schools project at Katherine High School & MacFarlane Primary Schools, Katherine, NT 0850 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Grounds maintenance contract for Katherine High School & MacFarlane Primary Schools. Click for more details...

YILLI RREUNG HOUSING ABORIGINAL CORPORATION GROUND MAINTENANCE CONTRACT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for Renovations, Refurbishments etc. development. Slashing & grounds maintenance within 250 km radius of Darwin. Click for more details...

BATCHELOR SUBSTATION - CIVIL/EARTHING WORKS
A project in the NT Within Darwin City. Work comprises civil and drainage works, earth grid and connection tails, fencing, installed certified and fully serviced crib room, new poles, nominated structures, and foundations for HV structures. All structures to include hold down bolts measured to ensure they will accommodate the future installation of electrical equipment that will be relocated from the Edith River substation. Click for more details...

EAST ARM PORT WHARF - REFERENCE ELECTRODE WELLS/SENSE CONNECTORS - STAGE 1
East Arm Port Wharf - Reference Electrode Wells/Sense Connectors - Stage 1 is currently at the Tenders & Building stage, valued at about $ 150000 it is Provision of (12) Reference Electrode Wells & Sense Connectors to Stage 1 Wharf, East Arm Port. Click for more details...

ROYAL DARWIN HOSPITAL REFRIGERATION/AIRCONDITIONING EQUIPMENT
Renovations, Refurbishments etc. project of Medical (Hospitals & associated buildings, mortuaries) project at Rocklands Dr, Casuarina, NT 0810. Repairs & maintenance of refrigeration & airconditioning equipment for 36 month period for Royal Darwin Hospital. Click for more details...

TENNANT CREEK ROAD AMENITY MAINTENANCE
Road Amenity - Maintenance Renovations, Refurbishments etc. project In The Barkly Shire Council Area. Provide maintenance for roadside amenities for 12 month period. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PIPE STRINGING & BENDING CONTRACT
From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846 Has Bonaparte Gas Pipeline Project - Pipe Stringing & Bending Contract currently at Construction stage. For a 275 km pipeline capable of delivering 30 petajoules per year. Click for more details...

ROPER GULF SHIRE COMMUNITY UPGRADES
A project in the NT Within Katherine Town. Refurbishment of recreation hall - Numbulwar. Erect shade structure (approx 15m X 20m) - Numbulwar. Erect shade sails over playgrounds - Barunga, Beswick & Manyallaluk. Construct new basketball court and cover - Beswick. Click for more details...

WALLACE ROCKHOLE, TITJIKALA, NTARIA GOVERNMENT EMPLOYEE HOUSING
Residential (Units, apartments, flats, townhouses, villas) project In The Various Council Area of Government Employee Housing type. Design, document, tender and project management of the construction of NT Government Employee Houses. Wallace Rockhole - 1 X 3 bed GEH dwelling. Ntaria - 1 X 3 bed GEH dwelling. Titjikala - 1 X 2 bed GEH duplex. Click for more details...

NORTHERN IMMIGRATION DETENTION CENTRE RECREATION AREAS UPGRADE
Recreation Building New project In The Darwin City Council Area. Construction of outdoor recreation buildings, work to include new recreation building in North 1 compound with associated electrical, mechanical & civil works including connections to existing services. Click for more details...

CASUARINA SQUARE STUDENT ACCOMMODATION
Student Accommodation - 8 Storey New project In The Darwin City Council Area. Construction of 8 storey student accommodation building for 303 students in flexible suites over 6 levels with common rooms & group study areas. 1 level to include internet kiosk, games room, dining & common areas. 2 lifts. Undercroft parking for 31 cars, 40 motorcycles & 80 bicycles. Click for more details...

TIGER BRENNAN DRIVE DUPLICATION FROM WOOLNER ROAD TO BERRIMAH ROAD
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Tiger Brennan Dr (from Woolner Rd to Berrimah Rd), Darwin, NT 0800. Construction of 9km duplication of Tiger Brennan Drive from Woolner Road to Berrimah Road. To include new bridge structure at Hidden Valley overpass & upgrade to all intersections for the length of duplication. Click for more details...

ARRAY APARTMENTS ON DALY
Units (68)/Commercial Premises - 11 Storey project at 29 Daly St (Lots 2811 & 1786), Darwin, NT 0800 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Construction of 11 storey mixed use building with 230sq m office/retail tenancy on ground floor & 68 units above. 5 x 1 bedroom, 54 x 2 bedroom & 9 x 3 bedroom units. Concrete blockwork, glass & steel. 2 lifts. Gymnasium. Swimming pool. 3 levels of basement carparking for 103 cars . Associated landscaping. Click for more details...

BERRIMAH TRUCK CENTRAL
Wishart Rd, Berrimah Rd & Tiger Brennan Dr, Berrimah, NT 0821 Has Berrimah Truck Central currently at Construction stage. Construction of truck stop, fuel station, 24 hour restaurant & rest/fatigue facilities. Associated car parking & landscaping. Click for more details...

NAUIYU/DALY RIVER HIGH PENETRATION ENERGY STORAGE SYSTEM
108 Wooliana Rd, Maranunga VIA NAUIYU, Daly River, NT 0822 Has Nauiyu/Daly River High Penetration Energy Storage System currently at Construction stage. Supply & installation of an energy storage system for the Nauiyu/Daly River high penetration solar/diesel hybrid power station as part of the Solar Energy Transformation Program (SETuP). To include battery system, power conversion system, isolation transformer & energy storage controller. Click for more details...

TABLELANDS HIGHWAY REDECKING OF BRUNETTE CREEK SOUTH, BRUNETTE CREEK NORTH & CRESWELL CREEK BRIDGES
Civil Engineering (Bridges, Aqueducts, Viaducts) project at Tablelands Highway (Ch127.07, Ch127.17 & Ch224), Tennant Creek, NT 0860 of Bridges (3) - Redecking type of New development. Redecking of Brunette Creek South, Brunette Creek North & Creswell Creek Bridges on the Tablelands Highway at Ch127.07, Ch127.17 & Ch224km. To include the removal of the existing precast concrete bridge decks & replacement with stronger precast decks, installation of W-beam guardrail, provision of double coat seal as well as minor patch repair of several headstocks & replacement of missing or damaged bridge signs. Click for more details...

FLORINA ROAD NURSERY
Industrial (Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)) project at 140 Florina Rd, Cossack, NT 0850 of Nursery type of New development. Construction of new Nursery. To include proprogation area, plant nursery, pump shed, 480sq m shed, 100sq m office, storage & water tanks. Wall cladding, roof cladding, roof & gable brackets, reinforced mesh & shade cloth. Associated car parking & landscaping. Click for more details...

GUNBALANYA GOVERNMENT EMPLOYEE HOUSING UPGRADE 1
Currently at the Construction stage In West Arnhem Shire is a project estimated to be $ 482000. This project Refurbishment works to 8 Government Employee Houses located within Gunbalanya, West Arnhem Land. To include painting of internal & external surfaces. Removal of existing vinyl & carper flooring. Removal of existing glass panels & replacement with louvers. Supply & installation of new kitchen & bathroom fittings & fixtures. Supply & installation of vinyl flooring & ceramic floor times. Replacement of timber decking & chain mesh fencing. Click for more details...

YUENDUMU NDRRA ROAD REINSTATEMENT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Central Desert Shire Council Area of Roadworks - Reinstatment type. Reinstatement of various sections of road as part of the Yuendumu region NDRRA works. To include clearing of sand & silt, reformation with sand clay & gravel. Repair works to 6m wide subgrade surface with 2 way 4% cross fall. Supply & lay base course gravel to 6m width. Box out floodways & regravel to 300mm depth with 1% cross fall. Construction & reformation of drainage structures. Click for more details...

MILES ROAD WAREHOUSES & SHOWROOM
Industrial (Warehouses, cargo sheds, distribution centres) project at 35 miles Rd (Lot 6416), Berrimah, NT 0828 of Warehouses/Showroom type of New development. Construction of warehouses, showroom & offices in 2 separate buildings. Building A to include 178sq m warehouse with loading bay & 304sq m of offices with amenities & mezzanine over. Building B to include 357sq m showroom with amenities & 450sq m warehouse with loading bay. Rendered concrete blockwork walls, steel stud walls, sheet metal roofing & powder coated aluminium awnings. Roller doors, timber cladding, feature wall tiles & aluminium framed windows & doors. Stormwater pipes & pits. Sealed concrete driveway on stabilised rubble. Car parking for 33 vehicles. Associated landscaping. Click for more details...

STUART PARK PRIMARY SCHOOL CLASSROOMS & COVERED BASKETBALL COURT
Classrooms & Covered Basketball Court project at Nudl St, Stuart Park, NT 0820 in the Education (Schools - primary, secondary (up to Yr 12)). Design & construction of new classrooms & cover to an existing basketball court at Stuart Park Primary School. Design team to include Architect, Interior Designer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Hydraulic Engineer, Civil Engineer & Building Certifier. Click for more details...

WILLOWRA REMOTE COMMUNITY HOUSING UPGRADE
Residential (Units, apartments, flats, townhouses, villas) project at Various Locations Within, Willowra, NT 0872 of Remote Community Houses (34) - Upgrades type of Renovations, Refurbishments etc. development. Upgrade works to 34 Remote Community Houses located within Willowra. To include internal & external painting of dwellings. Replacement of floor tiles, electrical fittings & fixtures & plumbing fittings & fixtures. Click for more details...

HUMPTY DOO PRIMARY SCHOOL - BLOCK A
Toilet Block - Replacement Renovations, Refurbishments etc. project In The Litchfield Shire Council Area. Replacement of ablution block A Click for more details...

JESSOP CRESCENT SHOWROOM & WAREHOUSE
Jessop Crescent Showroom & Warehouse is currently at the Construction stage, valued at about $ 1800000 it is Construction of showroom & warehouse to comprise 4 loading bays, office & meeting rooms. Powder coated aluminium awning, higth level louvres & cement render to paint finish blockwork. Car parking for 20 vehicles. Associated landscaping. Click for more details...

BISHOP STREET LEISURE & RECREATION FACILITY & OFFICE
Renovations, Refurbishments etc. project of Commercial Premises (Offices) project at Unit 1, 27 Bishop St (Lot 1837), Woolner, NT 0820. Conversion of 2 storey warehouse, showroom sales & office into leisure & recreation facility (279.8sq m), office (97.7sq m) & warehouse (50.7sq m). Ground floor - Demolition of reception area, office walls, bathroom & stairs to create additional space for sewing workshops. Existing kitchen to be expanded & relocation of bathroom. New access ramp, internal stairs & awning. First floor - Retention of balcony, demolition of kitchenette & meeting room wall, extension of floor to accommodate dance hall, toilet facilities & office/store room. Concrete floor slab & spring timber floor. Car parking for 8 vehicles. Associated landscaping. Click for more details...

TITJIKALA REMOTE COMMUNITY HOUSING
State ownership Residential (Units, apartments, flats, townhouses, villas) project In The Macdonnell Shire Council Area for New development. Demolition of one dwelling. Construction of 2 x 2 bedroom dwellings on Lot 8 in the community of Titjikala Click for more details...

BEATRICE HILL FARM
Residential (Units, apartments, flats, townhouses, villas) project In The Litchfield Shire Council Area of State ownership. Removal of nominated existing accommodation demountable buildings including verandahs & transportable structures from Beatrice Hill Farm. Supply & installation of 2 new 3 bedroom accommodation demountable buildings. Click for more details...

DINAH BEACH RAMP
A project in the NT Within Darwin City. Supply, install & commission of Pureablue Cab3-Accrh-Sa1 anti-vandal restroom Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect