State

Categories

Sub Categories

Click Here to Find Current Projects

List of ⊂category=Residential Subdivision Projects in NT®ion=⊂=1771 in region


RURAL PEST CONTROL SERVICES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 500000. This project Provision rural Pest Control Services to NT Government Agencies for 4 year period. Click for more details...


Residential (Units, apartments, flats, townhouses, villas) project at Pt Lot 5791 Barrett Dve, Alice Springs, NT 0870 of Duplexes (6) type of New development. 2 bedroom. Brick veneer construction, concrete floor, metal deck roof, aluminium framed windows. Carparking & landscaping. Click for more details...

NORTHERN TERRITORY UNIVERSITY
Science Faculty Building - 2 Storey For Casuarina Campus Development New project In The Darwin City Council Area. New building - 2,500 sq m approx. Masonry construction, concrete floor, colourbond roof, aluminium framed windows, reverse cycle refrigerated ducted airconditioning, fire hose reels & extinguishers. Refurbishment - 600 sq m approx for general learning spaces. Click for more details...

CAVANAGH 21
In Darwin City is a project estimated to be $ 20000000. This project Office retail. 83 bedsitters each 35 sq m approx, 32 x 1 bedroom flats each 45 sq m approx, 5 x 3 bedroom flats each 100 sq m approx. Masonry block walls, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire services, 2 lifts, stairs. Click for more details...


Renovations, Refurbishments etc. project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at South Stuart Hwy Area of, Alice Springs, NT 0870. Widen formation & Seal Chainage 1596.83 kms to Chainage 1604.33 kms. Click for more details...

MCARTHUR RIVER BASE METALS MINE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Katherine Town Council Area of Structural/Mechanical/Piping/ Packages For Mine - Regrind Area type. Supply and installation of piping and steelwork involved in addition to the installation of some mechanical components (provided). Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Electrical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

MOUNT TODD GOLD MINE
Mining - Civil Services (Power stations, Power generation) project In The Katherine Town Council Area of Private ownership. Contract to provide a 32 megawatt gas turbine power facility for mine expansion. Click for more details...

RAAF BASE DARWIN
A project in the NT Within Darwin City. Refurbishment to include painting, tiling, cabinet making, window repairs, plumbing & electrical work. Click for more details...

PROFESSIONAL TEAM
Renovations, Refurbishments etc. project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Various sites & Larapinta Dr, Alice Springs, NT 0870. Supply professional Engineer & Technical Officer with 5 to 12 years relevant experience to Alice Springs region for the supervision of contract construction of civil/roads projects generally on Larapinta Drive. Click for more details...

NIGHTCLIFF SHOPPING CENTRE
Woolworths Supermarket - Addns Addition project In The Darwin City Council Area. 350 sq m addition to existing store. Click for more details...

BORROLOOLA HOUSING
Houses (6) project, Borroloola, NT 0854 In The Council Area Of Katherine Town of Local Govt. Construction of 3 & 4 bedroom houses. Krusscrete construction, steel framed floor, metal deck roof, aluminium framed windows. Click for more details...

JULALIKARI BURAMANA ABORIGINAL CORPORATION
Residential (Units, apartments, flats, townhouses, villas) project In The Barkly Shire Council Area of Local Govt ownership. Construction of 4 x 3 bedroom houses. Steel frame & steel clad construction, elevated timber floors, metal deck roof, aluminium framed windows. Repairs & maintenance to 2 existing houses in Barkly Region under IHANT Program. Click for more details...

ROBERTSON BARRACKS
Administration Support Unit Brigade Headquarters - 2 Storey - Apin - Stage 1 project at Robertson Barracks (formerly Waler Barracks), Palmerston, NT 0830 in the Military (Military installations & facilities). 2 buildings. 1 - ASU-D headquarters, 2 - 1st Bridage headquarters. Block-work & light weight clad construction, concrete floor, metal deck roof, aluminium framed windows, airconditioning, fire services. Classified communications centre on ground floor. Carparking. Click for more details...

ADELAIDE RIVER/BATCHELOR RISING MAINS/RESERVOIRS REHABILITATION
Public Utilities (Water distribution systems, Drainage) project at Adelaide River, Batchelor Region of, Darwin, NT 0800 for Renovations, Refurbishments etc.. Various welding fabrications associated with rising mains & collection reservoirs. Click for more details...

LUDMILLA WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project for New development. Excavation & construction of large underground chambers & elevated concrete structure. 140 m reinforced concrete pipeline. Extension to existing building. Block-work & masonry construction, concrete floor, metal deck roof, electrical & associated works. Click for more details...

BATCHELOR INSTITUTE OF INDIGENOUS TERTIARY EDUCATION
Batchelor Institute Of Indigenous Tertiary Education is currently at the Construction stage, valued at about $ 210000 it is Construction of community study centre. Steel portal frames with steel stud & mud brick infill. Click for more details...

ALICE SPRINGS HIGH SCHOOL
Watermains - Replacement Renovations, Refurbishments etc. project In The Alice Springs Town Council Area. Remove existing water meter enclosure & replace all existing compressed fibre cement water pipes with equal sized UPVC rubber ring jointed pressure pipe. Click for more details...

BROWNS OXIDE PROJECT - PROCESSING PLANT/ LEACHING FACILITIES
Processing Plant/Leaching Facilities project at South East of, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Minerals Processing). The plant will treat 1.3 million tonnes per year. All major items of equipment for the plant have been acquired including grinding and classification circuit, Cawse solvent extraction, electrowinning plant, thickners and tanks have also been acquired. Other equipment is being custom designed and fabricated offsite. Detailed engineering design works of the plant are in progress. Finalisation of processing plant flowsheet and confirmatory metallurgical testwork are also in progress. Testwork has already shown that the valuable copper, cobalt and nickel minerals are dissolved in acid. Once the metals are in the solution, the liquor is separated from the leached solids which are then washed and sent to the tailings storage facility. Testwork is confirming solvent extraction design criteria for concentrating metals in solution ahead of copper electrowinning of high purity cathode product. The facility will comprise a solvent extraction plant, electrowiring plant, tankage and product filtering equipment. Click for more details...

HARTS RANGE GARNET/AMH PROJECT - WATER PIPELINE
15 Km Water Pipeline New project In The Alice Springs Town Council Area. Pipeline will now longer be needed as there will now be no wet plant constructed. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

PARLIAMENT HOUSE ROOF FLASHINGS
Currently at the Construction stage In Darwin City is a project estimated to be $ 54000. This project Replace roof flashings including manufacture & install access stairs to upper roof. Click for more details...

ROYAL DARWIN HOSPITAL - ELECTRICAL EQUIPMENT
Electrical Equipment - Repairs/Maintenance Renovations, Refurbishments etc. project In The Darwin City Council Area. Repairs & maintenance to electrical equipment for Royal Darwin Hospital, Acute Care Services department for 36 month period contract. Click for more details...

KATHERINE POWER STATION
Public Utilities (Power stations, Substations, Windfarms, Phone exchanges) project at McMinns Power Station, Katherine, NT 0850 for New. Remove existing and Supply with Install/Commissioning one (1) Main Central Fire Detection Panel. With minimal disruption to station fire dection and operations during cut-over, relocation and improvement of panel capacity. Supply, Route and Commission loop/comms cable from turbine Units for zone monitoring, Removal of fire systems cables that are no longer required. Confined Space competence (Minimum two persons) is required. Loop is for addressable system functionality is to be offered as an Optional Works Item. Provision of Maunals and Training of nominated site staff. Warranty and defects liability period is to be twelve (12) months on installed equipment. Operational testing required manufacturer or Australian Standards to be completed and documented. Above tests and periodic tests by existing period contractor (Wormald FS at present) will not void warranty or defects liability period. Click for more details...

ROPER GULF SHIRE MATARANKA HALL
Currently at the Construction stage In Roper Gulf Shire is a project estimated to be $ 120000. This project Building renovations & electrical upgrade at Mataranka Hall. Click for more details...

GOVE BAUXITE OPERATIONS - SHIP LOADING UPGRADE
A project in the NT Within East Arnhem Shire. A project to improve dust control at the Alcan site near Nhulnbuy. Late 2010 in-house engineering studies underway into optimal solution. Click for more details...

CHARLES DARWIN CENTRE (PASPALEY BUILDING)
Commercial Premises (Offices) project In The Darwin City Council Area of State ownership. Redevelopment of former Paspaley Building to house major government tenant (9970 sqm Level 6 to Level 15) in 5 green star rating building. To include other office, commercial & retail space, including Paspaley Pearl Properties (1984 sqm Levels 16 & 17). The building will present as two distinct parts - a tower with a lens-shaped floor plate, & a 5 level podium wrapping around & behind the base of the tower. The podium is configured to retain the heritage colonnade. Podium to includedate parking at levels 1,2 & 3 & some office space. The building will contain 16,170 sqm of office space above ground & 900 sqm of retail space at ground level. 1 level of basement parking. Click for more details...

MUIRHEAD SUBDIVISION STAGE 4
Muirhead Subdivision Stage 4 is currently at the Construction stage, valued at about $ 18000000 it is Reconfiguration onto 166 residential lots - stage 4. Construction of new roads. Click for more details...

TIGER BRENNAN DRIVE DUPLICATION FROM WOOLNER ROAD TO BERRIMAH ROAD
New project of Civil Engineering (Bridges, Aqueducts, Viaducts) project at Tiger Brennan Dr (from Woolner Rd to Berrimah Rd), Darwin, NT 0800. Construction of 9km duplication of Tiger Brennan Drive from Woolner Road to Berrimah Road. To include new bridge structure at Hidden Valley overpass & upgrade to all intersections for the length of duplication. Click for more details...

FOWLESTONE ROAD INDUSTRIAL DEVELOPMENT
Warehouses (2)/Workshop/Showroom/Offices (5) project at 35 Fowlestone Rd (& 36 Coffee St) (Lot's 11011, 11012, 10993 & 10994), Tivendale, NT 0822 in the Commercial Premises (Offices). Construction of industrial building with mezzanine level. To include 2 x warehouse (4616sq m), workshop (560sq m) showroom (131sq m), mezzanine level (200sq m), 5 x offices (291sq m) & staff amenities (88sq m). Concrete slab, rendered concrete blockwork & metal roof. Parking for 69 cars. 7 loading bays. Associated landscaping. Click for more details...

RAAF BASE DARWIN FLOOD MITIGATION PROJECT
Public Utilities (Water distribution systems, Drainage) project for New development. Design & construct stormwater drainage infrastructure at RAAF Darwin. To include new 1.5m deep x 4m wide base x 15-24m open unlined drain, expansion of existing stormwater detention basins, kerb, channels & concrete spoon drain. Click for more details...

BICENTENNIAL ROAD RETAIL SHOWROOM
Retail Showroom New project In The Katherine Town Council Area. Construction of retail showroom (1844sq m). To include 5 separate display areas (96sq m each), internal warehouse (866sq m), sales office (37sq m), managers office (37sq m), workshop (30sq m), staff room (20sq m), amenities (48sq m) & entry foyer (47sq m). Concrete slab, colour-coated panelled parapet, precast concrete wall, glazed powdercoat aluminium showroom front, colour-coated finish wall panels & roof sheeting. Loading bay. Parking for 62 cars. Associated landscaping. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
5,15 & 11 Yarrawonga Rd (Cnr Roystonea Ave & Stuart Hwy ) (Lots 7765, 7766 & 11037), Palmerston, NT 0830 Has Darwin Gateway Shopping Centre Stage 1 currently at Construction stage. Centre door hanging & carpentry sub-contractor for Gateway Shopping Centre Stage 1. To include construction of tiered Cinema seating. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Currently at the Construction stage In Palmerston Town is a project estimated to be $ 500000. This project Supply of door/sanitary washroom hardware as per Woolworths & Big W specifications. Click for more details...

DARWIN GATEWAY SHOPPING CENTRE STAGE 1
Retail (Shops, shopping centres & arcades, supermarkets) project for New development. Supply & installation of shower screens & robe mirrors within the Gateway Shopping Centre. Click for more details...

DOUGLAS DALY RESEARCH FARM CATTLE RAMP & FENCING
Douglas Daly Research Centre (Lot 2640), Douglas Daly, NT 0822 Has Douglas Daly Research Farm Cattle Ramp & Fencing currently at Construction stage. Construction of unloading ramp for livestock at the Douglas Daly Research Farm. To include supply & laying of gravel fill, subgrade, sub base, base course to 95% modified dry density. Supply & installation of handrails 115mm x 42mm x 2.5mm. Construction of block work retaining wall. Office maintenance to include removal of Air Conditioning units, painting of walls & doors, relaminate bench tops & installation of new kitchen sink fixtures. Supply, installation & erection of 1200mm high chain mesh fench to 8 houses to include gates. Click for more details...

HIDDEN VALLEY MOTORSPORTS COMPLEX PIT GARAGE VIEWING STRUCTURE
Viewing Structure - For Motorsports Complex New project In The Darwin City Council Area. Design & construction of a pit garage viewing structure at the Hidden Valley Motorsports Complex. Design team to include architect, structural engineer, mechanical engineer, electrical engineer, hydraulic engineer & building certifier. Design to include open plan main floor area (347sq m) kitchen area, bar/servery area (22.15sq m), amenities, storage space (15.53sq m), external viewing area & elevator. Glass wall facing race track, steel columns, steel frameworks & metal cladding roof. Click for more details...

PALMERSTON REGIONA HOSPITAL COMMUNICATIONS & SECURITY
213 Taylor Rd (Section 4231 Hundred of Bagot S901068), Holtze, NT 0829 Has Palmerston Regiona Hospital Communications & Security currently at Construction stage. Provision of communications & security services for the Palmerston Regional Hospital. To include supply & installation of communications & security works. Final & trade cleans. Full commissioning Click for more details...

BULMAN & WEELMOL SFNT HOUSING UPGRADES
Residential (Units, apartments, flats, townhouses, villas) project In The Katherine Town Council Area of Houses (22) - Upgrades type. Upgrade works to 11 houses at Bulman & 11 houses at Weemol under the National Partnership Agreement for Stronger Futures in the NT (SFNT). To include removal & replacement of windows, louvers, solid core doors & vinyl flooring. Supply & installation of ceramic floor & skirting tiles, shelving & cupboards. Painting of ceilings, external walls & internal walls. Supply & installation of solar hot water systems & solar panels. Click for more details...

DARWIN BOWLS CLUB CAR PARK
Sports (Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)) project at 8 Conacher St (Lot 5437), Fannie Bay, NT 0820 of Car Park - For Bowls Club type of Addition development. Construction of car park at the Darwin Bowls Club. Sealed car park for 64 vehicles with kerbing & guttering. Associated landscaping. Click for more details...

MANINGRIDA ROAD WIDENING & RESEAL
Roadworks - Reseal & Widening project at Located within, Maningrida, NT 0822 In The Council Area Of West Arnhem Shire of Local Govt. Road widening & reseal works in Maningrida. To include culvert construction works. Click for more details...

RONEY COURT HOUSING UPGRADES
Roney Court Housing Upgrades is currently at the Construction stage, valued at about $ 500000 it is Upgrade works to Defence Housing Australia houses at 4,5,8,14,20 & 21 Roney Court, Katherine. To include repair works to sheet metal roofing, eave lining & overhangs, plumbing& drainage. Supply & installation of ceiling installation, solar hot water system & air conditioning. Painting of all internal walls, external walls, ceilings, metal roof sheeting & shed. Remove & replace doors with solid core doors, ceramic floor tiles, tile skirting & timber skirting. Demolition & replacement of ensuite, kitchen, laundry & bathroom. Construction of blockwork lock up garage with insulation lined plasterboard ceiling & roller door. Construction of 1800mm pvc coated high chain mesh fencing. Click for more details...

YARRALIN COMMUNITY ROADS UPGRADE
Yarralin Community Roads Upgrade is currently at the Construction stage, valued at about $ 500000 it is Upgrade works to internal roads in the Yarralin Community. To include supply & lay of gravel overlay & bitumen seal. Click for more details...

BULLITA ROAD CONCRETE INVERTS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Bullita Rd, Katherine, NT 0850. This type is Roadworks - Concrete Inverts with State ownership. Construction of concrete inverts on Bullita Road between Ch7.17 & Ch10.38. To include provision of traffic control. Click for more details...

CENTRAL ARNHEM ROAD REFORM & GRAVEL
Central Arnhem Rd, East Arnhem, Nhulunbuy, NT 0880 Has Central Arnhem Road Reform & Gravel currently at Construction stage. Reformation & regravel of unsealed pavements on Central Arnhem Road CH480.22-487.22km. Associated civil works. Click for more details...

STUART HIGHWAY MEDICAL CLINIC
Medical (Surgeries, Medical centres) project In The Litchfield Shire Council Area of Private ownership. Conversion of shop into medical clinic. Car parking for 16 vehicles. Associated landscaping. Click for more details...

CENTRAL ARNHEM ROAD REFORM & GRAVEL
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Arnhem Rd, Nhulunbuy, NT 0880 of Roadworks - Reform & Gravel type of New development. Reformation & regravel of unsealed pavements on Central Arnhem Road CH403.1-407km & CH411.8?419.7km. Click for more details...

HOWARD SPRINGS PRIMARY SCHOOL
Education (Schools - primary, secondary (up to Yr 12)) project at 295 Whitewood Rd, Howard Springs, NT 0835 of Ablution Blocks - Refurbishment type of Renovations, Refurbishments etc. development. Refurbishment of toilet blocks F & H Click for more details...

NIGHTCLIFF SEAWALL & STORMWATER WORKS
., Darwin, NT 0800 Has Nightcliff Seawall & Stormwater Works currently at Construction stage. Construction of stormwater outlets & a rock seawall as a shoreline protection structure at Nightcliff. Construction of the rock revetment structure, including associated earthworks. Click for more details...

BELYUEN REMOTE COMMUNITY HOUSING
Units/Dwellings/Duplex (6) New project In The Belyuen Shire Council Area. Demolition of 3 lots on 249, 262 & 244. Construction of 3 x 2 bedroom units on lot 249 with extension to sewer main, 1 x 2 bedroom duplex on lot 262 & 1 x 3 bedroom dwelling on lot 244 in the township of Belyuen Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect